HomeMy WebLinkAboutAPRIL 20, 2010 WORKSHOP MINUTESCITY OF VIRGINIA BEACH
"COMMUNITY FOR A LIFETIME"
CITY COUNCIL
MAYOR WILLIAM D. SESSOMS, JR., At -Large
k7CE MAYOR LOUIS R. JONES, Bayside - District 4
RITA SWEET BELLI7TO, At -Large
GLENN R. DAVIS, Rose Hall - District 3
WILLIAM R. DeSTEPH, At -Large
HARRY E. DIEZEL. Kempsville - District 2
ROBERT M. DYER„ Centerville - District I
BARBARA M. HENLEY, Princess Anne - District 7
JOHN E. UHRIN, Beach - District 6
ROSEMARY WILSON, Ai -Large
JAMES L. WOOD, Lynnhaven -District 5
CITY COUNCIL APPOINTEES
('ITY MANAGER - JAMES K. SPORE
CITY ATTORNEY - MARK D. STILES
CITY ASSESSOR - JERALD BANAGAN
CITY AUDITOR - LYNDON S. REMIAS
CITY CLERK - RUTH HODGES FRASER, MMC
CITY HALL BUILDING
2401 COURTHOUSE DRIVE
VIRGINIA BEACH, VIRGINIA 23456-8005
PHONE: (757) 385-4303
FAX (757) 385-5669
E- MAIL: ctycncl@vbgov.com
CITY COUNCIL BUDGET WORKSHOP AGENDA
TUESDAY 20 APRIL 2010
I. CITY MANAGER'S BRIEFING
A. PLANNING ITEMS PENDING
Jack Whitney, Director — Planning
- Conference Room -
FY 2010-2011 MANAGEMENT RESOURCE PLAN
II. PARKS AND RECREATION - GOLF DIVISION
Cindy Curtis, Director — Parks and Recreation
Jim Keegan, Managing Principal — Golf Convergence
3:00 PM
- Conference Room - 3:15 PM
III. CAPITAL IMPROVEMENT PLAN
A. OVERVIEW
B. DEPARTMENTS
Catheryn Whitesell, Director — Management Services
1. Roadways — John Fowler, City Engineer — Public Works
2. Buildings — Dave Hansen, Deputy City Manager
3. Parks and Recreation — Cindy Curtis, Director
4. Water and Sewer — Tom Leahy, Director — Public Utilities
5. Stormwater — Dave Hansen, Deputy City Manager
6. Coastal — Phil Roehrs, Water Resources Engineer — Public Works
7. Economic and Tourism — Barry Frankenfield, Manager — Strategic Growth Area
8. Communications and Information Technology — Gwen Cowart, Director
1
MINUTE S
VIRGINIA BEACH CITY COUNCIL
Virginia Beach, Virginia
April20, 2010
Mayor William D. Sessoms called to order the CITY COUNCIL WORKSHOP in the City
Council Conference Room, on Tuesday, April 20, 2010, at 3:00 P.M.
Council Members Present:
Glenn R. Davis, William R. "Bill" DeSteph, Harry E. Diezel, Robert M. "Bob"
Dyer, Barbara M. Henley, Louis R. Jones, William D. Sessoms, Jr., John E.
Uhrin, Ron A. Villanueva, Rosemary Wilson
Council Members Absent:
James L. Wood
April 20, 2010
2
CITY MANAGER'S BRIEFING
PLANNING ITEMS PENDING
3:00 P.M.
Jack Whitney, Director of Planning, detailed the Planning Items to be heard by the City Council
in May 2010. Detailed items are hereby made a part of these proceedings.
May 11, 2010
Studio Evolve
Regent University
Bridgeway Community Church
Greater Hope of Deliverance Ministries
Internet Marketing Training Center
Drescher Development
City of Virginia Beach
Believer's House World Wide Ministries
May 25, 2010
City of Virginia Beach
Breathwaite Place, LLC
Harvest Outreach Ministries, Inc.
Virginia Beach United Methodist Church
Grace Bible Church
T -Mobile North East LLC
Chesapeake Atlantic, LLC
April 20, 2010
PLANNING ITEMS TO BE HEARD IN
MAY, 2010
Relevant Information
The applicant requests a Conditional Use
Permit for a tattoo studio within a 1,550
square foot unit.
The building where the studio is proposed
is part of a small office complex
consisting of five buildings.
The layout of the unit includes an office,
two restrooms, a waiting area, four tattoo
studios, and a break room.
• Tattooing will be 'by appointment' only.
4/19/2010
May 11 Items
• Studio Evolve (Use Permit)
• Regent University (Use Permit)
• Bridgeway Church (Use Permit)
• City / Thoroughgood House parcel
(Rezoning)
• Greater Hope (Use Permit)
• Internet Marketing (Use Permit)
• Drescher Development (Sub Variance)
• City / Comprehensive Plan Amendment -
Transportation Plan corrections
• Believers House (Use Permit)
1
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
4/19/2010"
Relevant Information
• The applicant requests a Conditional Use
Permit to allow development of the site for
a chapel and a school of divinity.
• The proposed Chapel is two -stories in
height and approximately 30,000 square
feet in floor area. Seating capacity for the
Chapel is 1,000 seats.
• The proposed buildings are of Georgian
architecture in keeping with the existing
architecture of the Regent University
campus.
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
2
BAYSIDE DISTRICT
Relevant Information
• The applicant requests a Conditional Use
Permit for a 70 -member church to operate
during Sunday mornings within the
Cinema Cafe, located in the Pembroke
Meadows Shopping Center.
• The church does not propose to utilize the
Cinema Cafe unit of the shopping center
any other days than Sunday.
• The main theater, where the church
services are held, has 144 seats. There are
two other theaters, which will hold the
education classes, the nursery, and a
children's church.
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
4/19/2010
3
Greater� ppq is pf
Deliverance Mim!tncs
CW MCMun•
ROSE HALL DISTRICT
4/19/2010
Relevant Information
On February 13, 2007, the City Council
approved the acquisition of this site upon the
request of the Board of Governors overseeing
the Adam Thoroughgood House, the Board of
Governors of the Lynnhaven River 2007
Executive Committee, the Thoroughgood
Civic League, the Daughters of the American
Revolution — Adam Thoroughgood House
Chapter, the Princess Anne County — Virginia
Beach Historical Society, and the Open Space
Subcommittee.
To protect the parcel consistent with its
purpose, a Change of Zoning from R-40
Residential District to P-1 Preservation
District is proposed.
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
4
Relevant Information
• The applicant requests a Conditional Use
Permit to allow a church to occupy the
east side of an existing building totaling
2,800 square feet.
The church currently occupies the unit
and was unaware of the need for a
Conditional Use Permit.
The western portion of the building is
already occupied by a church, which was
granted a Conditional Use Permit by City
Council in October 2007.
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
4/19/2010
Li
Relevant Information
The applicant requests a Conditional Use
Permit to allow a computer oriented
training center within a small office
complex. This center provides training for
use of websites and online marketing of
businesses.
The training center will employ up to ten
individuals. The hours of operation will be
8:00 a.m. until 8:00 p.m., Monday through
Friday. The average class size will be
approximately 30 students. There is one
Targe classroom which can be divided into
two smaller rooms.
5
Relevant Information
• The applicant requests a subdivision variance
to the required lot width (25 feet).
• It is the intent of the applicant to provide a 25 -
foot wide strip of land, subdivided from an
adjacent lot (owned by the applicant), from
Prosperity Road to the proposed parcel.
• The parcel is part of an illegal subdivision
recorded in 2009 (illegal because it was
created by deed instead of the required
subdivision process).
• The new lot will have one single-family
dwelling.
4/19/2010
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
6
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
Relevant Information
• The applicant requests a Conditional Use
Permit to allow a 4,500 square foot
community life center operated by the
Believer's House World Wide Ministries.
• The center will offer community outreach
and awareness, AIDS awareness, cultural
activities, diabetes education, drug
awareness and prevention, instructional
and GED classes, unwed mother
instruction, tutoring, and entertainment
such as concerts, youth events, weddings,
seminars, and mentoring programs.
4/19/2010
City of Va Beach
An Ordinance to amend the Comprehensive Plan
pertaining to Parkway typical sections, amendments
to the Primary Roadway Network Plan Map, and the
adoption by reference of the Major Street Network
Ultimate Right -of -Ways. Deferred on March 10, 2010.
7
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
City of Va. Beach
An Ordinance to amend Sections 111, 215, and 216
and add a new Section 218 to the City Zoning
Ordinance, defining electronic display billboards and
establishing requirements for suet" billboards.
Deferred on February 10 and March 10, 2010.
Comparison (Continued)
Removal of Existing
Billboards
Intensity
'Referred Ordinance' `Alternate #2'
Only atlwved as a replacement
d an existing billboard
7000 candelas maximum from
mise to sunset
500 candelas maximum frau
sunset to 1:0 a.m.
Not illuminated from 1:00 a.m
to 5:0 a.m., except for
emergency or public notices
Where visible from a Residential
o Apartment District. Council
may require no Rumination from
midnight to 5:0 a.m.
All on-site billboards must be
removed pus off-site billboards
must be removed equal to 2
times the sign area of the
proposed digital billboard
5000 candelas maximum from
sunrise to sunset
SAME
SAME
Where visible from a Residential
a Apartment Distract - no
illumination allowed from 10:0
p.m. to 6'.0 a.m.
4/19/2010
May 25 Items
• City - Billboard Amendment
• Breathwaite (Street Closure and Rezoning)
• Harvest Outreach (Modification of Use
Permit)
• V.B. United Methodist (Use Permit)
• Grace Bible (Modification of Use Permit)
• City — Zoning Ordinance Amendment
(cemeteries and columbariums)
• T -Mobile Edison (Use Permit)
• Chesapeake Atlantic (Modification of
Rezoning)
Comparison of Versions
'Referred Ordinance'
No greater then westing
bllbord. Coulee may require a
lesser mea.
Not allowed within the Transit
Extension Study area
'Alternate 42'
Allowed only as a replacement
of an existing standard billboard
Not allowed within 400' of an
Historic and Cultural District
Not allowed within 2000 of
another digital billboard
Comparison (Continued)
'Referred Ordinance' 'Alternate 02
Moving. blinking. flashing, scrolling,
and pulsating are prohibited
All electrical service lines must be
undeegrard
NA
Support structure must be fully
screened with landscaping,
maintained in good condNon
8
Comparison (Continued)
'Referred Ordinance' 'Alternate d2.
Capable of deplapng
emergency and public safely
messages
SAME
•
•
Relevant Information
The applicant proposes to close a portion
of Newtown Road, adjacent to 732 through
746 Newtown Road and 5573 Rock Creek
Lane, which will be consolidated with the
five adjacent parcels to create a single
developable parcel.
The applicant also proposes a Change of
Zoning for the new parcel from R-7.5
Residential to Conditional A-18 Apartment
for the purpose of developing 45
townhome-style dwellings.
4/19/2010
Evaluation and
Recommendation
• Planning Staff recommended denial
• Planning Commission recommends
denial (8-3)
.4
Newtown Rd.
Breathwaite Place
�1I1L_i�
9
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
4/19/2010
PRINCESS ANNE DISTRICT
Relevant Information
The applicant is requesting a modification
to Conditions 1 and 2 of a 2008 Use Permit
for the construction of a church.
The applicant has reduced the size of the
proposed church.
Since the previous Use Permit conditions
referred to a plan for a much larger
church, the Use Permit conditions must be
modified.
The new conditions refer to the plans with
the smaller size church.
10
Relevant Information
• The applicant requests a Conditional Use
Permit for a religious use.
• The applicant's purpose in seeking a Use
Permit is to renovate the facilities of the
existing church by demolishing the
existing north wing of the building and
constructing in its place a two and three-
story multi-purpose building.
• The new building will be used for various
support and accessory uses to the
church.
4/19/2010
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
NORTH WING REPLACEMENT
11
911103. -VZ vote rnom Avokir
NORTH WING REPLACEMENT
L uWd Wilxhx
Relevant Information
• The applicant desires to modify the
conditions of the Use Permit for the church
(approved April 24, 2007) to allow the
construction of a 44,815 square foot church
with a 1,000 seat sanctuary.
• The proposed church is approximately 45,000
square feet smaller than what was approved
in 2007 and consists of 400 fewer seats than
was previously approved.
• Since the proposed church is less intense
than what was previously approved, there will
be Tess of an impact on City services and the
surrounding community.
4/19/2010
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
12
City of Va Beach
Ordinance to amend Section 501 of the CZO to allow
cemeteries, columbariums, crematories and
mausoleums as conditional uses in the R-20, R-30 and
R-40 Residential Districts.
4/19/2010
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
Relevant Information
• The applicant requests a Conditional Use
Permit to allow construction of a wireless
communications tower and related
equipment on a site that currently houses
a mini -warehouse facility.
The proposed monopole tower is 139 feet
tall (including a four foot lighting rod), and
will support flush -mounted antennas for at
least three separate wireless carriers.
13
Relevant Information
• The applicant is requesting a modification
of the Conditional Change of Zoning,
granted on October 24, 2006.
• The modification will allow for flipping the
location of the building from the northern
side of the property, which is adjacent to
other industrial uses, to the southern side
of the property, which is adjacent to
single-family dwellings.
