HomeMy WebLinkAbout051606 Shore Drive AdvisoryShore Drive Advisory
Shore Drive Advisory
Committee Annual
Committee Annual
Report to City Council
Report to City Council
and
and
Implementation Strategy
Implementation Strategy
Briefing
Briefing
May 16, 2006
May 16, 2006
OVERVIEW
OVERVIEW
Shore Drive Plan –The Blueprint
Shore Drive Plan –The Blueprint
?
?
What has been accomplished?
What has been accomplished?
?
?
What is underway?
What is underway?
?
?
What has not yet been completed?
What has not yet been completed?
?
?
Existing Conditions
Existing Conditions
?
?
What should be the Implementation
What should be the Implementation
?
?
Strategy to get the job done?
Strategy to get the job done?
Recommendations and Next Steps
Recommendations and Next Steps
?
?
Shore Drive Plan –
Shore Drive Plan –
The Blueprint & Vision
The Blueprint & Vision
–A well defined plan to improve and beautify
–A well defined plan to improve and beautify
the Shore Drive corridor or “Bayfront”area
the Shore Drive corridor or “Bayfront”area
–Part of our Comprehensive Plan
–Part of our Comprehensive Plan
–A Resort neighborhood; not a resort
–A Resort neighborhood; not a resort
destination
destination
–A strategy to unify the “Bayfront”area for
–A strategy to unify the “Bayfront”area for
residents and businesses through urban design
residents and businesses through urban design
improvements
improvements
–Much more than a highway project; needs to
–Much more than a highway project; needs to
be driven by multiple factors (neighborhood
be driven by multiple factors (neighborhood
preservation, aesthetics, multi-modal transit
preservation, aesthetics, multi-modal transit
and pedestrian circulation, etc.)
and pedestrian circulation, etc.)
What has been accomplished?
What has been accomplished?
ULI Bayfront Study –1997
ULI Bayfront Study –1997
?
?
Creation of Shore Drive Advisory Committee –1998
Creation of Shore Drive Advisory Committee –1998
?
?
Shore Drive Corridor Plan –2000
Shore Drive Corridor Plan –2000
?
?
Shore Drive Transportation Study -2001
Shore Drive Transportation Study -2001
?
?
Landscaping Design Guidelines -2002
Landscaping Design Guidelines -2002
?
?
Architectural Design Guidelines -2002
Architectural Design Guidelines -2002
?
?
Lynnhaven Boat & Beach Facility –2002
Lynnhaven Boat & Beach Facility –2002
?
?
Cape Henry Trail Extension Project –2004
Cape Henry Trail Extension Project –2004
?
?
Beach Accessways (Albemarle Avenue, Sandalwood,
Beach Accessways (Albemarle Avenue, Sandalwood,
?
?
Dinwiddie Road) –2004 & 2005
Dinwiddie Road) –2004 & 2005
Numerous Private Development Projects that Incorporate
Numerous Private Development Projects that Incorporate
?
?
Plan and Guidelines Criteria
Plan and Guidelines Criteria
What is underway?
What is underway?
Shore Drive Demonstration Project, Phase 1 –
Shore Drive Demonstration Project, Phase 1 –
?
?
Commence Construction Spring 2006
Commence Construction Spring 2006
Shore Drive Demonstration Projects, Phases 2
Shore Drive Demonstration Projects, Phases 2
?
?
and 3 –Commence Study Spring 2006
and 3 –Commence Study Spring 2006
Lesner Bridge Replacement –Commence Study
Lesner Bridge Replacement –Commence Study
?
?
Spring 2006
Spring 2006
Live Oak Tree Strategy –Commence
Live Oak Tree Strategy –Commence
?
?
Implementation Spring 2006
Implementation Spring 2006
Beach Accessway (Kendall Street) –Commence
Beach Accessway (Kendall Street) –Commence
?
?
Construction Spring 2006
Construction Spring 2006
First Landing Fire Station Site and Design –
First Landing Fire Station Site and Design –
?
