Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNOVEMBER 16, 1999 MINUTES WKSPCITY COUNCIL
'~4YOR itI:YERA f OSERNDORF At
~1¢ I: ~fAtOR #ILI.14M
HAROI D }IEI$CHOBER Al ~rte
B~RBARA M llENLEY Dlzlrl(I 7 Prm(ejs Anne
LOUIS R JONES D,~lriC,
VANCY K PARKER
A M ~DONI WFffK$ D,str,~l 2 K~m~vdl~
JAMI:$ K SPORE ( .v Ma~atcr
LESUE L LILLE}' C~r~ A.nrne~
RUTIi IlODG~ES S~ITH C~fC/A 4£ C.~ Cirri
COUNCIL WORKSHOP AGENDA
Tuesday, November 16, 1999
4-6PM
CITY HALL BUILDING I
2401 COURTHOUSE DRIVE
WRGINIA BEACH VIRGINIA 25454 9005
PIIONE tT$T1427
FAX
LMAIL CTYCNCI,~CITY VIRGINIA BEACII VA U~
GOLF Report
Sara Henslcy, D~rcctor, Parks and Rccreauon
GUIDELINES - LARGE RETAIL DEVELOPMENT
Karen Laslcy, Planmng Operations Coordinator
III
TULLOCH DITCHING RULE
William M Macah, Deputy C~ty Attorney
IV
SOUTHEASTERN EXPRESSWAY - Status
Robert R Matthlas, Assistant to the City Manager
V
264 INTERCHANGE - Proposal
Robert R. Matthias, Assistant to thc C~ty Manager
Dale Castellow, Transportauon Plarmmg Coordinator
TRAM SYSTEM FOR THE BOARDWALK - Proposed
Rob Hudome, Convention and Vts~tor Dcvelopme. nt
Dale Castellow, Transportation Planning Coordinator
Municipal Golf Course Status Report
May - October, 1999
INTRODUCTION
The City of Virginia Beach owns and operates three pubhc golf courses that operate as an Enterprise Fund The
courses Bow Creek, Kempsvllle Greens, and Red Wing do not rely on the General Fund for assistance or subsidy
The City supplies "community golf' for its cmzens and visitors Over the past several months s~gmficant progress
has been made to ~mprove the operations and conditions of the golf courses This report outhnes ~mprovements,
~denttfies current projects, trends, and prowdes a plan for future improvements
BACKGROUND
This past April the Department of Parks and Recreation presented to the City Councd the Analysts of the Ct~ of
Virginia Beach Municipal Golf Courses Final Report, whmh was prepared by the National Golf Foundation In
summary, the recommendations presented and supported by the Parks and RecreatIon Commission ~ncluded
Continuation of City management of the courses
Economic chmate and golf market is positive for V~rglnla Beach
Customer survey does not support private operation/leasing of the courses
Operatmn of courses needs to be improved w~th addmonal well-trmned and educated personnel and
increased equipment
Cap~tal improvements are needed and should be accomphshed as soon as possible
Renovanon and expansion of the Red Wing Golf Course should be delayed until improvements can be
made at the other two City courses and the new upscale courses are opened
The fee structure needs to be evaluated
SIGNIFICANT ACCOMPLISHMENTS TO DATE
General
In July, a transfer was approved within the Golf Course Enterprise Capital Improvement Projects The
transfer of $500,000 from the Red Wing Golf Course Expansion project to the Golf Course Infrastructure
and Equipment project was completed
A revised Policy and Procedural Manual Is in draft form
Hours of the golf courses were changed to reflect the demands of the patrons
Tee t~me reservations are now taken earher ~n week for convemence of golfers
Rates were raised by one dollar ($1 00) on all green fees in July
Over $425,000 worth of golf course mmntenance equipment has been ordered
New chairs were placed ~n the concession areas at Red Wing and Kempswlle Greens
One position has been transferred within the Enterprise Fund to function ~n the maintenance field from a
customer service area
Requests for Proposals were opened on September 30 to obtain a contract for Certified PGA Professionals
to operate the pro shops at each of the golf courses effective January 2000
United States Golf Association agronomist has made three ~nspect~on ws~ts to the municipal golf courses,
recommendations have been recorded and followed
Open commumcanon has continued between the courses' personnel and the agronomist
The golf courses have been listed in the yellow pages
Advertisements for the three golf courses have been placed in the paper, golfpubhcatmns, and on a
telews~on news program
Mumctpal Golf Course Status Report
May - October, 1999
Page -2-
Bow Creek Golf Course
Specifications for renovation of the irrigation pump house at Bow Creek have been written
A new food and beverage contractor began services at Bow Creek m September, 1999
Course drainage, appearance and playability has been greatly improved
The installation of drainage lines on several holes has been completed
Kempsvlile Greens Golf Course
A feasibihty study of renovating versus new construction of the club house at Kempsvflle Greens is
complete
A contractor has installed test wells to obtmn data for securing a permit from the Commonwealth to
withdraw underground water for Kempsville Greens