4/19/2010
Evaluation and
Recommendation
• Planning Staff recommended approval
• Planning Commission recommends
approval (11-0)
• There was no opposition.
• Consent agenda
51.12.
Chesapeake Atlantic LLC ..
ORIGINALLY APPROVED PLAN
14
4/19/2010
Evaluation and
Recommendation
• Planning Staff recommended denial
• Planning Commission recommends
approval (10-0), with the understanding
that prior to the City Council meeting, the
applicant will revise the proffers of the
Conditional Zoning Agreement to
address the concerns of the commission.
• There was opposition.
15
3
CITY MANAGER'S BRIEFING
FY 2010-2011 MANAGEMENT RESOURCE PLAN
Parks and Recreation — Golf Division
3:20 P.M.
Cindy Curtis, Director — Parks and Recreation, introduced Jim Keegan, Managing Principal of
Golf Convergence. who gave an in-depth Golf study.
Mr. Keegan's presentation is hereby made a part of these proceedings.
April 20, 2010
I
L •
� O
Q �-
C�
I= I)
14-11
CM
Q
IC NE
L� O
Ti) 111, of onver.enc-
C
C
03 M•
a$ CD
L
CD
b C
cu
V/
W Wtto
c
>% 77,
co
03 w
O era) i
V
c
4.0
4m1 0
o s
e
c
0)
E
0)
co
c
WEI
E
0
c
O
. -
4-+
Ca
N
4-+
.-
0
1
1
i
®2010, Golf Conver•ence, nc
1
Operationai X -Ray
c
=
0
E
Q
00
d-
32%
%OZ
Indicator
Oversupplied
co
w
r1
(0
0
c
N
c
0
a)
D
Decrease in Rounds over Past 9 years
Experience < Price
Category
Market Supply
Weather
Rounds
W
co
In
In
s
3
cn
CI)
L
rto
cu
O
0•
c
CO
N
CU
L
C)
Lll
izrc
a)
CD
CU
o
L
4a
(111C11
0-
E E
0)
CU
s
v
L 1
a) L
s 0
3 0
�.c
(0 N
CL) c
Cs
T
in c
(o 4-.
IS
o .CL
1313 C/
03) 1 -
Fa
.n a
(9, o `+-
>
(a s
Q c
c
..
G) c
0 fa
o s
Z
®2010, of onver•ence
0
CD
N
O
M
LO
V
GOLF BUDGETED PROJECTIONS
Proposed
11-12
$2,380,390
2,370,752
co
La
1./)-00
0
Li)o
-U)-
0
mM
i./) -•(,)-m
0
o
N
0^
N
a)r)
lD
th
Proposed
r1
e -1N
6
r-1
$2,380,390
$2,329,869
r -I
u1
d
th
O
Ln
060
if)-
000`0E$
O
0
O
N
ih
O
N
O
LD
Budgeted
O�
O)
$2,834,784
$2,486,191
$348,593
0 L
0
O
N
-V1-
00
t./}
O
m
t/?
0
O
N
VI-
VI-
O
0
th
lii
=
a
al
OI
LL
2,182,189
2,171,439
0�
O
r�
0
0U01
O
O
`�
0
01
co
�-_-_-
d'
Oo
Oi
N
Actual
FY 08
2,670,741
2,298,791
0
Ul
01
N
000`00Z
0
O
O
O
O
CO
r -I
M
Fiscal Year
Total Revenues
Total Expenditures
Revenues Over (Under)
Expenditures
Less: Transfers Out
a
u
0
To GF Debt Service
Less: Reserves
Regular — Salary
Stumpy Lake Lease Agreement
Storm Water
Expenditures in Excess of
Revenues
02010, olf onver•ence
0
•
0)
c
a a)
co
.r3shni
C
2
>ft MO
40.
C
CO
0
N
O
v-1
C C C a
6 2b .6
r'i N Q 3, 9
1�
o 2 r' e • 8 a 0 ti •
0
U
Source: Longitudes, Inc.
02010, Golf Conver.ence, Inc
a,
E
0
U
c
-a N
o a) 4—
...c > 0
a)
c
0o = a) v'
0 )
II s_ _C o a) Q
ca C CU \ Ol D
E o' o 11 Vi
0 0 >' LD 11 L Vi
o IIA > °-
L.0 CU
II E •v t0 U
� a) 7:5o E - X
-J ago c '> W
v) Q — W Q
Ni m u7 El
N
courses:
©2010, Golf Convergence, Inc.
0
co
0
CZ 0 0
to kt,
c CNA 041
sled eigeAel+
t
cJ
0
t
CN
0
CO
0
0
C4
O
0
cy
0
a
ul
0
0
gct
0
0
a
c1
0
0
0
rc2010, Golf Conver.ence
1
o ^:;'
W
4-+ d)
co 4-•) L
•—
cu _Q ta0
O E
O 0)
A -0 a)
O c C
cu
E o a
O O O
z z z
r-1 N M
5. Customers not identified
6. Acquired/core/defectors unknown
©2010, Golf Convergence, Inc.
I>I>I>I>I>I
>I>III>IIIII
0
z
o-
0
z
0
z
0
z
0
z
0 0
z z
0
z
0
z
0
z
0
z
0
z
0
z
0
z
0
z
ju
(n
Yes
Yes
N
N
NN
N
to
Yes
Yes
Yes
Yes
Yes
Yes
Customer Analysis
Customer Distribution
Customer Demographics
Customer Retention
.. ......-.- ._
Customer Spending By Class
Customer Spending By Individual
Zip Code Analysis
Facility Analysis
Merchandise Sales By Vendor
LI3eservations By Booking Method
Reservations By Day Of Week
Revenue Benchmarks
Revenue Per Available Tee Time
Revenue Per Department
Revenue Per Hour
Round Per Revenue Margins
Utilization
111, olf Conver.encz
1
>-
co
cu
a)
aA
li bD
O
ca V) V)
CU OD
CU Q C
O �-
O
a) bD U
a3 47;
cn c
C
0_ O C
CO C
ro 67-
_ U
u_ ca
Concessionaire
a)
co Q)
co 0 t�
O
cam/) a) •c 4-
.c . '� co
E
•O
L_ u
73 0 O 1::
c6 -o
cil
Q - 'N a)
O a) E
-0 00
O c c
Q. to a) •—
. N Li) (./)
• a) tw a)
U 4 15 - :_,
C i c bp c6 Q
0) a),, # .
c LA
.c cu U Q C E 0)
4- ca a3
O �
O 0- a) 0
. _c 0
E� .§ O g
c6 , C (0 0 -I-'
tDA +-, . —
CU 0
taAIO . _
Q O c/) U v)
i D
ca O O
U .0 Cl... U U
("Ni M
©2010, Golf Convergence,
0
au
°Z;
°Z..;
au
0
V
Iunicipal
m
m
CO
1
m
CO
c -I
0
0
0
L
0
N
-(1).
18.17%
% -i
t/)-
City of
Virginia
Beach
Facility Revenues: average per 18 -holes $727,397
CO
00
m
-cn-
o
0
o
FY09 Actual
Earnings Before Interest Taxes
Depreciation Amortization
EBITDAasa %of Gross
o 610, Golf Conver.ence, Inc
1
1
1
4
c
L
to
c
:2
tai
2:4
O
ritO
au
4-0m
V
0 0 0 0
0 0 0 0
0 Li) 0 L(
dcda
s
0 0 r
0 Ln 0 ern
1 1 '
Ir'.
N �-
nfrastructure
a)
V)
0
U
CU
CO
J
C aA
a) c
a) E .
(i)a
= = -0
0 0- cu
U w w
02010, Golf Conver.ence
1
4
JJI
11 1
I
1
'4)201O. oVConver"enco.Inc
•
Household Income Demographics
Survey National
Household income ($s) Response Average Index
1 - 34,999 5% 5% 90
35,000 - 49,999 10% 10% 96
al
I-
m
up
100,000 - $249,999 41% 23% 176
$250,000 or more 3% 2% 170
0
0
ul
u1
N
01
0
0
O
N
N
N
al
Ql
Ql
Ql
Ol
61
N-
i--
O
Ol
O
O
O
O
O
in
IJ
r
u
c
0.
O
E
41
c
41
X O
73
031
73. ofa �
z a
cu
c -
° ii
ce
cu
i O.
7 cu
N
f0
2
Race/Ethnicity
Survey National
Response Average Index
92% 69% 133
African-American 3% 12% 26
I
Asian or Pacific Islander 2% 4% 51
N
LO
o
m
In
a
o
e -I
N
0
cco
L
o_
L
S
O
0 010, olf Conver.enc-
I
I
i
•
•
Net Promoter
0
c
rn
0
0"
0
tI1
N
o
O o
rn
m
o o o
LO0 0 Is)7O
0"
0
O
M
0
-°d
000 6>
.(
400J 04,
4
4i
°y
°e.
Q,
ops o,,o
10
ops
04,
�d Q,
p/,l ,b0
Iry 7
Os,� `°O
9 -P°d */</�
d/00
0,9
cy
,i
0000 O��
©2010, Golf Convergence,
o
r,c
au
E
> aJ
0. 0
O �
taCi E
sc
� 0
• r
c
0
O o
z
51)
O 0 L
E
10, Golf Convergence,
U
C
, N
U
C
N
Q)
O
C
O
0
4-
75 0
0
0
0
N
O \ \ O O O O \ O O
O O O O O O O O O O
Ql CO f� lO 1I1 M N c-1
THOUGHTS
au
0
0.
0
s
at Do Yo L' k;
Prices (VA rate)
Convenience
On course services
rc 111, olf onver.ence, In.
c%.
C
cuw
E
cc;
4.•
......0
a)O
-ci4-1
ast
0
0
c%
c%
©2010, Golf Convergence,
(1)
0)
b.O
C
N
ca
..c0
©2010, Golf Convergence,
1
1
L
13
L C
O
V ca
C3 E
LL
_O
i L_
W
n, O O W
V i >. 73
ID }, o
E
•
co C
v _C
s- cia CU
O 4--)X
Q c) L.L. c)
I
W
V
0
CC
0
4)
4--J
E
*4-1
c
0
co
4-•V
0
X
W
tai)
64-0c
0
U
Golfer/Taxpayer
ue Created
02010, Golf Conver•ence
1
4
Private Contract Management
0
00
\0
0
-1
1
r—
(875,000)
0 `_'
0
0
0
\
m
tn-
000`SLZ`E$
a)
0
m
N
>
c
o
c)
0
0
0
0
N
Status Quo
00
o
O
0
0
Ln
0
o
o
0
o
0
0
0
L.,/
N
0o
0
0
0
L.r)
N
m
Three Golf Courses
Expenditures over Revenues
Annual Income Rental Income
Capital Investment by City
General Fund Subsidy for Loan
Amortization
Capital Investment in City's
Assets by Private Management
Financial Return (After 10
Years)
Z42010, Golf Conver. ence
n
a,
I
7/1/2010 Technology integrated
ca
0
147-)
0
coF—
7/1/2010 Accounting revised consistent with golf standards
Golf Datatech and PGA Performance Trak benchmarking
Electronic marketing
a)
0
c
co
c
a)
c
co2
c
co
c
0
4J
co
L
41
(/)
E
Q
4-
(0
V
a)
4--0
CO
0
N
c
0
U
7/1/2010 Create customer database
co
c
0
c6
L
CU
S?
0
7/1/2010 Dynamic Pricing
7/1/2010 Online tee times
0
0
©201U.Golf Convergence, Inc.
1
4
CAPITAL IMPROVEMENT PLAN
OVERVIEW
Catheryn Whitesell, Director — Management Services
4:02 P.M.
Mrs. Whitesell gave a presentation on the six-year Capital Improvement Plan
consisting of Roadways, Buildings, Parks and Recreation, Water and Sewer,
Stormwater, Coastal and Communications and Technology. The presentation is
made a part of these proceedings.
April 20, 2010
ITAL IMPROVEMENT
PROGRAM WORKSHOP
/010-11 THROOCH FY2015-16
April 20, 2010
Capital
Improvement
Projects by
City Council
District
4/20/2010
1
pita' Budget
The Proposed Capital Budget decreases
from. S236.4 million to S170.5 million
ecrease of 28% or nearly $66
million in just one yea
IR y
1111110i
`rniect Financing
Pay -As -You -Go **
General Fund Undesignated Fund
Balance
Other Fund Balance/Retained
Earnings
State
Federal
Bonds/Lease Purchases
Other
$ 676,400,463 $ 341,804,375 $ 44,479,571 $ 290,116,517
140,073,902 85,981,678 9,142,224 44,950,000
136,528,195 113,663,008 22,665,187 200,000
247,206,704 169,077,059 10,481,450 67,648,195
55,403,245
937,937,882
40,879,230
49,095,245 6,308,000
393,911,189 68,014,722 476,011,971
29,887,905 9,426,325 1,565,000
Total Financin : - All Sources
$ 2,234,429,621
$ 1,183,420,459 $ 170,517,479 $ 880,491,683
• Appropriations to date reflect allocations from previous years, much of which has already been spent
Reflects pay-asyou-gofine s rtd revenues in the atin; 5,,. ,t that are dedicatedan• or State revenue that is transferred to the UP.
ion reduction in pay-as-you-go funding from the
amount planned for FY 2011.
