Award Levels
Outstanding Recognition
• Highest level of distinction
• Honors projects that have achieved high marks
in all criteria
• Sufficiently completed project
• Demonstrates accomplishments or expected
accomplishments
Award Levels
Significant Achievement
• Second level of achievement
• Honors projects that have received a final approval
from the Virginia Beach Planning
Department/Development Services Center as
meeting all applicable codes and standards
May also spotlight a specific aspect of the project
Juliette's Reef and Grandma's Reef
Outstanding Recognition
• Rainey's Gut is a waterway that Reefs act as energy buffers to
has substantial wetland erosion protect the remaining wetlands
Juliette's Reef and Grandma's Reef
• Reefs provide a multitude of immediate and long-term
environmental benefits
• Oysters are prodigious filter feeders and remove suspended
sediments from the waters
• Revival of oysters will significantly contribute to improving the
water quality
Renaissance Academy
Outstanding Recognition
Renaissance Academy
• Sustainable concepts are fully
integrated into the design of the facility
• Removal of buildings and pavement
decreases stormwater runoff,
alleviating backed up storm sewers
and local flooding
• Converts site from brown to
green by recycling 90% of non-
hazardous materials from site
demolition
• Abundant interior natural light,
high indoor air quality and fully
landscaped site
Renaissance Academy
• Natural light provides energy
conservation as well as a healthy,
vibrant indoor environment for
students to excel and move into a
productive community life
Pupil Transportation Mai ntenance
Faci lity Va Beach Pu blic Schools
Significant Achievement
Pupil Transportation Mai ntenance
Faci lity Va Beach Pu blic Schools
Cutting-edge Items
Windmills
Solar Panels
Green Roof
Practical Features
Water recycling system for washing vehicles
Engineered meadowlands protect/enhance wildlife
Restoration of native areas
Pupil Transportation Mai ntenance
Faci lity Va Beach Pu blic Schools
Reduces heat island effect with:
• Light colored concrete paving
• White roof
• Green roof
• Stormwater bioretention system
is an aesthetic amenity
• System is shaped to be longer in
the direction of flow for maximum
filtration benefit
Va Beach Middle School
Revitalization of Beach Garden Park
Significant Achievement
• Constructed utilizing LEED Principles
and will receive a Gold Certification
• All stormwater runoff will be
captured and used on site
Va Beach Middle School
• Existing site of the former Virginia Beach High School and consisted of
the original building, a network of sidewalks, entry plazas, supporting
parking and roadway system
• In order to replace the school, it was necessary to consume the full site
for construction
• Athletic fields could no longer be used for activities
Beach Garden Park
~.
• Formerly a landfill and
abandoned septic treatment site
• Re-filling and re-grading the site
created athletic fields and a
nature walk
• Almost completely surrounded by
tidal wetlands and Little Neck Creek
• Rain Garden Bio-retention basins
and pervious pavers in paved
parking areas reduce runoff
Perfect example of redevelopment that lowers carbon footprint and improves water quality
Convergence Center
Significant Achievement
• Strategically located undeveloped site was contaminated and situated along a
valuable stretch of tidal saltwater creeks, ditches and wetland areas
• Becoming a natural oasis multi-tenant office park within Town Center urban core
Convergence Center
• The project incorporates Thalia Creek
Greenway Master Plan by establishing
a nature walk within the buffer
Sago Farms
Significant Achievement
Located along the Lake Lawson shoreline
Creates a unique blend of formality and natural setting
Sago Farms
• Stormwater will be
treated on site and then released
to the adjoining waterway
• Buffers maintained around the
waterway, will help sustain the
quality of the water in the lakes
• Wildlife and vegetation was
identified as preservation areas
Sago Farms
Preservation of a Champion Black Oak tree
Fallen trees and rotting logs remained in the interest of wildlife habitat
Mathews Green
Significant Achievement
• Low impact development design style preserving 17 acres of trees and forest
• BMP/detention ponds were constructed on the developed portion of the site to
reduce the rate of stormwater discharge and promote water quality
• Protection of existing wetlands and forest
• Parks and larger urban forest areas are strategically placed within the
community
Great Neck Middle School
Significant Achievement
Building footprint maximizes open space and minimizes impervious surfaces
Great Neck Middle School
• High performance "Green "building designed for LEED Gold certification
• Landscape designed to promote buffers of natural planting materials
• High energy conservation for both economic and environmental stewardship
• Exterior light shelving placed according to solar orientation and desirable interior
light levels
• Electrical distribution rooms strategically placed to reduce wire sizes, voltage drop,
etc. which overall reduces energy used.