Red Wing Golf Course
Seven day a week tee time reservations were ~mplemented at Red Wing, and customer service training has
been emphasized
Red Wing was named most popular course by the Vtrgtntan-Pdot tn the "Best of the Beach" recognition
A digital weather reporting service has been contracted for Red Wing
Selection process has begun for a new Superintendent at Red Wing Golf Course
PLANNED INTERMEDIATE IMPROVEMENTS (funded by the Golf Course Enterprise Fund)
General
The paving and repair of some of the cart paths at the courses will be contracted
Turf growing condmons will be enhanced at trouble spots on courses
Bow Creek Golf Course
· New entrance to golf course to be made after motel ~s removed
· The pump house renovations at Bow Creek will go out on b~d
· A nursery for bent grass will be estabhshed at Bow Creek
· The testing of a new bent grass seed will be evaluated for use at Bow Creek
Kempsvflle Greens Golf Course
· The irrigation pump at Kempsvflle will be overhauled
· New hole identification markers at Kempsvllle Greens will be researched
Red W~ng Golf Course
· Drmnage issues on selected greens at Red Wing will be addressed
Municipal Golf Course Status Report
May - October, 1999
Page -3-
CURRENT ISSUES
General
Whale the golf courses continued to operate in the black this past fiscal year, the amount of revenue was
less than the previous year There are several issues that accounted for this
(l)
(2)
(3)
(4)
(5)
(6)
the effects of Hurricane Bonnie last August
poor condlnons of the greens at Red Wing last summer
the opening of new courses m the market
Intensive heat and too much rain, which affected the growing and playing condlUons
the effects of Tropical Storm Dennis and Hurricane Floyd
Red Wmg Golf Course was closed eleven days at the end of August and twelve days in September
due to weather complications
The review process of proposals presented by PGA Professionals to operate the pro shops is currently
underway
This year the financial picture is stable, but there will not be extra funds On a positive note, Bow Creek has showed
an 8% increase In paid rounds compared to the previous fiscal year
Bow Creek Golf Course
Recent test results from the ~rngauon water wells at Bow Creek md~cate an elevated level of salt content,
which is non-compatible with the estabhshed turf on the greens An agronomist has recommended
apphcatlons of gypsum and to consider switching to a more salt tolerant bent grass A testing of the seed
and new grass for tees will take place this w~nter Renovation of greens should be placed on hold until a
known grass can be sustained with the current water supply Other alternatives for irngauon will be
investigated
Kempsville Greens Golf Course
The club house at Kempsvflle Greens needs to be replaced The roof leaks, plumbing and electrical
systems are failing, it IS not ADA accessible, and the pro shop section of the structure has deteriorated
from Insect mfestauons It is more feasible to construct a newer but smaller facility than It is to renovate
the emstmg structure
Red W~ng Golf Course
· The selection of a Superintendent for Red Wing Golf Course is under revIew
Mumctpal Golf Course Status Report
May - October, 1999
Page -4-
CURRENT FINANCIAL TREND
The Golf Course Enterprise Fund continues to operate tn the black
The one dollar ($1 00) increase m greens fees m July has contributed to the overall stabll,ty of the
Enterprise Fund
While pard rounds at Kempsvtlle Greens and Red Wing were down from the previous fiscal year, Bow
Creek Golf Course showed an eight percent increase
Effecttve April, 2000, the cost of range balls and electric cart rental will be raised one dollar ($1 00) This
will enable the Enterprise Fund to continue contributing to course improvements and replacement of
needed equipment
The funding for increasing the number of staff members and trainmg wtll contmue for the next several
years
Green Fees wtll be raised one dollar ($1 00) across the board every two years (commencing this fiscal year
99/00)
Major renovations as previously planned wtll not be supported wtthout sigmficant tncreases to greens fees
It ,s the tntenuon of the Department to conttnue to make tmprovements on a pay as you go basis
PRIORITIES/IMPROVEMENTS - To be accomplished
The replacement of the Kempsvllle Greens Club House ts on the top of our list It is more feasible to
replace w~th a smaller more practtcal facility than tt ts to repair and renovate the extsting structure due to
the following reasons
(1) The building does not conform to the American D~sabfitt~es Act
(2) The roof leaks
(3) The electrical and pump;ng services are failing
(4) The structure that houses the pro shop has deteriorated from insect mfestatlon
The project will also tnclude the renovatton of the cart storage structure, enhancement of the parking and