$2.75 million reduction in funds to Storm Water projects.
o $5 million shift of bonds from Schools to City.
o Reduced use of Fund Balance by $24.5 million.
o No additional Federal stimulus funds.
4/20/2010
2
1
Economic &
Tourism,
124,903,487,
11.9%
Coastal,
38,406,557,
3.7%
Storm Water,
51,759,444,
4.9%
Water& Sewer
Utilities,
225,000,000,
21.4%
FY 2011-2016 CIP by Section
/// Communications &
Info 3,673, 9 43,673,792,
4.2%
Parks & Recreation,
85,579,952,
8.1%
Schools,
268,360,940,
25.5%
Buildings,
45,057,924,
4.3%
Roadways,
168,267,066,
16.0%
Parks& Recreation,
8,931,858,
5.2%
Buildings,
13,774,748,
8.1%
FY 2011
Water & Sewer
Utilities,
25,000,000,
14.7%
Capital Budget
Storm Water,
8,626,574,
5.1%
Coastal,
6,355,842,
3.7%
Economic &
Tourism,
19,798,556,
11.6%
Roadways,
48,377,725,
28.4%
Communications &
Info Tech,
4,635,376,
2.7%
Schools,
35,016,800,
20.5%
•
4/20/2010
3
Study/ Design
& Other
1.2%
Capital Budget
Projects by Type
Major
Equipment
2.2%
New Facilities
25.2% \;{
Site Acquisition
9.6%
Renovation/
Replacement/
Expansion
61.8%
$250
$200
$150
c
0
E
$100
$50
so
Capital Budget Financing by Source
FY 07
FY 08
FY 09
FY 10
FY 11
• Debt
• Pay -Go
■ Fund Balance
■ Utilities
• State
■ Federal
■ Other
4/20/2010
4
1
INV
$2.50
$2.00
$1.50
$1.00
$0.50
$0.00
Capital Budget Debt to Pay -Go Ratio
(Excludes Utilities)
$1.82
$1.57
$1.17
$2.20
$1.31
FY 07 FY 08 FY 09 FY 10 FY 11
1 Charter Bonds Used :;Additional Charter Bond Capacity
4/20/2010
5
0
$2,450
$2,400
$2,350
$2,300
$2,250
$2,200
$2,150
$2,100
General Government Debt per Capita
Annual Target
$2,287
$2,262 $2,295
$2,2(5
$2,213
2,369
$2,333
$2,285
$2,367
$2,318
..t2,277
"*'$Z246
Proposed CIP
40q404°s �l -roe
l 1 4 4 O O• O '' Pp.
'Od/ /Od/ a�P/ eP/ PC, 4 IPC/ Cr IPPl
PO. PO. P, 4IPO, PO.
•
Trends & Issues
o State Funding
• Reduced from peak of $32.7M in FY 07 to $10.5M in FY 11
and no permanent source of funding after that point.
• Reduced commitment to education construction
• No Oceana project funding planned for FY 12
o a Aging Infrastructure
• Buildings
Current inventory = 205 buildings; 29% > 20 years old
• Roadways
Current maintenance schedule = 24 years; desired = 15 years
12
•
4/20/2010
1
ends & Issues
Ec Aging Infrastructure (continued)
■ Water and Sewer
Consent order will require over $200 million in
expenditures to overhaul the sewer system
Sand Replenishment
■ Over the last several years, federal funding has been
nonexistent or less than the 65% per agreement
Additional Funding Needs
• Dome site development
• Headquarters Hotel
• Total Requested But Not Funded in FY 11 = $482M
1 ►cjbIighted Projects
u VB Animal Care/ Adoption Center
• #1 on list of City buildings for renovation or replacement
• $2.7M funded to date and $9.8M needed beyond FY 16
• $1.3 million in additional operating and staffing costs
• 0.4 cent increase in real estate tax rate needed to build
and operate
G7 Williams Farm Community Recreation Center
• $24.6M facility for western Bayside area
• $2.6 million in annual operating and staffing costs which
will be partially offset by $750,000 in program revenues.
• 0.7 cent increase in real estate tax rate needed to build
and operate
14
to
4/20/2010
7
Section Presentations
o Roadways - John Fowler
D Buildings - Dave Hansen
Parks and Recreation - Cindy Curtis
n Water and Sewer - Tom Leahy
E Storm Water - Dave Hansen
ID Coastal - Phi11 Roehrs
El Economic and Tourism - Barry Frankenfield
o Communications and Info Tech - Gwen Cowart
•
•
4/20/2010
8
Capital Improvement Projects by Council
District (Generalized Locations) Proposed
FY 2010-11
60 3-244
•
2-0834
66
/
7-036
2-116
2-1
2-11 8-0
2-731
4-512
3-103
2-117
r•
4-013
4-300
2-177
2-26
1-035
11 I:SIDF
1-233
7-040
■
R
7-038
4-300 ��
4-013
1-019 GINN!'11/:N
279
7-902
8-110 8-004
■ •
• 2-178
7-157
279
408
2-156
5-207
-011
234
8-008
9-182,
9-082
-049
7-145 1
7-005
6-019! 9-082,
2-178
7-016 ■ 958
8-830 7-263.8-007
3-
6EMP.S [ JJ
7-010
■
2.025
3-021
2-931
6-603
--2-048 4-0
2-035 6-60290 C �4-302
O 'ss 4-013
o9 344 i . -300
1-107
2-178
• 2-018 •
08
-026
5-1 "-
7-037 •
4-013 2-263
v 4-309 ` 4-300 414
-505 V 4-505
d 411 v-4-017 2-018
4-302
4-013
3-054
49
2-150
2-089
1-078
3-146
\3-148
3-278
4-017
"'".-4-302
L• 5-116
6-116
8-933
8-003
0.0
2-177
-262 3-175
6-1 1.12-158'
9-500 4-503'165` 6--05/
� 305 Oto
• 3-150 5-944 2-121
2-152 4-053 6-i49 •
4-080 _06
4-300
2-107 5-60
•
149 2-195
1-056
3-054
3-125
3-317
5-203
6-203 ("
LEGEND
4 BUILDINGS
• COASTAL
ECONOMIC AND TOURISM
• PARKS AND RECREATION
• ROADWAYS
• SCHOOLS
• SEWER UTILITY
▪ STORM WATER
• WATER UTILITY
COUNCIL DISTRICTS
1 1
I I
1 1
1.0
BAYSIDE
BEACH
CENTERVILLE
KEMPSVILLE
LYNNHAVEN
PRINCESS ANNE
ROSE HALL
2.0
3.0
Miles
4.0
PRINCESS ANNE
2-263
5.0
1 1
3-248
7-024
Map Copyright O 2010 Center f4 G6. City of Virginia Beach
DISCLAIMER:
The data is provided "as is" and the City cf Virginia Beach expressly disclaims all warranties,
UCC, and otherwise, express a impied including perticulor purpose, and further expressly
disclaims responsiblity fa all incidental consequential or special damages arising out of or in
connection win the use a performance of the data. The user acknowledges the disclaimer of
warranty and waives all warranties expressed a imphed rid waives any 0ght of clam for
damages incidental, consequential or special, arising out 01 or in connectlar with the use a
periamance of the data.
Capital Improvement Projects by Council District (Generalized Locations) Proposed FY 2010-11
143 Total Number of Projects shown on Map (excludes duplicate project numbers)
$100 million Total Funding in FY 2010-11 for Projects Shown on Map
$1.5 billion Total Funding in FY 2010-11/FY2015-16 for Projects Shown on Map
304 Total Number of Projects in the Proposed FY 2010-11 CIP
$1 70.5 million Total Funding in FY 2010-11 for Projects in Proposed FY 2010-11 CIP
$2.2 billion Total Funding in FY 2010-11/FY2015-16 for Projects in Proposed FY 2010-11 CIP
(Note: some projects in the Proposed CIP are not shown on the map, because they are communication and
information technology projects or city-wide pr�ects)
N N
N N
W
N N
N N
(T
2-178
2-178
2-178
2-178
, 2-178
2-178
2-178
2-178
2-177
2-177
N
2-168
2-177
N N
(T
N
Oo
2-156
2-157
N
N
2-149
2-150
N
(Al1
N N
W N
2-118
N
V
N N
0) (O
N
OV
N N
N
L
......
N_
f .� .�
OD (n
_
I 2-018
2-018
W
W
W
Project #
Major Bridge Rehabilitation- Lesner Bridge
Major Bridge Rehabilitation- Rudee Inlet
Major Bridge Rehabilitation- Long Creek
Major Bridge Rehabilitation- Pungo Ferry
Major Bridge Rehabilitation- Potter's Road Bridges
Indian River Rd - Ph. VII (1st Cities Project)(Partial)
Princess Anne Road Phase VII
Constitution Drive Extended
Highway Safety Improvement Program-Lynnhaven Pkwy. and S. Independence Blvd.
Highway Safety Improvement Program -London Bridge Rd. and Shipps Corner Rd.
Highway Safety Improvement Program -Dam Neck Rd. and Galvani Dr,
Highway Safety Improvement Program -Mill Dam Rd. from First Colonial Rd. to Great Neck Rd.
Highway Safety Improvement Program -Virginia Beach Blvd. from First Colonial Rd. to Birdneck Rd.
Highway Safety Improvement Program -Norfolk Av. from Arctic Av. to Pacific Av.
Highway Safety Improvement Program -Virginia Beach Blvd. and Stepney Ln.
Highway Safety Improvement Program -General Booth Blvd. and London Bridge Rd.
Proactive Safety Improvement Program-Kempsville Rd. to Beaufin Blvd./Brandon Blvd.
Proactive Safety Improvement Program -Holland Rd. and Windsor Oaks Bkd.
Proactive Safety Improvement Program -North Great Neck Rd. and Lynnhaven Dr.
Lesner Bridge Replacement (Partial)
Proactive Safety Improvement Program -Holland Rd. and Rosemont Rd.
Laskin Road - Ph. II (First Cities Project) (Partial)
Lynnhaven Parkway - Phase XI (VDOT) (Partial)
Holland Road - Phase VI (VDOT) (Partial)
Elbow Road Extended - Ph. II (First Cities Project)
Laskin Road - Phase 1 (VDOT) (Partial)
Lynnhaven Parkway - Phase IX (VDOT)
Nimmo Parkway -Phase V-A (VDOT)
Laskin Road Gateway - Phase I -A
Wesleyan Drive (First Cities Project)
Birdneck Road - Phase II (VDOT)
Salem Rd/Princess Anne Rd Intersection Improvement
Shore Drive Corridor Improvements - Phase II (Partial)
Shore Drive Corridor Improvements - Phase III (Partial)
Shore Drive Corridor Improvements - Phase IV
'Pembroke Area Transportation Improvements
d
Diamond Springs Road Bridge Replacement
Southeastern Parkway & Greenbelt (Partial)
Rural Road Improvements -Princess Anne Rd./Gum Bridge Rd.
Wtchduck Road - Phase II (First Cities Project)
Avalon Avenue - Avalon Woods
Princess Anne Rd./Kempsville Rd. Inter. Impr. (First Cities)
Baker Road Extended
First Colonial Rd.Na. Beach Blvd. Intersection Imp.
1-264 Great Neck Ramps
Major Intersection Improvements -International Pkwy. / Lynnhaven Pkwy.
Major Intersection Improvements -Bonney Rd./Kentucky Av.
Virginia Beach Middle School Replacement
Consolidated Old Donation Center/Kemps Landing Magnet Replacement
Princess Anne High School Replacement
Pupil Transportation Services Maintenance Facility
Kellam High School
Thoroughgood Elementary School Replacemen
Princess Anne Middle School Replacement
College Park Elementary School Replacement
John B. Dey Elementary School Modernization
Title
Bayside Lynnhaven
Beech
Lynnhaven
Princess Anne
Beach
Centerville
Princess Anne
Lynnhaven
Beach
Princess Anne
g6
•�i
-13
'
3
Centerville
Rose Hall
Lynnhaven
Bayside Lynnhaven
Rose Hall
Beach Lynnhaven
Centerville
=o
yQ
m
Centerville Princess Anne
Beach Lynnhaven
Princess Anne
Beach
Bayside Kempsville
Beach
Centerville Kempsville Rose Hall
m B
$
Bayside Kempsville Lynnhaven
'o
ry
m
Bayside
Beach Centerville Princess Anne
Princess Anne
Ke •sville
Kern.- ilk:
Kem•sville
Ba side
Beach
Beach
Beach
Beach
Rose Hall
m
Lynnhaven
Beach, Centerville
Princess Anne
=
m
m
Centerville
Dlstrlct
T
C T 227'
VOow
f71
AN
NA-+WoNNNOOOOg
IL:
b
i♦♦
♦
a
♦ ♦
♦ ♦ ►
♦ t�a=_._
4-080
4-300
.....
