HomeMy WebLinkAbout04202010 PARKS & RECREATION PRESENTATIONTYPES OF PARKS AND RECREATION CI P PROJECTS
FY 2010-11
FY 2010-11 thru FY 2015-16
^ Facility Repair ~ Facility Repair &
& Renovation Renovation
(83.9%) (74.5%)
^ Facility ~' ~' ^ Facility
Replacement Replacement
(3.5%) (4.8%)
Facility Facility
Development Development
(12.6%) (20.7%)
2
Parks and Recreation
Outdoor and Indoor System
• Parks, Natural Areas, Open Space Preservation Areas,
Trail/linkage Corridors, and Special Use Facilities (i.e. athletic
facilities, water access sites, resort area parks)
- 4,480 acres on 287 sites
- $282,689,932 asset value per Parks and Recreation Asset Inventory
- $5.65 million/year minimum annual capital maintenance based on 2%/50-
yearreplacement schedule
Note: These figures exclude the five City-owned golf courses
• Community Recreation Centers
- 398,769 sq. ft. throughout six facilities
- $104,896,220 asset value per 2007 Facility Condition Assessment by
Applied Management Engineering, Inc.
- $3.15 million/year minimum annual capital maintenance based on 3%/35-
yearmodernization schedule
OVERALL PARKS AND RECREATION CIP STRATEGY
7
1) Facility Condition Assessment (FCA) study implementation
by scheduling CIP projects based on the following
priorities:
- Safety & secu rity
- Backlogged Maintenance (i.e. shelter/park building
roofs)
- Life cycle maintenance and repair (plumbing and
HVAC system renovations and conversions)
- Cyclic maintenance (painting & electrical repair)
- Component renewal (i.e. playground replacements)
2) Fund Capital Maintenance Required by Contractual Obligations and
Special Revenue Facilities
3) Develop Priority Recreation Improvements Identified by our
Residents as
Recommended in the City Council-adopted Outdoors Plan and
Bikeways and Trails Plan
~~
I~
---~
i
~.
~_ __. _ --
PARKS AND RECREATION CI P STRATEGY -
EXISTING PARKS FOCUS
An average of $2,439,938/year is appropriated annually to fund the capital
maintenance for existing park sites.
However, total CIP needs to address capital maintenance of existing park sites is
$3,780,971 based on the 2008 Facility Condition Assessment for major parks.
Therefore, over the next 6 years, there will be an $1,341,033 CIP funding short fall
($3,780,971/year need -average target funding 2,439,938/year) for park capital
maintenance. Consequently, an $825,000 CIP project is recommended to start to
address backlogged maintenance, redirected from recommended reduction of the
Open Space CIP project.
~:w ~ {,,
-~
~: ~~.
~ ; .~. ,
~ -:
~`~ ~ ~
PARKS AND RECREATION CI P STRATEGY -
RECREATION CENTERS FOCUS
• Current estimated six year CIP appropriations are adequate to fund
building renovation and mechanical equipment replacement projects for
all six existing recreation centers including the potential Seatack
expansion project.
• Current estimated six year CIP appropriations are not adequate to fund
existing facility modernizations:
- Bow Creek modernization* Estimated $22.0 Million
- Kempsville modernization* Estimated $18.9 Million
• Note: Bow Creek and Kempsville Modernizations recommended in budget
under CIP 4.505 project
6
P&R CIP PROJECTS HIGHLIGHTS
PRIMARY CORE MISSION PROJECTS
CIP 4-013: Community Recreation Centers Repairs & Renovations Ph. 2
FY 11 Funding: $2,900,000
CIP 4-016: Parks & Special Use Facilities Development & Renovations Ph.2
FY 11 Funding: $1,171,573
CIP 4-506 Parks Infrastructure Renewal and Replacement
FY 11 Funding: $825,000
CIP 4-024: Park Playground Renovations Ph.2 FY 11 Funding: $300,000
CIP 4-503: Parks & Rec. Admin. Offices (City-Wide) Relocation FY 11
Funding: $337,500
CIP 4-063: Athletic Fields Lighting & Renovations Ph. 2
FY 11 Funding: $236,715
CIP 4-309: Mount Trashmore Signature Park Renovations Ph. 2
FY 11 Funding: $250,000
CIP 4-501: Athletic Fields Energy Conservation Renovations
FY 11 Funding: $400,000 Year 1 only
CIP 4-018: Greenways, Scenic Waterways, & Natural Areas - Ph. 2
FY 11 Funding: $131,473
CIP 4-036: Tennis Court Renovations - Phase 2 FY 11 Funding: $100,000
CIP 4-504: Park Parking Lot Repairs & Renovations
FY 11 Funding: $50,000
P&R CIP PROJECTS HIGHLIGHTS
SPECIAL REVENUE FACILITY OR
CONTRACTURAL OBLIGATION PROJECTS
^ CIP 4-017: Golf Course Equipment & Infrastructure
Replacement -Phase 2
FY 11 Funding: $0
^ CIP 4-053: Field Hockey National Training Center
Repairs & Renovations
FY 11 Funding: $602,664
^ CIP 4-080: Sportsplex & Field Hockey National
Training Center Repairs & Renovations -Phase 1
FY 11 Funding: $430,100
^ CIP 4-502: Lynnhaven Boat Ramp & Beach
Facility Repairs & Renovations - Phase 1
FY 11 Funding: $40,000
s
P&R CIP PROJECTS HIGHLIGHTS
OUTDOORS PLAN & BIKEWAYS & TRAILS PLAN PRIORITY PROJECTS
CIP 4-306: Open Space Park Development &
Maintenance - Phase 2 FY 11 Funding.:.