pedestrian ctrculauon patterns around the bufldtngs, and the replacement of the practice puttmg green
This project will be supported with planned phased increases of one dollar ($1 00) every two years to
greens fees, cart rentals, and range ball rentals over the next few years
Bow Creek Golf Course - as funding permits
addlttonal cart path renovattons
expansion of tee boxes
bunker renovauons
replacement of greens
enhancement of driving range
Kempsvtlle Greens Golf Course - as funding permits
expanston of tee boxes
addlttonal cart path renovations
bunker renovattons
enhancement of driving ranges
Mumc~pal Golf Course Status Report
May o October, 1999
Page -5-
Red Wing Golf Course
The dectston to make ma. lor renovattons at Red Wing ts on hold for two years This will enable the
department to assess the impact that Heron R~dge, Tournament Players Club, and other new courses (as
well as the Virginia Beach Golf AssocIation) have had on the market
add~nonal cart path renovanons
PARKS AND RECREATION COMMISSION RECOMMENDATIONS
The Parks and Recreation Commission supports ~mprovements at Bow Creek and Kempsvflle Greens on a
pay as you go basis They further support the fee increase tmplementatlon schedule and the fact that the
courses remain affordable and provide a place for community recreational golf
PUBLIC INPUT
It is the ~ntent of the Department to present recommended ~mprovements to the public by having meetings
with strategically chosen civic leagues and golfassoclanons within the C~ty
goll%tatusrepoamay-sept wpd
11/12/99
EXISTING RETAIL - SQUARE FOOTAGE
New Lord and Taylors - 66,000 square feet per floor x 2 floors = 132,000 square feet.
Lynnhaven Mall
Home Depot -107,004 square feet
Va Beach Blvd and Little Neck
Homequarters - 112,703 square feet
Va Beach Blvd and South Plaza
Harris Teeter and Shops - 66,766 square feet
Va Beach Blvd and South Plaza
Food Lion 40,486 square feet
Aragona
Best Buy - 47,063 square feet
Independence and Euchd
Farm Fresh - 54,987 square feet
Chimney Hall
Big Lots - 25,920 square feet
Chimney Hill
Rite Aid Drug Store - 11,288 square feet
Rosemont and Dahlia
Bed Bath and Beyond - 30,250 square feet
Pembroke - near Barnes and Noble, RC Theaters and Planet Music
Super K-Mart - 139,363 square feet
Hilltop
Target - 130,946 square feet
Hilltop
Walgreens- 10,005
Independence and W~tchduck
Hannaford - 41,103 square feet
Shore Drive and Northampton
City of Virginia Beach
DEPARTMENT OF PLANNING
(757) 427-4621
FAX (757) 426 5667
MUNICIPAL CENTER
BUILDING 2, ROOM 115
2405 COURTHOUSE DRIVE
VIRGINIA BEACH, VA 23456-9040
November 12, 1999
TO: James K. Spore
scott ,
DEPT: City Manager
DEPT: Planning
RE: Design Criteria for Large Retail Establishments
Attached ~s a copy of the proposed Design Criteria for Large Retail Estabhshments recommended
by the Planmng Commission as an amendment to the Comprehensive Plan I am forwarding ~t
for enclosure ~n C~ty Councd's package. I will g~ve a brief presentation on the criteria at
Council's workshop on November 16th and ~t ~s scheduled for formal pubhc heanng on the
November 23ra C~ty Council meeting
Proud Rectptent of the 1998 U.S Senate Medalhon of Excellence for Produchvtty and (.~)uahty tn the Pubhc Sector
DESIGN GUIDELINES FOR LARGE RETAIL ESTABLISHMENTS
WITH 80,000 SQUARE FEET OR MORE
"Definition" of Lar e Retail
Any combination of retail establishments in a single building, occupying 80,000
gross square feet or more of floor area. Also included are existing retail
establishments where the gross square footage of floor area is being increased by
50 percent or more and the total gross square footage will equal or exceed 80,000
square feet.
round
The bulk, size and scale of large retail estabhshments present land use concerns
for the City of Virginia Beach regarding aesthetic and transportation impacts.
Because large retail establishments depend on high visibility from major pubhc
streets, their building and site design has a significant impact on the character
and attractiveness of the city's major streetscapes. Large retail estabhshments
can be potentially detrimental to the goals of the City of Virginia Beach and can
contribute to a loss of a sense of place when they result in massive individual
developments that do not advance the City's goals or integrate with the city in a
positive way.
These standards and guidelines are a response to dlssatlsfacDon with corporate
chain marketing strategy dictating design that is indifferent to local identity and
interests The main goal is to encourage development that contributes to the
uniqueness of the communmes of Virginia Beach by reflecting their physical
character and sense of place and by enhancing those qualities in appropriate
ways.