WVVVwwwwWw
bbbbbbbbow
A A AA
A W WA
WV
WN
w wW
wN
3-133
3-146
3-148
3-150
3-175
3-244
3-248
3-103
3-103
3-125
WS
SNOo
NNNO
w
N
1 Project #
Lynnhaven Parkway - Phase XI Water Improvements (VDOT)
Potters Road Water Improvements - 51% Program
Indian River Rd. -N. Landing Rd. Water Improvements -51%
Prosperity Road Water Improvements - 51% Program
Providence Road Water Improvements
Courthouse and Sandbridge Tank Modifications
Holland Road - Phase VI Water Improvements (VDOT)
Salem Rd./N. Landing Rd. Water Improvements - 51% Program
Beach Garden Park - Kilbome Court & Holly Road Improvements
Parks & Recreation Administration Offices Relocation
Modernization of Kempsville &Bow Creek Recreation Centers
Mount Trashmore Signature Park Renovations - Phase II
Lynnhaven Boat Ramp & Beach Facility Repairs/Renovations
Golf Courses Equipment & Infrastructure - Phase III- Red Wing
Golf Courses Equipment & Infrastructure - Phase III- Kempsville Greens
Golf Courses Equipment & Infrastructure - Phase III- Bow Creek
Community Recreation Centers Repairs & Renovations - Phase III - Kempsville
Community Recreation Centers Repairs & Renovations - Phase III - Princess Anne
Community Recreation Centers Repairs & Renovations - Phase III - Seatack
Community Recreation Centers Repairs & Renovations - Phase III - Bow Creek
Community Recreation Centers Repairs &Renovations - Phase III - Great Neck
Sportspkex Renewal & Replacement - Phase I
Community Recreation Centers Repairs & Renovations - Phase III - Bayside
Golf Courses Equipment & Infrastructure - Phase II-Kempsville Greens
Golf Courses Equipment & Infrastructure - Phase II -Bow Creek
Golf Courses Equipment & Infrastructure - Phase II -Red Wing
,Field Hockey National Training Facility Repairs & Renovations
Community Recreation Centers Repairs & Renovations - Phase II - Bow Creek
Community Recreation Centers Repairs & Renovations - Phase II - Great Neck
Community Recreation Centers Repairs & Renovations - Phase II - Kempsville
Community Recreation Centers Repairs & Renovations - Phase II - Princess Anne
Community Recreation Centers Repairs & Renovations - Phase II - Seatack
Police Fourth Precinct - Replacement (Partial)
Fire Training Center Improvements - Phase IV
Community Recreation Centers Repairs & Renovations - Phase II - Bayside
(Police Special Ops / Forensics / Evidence Complex
Virginia Aquarium Animal Care Annex (Partial)
TCC Expansion/Operation Smile Headquarters
Virginia Aquarium Renewal and Replacement - Phase II
Fire Training Center Improvements - Phase III
VA Aquarium Building Systems Rehab & Renewal - Phase!
Aquarium/Owl Creek Master Plan
Virginia Beach Fiekt House Emergency Shelter
Virginia Beach Lifelong Leaming Center (Partial)
Fire and Rescue Station - Chesapeake Beach
Fire and Rescue Station - Blackwater (Partial)
Heritage Building - Maintenance Program (Ferry Farm House)
Heritage Building - Maintenance Program (Buffington House)
Large Vehicle Repair Shop
Heritage Building - Maintenance Program (Adam Thoroughgood House)
(Heritage Building - Maintenance Program (Francis Land House)
Fire and Rescue Station - Thalia
Animal Control & K-9 Unit Replacements
Fx
Shore Drive Interim Safety Improvements
Witchduck Road - Phase I ( First Cities Project)
Greenwich Road/Cleveland Street Crossover
yWasY�im Safety m ovements - — — — - - -
M
m
Centerville
Beach
Princess Anne
Beach
Kempsvtle
Princess Anne
Princess Anne
Princess Anne
m'm
Princess Anne
Kempsville, Rose Hall
Rose Hall
Bayside
Beach
.O m
m 3
=,
m
1-m
R
= =
Princess Anne
Bayside
Rose Hall
Lynnhaven
Kempsville
Princess Anne
Beach
Kempsville
Rose Hall
Beach
Princess Anne
Kempsville
Beach
Bayside
Princess Anne
Beach
m
m
Beach
Beach
Beach
Princess Anne
Rose Hall
Bayside
Princess Anne
Bayside
Princess Anne
Princess Anne
CO
Kempsvtle
Beach Princess Anne
Bayside Lynnhaven
Kempsvtle
L Kempsvtle
o•li--•-- Anne
faA
(per
O
i�pp
pp�io
W N f0 O U
OD
W
8-282
8-830
�_$
O
8-014
8-023
W
V
g
8-003
8-004
7-157
7-902
8-002
7-145
7-153
7-040
7-049
7-010
7-016
7-024
7-033
7-035
7-036
7-037
7-038
7-039
V
to A w
O)
bow
N
Q1
6-203
6-505
D1 m m m m m
»�_ �_ bboo
U (0 O) 0 V O
Sn
o ��oi
<0 A A
(r U�
0 A
(T (T
o� 6>
N�
I 5-203
5-207
T
T t(p
P
1 Project #
Virginia Beach Amphitheater Capital Maintenance_ __
Landfill #2 - Expansion
Rudee Inlet Connector Walk
Oceana & Interfacility Traffic Area Conformity & Acquisition
19th Street Corridor Improvements
Oceanfront Garages Capital Maintenance
Town Center Garage and Plaza Capital Maintenance
Sandbridge Beach Restoration
Rudee Inlet Federal Dredging
IEastem Branch Lynnhaven River Dredging
Lynnhaven Inlet Maintenance Dredging
Sandbridge Beach Access Improvement & Sand Management
Rudee Inlet Outer Channel Maintenance Dredging
Beach Replenishment
Westem Branch Lynnhaven River Maintenance Dredging
Landfill #2 Phase I Closure
Various Minor Dredging Projects
Lynnhaven River Environmental Restoration Study
North Beach Drainage
Beach Profile Monitoring Program (Partial)
Arctic Avenue - Baltic Avenue
Lynnhaven Watershed Restoration
Aragona Village -Interim
Beach Garden Park - Kilborne Court & Holly Road Improvements
Elizabeth River Shores (Partial)
South Lake Holly Watershed
Southern Canal / Lead Ditch and Culvert Improvements
Rosemont Forest Drainage Improvements
Lawson Forest Drainage
Baler Road Culvert & Ditch Improvements
Bellamy Manor Outfall Ditch
Thoroughgood Drainage
Level Green - Interim
Witchduck Rd - Phase I Sewer Improvements
Wtchduck Rd - Phase II Sewer Improvements
North Lake Holly Watershed
1Princess Anne Rd./Kempsville Rd. Intersection Improvements
First Colonial Rd.Na. Beach Blvd. Intersection Improvements
Lotus Gardens Sewer Improvements - 51% Program
Princess Anne Plaza Rehabilitation - Phase II
Salem Rd./N. Landing Rd. Sewer Improvements - 51% Program
Indian River Rd. Sewer Improvements - Phase VII (VDOT)
Holland Road - Phase VI Sewer Improvements (VDOT)
I ndian River Rd. - N. Landing Rd Sewer Improvements - 51%
Prosperity Road Sewer Improvements - 51% Program
Princess Anne Sewer Force Main Phase IV (VDOT)
Landstown Yard Improvements - Phase IV
Princess Anne Road Water Improvements Phase IV (VDOT)
Potters Road Sewer Improvements - 51% Program
Resort Area Neighborhood Revitalization
Princess Anne Road Water Improvements - Phase VII
Resort Area Neighborhood Revitalization
First Colonial Rd.Na. Beach Blvd. Intersection Improvements
Princess Anne Rd./Kempsville Rd. Intersection Improvements
ar provemen - asevLotus Garden Water Improvements - 51% Program
Laskin Road Water Improvements - Phase I (VDOT)
Indian River Road Water Improvements - Phase VII (VDOT)
11,2111.1MIJI,11
Y d Ira is Ph I
e
Princess Anne —
Centerville
Beach
Beach Princess Anne
Beach
Beach
Lynnhaven
Princess Anne
Beach
Beach Lynnhaven
Bayside Lynnhaven
Princess Anne
Beach
Beach Lynnhaven
Bayside Lynnhaven 1
Centerville
Bayside Lynnhaven
Lynnhaven
Beach Lynnhaven
Bayside Beach Lynnhaven Princess Anne
'<
m
m
<g-
0
Bayside
Beach
Centerville Kempsville
Beach
Princess Anne
Centerville
Bayside
Bayside
Kempsville
Bayside
Centerville
Kempsville
Kempsville
Beach
3
m
Beach Lynnhaven
Princess Anne
Rose Hall
Princess Anne
Centerville
Princess Anne
Princess Anne
Beach
Princess Anne
Rose Hall
Princess Anne
Beach
Beach
Princess Anne
Beach
Beach Lynnhaven
Kempsville
Princess Anne
Beach Lynnhaven
T1 �%
m
=3.
_
1 Centerville Princess Anne 1
District
Capital Improvement Projects by Council District (Generalized Locations) Proposed FY 2010-11
5
CAPITAL IMPROVEMENT PLAN
DEPARTMENTS
4:15 P.M.
The following Departments gave presentations, all of which are attached and made part of these
proceedings:
Roadways — John Fowler, City Engineer — Public Works
Buildings — Dave Hansen, Deputy City Manager
Parks and Recreation — Cindy Curtis, Director, Brian Solis, Planning
Design and Development and Doug Carey, Staffing and Projects for
Recreation Centers
Water and Sewer — Tom Leady, Director — Public Utilities
Stormwater — Dave Hansen, Deputy city Manager
Coastal — Phil Roehrs, Water Resources Engineer — Public Works
Presentations for Economic and Tourism and Communications and Information Technology
were postponed until a later date.
April 20, 2010
m
•
FY 2011-2016 Proposed Roadways
Capital Improvement Program (CIP)
Briefing to the City Council
Public Works/Engineering
Presenters:
John Fowler, P.E., City Engineer
Phil Pullen, P.E., Transportation
Division
April 20, 2010
Overview
I. Importance of Transportation
II. Transportation Funding — "The Good and the
Bad"
III. Recent Accomplishments
IV. Proposed FY 2011-2016 Roadways CIP
- Funded Projects
- RBNF Projects
V. CIP Project Information
2
1
I. Importance of Transportation
3
Importance of Transportation
• Quality of Life
— Our citizens mobility within our City
• Economic Vitality
— Movement of Goods and Services
• Quality Physical Environment
— Transportation System: Foundational Element
• Importance to City Council
— Improve the Transportation System: Council Goal with 25
Transportation projects listed in the Goal Setting Workshop
Document
— Of the 56 Initiatives identified in the City Council Pending
Items List, 20 are Transportation Initiatives 4
2
0
11. Transportation Funding -
"The Good and the Bad"
5
rti
Transportation Funding
• State Transportation Funding has been cut,
right?
• Yes — particularly Urban Funding
• VDOT Six Year Urban Funding:
FY09 — FY14 (Original) $62.8 M
FY09 — FY14 (Revised) $10.2 M
FY10 — FY15 $0
6
3
0 •s
0
Transportation Funding (cont.)
• Urban Funding as it impacts the current and
proposed biennial budgets
Urban Funding
Original $12.3M $11.15M
Current $10.2M $0.2M
Cut $2.1M $10.95M
$10.8M
$0.2M
$10.6M
$10.8M
$0.2M
$10.6M
Total FY09-10 Cut $13.05M Total FY11-12 Cut $21.2M
Total FY 09-12 Cut $34.25M
7
,
lTransportation Funding (cont.)
The Urban Program: Primarily used to fund Targe
projects
• Fully Funded Projects
— Birdneck Road Ph II
— Lynnhaven Pkwy Ph IX
— PA/Kempsville Road Int.
— Witchduck Road Phase I
• Indefinitely Deferred Projects
— Witchduck Road Ph II
— Laskin Road Ph I
— Elbow Road Ph II
— Princess Anne Road Ph IV
— NimmoPkwyPhV-A
— Lynnhaven Pkwy Ph XI
— Wesleyan Drive
— Indian River Road Ph VII
— Holland Road Ph VI
— Laskin Road Ph II
8
4
4 ` t,
Transportation Funding (cont.)
• So overall funding amounts are Tess, right?
— Not really.
• But the Funding Environment has changed
• Focusing on Federal/State Competitively Obtained Funds
(COF)
• COF Obtained for FY2009-FY2012
— American Recovery & Reinvestment Act (ARRA) $45.4 M
— Congestion Mitigation and Air Quality (CMAQ),
Highway Safety Improvement Program (HSIP),
& Revenue Sharing (RS) $13.7 M
Total $59.1 M
9
'Transportation Funding (cont.)
• So what does this new funding provide?
ARRA IndependenceBuckerint $563K
Witchduck Rd Ph l $10.6M Northampton/Pleasure House Int $225K
PA Rd Ph IV $24.2M Norfolk Ave Sidewalk $55K
Great Neck Ramps $10.6M Mill Dam Road Sidewalk $67K
CMAQ VA Beach Blvd Sidewalk $498K
PA Rd/Salem Rd Int $1.054M General Booth/ London Bridge Int $56K
General Booth/London Bridge Int $900K Dam Neck/Galvani Dr Int $290K
S Independence/Lynnhaven Int $900K London Bridge/Shipp$ Comer Int $280K
S Independence/Dahlia Int $1.19M Lynnhaven/S. Independence Int $225K
Rosemont/Lynnhaven Int $700K VA Beach Blvd/Stepney Lane Int $76K
Indian River/Kempsville Int $1.5M Pacific Ave 5.-43f° $71K
HSIP Shore Dr Kendall to Vista $40K
Holland Rd/Windsor Oaks Int $337K Holland/Rosemontlnt $400K
N. Great Neck/Lynnhaven Int $380K General Booth/Nimmo Int $400K
Kempsville/Brandon Int $565K RS
Mediterranean/Pacific Signal $300K Nimmo Pkwy Ph V $1M
North Lynnhaven Sidewalk $450K PA/Kempsville $1M
10
5
Transportation Funding (cont.)