?
Commence Construction Summer 2006
Commence Construction Summer 2006
What has not been completed?
What has not been completed?
Implementing Adopted Shore Drive Plan
Implementing Adopted Shore Drive Plan
?
?
Recommendations
Recommendations
Implementing Adopted Outdoors Plan
Implementing Adopted Outdoors Plan
?
?
Open Space Acquisition Recommendations
Open Space Acquisition Recommendations
Implementing Adopted Beach
Implementing Adopted Beach
?
?
Management Plan Recommendations
Management Plan Recommendations
Adopt and Implement Shore Drive Safety
Adopt and Implement Shore Drive Safety
?
?
Task Force Recommendations
Task Force Recommendations
Incorporating SDAC Recommendations
Incorporating SDAC Recommendations
Revisit Adopted Plans, Policies and
Revisit Adopted Plans, Policies and
?
?
Ordinances re: “Bayfront”area
Ordinances re: “Bayfront”area
Existing Conditions
Existing Conditions
Northampton Interchange
Northampton Interchange
Gateway to “Bayfront”Area
Gateway to “Bayfront”Area
Lack of Pedestrian
Lack of Pedestrian
Connectivity and Safety
Connectivity and Safety
Northampton Interchange Lack of
Northampton Interchange Lack of
Sidewalks and Landscaping
Sidewalks and Landscaping
Lack of Pedestrian or Vehicular
Lack of Pedestrian or Vehicular
Areas Definition
Areas Definition
Lack of Pedestrian
Lack of Pedestrian
Connectivity and Safety
Connectivity and Safety
Need to Reclaim and Improve
Need to Reclaim and Improve
the City R-O-W
the City R-O-W
Dependence on Private Sector to
Dependence on Private Sector to
Make Desired Improvements
Make Desired Improvements
Lack of Safe Pedestrian Crossing
Lack of Safe Pedestrian Crossing
at East Stratford Road
at East Stratford Road
Lack of Sidewalks and
Lack of Sidewalks and
Landscaping from West Lesner
Landscaping from West Lesner
Bridge
Bridge
Lack of Sidewalks and
Lack of Sidewalks and
Landscaping from East Lesner
Landscaping from East Lesner
Bridge
Bridge
Landscaping is Appropriate but
Landscaping is Appropriate but
Lack of Pedestrian Connectivity
Lack of Pedestrian Connectivity
Landscaping is Appropriate but but
Landscaping is Appropriate but but
Lack of Pedestrian Connectivity
Lack of Pedestrian Connectivity
West Great Neck Road –
West Great Neck Road –
Crosswalks to Nowhere
Crosswalks to Nowhere
Shore Drive East of West Great
Shore Drive East of West Great
Neck Road
Neck Road
Implementation Strategy
Implementation Strategy
Implementation Strategy
Implementation Strategy
Phased Approach
Phased Approach
?
?
Identification of Funding Mechanism and
Identification of Funding Mechanism and
?
?
Financing Strategy
Financing Strategy
Commitment to Follow Through for Long Term
Commitment to Follow Through for Long Term
?
?
Commitment to Interdepartmental Coordination
Commitment to Interdepartmental Coordination
?
?
and Ongoing Community Involvement
and Ongoing Community Involvement
Demands a new CIP Approach for Grouping
Demands a new CIP Approach for Grouping
?
?
Multiple Kinds of Projects (Roads, Open Space,
Multiple Kinds of Projects (Roads, Open Space,
etc.) for the “Bayfront”Area
etc.) for the “Bayfront”Area
Integrates with Shore Drive Safety Task Force
Integrates with Shore Drive Safety Task Force
?
?
and SDAC Recommendations
and SDAC Recommendations
Roads –A Phased Approach
Roads –A Phased Approach
Establishes Timetable for Ultimate
Establishes Timetable for Ultimate
?
?
Completion
Completion
Communicates Schedule to Citizens
Communicates Schedule to Citizens
?