In addmon, these design guldehnes incorporate the pnnclples of crime
prevention through environmental design (CPTED). CPTED advocates that
natural access control, natural surveillance and territorial reinforcement be
incorporated into sight design to help minimize crime opportunities.
The City of Vlrglma Beach already has development regulations and standards
that apply city-wide and design gmdehnes have been adopted for some portions
of the City. These gmdehnes are intended to augment those with more specific
criteria that apply to the design of large retail store developments.
G \INBASKETkAGENDAPC\Agn99_10\Maps\maps 025 Page 3
Virginia Beach Comprehensive Plan
DRAFT October 5, 1999
A. Facades and Exterior Walls
lo
Facades should be amculated to reduce the masstve scale and the umform appearance
of large retml buildings and to provide wsual ~nterest. The overall zntent ~s to
encourage a more human scale. At a mlmmum, the following ~s desired:
Facades greater
than 100 feet ~n
length, measured
horizontally,
should ~ncorporate
wall plane
projecnons or
recesses hawng a
depth of at least
3% of the length
of the facade and
extending at least
20 percent of the
length of the
facade.
ProJections and
recesses should be
loc>
I
I
!
well ht to encourage a safe enwronment. Normally, no umntermpted length of
any facade should exceed 100 horizontal feet. Th~s ~s desirable for both facades
that face a street and those that do not face a street.
bo
Ground
floor
facades that
face pubhc
streets
should have
arcades,
G \INBASKET~GENDAPC\Agn99_I0XMaps\maps025 Page 4
Virginia Beach Comprehensive Plan
DRAFT October 5, 1999
d~splay w~ndows, entry areas, awmngs or other such features along no less than 60
percent of their horizontal surface
Facades that do not face pubhc streets should incorporate a repeating pattern that
~ncludes color change, texture change and material change, each of which should
be ~ntegral parts of the bmldlng -- not superfictally applied trim, graphics, or
paint At least one of these elements shall repeat horizontally In addition, the
structural or architectural bay pattern of the building should be expressed on the
exterior through the use of reveals, projecting ribs, or offsets no less than 12
~nches ~n width. All such elements should repeat at ~ntervals of no more than 30
feet, e~ther horizontally or vertically.
d. See comments below ~n the Site Design / Entrances section for additional
comments related to design of facades.
o
In h~gher-~ntens~ty areas of the city, characterized by urban-type development,
developers are encouraged to reduce the footprint of large retail establishments by
designing a store with multiple levels
B. Roofs
le
o
Variations ~n roof lines should be used to add interest and reduce the massive scale of
large braidings.
Parapets should conceal flat roofs and all rooftop equipment such as heating,
ventdat~on, and mr cond~t~omng (HVAC) umts from view on all sides of the
budding. Such parapets should feature three d~menslonal cornice treatment (not a two
dimensional superficial treatment).
3. Roofs facing a pubhc street should have the following features:
a. Overhanging eaves, extending no less than three foot past the supporting walls.
b. Three or more roof slope planes.
G \INBASKET~AGENDAPCVkgn99_I0\Maps\maps 025 Page 5
Virginia Beach Comprehensive Plan
DRAFT October 5, 1999
C. Materials and Colors
le
Exterior building materials for all portions of the braiding should be high quahty~,
durable, and aesthetically pleasing. Predominant exterior braiding materials should
include any combination of brick, wood, stone, or tinted, textured, concrete masonry
units. Exteriors should utilize to the greatest extent possible the traditional building
materials of southeastern Vlrglma rather than ~ntroduclng non-traditional materials
that are part of a 'franchise' design.
2. The predominant exterior building materials should not include smooth-faced
concrete block, tilt-up concrete panels, or pre-fabricated steel panels.
The predominant exterior building material should be incorporated into the design of
the facades facing public right-of-ways consistent with the facade design criteria of
Section I(A)(1)(a) and (b), utilizing the building material as a key means of
developing variety ~n the facade.
e
Facade colors for all portions of the building should be low reflectance, subtle, neutral
or earth tone colors (no primary colors). Building trim and accent areas may feature
brighter colors, including primary colors.