• Strict usage requirements for Competitively Obtained Funds
- Funds are project specific
- Use or lose deadlines
Must use Federal/State project processes and procedures with
Federal/State oversight
- Any leftover funds to be returned
• Adding it up (FY2009-FY2012)
— Urban Program Reduction - $34.25 M
— COF + $59.10 M
Net Increase + $24.85 M
11
III. Recent Accomplishments
12
6
Recent Accomplishments
• In FY 10, 11 projects completed and 6 currently under
construction
• Total Construction Cost: >$130 M
• Types: Urban Roads, Bridges, Intersection
Improvements, Sidewalk and Pedestrian Improvements
13
•
Recent Accomplishments
Lynnhaven Pkwy Ph IX $44.3M
Norfolk Ave Sidewalk
$51K
Buckner Blvd $2.2M
Indian River Rd / Elbow Rd
Intersection Improvements
$850K
Diamond Spring Road Bridge
$4.3M Providence Rd Sidewalk
$434K
7
Construction Projects in FY 11
• In FY 11, over 30 transportation projects under
construction.
• Total Project Cost: >$260 M
• Types: Urban Roadways, Intersection Improvements,
Safety improvement, Sidewalks and Pedestrian Facilities.
15
Construction Projects in FY 11
Witchduck Rd Ph 1 - $26.4M
Princess Anne Road Ph IV - $71 M
Laskin Gateway $30M
1 264 - Great Neck Ramps $23M
Princess Anne Rd/Kempsville Rd
Improvements $89.6 M
16
8
Construction Projects in FY 11
West Neck Rd Safety Improvements $5.2M
Avalon Ave Sidewalk $1.2M
Baker Road $3.2M
Rural Roads Improvements $1.5M
17
IV. Proposed Roadway
Six Year CIP
18
9
•
Proposed Roadway Six Year CIP
Highlights
• 49 Projects and Programs
• Total six year funding: $168M
• Continue to fully fund City Council's top priorities:
Princess Anne Road/Kempsville Road Intersection Improvements
Witchduck Road Phase I
Princess Anne Road Phase IV
Nimmo Parkway Phase V-A
Lynnhaven Parkway — Ph. XI (Now Fully Funded)
— Laskin Gateway
Shore Drive Phase IV
19
• Proposed Roadway Six Year CIP
Project Impacts cont.)
• Elbow Road Phase II — Reprogrammed non -committed funds
• Indian River Road Phase VII — Reprogrammed non -committed funds
• Witchduck Road Phase II — Reprogrammed non -committed funds
• First Colonial/Virginia Beach Boulevard — Some funding reprogrammed,
delayed project 2 years
• Princess Anne Road Ph VII — Delayed beyond 6 year plan
• Shore Drive Phase IV — Delayed 2 years
• Pembroke Area Transportation Improvements — Delayed 3 years
20
10
ma ° Proposed Roadway Six Year CIP
(cont.)
)
City and State Funding
FY11-16
Categories of Projects
and Programs
Congestion
Relief &
Capacity
Improvement
Projects, 61.7%,
$103,818,880
`Pavement Maintenance Program (CIP 2-
129) and its six year funding total of
$49,047,729 is now in the Operating
Budget
Safety
Improvement
Projects, 10.8%,
$18,136,650
Maintenance
Projects*,
10.4%,
$17,460,000
Special
_ Projects, 17.1%
$28,851,536
$168M
21
IP Proposed Roadway Six Year CIP
idly (FF) or Pa
Avalon Avenue - Avalon Woods (FF)
Baker Road Extended (FF)
Birdneck Road - Phase 11 (VDOT) (FF)
City Wide Street Lighting Imp. - Phase 11 (FF)
Computerized Traffic Signal System Upgrade/Rept. (FF)
*Congestion Relief/Safety Improvement Prog. Ph. I (FF)
Constitution Drive Extended (FF)
Diamond Springs Road Bridge Replacement (FF)
Elbow Road Extended - Ph. 11 (First Cities Project) (PF)
First Colonial RdNa. Beach Blvd. Int. Imp. (FF)
Greenwich Road/Cleveland Street Crossover (FF)
*Highway Safety Improvement Program (FF)
Holland Road - Phase VI (VDOT) (PF)
*These programs contain multiple projects
(cont.)
1-264 Great Neck Ramps (FF)
Indian River Rd - Ph. VII (First Cities Project) (PF)
Laskin Road - Phase 1 (VDOT) (PF)
Laskin Road Gateway - Phase 1-A (FF)
Laskin Road - Ph. II (First Cities Project) (PF)
Lesner Bridge Replacement (Partial) (PF)
Lynnhaven Parkway - Phase IX (VDOT) (FF)
Lynnhaven Parkway - Phase XI (VDOT) (FF)
Major Bridge Rehabilitation (FF)
*Major Intersection Improvements (FF)
Nimmo Parkway - Phase V-A (VDOT) (FF)
Pembroke Area Transportation Improvements (FF)
Princess Anne Rd./Kempsville Rd. Inter. Impr. (First
Cities) (FF)
22
11
Proposed Roadway Six Year CIP
(cont.)
Fully (FF) or Partially Funded
Princess Anne Road - Phase IV (VDOT) (FF)
Princess Anne Road Phase VII (PF)
*Proactive Safety Improvement Program (FF)
*Rural Road Improvements (FF)
Salem Rd/Princess Anne Rd Intersection Improvement
(FF)
Seaboard Road (FF)
Shore Drive Corridor Improvements - Phase II (PF)
Shore Drive Condor Improvements - Phase III (PF)
Shore Drive Corridor Improvements - Phase IV (FF)
*Shore Drive Interim Safety Improvements (FF)
Southeastem Parkway & Greenbelt (FF)
Street Reconstruction (FF)
`These programs contain multiple projects
Traffic Calming (FF)
'Traffic Safety Improvements - Phase III (FF)
Traffic Signal Rehabilitation (FF)
Traffic Signal Retiming (FF)
Transportation Network Analysis (FF)
Various Cost Participation Projects (FF)
Wesleyan Drive (First Cities Project) (FF)
West Neck Road Interim Safety Improvements (FF)
Wetlands Mitigation Banking (FF)
Witchduck Road - Phase I (First Cities Project) (FF)
Witchduck Road - Phase II (First Cities Project) (PF)
23
(TMProposed Roadway Six Year CIP
Birdneck Rd (1-264 to Virginia Beach Blvd)
Centerville Tumpike — Phase II (Indian River Rd to
Kempsville Rd)
Centerville Tumpike — Phase III (Kempsville Rd to
Chesapeake City Line)
Dam Neck Rd (Drakesmile Rd to London Bridge Rd)
Dam Neck Rd (Holland Rd to Drakesmile Rd)
Dam Neck Rd (Princess Anne Rd to Holland Rd)
Ferrell Parkway (Indian Lakes Blvd to Indian River Rd)
Ferrell Parkway (Indian Lakes Blvd to Pleasant Valley
Rd)
Ferrell Parkway (Pleasant Valley Rd to Salem Rd)
First Colonial Rd (Laskin Rd to Old Donation Pkwy)
General Booth Blvd (Darn Neck Rd to London Bridge Rd)
General Booth Blvd (Oceana Blvd to Dam Neck Rd)
(cont.)
General Booth Blvd (Birdneck Rd to Oceana Blvd)
General Booth Blvd (London Bridge Rd to Nimmo
Pkwy)
Holland Rd (Lynnhaven Pkwy to Shipps Comer Rd)
Holland Rd (S. Independence Blvd to S. Plaza Trail)
Holland Rd (S. Plaza Trail to Rosemont Rd)
Independence Blvd (Northampton Blvd to Haygood Rd)
Independence Blvd (Pembroke Blvd to Virginia Beach
Blvd)
Indian River Rd (Centerville Tumpike to Ferrell Pkwy)
Indian River Rd East (West Neck Rd to North Landing
Rd)
Indian River Rd West (Elbow Rd to North Landing Rd)
London Bridge Rd (Dam Neck Rd to Shipps Comer Rd)
Lynnhaven Pkwy (Holland Rd to Princess Anne Rd)
24
12
Proposed Roadway Six Year CIP
(cont.)
Newtown Rd (Baker Rd to Virginia Beach Blvd)
Nimmo Pkwy Ph 11 and III (West Neck Rd to North Landing
Rd)
Nimmo Pkwy/West Neck Pkwy (Nimmo Pkwy to North
Landing Rd)
North Great Neck Rd (Virginia Beach Blvd to Wolfsnare Rd)
North Lynnhaven Rd (Virginia Beach Blvd to Kings Grant
Rd)
North Lynnhaven Rd (Virginia Beach Blvd to Lynnhaven
Pkwy)
Princess Anne Rd (Nimmo Pkwy to North Landing Rd)
Princess Anne Rd (Providence Rd to Salem Rd)
Princess Anne Rd (Sandbridge Rd to Indian River Rd)
Providence Rd (Kempsville Rd to Princess Anne Rd)
Rosemont Rd (Buckner Blvd to Lynnhaven Pkwy)
Rosemont Rd (S. Plaza Trail to Holland Rd)
Rosemont Rd (Virginia Beach Blvd to S. Plaza Trail)
Salem Rd (Elbow Rd to North Landing Rd)
Sandbridge Rd (Princess Anne Rd to Lotus Dr)
Seaboard Rd (Princess Anne Rd to Princess Anne Rd)
Shore Dr (Norfolk City Line to Diamond Springs Rd)
Silina Dr (Rosemont Rd to S. Lynnhaven Rd)
South Independence Rd (Holland Rd to S. Plaza Trail)
Virginia Beach Blvd (1-264 to First Colonial Rd)
West Neck Pkwy (North Landing Rd to Elbow Rd)
Total Project Cost: $1.4 B
25
ti
V. CIP Project Information
26
13
1
Safety Improvement Projects/
Programs
Avalon Avenue - Avalon Woods
• Roadway safety improvements along Avalon Ave from Providence Rd
to Normandy Ave
• City managed project
• Fully funded
• Construction bids opened February 2010
• Currently in site acquisition
• Total project cost: $1.15M
14
}N,
Shore Drive Interim Safety
Improvements
• A combination of interim safety improvements recommended by
the Shore Drive Safety Task Force
• Improves the safety of pedestrians and drivers along the Shore
Drive Corridor in the interim until comprehensive projects can be
completed
• Projects being designed:
— Pleasure House Road Intersection Improvements (2-731.001)
— Lake Joyce Crossing (2-731.003)
• Total project cost: $1M
29
Shore Drive Interim Safety
Improvements (cont.)