?
Allows for Integration of Design
Allows for Integration of Design
?
?
Elements for Entire “Bayfront”Area
Elements for Entire “Bayfront”Area
Builds upon Successful Model Utilized
Builds upon Successful Model Utilized
?
?
for Resort Area Improvements
for Resort Area Improvements
Phases 2 and 3
Phases 2 and 3
Phase 2 -South Oliver Drive / Waters Point Place
Phase 2 -South Oliver Drive / Waters Point Place
?
?
to Treasure Island Drive
to Treasure Island Drive
Phase 2 -Includes Northampton Interchange
Phase 2 -Includes Northampton Interchange
?
?
Aesthetic and Pedestrian Improvements Only
Aesthetic and Pedestrian Improvements Only
Phase 3 -East Lesner Bridge to Croix Drive
Phase 3 -East Lesner Bridge to Croix Drive
?
?
Phase 3 -Includes Vista Circle / Page Avenue,
Phase 3 -Includes Vista Circle / Page Avenue,
?
?
West Great Neck Road and North Great Neck
West Great Neck Road and North Great Neck
Road Intersections
Road Intersections
Phase 3 -Links Cape Henry Trail from Jade Street
Phase 3 -Links Cape Henry Trail from Jade Street
?
?
to Lesner Bridge
to Lesner Bridge
Study Underway; $575,000 Cost Appropriated in
Study Underway; $575,000 Cost Appropriated in
?
?
CIP; $500,000 Proposed for FY 2007-2008
CIP; $500,000 Proposed for FY 2007-2008
Total Estimated Cost $11.0 million
Total Estimated Cost $11.0 million
?
?
Completion Scheduled Late 2012
Completion Scheduled Late 2012
?
?
Phase 6
Phase 6
Croix Street to First Landing State
Croix Street to First Landing State
?
?
Park
Park
Includes First Landing State Park
Includes First Landing State Park
?
?
Entrance Road Intersection
Entrance Road Intersection
Funds to Initiate Study not yet
Funds to Initiate Study not yet
?
?
Appropriated
Appropriated
Not Identified as Project in CIP
Not Identified as Project in CIP
?
?
Priority Road Project
Priority Road Project
Recommendations
Recommendations
Adopt and Implement Shore Drive Safety
Adopt and Implement Shore Drive Safety
?
?
Task Force and SDAC Recommendations
Task Force and SDAC Recommendations
(Including Full Funding to Complete
(Including Full Funding to Complete
Phases 1, 2 & 3 and Study & Design Funds
Phases 1, 2 & 3 and Study & Design Funds
for Phase 4)
for Phase 4)
Identify and Provide Necessary Funding of
Identify and Provide Necessary Funding of
?
?
$30.2 million Over the CIP 6 Year Funding
$30.2 million Over the CIP 6 Year Funding
Period by FY 2011-2012
Period by FY 2011-2012
Financing and Funding Strategy
Financing and Funding Strategy
Exploration of Alternatives (“TIF –
Exploration of Alternatives (“TIF –
?
?
Like”, CIP, Special Tax District); Pros
Like”, CIP, Special Tax District); Pros
and Cons
and Cons
Evaluation of Economics and
Evaluation of Economics and
?
?
Demographics and Anticipated
Demographics and Anticipated
Revenue Streams from “Bayfront”
Revenue Streams from “Bayfront”
Area
Area
Selection of Recommended Funding
Selection of Recommended Funding
?
?
and Implementation Strategy
and Implementation Strategy
Economics and Demographics
Economics and Demographics
Why has the impact of the “Bayfront”Area
Why has the impact of the “Bayfront”Area
?
?
been lost in the economic maze?
been lost in the economic maze?