D. Entryways
Entryway design elements and variations should give orientation to the building and
produce an aesthetically pleasing character. The building should have clearly defined,
highly visible customer entrances featuring no less than three of the following:
1. Canopies or porticos
2. Overhangs
3. Recesses/projections
4. Arcades
5. Raised corniced parapets over the door
~ "Quahty elements of our city are those elements that I ) In the aggregate respond to the needs of all the
community, and not just to the needs of a select few, 2 ) Present a long-range rather tha short-range response to
the needs of the community, that is, that tend to braid a broad and long-lasting base of amenity, and 3 ) Evoke a
positive image of Virginia Beach in the m~nds ol our residents and ws~tors" (Comprehensive Plan, Policy
Document, p ~v)
G \INBASKE%AGENDAPCXAgn99_I0\Maps\maps 025 Page 6
Virginia Beach Comprehensive Plan
DRAFT October 5, 1999
6. Peaked roof forms
7. Arches
8. Outdoor patios
9. Display windows
10. Architectural details such as tile work and moldtngs which are integrated into the
building structure and design
11. Integral landscaped areas and/or places for sitting (no self-standtng planters)
E. Signs
le
The style, size, color, and budding material of all signs on the site should be
coordinated to include signs for any outparcel development, on-site directtonal s~gns,
and stgns to be located on the face of any structure. Colors and materials should be tn
keeptng with the colors used on the primary structure(s). Colors should be primarily
neutral or earth tone (no primary colors). A limited amount of brighter accents
(primary colors), such as those found tn corporate logos, are acceptable.
0
Heavily landscaped monument style signs with hmght restrictions below the 12 foot
maximum allowed by the zomng ordinance are encouraged. Materials should be
durable, attractive and coordinated with materials used on the primary structure(s).
Colors should follow the same guidelines as noted above in ttem 1.
3. Signs using neon are not encouraged.
4e
Signs for the budding(s) should ~nclude only a sign to identify the tenant of the retail
space. Other signs used to ldennfy the products sold by the tenant, the charactensttcs
of the tenant, or the various departments or parts of the tenant's business are not
encouraged, e.g "Garden Center", "Drive-Thru Prescnpttons", "Low Prices".
F. Outdoor Display Areas, Vending Machines and Ground Level Mechanical
Equipment
me
e
All outdoor dtsplay areas, such as garden centers, should be enclosed on all sides with
attractive, h~gh quality fencing material. Chaln-hnk fences are strongly d~scouraged
Any vending machines to be located outdoors should not be visible from a pubhc
street. The design of the facade of the bmldmg should mclude a screened area
appropriate for vendtng machines if vending machtnes are desired
G \INBASKET~GENDAPC\Agn99_I0\Maps\maps 025 Page 7
Virginia Beach Comprehensive Plan
DRAFT October 5, 1999
e
No mechanical or HVAC equipment should be located along any portion of the
building facing a public right-of-way. All ground level mechanical equipment should
be well screened by a sohd fence or wall and native plants that are known for their
screening abilities (wax myrtle or leyland cypress, for example) Shrubs should be at
least three feet high at planting and trees should be at least slx feet high at planting
G. Lighting
All outdoor hghtlng should be coordinated as to style, material and color. Neutral and
earthtone color (no primary colors) hghtlng fixtures are encouraged Lighting throughout
the s~te should overlap, creating an even level of illumination throughtout the parking
area. A variety of pole heights should be used including pedestrian level lighting and
vehicular traffic lighting on taller light mounts.
A. Site Layout
1. Buildings should be located closer to streets, reducing the scale of the complex,
encouraging pedestrian traffic and highhghtlng architectural detmls of the building.
2. Outparcels associated with centers that include large retml development should be
hmlted to 50% of the street frontage.
o
Buddings located along the street frontage, as suggested by Item 1 above, should
consist of the primary budding or braidings - not bmld~ngs associated with outparcel
development
B. Parking
1. Parking areas should provide safe, convement and efficient access. They should be
G \INBASKETxAGENDAPC\Agn99_10\Maps\maps 025 Page 8
Virginia Beach Comprehensive Plan
DRAFT October 5, 1999
distributed around large buildings in order to shorten the distance to other bmldlngs
and public sidewalks and to reduce the overall scale of the paved surface.
0
The vehicular circulation system which provides access to the parking area should be
designed to reduce the number of vehicular confhcts to a mlnlmum. Main drive aisles
through the site should not be punctuated by continuous accesses for the parking
aisles. Parking aisle traffic should be collected and then directed to the main drive
aisles. Adequate stacking for vehicles should be provided at the access points from
the parking area.
0
To the greatest extent possible, approximately 50 percent of the off-street parking area
should be located between the front facade of the pnncipal building and the abutting
street. Parking in the ~nterlor of the s~te is encouraged.
Developers should explore the use of alternative porous pavement areas for portions
of the parking areas that are typically utihzed only during llmlted times of the year
(e g, hohday parking).