• Completed Improvements:
— Jade Street Right Turn Lane
— West Great Neck Road Sidewalk Phase I
— Installed new community signs
— Installed pedestrian warning signs
— Evaluated right turn on red movements
Installed and Repaired 2,000 linear feet of sidewalk
— Refreshed crosswalk markings at all signalized intersections from
Northampton Boulevard to Great Neck Road
— Installed pedestrian countdown heads at intersections without heads
— Removed existing landscaping causing visual obstructions
— Installed solar powered pedestrian warning flashers from Kendall Street to
Vista Circle
— Installed handicap ramps and eastern crosswalk of Shore Drive at Great
Neck Road
Installed sidewalk on south side under Northampton Boulevard
— Intersection improvements at Great Neck Road
30
15
Congestion Relief/Safety
Improvements Program Phase 1
• The Congestion Relief program is for the modification/reconstruction
of intersections and roadway segments to minimize congestion and
improve safety. Most of these projects are Congestion Mitigation
and Air Quality (CMAQ) projects. The following are active projects in
this program:
Rosemont Road/Buckner Blvd Right Turn Lane (City)
General Booth Blvd and London Bridge Road (CMAQ)
— S. Independence Blvd/Lynnhaven Pkwy Intersection Improvements (CMAQ)
— S. Independence Blvd/Dahlia Drive Intersection Improvements (CMAQ)
— Rosemont Road/Lynnhaven Pkwy Intersection Improvements (CMAQ)
— Indian River Road/Kempsville Road Intersection Improvements (CMAQ)
• Total project cost: $8.7M
31
Highway Safety
Improvement Program
• This program is to provide bicycle and pedestrian safety improvements to
locations in the City using federal Highway Safety Improvement Program (HSIP)
funding. The following are active projects in the program:
Virginia Beach Boulevard Sidewalk
Norfolk Avenue Sidewalk
Mill Dam Road Sidewalk
Lynnhaven Pkwy & S. Independence Blvd
London Bridge Road & Shipps Corner Road
Dam Neck Road & Galvani Drive
Virginia Beach Boulevard & Stepney Lane
— General Booth Boulevard & London Bridge Road
— Pacific Avenue — 5th Street to 43rd Street
— Shore Drive — Kendall Street to Vista Circle
— Virginia Beach Boulevard & Mediterranean Avenue Signal
Northampton Blvd & Pleasure House Rd Intersection Improvements
— General Booth Blvd & Nimmo Pkwy Intersection Improvements
Independence Blvd & Buckner Blvd Left Turn Lane
— North Lynnhaven Sidewalk
• Total project cost: $4.4M
32
16
Proactive Safety
Improvement Program
• This program provides for safety improvements to high -accident
locations using federal Highway Safety Improvement Program
(HSIP) funds. Intersections chosen are high accident locations that
are at or near overcapacity. The following are the active projects in
the program:
- Holland Road and Windsor Oaks Boulevard
- N. Great Neck Road and Lynnhaven Drive
- Kempsville Road and Brandon Blvd/Beaufain Blvd
- Holland Road and Rosemont Road
• Total project cost: $1.7M
33
Traffic Safety Improvements
• This program provides for modification of existing roadways by constructing
turn lanes and bypass lanes, realignment of existing roadways, installing
traffic signals, installing guardrails, installing sidewalks, removing visual
obstructions, and various other traffic safety improvements. The following
are the active projects in the program:
- Holland Road RTL - West Great Neck Rd Phase II
- Cypress Ave Sidewalk Sidewalk
- Mill Dam Road LTL Roadways - Shipps Corner Safety Study
- Princess Anne Road Sidewalk - 13th Street &Atlantic Ave
Pedestrian Crosswalk
- Old Princess Anne (Bellamy to Timberlake) - Daytona Dr & Dillion Dr Sidewalk
- Old Princess Anne (Dunhill to Timberlake) - N. Lynnhaven Road Sidewalk
- Regent University Sidewalk - Independence Blvd Sidewalks
- Independence Blvd/Windsor Oaks Blvd - N. Lynnhaven Sidewalk
- Mediterranean Avenue Sidewalk (Johnson to Congress)
- Old Virginia Beach Blvd/Realty
- Donnington Road Sidewalk Lane
- Old Providence Road Sidewalk
• Total project cost: $9.9M 34
17
Citywide Street Lighting
Improvements
• Helps preserve older neighborhoods by improving nighttime
safety
• Provides greater safety on existing roadways by lighting
previously unlit areas
• Funding: $60K/yr
35
Transportation Network Analysis
• Used to develop roadway alignments for planned roadways in
advance of design activities in order to identify the project
features and preserve the project corridor. Alignments will serve
as planning tools for future development and will be used to
develop the scope of the design of the roadway
• Identification of Improvements to alleviate High Accident
Locations
• Funding: $100K/yr
36
18
Rural Roads Improvements
• Program is to improve safety
and geometrics of substandard
roads in the "rural' part of the
City.
• Two active turn lane projects.
• Princess Anne Rd and Gum
Bridge Road Left Turn Lane
• Princess Anne Rd Turn Lanes
at Pleasant Ridge Rd & West
Neck Rd
• Currently at 60% design
• Funding: $100K/yr
West Neck Road Interim Safety
Improvements
• Safety improvements in 3 phases
• Phase I — intersection improvements including a
new traffic signal and turn lanes at Indian River
Road and West Neck Road. Construction NTP
April 2010.
• Phase II — re -grading of the roadside ditches to
4:1 slope with 2:1 back slope with the addition of
shoulders and improve drainage between North
Landing Road and Signature Drive.
Construction completed Aug 2009.
• Phase III — re -grading of the roadside ditches
with the addition of shoulders between
Signature Drive and Indian River Road. Tree
removal at the southernmost curve to allow
increased sight distance. Project to be
constructed with Kellam HS R/W improvements,
scheduled to begin Spring 2011.
• Total project cost: $5.2M
19
Special Programs/Projects
39
Laskin Road Gateway
• Component of the Resort Area SGA Plan
• Improvements along segments of Laskin Road, 32nd Street, Holly
Road, and Arctic Avenue
• Phase 1 and 2 under construction
• Phases 3 and 4 currently in design
• Total project cost: $30M
• City managed project
• Fully Funded
40
20
Diamond Springs Road Bridge
Replacement
• Fully funded
• Currently under construction,
approximately 70% complete
• Construction scheduled to be
complete in August 2010
• Total project cost: $4.3M
Computerized Traffic Signal System
Upgrade/Replacement
• New Computerized Traffic System
• Updating the current Vehicle Management System to help
accommodate usage of the latest software and effectively handle the
364 signalized intersection in the City
• New system will consist of a network of components including a
central computer, communications cable, traffic signal controllers,
vehicle detectors, and related devices all feeding into a new Traffic
Management Center (TMC)
• Help reduce congestion between 5-15% in other municipalities
• Started in October 2008
• Fully funded
• Total project cost: $23.9M
• Final phase is 92 miles of fiber optic and 40 closed circuit TV
cameras and video wall: Completion in September 2010. 42
21
Traffic Signal Retiming
• Part of the approved plans and programs developed by the Regional
Metropolitan Transportation Planning Organization as a means of
attaining State air quality standards
• Project will retime and optimize traffic signal timings on 251 selected
signalized intersections in the City, of a total 360 intersections.
• Improves traffic progression, reduce delay, decrease trip time, and
reduce vehicle emissions
• Total project cost: $1.8M
43
{z:
Lesner Bridge Replacement
• Funded through design
• Design is approximately 90% complete
• Environmental document is ready for FHWA approval
• Total project cost: $90M
44
22
Pembroke Area Transportation
Improvements
• Implementation of
Pembroke Area
Transportation Study
• Initial improvements
include various
intersection improvements
such as:
- Independence Blvd./I-
264 Ramp Modifications
-Independence
Blvd./Bonney Road Int.
Improvements
• Total project cost: $3.5M
Shore Drive Phase 11
• No capacity
expansion — Retains
four lane from
Pleasure House Road
to Treasure Island
Drive
• Includes safety
improvements, edge
treatments, and multi-
use paths
• City managed
• Partially funded
• Currently at 30%
design
• Total project cost:
$12M
23
Shore Drive Phase III
• No capacity
expansion — Retains
four lane from Vista
Circle to N. Great
Neck Road
• Includes safety
improvements, edge
treatments, and multi
use paths
• City managed
• Partially funded
• Currently at 30%
design
• Total project cost:
$11.1M
Shore Drive Phase IV
• No capacity
expansion — retains
four lane from Marlin
Bay Drive to East
Stratford Road
• Includes safety
improvements, edge
treatments, and multi-
use paths
• City managed
• Fully funded —
Construction to begin
FY 2014
• Currently at 30%
design
• Total project cost:
$12.8M
24
Other Special Projects
• Traffic Calming
— Annual on-going project for secondary roads and subdivision streets that
involves four phases: community awareness and education, selective
enforcement, non-physical measure with minimum fine, and installation of traffic
calming devices
• Southeastern Parkway and Greenbelt (Strategic Acquisitions)
— 11.5 miles of four -lane divided parkway in three phases from 1-264 to the City
line with Chesapeake and includes five major interchanges
• Wetlands Mitigation Banking
— Establishes and maintains the Wetland Banking System including property
acquisition, wetlands design, construction and monitoring
• Various Cost Participation Projects
— Provides the City's share of cost to enable cost sharing projects with residents
and private developers
49
Congestion Relief and
Capacity Improvement Projects
50
25
Lynnhaven Parkway Phase IX
• Six -lane highway from Holland Road to
Lishelle Place
• VDOT managed project
• Fully funded
• Currently in construction,
approximately
95% complete
• Construction scheduled
to be complete in
Spring 2010
• Total project cost: $44.3M
4
Birdneck Road Phase II
• Four -lane highway from Southern
Boulevard to General Booth Boulevard
• VDOT managed project
• Fully funded
• Currently in construction,
approximately 90% Complete
• Construction scheduled to
be complete in May 2010
• Total project cost: $49.4M
26
Witchduck Road Phase I
• Six -lane highway from
Princess Anne Road to
1-264
• ARRA Funded Project
• City managed project
• Fully funded
• Construction 10% complete
• Total project cost: $26.5M
.04"2".lQ}
t~G
Princess Anne Road Phase IV
• Four -lane parkway from
Dam Neck Road to Nimmo
Parkway
• VDOT managed project
• ARRA Funded Project
• Advertised for Construction
March 23, 2010
• Construction NTP
scheduled for July 2010
• Total project cost: $71.2M
54
27
if
Princess Anne Rd/Kempsville Rd
Intersection
• Relocate/Reconstruct
intersection to 6 -lanes
• City managed project
• Fully funded
• Construction advertisement
scheduled for
July 2010
• Currently in
site acquisition
• Total project cost: $90M
55
k
�jw:sFj2x'
1-264, Great Neck Ramps
• VDOT Interstate Project
• On/Off Ramps Signalized at
Great Neck Rd.
• ARRA Funded Project
• Construction Advertisement
March 23, 2010
• Construction NTP Scheduled
for July 2010
• Roadway, Concrete Pavement,
Drainage, Bridge Widening,
Retaining Wall
• Total Funding: $2.0M (City
Share)
56
28
.: Constitution Drive Extended
• Four -lane roadway from Columbus St to Bonney Rd
• Completes a network linkage between Columbus St and Bonney Rd
• Cost participation project with developer who is constructing the
project
• Total project cost: $8.8M
• Fully funded
• Construction
40% complete
• Construction
completion
October 2010
Buckner Boulevard Extended
• Two lane street from Buckner Farms subdivision to Holland Road
• Completes a network linkage between Rosemont Rd and Holland Rd
• Cost participation project in conjunction
with developer
• Fully funded
• Construction 95% complete
• Construction scheduled to be completed by May 2010
• Total project cost: $2.4M
29
7ej
Baker Road Extended
• Two lane street from Bulls Bay Drive to west of Holly Farms Drive
• Completes a network linkage between Newtown Rd and Witchduck Rd
• City managed Project
• Fully funded
• Construction Advertisement Scheduled for June 2010
• Currently in site acquisition
• Total project cost: $3.2M
At
o0
os 0_
(a
59'
Salem Rd/Princess Anne Rd
Intersection Improvement
• Fully funded
• CMAQ Project
(Federally Funded)
• Construction 25%
Complete
• Total project cost:
$1.1M
Elk/ A lift.
30
Nimmo Parkway Phase V-A
• Four -lane roadway from
Princess Anne Road to
General Booth Boulevard
• VDOT managed project
• Funded through site
acquisition
• Construction scheduled to
begin July 2011
• Total project cost: $63.1M
61
kl
f Lynnhaven Parkway Phase XI
• Four -lane highway from Indian
River Road to Centerville Turnpike
• VDOT managed project
• Construction previously beyond
program; now fully funded for
construction start July 2013
• Total project cost: $41.1M
62
31
vli er^,er^,7 .,
Wesleyan Drive
• Links to Burton Station
Strategic Growth Area
• Working in conjunction
with City of Norfolk
• Four -lane roadway from
Baker Road to
Northampton Boulevard
• City managed project
• Fully funded
• Construction scheduled
for Fall 2012
• Currently in design
• Total project cost: $8.8M
f'"
Seaboard Road
• Three -lane roadway from
Princess Anne Road to Nimmo
Parkway
• Construction to be phased with
Nimmo Parkway Phase V-A
• Total project cost: $7.3M
64
32
First Colonial Road/Va. Beach Blvd
Intersection Improvement
• Fully funded
• Currently in site
acquisition
• Construction
scheduled to begin in
FY 2014
• Total project cost:
$22.8
Major Intersection Improvements
• Bonney Road/Kentucky Avenue
— Fully funded
— Currently in
acquisition
— Construction
scheduled to begin
July 2010
— Total project cost:
$2.0M
33
ri.lCe�i�
"Major Intersection Improvements (cont.)
• Lynnhaven Pkwy/International Pkwy
— Currently designing
utility relocations
— Construction
scheduled to begin
July 2013
— Total project cost:
$8.0M
Greenwich Road/Cleveland Street
Crossover
• VDOT Interstate Project
• 1-264 Flyover connecting Greenwich Road
to Cleveland Street
• Partially Funded
• Total Cost: $3.7M (City Share)
68
34
,{61,11:474,, wA
Witchduck Road Phase 1I
• Six -lane highway from
1-264 to Virginia Beach
Boulevard
• City managed project
• Partially funded
• Currently in preliminary
design
• Total project cost:
$32M
Princess Anne Road Phase VII
• Four -lane divided
roadway from General
Booth Blvd to Sandbridge
Road
• City managed project
• Partially funded
• Design is 100%
• Currently in acquisition
• Total project cost:$19.7M
35
m
Ccs.:..=�..r.
