Second Year Update
Second Year Update
FY 2009-10
FY 2009-10
Capital Improvement Program
Capital Improvement Program
Storm Water Section
Storm Water Section
Jason E. Cosby, PE
Department of Public Works
Tuesday, April 14, 2009
Storm Water CIP Section
Storm Water CIP Section
FY 2009-10
FY 2009-10
Total Budget $11,526,159
Operation &
Flood Control,
Maintenance,
$4,137,500
$4,185,980
Water Quality,
$3,202,679
Storm Water CIP Section
Storm Water CIP Section
Program Highlights –Flood Control
Program Highlights –Flood Control
? Rosemont Forest
? North Beach Drainage Improvements
? Elizabeth River Shores Phase I
? North Lake Holly Section II
? South Lake Holly Section III
? All scheduled for construction starting in FY
2010
Storm Water CIP Section
Storm Water CIP Section
Project Highlights –Flood Control
Project Highlights –Flood Control
Rosemont Forest -$6.8 million
Storm Water CIP Section
Storm Water CIP Section
Project Highlights –Flood Control
Project Highlights –Flood Control
North Beach Drainage Improvements -$19.0 million
Storm Water CIP Section
Storm Water CIP Section
Project Highlights –Flood Control
Project Highlights –Flood Control
Elizabeth River Shores Phase I -$1.0 million
Storm Water CIP Section
Storm Water CIP Section
Project Highlights –Flood Control
Project Highlights –Flood Control
North Lake Holly Section II -$5.2 million
Legend
Section I-A
Section I-B
Section II
Section III
Section IV
Section I-C
Storm Water CIP Section
Storm Water CIP Section
Project Highlights –Flood Control
Project Highlights –Flood Control
South Lake Holly Section III -2.5 million
Legend
Section III
Section II
Section IV
Section I
Storm Drainage
Revitalization
Storm Water CIP Section
Storm Water CIP Section
Project Highlights –SW Quality
Project Highlights –SW Quality
Completion of
the Lynnhaven
River
Environmental
Restoration
Study. Total
Study Funding
$1,500,000
Storm Water CIP Section
Storm Water CIP Section
Project Highlights –SW Quality
Project Highlights –SW Quality
Broad Bay
Comprehensive
Stormwater
Great Neck Rd
Management Plan –
Milldam Creek:
First
$200,000 (study)
Colonial
H.S.
First Colonial Rd
Storm Water CIP Section
Storm Water CIP Section
Project Highlights –SW Quality
Project Highlights –SW Quality
Public Information/Education Program : $100,000
HRSTORM and Lynnhaven River Now
Responsible Yard Care
for the Chesapeake Bay
Storm Water CIP Section
Storm Water CIP Section
Project Highlights –Stormwater
Project Highlights –Stormwater
Quality
Quality
Lynnhaven River Watershed Restoration:
Coordination with Lynnhaven River Now,
Bacterial Tracking and elimination and
Retrofits: $500,000
Storm Water CIP Section
Storm Water CIP Section
Project
Project
Highlights –Maintenance & Repair
Highlights –Maintenance & Repair
Storm Water Infrastructure
Rehabilitation
Princess Ann Plaza
?
Failed
joint
neighborhood
$3.0 million in FY 2010
?
Total Project Cost of
$5.5 million
Princess Anne Plaza CCTV
Inspection
Storm Water CIP Section
Storm Water CIP Section
Project
Project
Highlights –Maintenance & Repair
Highlights –Maintenance & Repair
Kingston Lake
? Dam/Spillway
Maintenance
$600,000
? Lake Maintenance
$400,000
Kingston Lake
Storm Water CIP Section
Storm Water CIP Section
Project
Project
Highlights –Maintenance & Repair
Highlights –Maintenance & Repair
Primary System
Maintenance
Arctic Ave. 28Street
? th
pipe replacement
$400,000
th
Arctic Ave./28St.
Pleasant Valley Rd.
?
Pipe Repair $200,000
Pleasant Valley Rd.
Storm Water CIP Section
Storm Water CIP Section
Changes from Original FY 2010
Changes from Original FY 2010
? Provides funding to North Beach Drainage
Improvements Project
? Delays future phase of South Lake Holly
(Section II)
? Defers Thalia Creek Tributary Restoration
(Pembroke) project
Second Year Update
Second Year Update
FY 2009-10
FY 2009-10
Capital Improvement Program
Capital Improvement Program
Coastal Section
Coastal Section
Jason E. Cosby, PE
Department of Public Works
Tuesday, April 14, 2009
Coastal CIP Section
Coastal CIP Section
FY 2009-10
FY 2009-10
Total Budget $7,690,938
Landfill #2
Funding,
$687,536
City Funded
Projects,
$1,087,282
Federal Cost
Participation
Projects,
$5,916,120
Coastal CIP Section
Coastal CIP Section
Program Highlights
Program Highlights
? Western Branch Lynnhaven River Dredging
? Sandbridge Beach Access Improvements
? Lynnhaven Inlet Dredging
? Rudee Inlet Dredging
? Resort Beach Replenishment
Coastal CIP Section
Coastal CIP Section
Project Highlights
Project Highlights
Western Branch Lynnhaven River Dredging
$4.6 million
Coastal CIP Section
Coastal CIP Section
Project Highlights
Project Highlights
Sandbridge Beach Access Improvements -$250,000
Coastal CIP Section
Coastal CIP Section
Project Highlights
Project Highlights
Lynnhaven Inlet Dredging -$400,000
Coastal CIP Section
Coastal CIP Section
Project Highlights
Project Highlights
Rudee Inlet Dredging -$400,000
Coastal CIP Section
Coastal CIP Section
Project Highlights
Project Highlights
Resort Beach Replenishment -$5.0 million
Coastal CIP Section
Coastal CIP Section
Changes from Original FY 2010
Changes from Original FY 2010
? Provides Funding for Western Branch
Lynnhaven River Dredging
? Issues: Beach Replenishment –Dependent
on Receiving Federal Participation
BMP MAINTENANCE
BMP MAINTENANCE
Top 20
LAKE NAMEPROJECTED COMPLETIONCOST
•Kingston Lake2010 $0.4M
•Brigadoon Lake 22014 $1M
•Brigadoon Lake 32015 $0.5M
•Brigadoon Lake 42015 $0.25M
•Brigadoon Lake 52016$0.2M
•Brigadoon Lake 6 2016$0.3M
$4.15M
•Green Run Lake 12018$1.5M
•Green Run Lake 22020$1.5M
Limitations require
•Green Run Lake 3>2020$1M
accumulation of
•Green Run Lake 4 $0.75M
funding to perform
•Green Run Lake 5$0.5M
maintenance
•Brookside Lake$0.5M
•West Lake Pembrook$6M
•Stratford Chase 1 $0.25M
•Stratford Chase 2$0.5M
•Stratford Chase 3$0.15M
•Level Green Lake 1 $0.5M
•Level Green Lake 2 $0.25M
•Reedtown Lake (Wishart) $0.75M
•Rock Creek 1$0.25M
$17.05M
Rosemont Forest
Rosemont Forest
Drainage Area
Drainage Area
Neighborhood
Improvements
Pump Sta.
Location
Stumpy
Lake
Elizabeth River Shores
Elizabeth River Shores
Storm Drainage Improvements
Storm Drainage Improvements