C. Entrances
lo
To the greatest extent possible, large retml estabhshments should feature multiple
building entrances to reduce walking distances from cars and to facilitate pedestrian
and Ncycle access from public sidewalks As noted above ~n the Building Design
Section, multiple entrances also m~t~gate the effect of the unbroken walls and
neglected areas that often characterize budding facades that face bordenng land uses
e
All sides of a pnnclpal budding that d~rectly face an abutting pubhc right-of-way
should feature at least one customer entrance. Where a principal bmld~ng d~rectly
faces more than two abutting pubhc rights-of-way, this recommendation should apply
only to two sides of the budding, ~ncludlng the side of the bmld~ng faczng the primary
street, and another side of the budding facing a second street
D. Pedestrian Access
Providing pedestrian accesslblhty opens auto-oriented developments to any surrounding
existing or planned residential or office / retail community areas, thereby reducing traffic
impacts and enabhng the development to project a fnendher, more lnwnng image. Th~s
section sets forth guldehnes for public sidewalks and internal pedestrian clrculanon
G \INBASKETxAGENDAPC\Agn99_I0~vlaps\maps 025 Page 9
Virginia Beach Comprehensive Plan
DRAFT October 5, 1999
systems that can provide user-friendly pedestrian access as well as pedestrian safety,
shelter, and convemence w:thln the center grounds.
1. Sidewalks are required along public rights-of-way in accordance with Pubhc
Works Englneenng Spec:flcat:ons and Standards
e
Cont:nuous internal pedestrian walkways, no less than eight feet in width,
should be provided from the public sidewalk or right-of-way to the principal
customer entrance of all principal braidings on the s:te. At a mlmmum,
walkways should connect focal points of pedestrian act:vlty such as, but not
hmlted to, transit stops, street crossings, braiding and store entry points, and
parking areas The walkways should feature adjo~mng landscaped areas that
include trees, shrubs, benches, flower beds, ground covers or other such
materials for no less than 50 percent of :ts length These walkways should also
be designed w:th safety :n m~nd. Clear slghthnes allowing for good natural
survedlance and adequate lighting should be incorporated. Landscaping along
the walkways should be malntmned at no more than three feet :n height or
limbed up to at least seven feet so that vis~Nhty in
not h~ndered.
For every two parking aisles, a walkway
should run through the parking area parallel to
the parking msles, providing access from the
parking area to the pr:mary budding without
walking in the veh:cular parking msle (see
graphic at left).
Internal pedestrian walkways should prowde
weather protection features such as awmngs or
arcades w:th~n 30 feet of all customer
entrances.
All internal pedestrian walkways should be
d~stingmshed from dnv:ng surfaces through
the use of durable, low mmntenance surface
materials such as pavers, bricks or scored
concrete to enhance pedestrian safety and
G \iNBASKET~AGENDAPC\Agn99_10\Maps\maps 025 Page 10
Virginia Beach Comprehensive Plan
DRAFT October 5, 1999
comfort, as well as the attractiveness of the walkways
6. Provision of bike racks is encouraged. Bike racks should be in a well lighted
area and placed in a location visible from the entrance and/or parking area.
E. Central Features and Community Spaces
Large retail establishment sites should offer attractive and lnwtlng pedestrian scale
features, spaces and amenmes. Entrances and parking lots should be configured to be
functional and lnvlnng w~th walkways conveniently tied to logical destlnanons. Transit
stops and drop-off/p~ck-up points should be ~ntegrated into the site. Pedestrian ways
should be anchored by special design features such as towers, arcades, porticos,
pedestrian hght fixtures, bollards, planter walls and other architectural elements that
define circulation ways and outdoor spaces.
Each large retail establishment should provide at least two of the following:
1. Patio/seating area
2. Pedestrian plaza w~th benches
3. Window shopping walkway
4. Outdoor playground area (needs to be carefully located for safety)
5. Kaosk area
6. Water feature (other than a stormwater management facility)
7. Clock Tower
8. Outdoor sculpture
As a subsmute, any other focal feature or amenity may be provided that ~n the judgement of
the Planning Commission and City Council adequately enhances community and public
spaces.
All such features and community spaces should have direct access to the public
sidewalk/bikeway network and should not be constructed of materials that are inferior to the
principal materials of the building and landscape.
G \INBASKET~GENDAPC\Agn99_I0XMaps\maps 025 Page 11
Virginia Beach Comprehensive Plan
DRAFT October 5, 1999
F. Landscaping and Buffering
In addition to meeting the m~nlmum Oty requirements for parking lot landscaping,
foundation landscaping and buffering, it is recommended that sites with large retml
establishments also provide the following:
le
Any loading operations within view of a residential or apartment zoning district or a
public right-of-way should be screened by a landscaped berm or a solid wall with
landscaping on the outside
.
Large parking areas should be enhanced w~th additional landscaping. Creative s~te
design, to include preservation of existing stands of trees and clustered landscaped
areas, ~s encouraged over symmetrical rows of small landscaped islands.
3. Sites with ex~st~ng trees and vegetation along the street frontage should retmn those
landscape features and integrate them into the landscape plan for the center.
4. To the greatest extent possible, 50 % of the landscaping should be evergreen species.
e
To the greatest extent possible, planting pits should be backfilled with 36 inches of
topsoil to prowde the most conducive growing environment for new landscape
planting.
e
To the greatest extent possible, median w~dths should be at least double the w~dth that
is typical to provide the most conducive growing environment for new landscape
plantmg.