Laskin Road Phase I
• Eight -lane highway from
Republic Road to Winwood
Drive and six -lane highway
to Oriole Drive
• VDOT managed project
• Site acquisition is complete
• Construction not funded
• Total project cost: $89.5M
lElbow Road Extended Phase II
• Four -lane highway from Dam Neck Road (near the
amphitheater) to Indian River Road
• City managed project
• Partially funded through site acquisition
• Currently in site
acquisition
• Total project cost:
$52.8M
36
Indian River Road Phase VII
• Four -lane highway from
Lynnhaven Parkway to Elbow
Road
• City managed project
• Partially funded through site
acquisition
• Currently in site acquisition
• Interim safety improvement at the
3 -way stop completed in October
2009
• Total project cost: $76.9M
•
Holland Road Phase VI
• Four -lane highway from Dam
Neck Road to Nimmo Parkway
• VDOT managed project
• Currently in site acquisition
(90% Complete)
• Construction not funded
• Total project cost: $60.4M
74
37
Laskin Road Phase 11
• Six -lane highway from
Oriole Drive to the
31St/30th Street split
• City managed project
• Design is approx 30%
complete
• Construction not funded
• Total project cost:
$22.3M
75
77
Maintenance Projects/
Programs
76
38
Q
Maintenance Projects/Programs
• Traffic Signal Rehabilitation
— Includes, but not limited to, the replacement of deteriorated and/or antiquated
components of traffic signals
• Major Bridge Rehabilitation (FY2010 & FY2011)
— Rehabilitation of bridges and overpasses
— Lesner Bridge rehabilitation
• Fender repairs
• Pile jacketing
• Concrete beam rehabilitation
— Long Creek Bridge fender repairs
— Rudee Bridge fender repairs
— Pungo Ferry Bridge fender repairs
— Funding per year: $660K
77
itl
• •,-71:-.747.,
Maintenance Projects/Programs
• Street Reconstruction
— Reconstruction of streets, as funding allows, that have reached
the end of their service life and for which maintenance is not
effective
— FY2010
• 21st & 22nd Street
• Broad Street Phase 1
• Croatan Road
• Elbow Road (City line to Indian River)
— FY2011
• Broad Street Phase 2
• Pleasure House Road
• Elbow Road (Salem Road to the bridge)
— Funding per year: $2.15M
78
39
Summary
• Transportation is a top Council and Citizen Priority
• Funding Strategies have shifted from "Formula" funds
to Competitively Obtained Funds
• Public Works is fully engaged with a full program of
improvements
79
Questions??
80
40
FY 11 Buildings
Capital Improvement Program
April 20, 2010
Replacement
Fire Apparatus,
$2,858,361,
21%
FY 11 Funding
Type of Building Project
Site Acquisition,
$1,436,000 ,
10%
Expansion &
New Facility,
$1,950,000 ,
14%
FY 11 Total: $13.77 Million
Maintenance,
Rehabilitation,
& Replacement
of Buildings,
$7,530,387,
55%
4/20/2010
1
Strategy for the FY11 Buildings CIP
➢ Focus on MRR (Maint, Rehab, & Renewal):
Maintain efficiencies and Leverage Fund
Balance
➢ Continue to develop strategies for
resourcing City's Top 13 Facility
Replacements
City Council Commitment
City Council Policy
mend a .2.9 er..,.,.
alae Ico.a ane.
r .
yam.
2.0
2.1 F lathe p lay ciCIW(b• IdOr rptat Came: m>ir.nntnea a.d repsfr of Fa :21kc n*vsrn..vie it n rymef
which protides the heal haglike PO moto.oP g and.-eaircaix Fof ne ca+o mo$smeni
2.2 nem pdiri at [;el, (.atoi yf tD II?et ih8s1nL1uq naiile^aece and mita.- ez.K as Fund :atb lar ncn prxa la.
2.3 I- is:he hnno•ter n goal at City Cr -until i . a-hlaw mcadmanot and 2* 2 Wale One, inourc that ft, C4q i
intrzt hrp is kr:Fauial and n,aveairad in unrn cnndwn 1y dtxa5ep s» 11303:1fonn raav+vd byoene<en
esaesanent suncys orge enaly sampled Pducey kxldrq sandaeta.
24 It is theof Gy Cnnncil to seek tee cxpe»on u es .r e cadoci v far lFn_nn pinones.
Willecr oxl nanals Pe am olInn.s.renftwi:rv... �y
aaa...
..e.2011a..e."
11.2.11/III".r. �..�.-�, ,r., 2 , 2
Mitabgaihkekti
11 ..,11....,....w.... .,..�a rt...p.:*** �
• �= �.� TM... a .. 1111.
P the
,.or,...P#.....,,, wm,.�apoae..,»..0 ee.mason .,....
u .. .,....a_nm.,...a. Dun. .,...e,..,.....ere . ...
1111▪ Wpe...:'"". `......bM,...a..,e.al*aow.r,
• y11•10140pYr4
11 41112,1121.114.1.2..11,.•••••.01..60.244.�an.rswrms
12 II la ae KoN awn Is nau MOM.
lm h Carta ie enra�brm en0,...611. we.1.. ✓.
set..q.a...y...cra.,aa.aaNwuen
.r.nwrma a.sM�¢ebYmsnumy..vwa
Ito m NeFa'.ae s r.nvea m{aeysti ..
u.ut_ r jam• IL�y. , Z. —.
mo.ftemars• foe.
i. at omen.
4/20/2010
2
2 Annual Maintenance and Repair
— Based on Industry Standard of
2% to 4% of Asset Replacement Value
Asset Category :Facilities
Project Description - 3367 Facility Rehab/ Replace
Amount
Encumbered
258 Facilities
4,348,172 Sq. Ft.
$175 per
Sq Ft
FY 08/09
FY -09/10
FY -10/11
090
Annual Roof Warranties
Estimated Replacement
Value
Building
Structure
Only
745,711,498
760,930,100
776,148,702
Design
067
Industry Standard
2%
14,914,229
15,212,514
15,516,764
450,000
Design
Recommended Annual
TO
203,730
Construction
044
Bldg 11 - Public Safety Electrical Upgrades and Generator
Replacement
647,000
Maintenance
Replacement Value
4%
29,828,458
30,425,027
31,033,528
086
Carpet Replace,Bldg 11,19,21,Highways & Pendleton, Art Ctr
67,300
Construction
FUNDING SOURCES
FY 08/09
FY -09/10
FY 10/11
064
Central Library Windows
Building Maintenance Budget
8,242,917
8,325,346
8,408,600
215,000
Construction
Convention Center Budget
236,637
241,170
243,582
Building Maintenance CIP's
5,529,255
5,907,471
619,807
Total
14,008,809
14,473,987
9,271,988
1.9% 1.9% 1.2%
of of of
Replacement Replacement Replacement
Value Value Value
4/20/2010
3
5ubb
Project Description - 3367 Facility Rehab/ Replace
Amount
Encumbered
Project Phase
101
17th Street Stage -Electrical Up -grade
40,000
Construction
090
Annual Roof Warranties
100,000
Bid
113
Bldg 1 & 11 -Renovation/System Replacement study
86,476
Design
067
Bldg 1 City Hall Elevators
400,000
Construction
105
Bldg 1 City Hall Roof Replacement
450,000
Design
103
Bldg 1 City Hall Windows
203,730
Construction
044
Bldg 11 - Public Safety Electrical Upgrades and Generator
Replacement
647,000
Construction
104
Building 2 -Operations - Window Replacement
457,111
Bid
086
Carpet Replace,Bldg 11,19,21,Highways & Pendleton, Art Ctr
67,300
Construction
092
Central Library Elevator Replacement
325,000
Construction
064
Central Library Windows
160,000
Construction
093
City Garage Heavy Duty Electrical Upgrades
215,000
Construction
4/20/2010
3
4/20/2010
4
sub#
Project Description - 3367 Facility Rehab/Replace
Amount
Encumbered
Project Phase
Project Phase
033
los
Contemporary Art Center Fire Alarm System Upgrades
170,000
Design
LETA HVAC system replacement
370,000
097
Contemporary Art Center Specialty Track Lighting
65,000
Construction
Bid
030
056
Contemporary Art Center Windows
925,000
Construction
Contemporary Art Center Boiler Replacement
69,000
109
Correction Center Gutter repairs
450,000
Construction
095
Ferry Farm House Renovations
95,000
Construction
066
Highways Upgrade electrical system and Generator Replace
375,000
Construction
057
Judicial Center Escalator Upgrades
400,000
Construction
102
Judicial Center -Mansard Roof- Metal Panels
1,400,000
Design
106
Judicial Center -Waterproofing -Below grade
800,000
Study/Design
112
Painting EXTERIOR -24th st stage , Coast Guard Sta Dewitt
Cottage Art Center Windows, Adam Thoroughgood House
Waste Mgt Holland Rd. & 22nd st
145,000
Construction
045
Sewer Lift Station Replacements
175,000
Construction
078
Various Brick Repairs Bldg 20, #1 & #2, PA Rec , Mun Ctr
150,000
Construction
111
Va Marine Science Museum Skylights Repair Replace
80,000
Design
TOTAL CURRENT FUNDING ENCUMBERED -3367 BUILDING
8,381,617
REHAB PROJECTS
BOTTOM LINE BALANCE IN 3367 BUILDING REHAB CIP $262,173
4/20/2010
4
Sub
Project Description 3366 - HVAC
Amount
Encumbered
Project Phase
033
Central Heat Plant Cooling Tower And Chiller
1,180,000
Construction
032
LETA HVAC system replacement
370,000
Design
Ng
Replace HVAC in Visitor Info Ctr
30,000
Bid
030
Human Services Cooling Tower
500,000
Construction
D46
Contemporary Art Center Boiler Replacement
69,000
Design
TOTAL CURRENT FUNDING ENCUMBERED FOR
3366 HVAC PROJECTS 2,149,000
BOTTOM LINE BALANCE IN 3366 HVAC 612,133
4/20/2010
4
4/20/2010
Top 13 Facility Replacements
Created May 2007
Page 27 of FY 11 Executive Summary
Top 13 Facility Replacement Priority List
Priority Project
1 Replace Animal Care and Adoption Center and K-9
Unit
2 Replace Parks and Recreation City-wide Programs
Office (currently located on Lynnhaven Parkway)
3 Relocate Resort Maintenance Compound away
from 14' Street
4 Replace Fire/Large Vehicle Repair Shop et Leroy
Drive
5 Replace Euclid Yard Buildings
6 Relocate EMS Administration Building and
Treasurer's Beach Branch
7 Replace Thalia Fire Station
8 Replace Police Special Operations/Evidence
Storage/Forensics Complex at Leroy Drive
9 Replace Parks and Recreation Landscape
Services/Parks Construction Facilities (currently
located on Lynnhaven Parkway)
10 Replace Chesapeake Beach Fire and Rescue
Station
11 Replace Police Fourth Precinct
12 Replace Public Works/Highways Modular Buildings
at Darn Neck ,..
13 Replace Blackwater Fire and Rescue Station
StatusofF2010-11 CIP
Partiallyy fuunn dee d—Animal Shelter replacement
requires future funding
Design funded — funding for construction
planned to come from swapping the City owned
property for a new building
Not funded —financing strategy is to swap City
owned property for e building and equipment
shelters
Funded for construction
Not funded
EMS portion complete -Treasurers neWranded
Funded for construction
Funded for construction
Not funded - funding for construction planned to
come from swapping the City owned property
for a new building
Funded for construction
Funded for design
Not funded
Funded for design
Animal Shelter
CONSTRUCTION COSTS
• Armada Hoffler Proposal:
• Other Project Cost/Contingencies:
Total Project Cost:
• Project funds available (CIP 3-054): $ 2,000,000
• Construction Funds Needed: $ 9,811,000
$11,061,000
750,000
$11,811,000
Personnel
FTEs
Utilities/
Maintenance
Health Services
Other Operating
Total
ANNUAL OPERATING COSTS
Current
$430,000
11
$ 60,000
$195,000
$130,000
$815,000
New
$435,000
10
$220,000
$380,000
$ 210,000
$1,245,000
Total
$865,000
21
$280,000
$575,000
$340,000
$2,060,000
Thalia Fire Station
Mixed Use Development
• Exploring Opportunities with Private
Sector Partners in the Pembroke SGA
• Opportunity to reserve City owned
Columbus St. property (post
office)for transit oriented
development (Pembroke Plan calls
for Station within walking distance)
• Leveraging City Fire Station Project
to "jump start" next phase of
Pembroke Plan
• Keeping the Fire Station Project in
alignment with desired outcomes of
the Pembroke Strategic Growth Area
Plan (Form and Density)
• Potential to develop
affordable/workforce housing, retail,
and office space in conjunction with
the Fire Station Project
ATD $5.5M
ACQ $1.5M
AVAIL $4.0M
Top 13 Facility Replacements
Created May 2007
Page 27 of FY 11 Executive Summary
Top 13 Facility Replacement Priority List
Priority Project
1 Replace Animal Care and Adoption Center and K-9
Unit
2 Replace Parks and Recreation City-wide Programs
Office (currently ?�: v r+, even Parkway)
3 Relocate Resort Maintenance Compound away
from 14" Street
4 Replace Fire/Large Vehicle Repair p at Leroy
Drive
5 Replace Euclid Yard Buildings
6 Relocate EMS Administration Building and
Treasurers Beach Branch
7 Replace Thalia Fire Station
8 Replace Police Special Operations/Evidence
Storage/Forensics Complex at Leroy Drive
9 Replace Parks and Recreation Landscape
Services/Parks Construction Facilities (currently
located on Lynnhaven Parkway)
10 Replace Chesapeake Beach Fire and Rescue
Station
11 Replace Police Fourth Precinct
12 Replace Public Works/Highways Modular Buildings
at Dam Neck
13 Replace Blackwater Fire and Rescue Station
Status as of -yn CIP
Partially funded —An Animal Shelter replacement
requires future funding
Design funded —funding for construction
planned to come from swapping the City owned
property fora new building
Not funded —financing strategy is to swap City
red property tora building ad equipment
shen
shelters
Funded for construction
Not funded
EMS portion complete -Treasurer's not funded
Funded for construction
Funded for construction
Not funded - funding for construction planned to
come from swapping the City owned property
for a new building
Funded for construction
Funded for design
Not funded
Funded for design
Y09
4/20/2010
6
Highlighted Building Projects
Y Top 13 Projects funded
• #4 - Large Apparatus Repair Shop (#3-125) $1.8M
• #8 - Design to Replace Police Special
Operations/Forensics/Evidence (#3-125) $335K
• #10 •- Design to Replace Chesapeake Beach Fire &
Rescue Station (#3-244) $755K
Maintenance, Rehab & Renewal projects funded
• Heritage Buildings (3.103) $75K
• Various Building HVAC Maint, Rehab & Renewal
(3.366) $200K
• Various Building Rehabilitation and Renewal (3.367)
$419,807
Highlighted Building Projects
➢ State Funded & Joint Projects
• Fire Training Center Improvement (3.133) $400K
• TCC -City Joint Use Library (3.175) $850K
• TCC Expansion/ Operation Smile (3.262) $700K
Equipment & Site Acquisition
• Various Site Acquisition (3.368) $1,436,000
• Fire Apparatus (3.371) $2,858,361
➢City Services
• Lighthouse Multi -Service Center (3.503) $3,946,000
4/20/2010
7
TCC -City Joint Use Library: $850K
• Joint Project w/ TCC
Approximately 17% City of total $40+M project
• 120,000 Square foot
facility
• Design being finalized
• Sept 2010 Construction
• Open Sept 2012
Fire Equipment: $2.8M
Tiller truck for the Town
Center Fire and EMS
station: $1.318M
Foam pumper: $500K
TeleSquirt: $700K
4/20/2010
8
• 4/20/2010
(Design Build: 10,800sf
A -City currently uses 2,520sf
garage but requires large
vehicle maint work to be
performed outside
r New shop will facilitate
efficient maint on large equip,
provide adequate parts storage,
& reference/admin area
➢ Frees up space which can be
reassigned for smaller vehicles
and equip
Police Complex: Leroy Road $335K
• Modernizes & Combines 3 Public Safety functions
➢ Special Operations
> Forensics
> Property & Evidence
• 32,000 sq ft
• Vehicle Processing
• Enhanced DNA
Storage
• Frees up space in
Building 11
9
a
Chesapeake Beach
Fire/EMS Station $755K
➢Current station
• Building 50+ years old
• undersized for equip
• Challenging living
situation
>New Facility
• Meet needs of equip
• Provide adequate
living, training, meetings
spaces
•Better accessibility for
response times
C
PRELIMINARY CONCEPTUAL. WE LAYOUT
Light House Center Replacement $3.94M
➢Current Facility
Inadequate storage space for winter shelter
bedding and mats.