–Bayside and Lynnhaven Voting Districts
–Bayside and Lynnhaven Voting Districts
both include portions of the “Bayfront”
both include portions of the “Bayfront”
Area
Area
–Real Estate Assessments have not
–Real Estate Assessments have not
routinely aggregated this data together
routinely aggregated this data together
–“Bayfront”Area has not been
–“Bayfront”Area has not been
considered as a destination for a
considered as a destination for a
funding strategy before
funding strategy before
Bayfront Population Compared to
Bayfront Population Compared to
Other Planning Areas
Other Planning Areas
% of Total Population
TOTAL LESS PUNGO BLACKWATER
TOTAL ALL DISTRICTS
Pungo Blackwater
Oceanfront
Little Neck
Kempsville
Holland
Great Neck
South Courthouse Sandbridge
North Courthouse Sandbridge
Bayside
Bayfront
0%20%40%60%80%100%120%
Bayfront Development Compared
Bayfront Development Compared
to Other Planning Areas
to Other Planning Areas
% DEVELOPED WITHIN EACH PLANNING AREA
TOTAL LESS PUNGO BLACKWATER
TOTAL ALL DISTRICTS
Pungo Blackwater
Oceanfront
Little Neck
Kempsville
Holland
Great Neck
South Courthouse Sandbridge
North Courthouse Sandbridge
Bayside
Bayfront
0%10%20%30%40%50%60%70%80%90%100%
Bayfront Student Population Density
Bayfront Student Population Density
Compared to Citywide Average
Compared to Citywide Average
(1 = Bayfront; 2 = Citywide)
(1 = Bayfront; 2 = Citywide)
STUDENTS PER DEVELOPED ACRE
2
1
0.850.900.951.001.051.101.15
STUDENTS PER POPULATION210.900.800.700.600.500.400.300.200.10-
Schools Impact
Schools Impact
TOTAL LESS
PUNGO
SCHOOLSBayfrontBLACKWATERDifference
No. Students 2003-2004 2,153 75,424
Percent Student Population2.9%100%
STUDENT PER POPULATION 0.10 0.83 (0.733)
STUDENT PER DEVELOPMENT AC 0.96 1.10 (0.139)
STUDENT PER DWELLING UNIT 0.22 0.47 (0.246)
Estimated School Impact
Developed Acres 2,241
Difference Per Development Acre (0.139)*
Reduced impact on Schools (311)
Estimated Cost per Student for 2004$ 7,846
Estimated Savings$ (2,438,946)
REAL ESTATE ASSESSMENT COMPARISON
CITYWIDE COMPARED TO THE BAYAREA DISTRICT
1 2
Citywide Bayside Area
TOTAL ASSESSMENT FY 2006 - 2007 45,582,234,063 3,558,195,055
ASSESSMENT PER POPULATION 109,713 159,004
ASSESSMENT PER ACRE 253,684 1,162,809
ASSESSMENT PER DEVELOPED ACRE 445,770 1,587,771
TAXES PER DEVELOPED ACRE 4,564 16,257
Assessment Per Acre and Assessment Per Developed
Acre
1,800,000
1,600,000
1,400,000
1,200,000
1,000,000
800,000
600,000
400,000
200,000
-
CitywideBayside Area
Funding Strategy
Funding Strategy
SOURCES OF FUNDING THE CAPITAL IMPROVEMENTS IN THE BAYFRONT AREA
SOURCES OF FUNDING THE CAPITAL IMPROVEMENTS IN THE BAYFRONT AREA
Bayfront
Citywide
$ 3,558,195,055
TOTAL ASSESSMENT FY 2006 - 2007$ 45,582,234,063
9%
Assumed Area Rate of increase in assessed value9%
$ 320,237,555
Estimated Increase$ 4,102,401,066
$ 0.99
Tax Rate$ 0.99
$ 3,170,352
Increase Tax Revenue$ 40,613,771
"TIF - Like" Revenue
$ 30,180,500
Capital Needs
5%
Assumed Rate
20
Term of Bond
$ 2,421,774
Required Annual Bond Payment
76%
Percent of Increased Real Estate Taxes in the "TIF - Like" Area
Questions
Questions