G. Signs and Lighting
Recommendations concerning signs 0dent~ficatlon and traffic) and site hghtlng are
provided in the Aesthetic Character Section, above.
H. Stormwater Management Facility Ponds
G kiN BASKET~AGENDAPC~Agn99_ 10\Maps\maps 025 Page 12
Virginia Beach Comprehensive Plan
DRAFT October 5, 1999
le
On-site stormwater management faclhty ponds should be attractively landscaped
amenmes. Wetlands benching, fountains, and the incorporation of walking trails and
pedestrian benches around the perimeter of the ponds are all encouraged. Lighting of
these areas is also encouraged for safety
2. Enclosing the ponds with chmn hnk fencing is strongly discouraged.
3. To the greatest degree possible, stormwater management should either utilize existing
regional stormwater management facilities or be engineered to accommodate other
regional drainage.
G \INBASKETXAGENDAPCXAgn99_I0\Maps\maps 025 Page 13
~C~'' (D
·
~ 0
0 .~ 0
0
0 ~
c~ 0 0
0 0 0 ~ .~
0 ~ 0 c~
~ ~o o
c~
LLI
· , 0
(D
(D
(D
o~
o~
0
(D
(D
~ 0
· I
· I
c~
0
(D
CD
Z~
CD
0
LLI
0
o~
o~
0
o
¢~ 0
o~
(D
(D
© ©
CD
CD
0
0 0 o
(D
I I
0 0
o(~o
(D c~ 0
(D
(D
(D
0 0 0 0
· 0 0 0
0
.~ . 0 c~
.~ 0
0 0 CD ~ 0 c~
~ ~ c~ 0
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1401 EAST BROAD STREET
RICHMOND 23219-1939
EARL T ROBB
ENVIRONMENTAL ADMINISTRATOR
Mr James K Spore
Manager, C~ty of V~rg~n~a Beach
Municipal Center, Bldg #1
V~rg~n~a Beach, V~rg~n~a 23456
Dear Mr Spore
November 3, 1999
NOV
I attended a meebng of the Southeastern Greenbelt and Parkway Task Force on April 8, 1999 to d~scuss
the status of the enwronmental ~mpact statement Dunng that meeting, the decision was made by the
c~bes to conduct a consultant study of transportabon ~mprovements ~n V~rg~n~a Beach and Chesapeake
before further cons~denng the Southeastern project
Because of the bme lapse s~nce the April meeting, ~t m~ght be beneficial to review the steps necessary to
reactivate th~s project Th~s ~nformabon w~ll serve as guidance for your cons~derabon
The original enwronmental document ~s no longer vahd For that reason, the ~n~t~al challenge will be to
conwnce the Federal H~ghway Admln~strabon (FHWA) to serve as the lead federal agency for another
study To secure FHWA part~c~pabon, both c~bes would have to endorse the project by strong resolutions
and agree to participate ~n a study The Chesapeake resolubon would have to document the reason for a
change of pos~t~on The reason ~s that the Chesapeake C~ty Council's bas~s for not supporting the project
is the same rabonale used by some regulatory agencies to oppose the project
Other steps would ~nclude the need to secure consultant services to conduct a study and prepare new
environmental ~mpact statements New water quahty permit apphcat~ons and pubhc heanngs would be
required
We estimate that ~t would take a m~n~mum of 30 months to complete the enwronmental documents If the
start of a new study ~s further delayed, the study bme and effort will most hkely increase because of the
changes taking place ~n the study corridor
I hope that th~s ~nformat~on wdl be of some use to you ~n the further consideration of th~s project
S~n~erely, ~
~~~m~tor
cc Mr J G Browder, Jr
WE KEEP VIRGINIA MOVING
1-264(ROUTE 44) PROPOSED INTERCHANGE IMPROVEMENTS
A. WITCHDUCK ROAD INTERCHANGE
Concept I Improvements
Provide grade separated bypass ramp at Greenwich Rd. ~ntersecnon
Provide new ramps from W~tchduck Rd. to eastbound & westbound 1-264
Ehm~nate Mac Street ~ntersecnon at W~tchduck Rd & relocate to connect with Southern
Blvd
Re-design loop ramps & eliminate s~gnals
Proposed design based on W~tchduck Rd. being ~mproved to the Pnncess Anne Rd.
Intersection
· Estimated Planmng Cost Without Right-of-Way $25,000,000
Concept II Improvements
Re-design to full cloverleaf configuration
Provide new loop ramp from v~estbound 1-264 to southbound W~tchduck Rd
Provide grade separated bypass ramp at Greenwich Rd. intersection
Provide nexv ramps from Witchduck Rd. to eastbound & westbound 1-264
Eliminate Mac Street ~ntersect~on at W~tchduck Rd & relocate to connect with Southern
Blvd.