750,000
Projects Underway or Planned on Open Space Sites within
Modified Funding
- Stumpy Lake Natural Area Public Access
Improvements
- Lake Lawson & Lake Smith Natural Area
Improvements
- Marshview Park - DCR Grant Match, Construction
- Woods of Avalon Neighborhood Park
- Thalia Creek Multi-Use Water Access Site
- (Dredge TransferStation/Canoe/Kayak/Crew Launch)
- Temporary/Transitional Maintenance
(1St ear of ownership, removal of hazardous trees,
etc.
CIP 4-074: City Bikeways &Trails Plan
Implementation -Phase 1 FY 2010-11
Funding. $150,000
CIP 4-075: Pedestrian System Improvements
- Phase 1 FY 2010-11 Funding.. $50,000
^ CIP 4-070: Open Space Program Site
Acquisition -Phase 2
FY 2010-11 Funding: 0
9
CIP 4-503: Parks & Rec. Admin. Offices (City-Wide) Relocation
Project Highlights FY 11 Funding: $337,500
Project funds design only to
relocate City Wide Office
complex to the Princess Anne
Commons -Athletic Complex.
Existing offices, storage, and
recreation service facilities date
back to World War II era (60+
years old) and are structurally,
mechanically, and electronically
in very poor condition,
overcrowded; and increasingly
difficult to maintain.
Existing facilities are utilized by
47+ P&R staff.
10
CIP 4-503: Parks & Rec. Admin. Offices (City-Wide) Relocation Contd.
• The inadequate 9,876 s.f. of office
buildings provide less than 1 /3 of the
identified need from the space
assessment. The building would include
15,000 s.f. office space + 5,000 s.f. of pre-
engineered storage space.
• Projected need based on a Facilities
Assessment and Rehabilitation/
Renovation Feasibility Study completed
by A & E consultants (HBA) in October
2001.
• This project was first proposed in the
Parks and Recreation CIP in FY 2005-06.
Photograph No. I-t: Close-up cicn of the cirood framing above the. top of the column
showing the termite damage to the eoluma, beam, and raffers exposed at this area.
11
r
CIP REQUESTED-BUT-NOT F
^ Williams Farm Community
<<
Recreation Center ~
Design/Build
:~~
^ $24,650,058 F.
-~ so~~ ~
^City Bikeways and Trails
Plan Implementation Phase
I I
^ $475, 000
^ Pedestrian System
Improvements -Phase II
$100, 000
^ Thalia Creek Greenway
Phase I
^ $125, 000
Dam Neck
Intersection Treatments
UNDED PROJECTS FOR FY 11
~~~ -~.
sk
Thalia Crcek
c,~eenaa)
.~
~_ Master Phn
Primary Corridor
.~ .~
~.~..-~
I
-~
~;:.
~~`~ ! j
~.
~ .-
.R ~.. 4
~~
.~.
~.~,
m~~,o.~~
12
CITIZEN IMPACT FROM UNDERFUNDING
CAPITAL MAINTENANCE
Capital maintenance may not be sexy but if it is not adequately funded our park
infrastructure and facilities begin to deteriorate as shown below. Our residents and
visitors are beginning to perceive our parks as:
• Unappealing
• Uncomfortable
• Unsafe
~~.
~ t . ~ °K. ~mr~,
~':
If this progresses, our residents and visitors will feel:
• Unwelcome
From abusiness/service provider perspective, we run the risk of then becoming:
• Uncompetitive
"U n" is not a positive prefix to be associated with Virginia Beach. 13