Re-design loop ramps & eliminate signals
Proposed design based on Witchduck Rd. being improved to the Pnncess Anne Rd.
Intersection
· Estimated Planning Cost Without R~ght-of-Way $30,000,000
Concept III Improvements
Re-construct to an Urban D~amond Interchange
Eliminate emst~ng s~gnals on Witchduck Rd. at emsting ramp termim
Construct new structure on 1-264 over W~thcduck Rd to accommodate the urban
interchange
Proposed design based on W~tchduck Rd being ~mproved to the Pnncess Anne Rd
Intersection
· Estimated Planning Cost Without Right-of-Way $35,000,000
B. ROSEMONT ROAD INTERCHANGE
Concept I Improvements
Re-construct to an Urban Diamond Interchange
Re-construct the structure over Rosemont Rd. to accommodate the urban interchange
· Estimated Planning Cost Without Right-of-Way $38,000,000
Concept II Improvements
Re-construct to an Urban Dtamond Interchange
Re-construct the structure over Rosemont Rd. to accommodate the urban interchange
Eliminate Bonney Rd. intersection at Rosemont Rd. & provide a new connection from the
proposed westbound on-ramp
· Estimated Planning Cost Without Right-of-Way $39,000,000
Concept III Improvements
New ramps for the Rosemont Rd to eastbound 1-264 movement and for the eastbound 1-
264 to northbound Rosemont Rd. movement
CD (collector/distributor) road proposed for eastbound 1-264 through the interchange
Local street in the southeast quadrant (Waverly Dr.) re-located
Eliminate Bonney Rd. intersection at Rosemont Rd. & provide a new connection from the
proposed westbound on-ramp
New structure required for the proposed CD road
· Estimated Planning Cost Without Right-of-Way $33,000,000
Concept IV Improvements
New ramps for the Rosemont Rd. to eastbound 1-264 movement & for the eastbound 1-
264 to northbound Rosemont Rd. movement; Additionally, new ramps are provided for
the westbound 1-264 to southbound Rosemont Rd. movement & tbr the southbound
Rosemont Rd. to westbound 1-264 movement. This would provide a full cloverleaf
design A CD road may be desirable for westbound 1-264 with this design
CD (collector/distributor) road proposed for eastbound 1-264 through the interchange
Local street in the southeast quadrant (Waverly Dr.) re-located
Eliminate Bonney Rd intersection at Rosemont Rd. & provide a new connection from the
proposed westbound on-ramp
New structure required for the proposed CD road
· Estimated Planmng Cost Without Right-of-Way $40,000,000
C. LYNNHAVEN PARKWAY/GREAT NECK RD. INTERCHANGE
Concept I Improvements (existing Lynnhaven Pkw. interchange)
Re-construct the interchange to a tull cloverleaf design
Provide a grade separated bypass ramp at Lynnhaven Rd from eastbound 1-264 to
southbound Lynnhaven Pkw. Also provide ramp to Lylmhaven Rd.
CD roads on 1-264 eastbound & westbound are recommended
· Estimated Planning Cost Without Right-of-Way $39,000,000
Concept I Improvements (new Great Neck Rd. Interchange)
Construct a new interchange Provide tbr eastbound 1-264 to Great Neck Rd. movement
and for Great Neck Rd to westbound 1-264 movement
CD roads provided on eastbound & westbound 1-264
Proposed westbound ramp to utilize structure over the railroad
Estimated Construction Cost (with Right-of- Way) as shown in VDOT S~x Year Plan
$46,000,000
Concept II Improvements (existing Lynnhaven Pkw. interchange)
Same basra design as Concept I except the proposed loop ramp from southbound
Lynnhaven Pkw to eastbound 1-264 ex~ts frorn Lynnhaven Rd
Re-construct the interchange to a full cloverleaf design
Provide a grade separated bypass ramp at Lynnhaven Rd from eastbound 1-264 to
southbound Lynnhaven Pkw; Also provide ramp to Lynnhaven Rd
CD roads on 1-264 eastbound & westbound are recommended
· Estimated Planmng Cost W~thout Right-of-Way $40,000,000
Concept II Improvements (new Great Neck Rd. Interchange)
Construct a new interchange. Provide for eastbound 1-264 to Great Neck Rd. movement
and for Great Neck Rd. to westbound 1-264 movement
CD roads provided on eastbound & westbound 1-264
Proposed westbound ramp to utilize structure over the railroad
This concept provides the same exit and entrance to 1-264, however the proposed ramps
are designed for free flowing movement at the connection with London Bridge Rd
· Estimated Planning Cost Without Right-of-Way $18,000,000