Inadequate space for teaching life skills, job
training
One small area serving as waiting, reception,
winter shelter triage spot for clients.
Limited to serve only the single homeless,
homeless families seek services in other areas
throughout the city.
>New Facility
• Ability to increase number of services and
providers to deliver services to homeless
• Ability to serve homeless families in addition to
the single homeless
• Allow for a centralized intake process/system that
will provide a better system for services, reporting
and planning
4/20/2010
10
Strategy for the FY11 Buildings CIP
> Focus on MRR (Maint, Rehab, & Renewal):
Maintain efficiencies and Leverage fund
balance
➢ Continue to develop strategies for
resourcing City's Top 13 Facility
Replacements
0
0
4/20/2010
11
Parks and Recreation
Capital Improvement Program
TYPES OF PARKS AND RECREATION CIP PROJECTS
FY 2010-11 FY 2010-11 thru FY 2015-16
Facility Repair
& Renovation
(83.9%)
■ Facility
Replacement
(3.5%)
Facility
Development
(12.6%)
Facility Repair &
Renovation
(74.5%)
• Facility
Replacement
(4.8%)
Facility
Development
(20.7%)
4/20/2010
1
Parks and Recreation
Outdoor and Indoor System
• Parks, Natural Areas, Open Space Preservation Areas,
Trail/Linkage Corridors, and Special Use Facilities (i.e. athletic
facilities, water access sites, resort area parks)
— 4,480 acres on 287 sites
— $282,689,932 asset value per Parks and Recreation Asset Inventory
— $5.65 million/year minimum annual capital maintenance based on 2%/50 -
year replacement schedule
» Note: These figures exclude the five City -owned golf courses
• Community Recreation Centers
— 398,769 sq. ft. throughout six facilities
— $104,896,220 asset value per 2007 Facility Condition Assessment by
Applied Management Engineering, Inc.
— $3.15 million/year minimum annual capital maintenance based on 3%/35 -
year modernization schedule
OVERALL PARKS AND RECREATION CIP STRATEGY
1) Facility Condition Assessment (FCA) study implementation
by scheduling CIP projects based on the following
priorities:
— Safety & security
— Backlogged Maintenance (i.e. shelter/park building
roofs)
— Life cycle maintenance and repair (plumbing and
HVAC system renovations and conversions)
— Cyclic maintenance (painting & electrical repair)
— Component renewal (i.e. playground replacements)
2) Fund Capital Maintenance Required by Contractual Obligations and
Special Revenue Facilities
3) Develop Priority Recreation Improvements Identified by our
Residents as
Recommended in the City Council -adopted Outdoors Plan and
Bikeways and Trails Plan
4
m
4/20/2010
2
PARKS AND RECREATION CIP STRATEGY -
EXISTING PARKS FOCUS
An average of $2,439,938/year is appropriated annually to fund the capital
maintenance for existing park sites.
However, total CIP needs to address capital maintenance of existing park sites is
$3,780,971 based on the 2008 Facility Condition Assessment for major parks.
Therefore, over the next 6 years, there will be an $1,341,033 CIP funding short fall
($3,780,971/year need — average target funding 2,439,938/year) for park capital
maintenance. Consequently, an $825,000 CIP project is recommended to start to
address backlogged maintenance, redirected from recommended reduction of the
Open Space CIP project.
PARKS AND RECREATION CIP STRATEGY -
RECREATION CENTERS FOCUS
• Current estimated six year CIP appropriations are adequate to fund
building renovation and mechanical equipment replacement projects for
all six existing recreation centers including the potential Seatack
expansion project.
• Current estimated six year CIP appropriations are not adequate to fund
existing facility modernizations:
— Bow Creek modernization* Estimated $22.0 Million
— Kempsville modernization" Estimated $18.9 Million
• Note: Bow Creek and Kempsville Modernizations recommended in budget
under CIP 4.505 project
4/20/2010
3
P&R CIP PROJECTS HIGHLIGHTS
PRIMARY CORE MISSION PROJECTS
CIP 4-013: Community Recreation Centers Repairs & Renovations Ph. 2
FY 11 Funding: $2,900,000
CIP 4-016: Parks & Special Use Facilities Development & Renovations Ph.2
FY 11 Funding: $1,171,573
CIP 4-506 Parks Infrastructure Renewal and Replacement
FY 11 Funding: $825,000
CIP 4-024: Park Playground Renovations Ph.2 FY 11 Funding: $300,000
CIP 4-503: Parks & Rec. Admin. Offices (City -Wide) Relocation FY 11
Funding: $337,50;;
CIP 4-063: Athletic Fields Lighting & Renovations Ph. 2
FY 11 Funding: iS236,715
CIP 4-309: Mount Trashmore Signature Park Renovations Ph. 2
FY 11 Funding: $250,000
CIP 4-501: Athletic Fields Energy Conservation Renovations
FY 11 Funding: fS400,0C Year 1 only
CIP 4-018: Greenways, Scenic Waterways, & Natural Areas - Ph. 2
FY 11 Funding: $131,473
CIP 4-036: Tennis Court Renovations - Phase 2 FY 11 Funding: $100,000
CIP 4-504: Park Parking Lot Repairs & Renovations
FY 11 Funding: $50,00C
P&R CIP PROJECTS HIGHLIGHTS
SPECIAL REVENUE FACILITY OR
CONTRACTURAL OBLIGATION PROJECTS
• CIP 4-017: Golf Course Equipment & Infrastructure
Replacement - Phase 2
FY 11 Funding: $0
• CIP 4-053: Field Hockey National Training Center
Repairs & Renovations
FY 11 Funding: $602,664
• CIP 4-080: Sportsplex & Field Hockey National
Training Center Repairs & Renovations - Phase 1
FY 11 Funding:
• CIP 4-502: Lynnhaven Boat Ramp & Beach
Facility Repairs & Renovations - Phase 1
FY 11 Funding: $40,00C
4/20/2010
4
P&R CIP PROJECTS HIGHLIGHTS
OUTDOORS PLAN & BIKEWAYS & TRAILS PLAN PRIORITY PROJECTS
CIP 4-306: Open Space Park Development &
Maintenance - Phase 2 FY 11 Funding
$750.000
Projects Underway or Planned on Open Space Sites within
Modified Funding
- Stumpy Lake Natural Area Public Access
Improvements
- Lake Lawson & Lake Smith Natural Area
Improvements
- Marshview Park - DCR Grant Match, Construction
- Woods of Avalon Neighborhood Park
- Thalia Creek Multi -Use Water Access Site
- (Dredge Transfer Station/Canoe/Kayak/Crew Launch)
- Temporary/Transitional Maintenance
(l year of ownership, removal of hazardous trees,
etc.)
CIP 4-074: City Bikeways &Trails Plan
Implementation - Phase 1 FY 2010-11
Funding: $150,000
CIP 4-075: Pedestrian System Improvements
- Phase 1 FY 2010-11 Funding $50,000
• CIP 4-070: Open Space Program Site
Acquisition - Phase 2
FY 2010-11 Funding:
CIP 4-503: Parks & Rec. Admin. Offices (City -Wide) Relocation
Project Highlights FY 11 Funding: $337,500
Project funds design only to
relocate City Wide Office
complex to the Princess Anne
Commons - Athletic Complex.
Existing offices, storage, and
recreation service facilities date
back to World War II era (60+
years old) and are structurally,
mechanically, and electronically
in very poor condition,
overcrowded; and increasingly
difficult to maintain.
Existing facilities are utilized by
47+ P&R staff.
4/20/2010
5
CIP 4-503: Parks & Rec. Admin. Offices (City -Wide) Relocation Cont'd.
• The inadequate 9,876 s.f. of office
buildings provide less than 1/3 of the
identified need from the space
assessment. The building would include
15,000 s.f. office space + 5,000 s.f. of pre-
engineered storage space.
• Projected need based on a Facilities
Assessment and Rehabilitation/
Renovation Feasibility Study completed
by A & E consultants (HBA) in October
2001.
• This project was first proposed in the
Parks and Recreation CIP in FY 2005-06.
Photograph \o.14: Cbu-N.in of the..aad framing above me top or tx. col
skewing He tereik d.matt to the column. beam. and rakera nPased at ibis arca.
CIP REQUESTED -BUT -NOT FUNDED PROJECTS FOR FY 11
■ Williams Farm Community
Recreation Center
Design/Build
• $24,650,058
- City Bikeways and Trails
Plan Implementation Phase
I I
• $475,000
• Pedestrian System
Improvements - Phase II
$100,000
• Thalia Creek Greenway
Phase I
• $125,000
4/20/2010
6
0
CITIZEN IMPACT FROM UNDERFUNDING
CAPITAL MAINTENANCE
Capital maintenance may not be sexy but if it is not adequately funded our park
infrastructure and facilities begin to deteriorate as shown below. Our residents and
visitors are beginning to perceive our parks as:
• Unappealing
• Uncomfortable
• Unsafe
If this progresses, our residents and visitors will feel:
• Unwelcome
From a business/service provider perspective, we run the risk of then becoming:
• Uncompetitive
"Un" is not a positive prefix to be associated with Virginia Beach.
Parks and Recreation
Capital Improvement Program
4/20/2010
7
.1
m
Department of Public
Utilities
CIP Budget
2011 through 2016
Department of Public Utilities
Section 5 — Water
Section 6 — Sanitary Sewer
Actual Need: $40,000,000 / year
• Aging Infrastructure
• Regional Consent Order
Requested: $25M year 1, $40M years 2-6
• Sanitary Sewer Rate Increases Needed to
support $40M/yr CIP
4/20/2010
1
Department of Public Utilities
Deferments caused by reducing
$40M to $25 M are as fol
- Water Pumping Station and Tank
Upgrade Program (Nimmo Tank)
- Water & Sewer Pumping Station
Flow -Monitoring/Data Storage
- Sanitary Sewer Pumping Station
Modifications
FY2011 from
lows:
- Sanitary Sewer Pumping Station
Aux. Power Program
$2.5 million
$6.5 million
$3.6 million
$0.6 million
Department of Public Utilities
Capital Improvement Program
Fiscal Year Water
FY2011 $ 4,770,271
FY2012 $ 8,407,000
FY2013 $ 11,524,000
FY2014 $ 9,280,000
FY2015 $ 6,601,000
FY2016 $ 8,770,000
Total $ 49,352,271
Sanitary Sewer
$ 20,229,729
$ 31,593,000
$ 28,476,000
$ 30,720,000
$ 33,399,000
$ 31,230,000
$175,647,729
Total
$ 25,000,000
$ 40,000,000
$ 40,000,000
$ 40,000,000
$ 40,000,000
$ 40,000,000
$225,000,000
4/20/2010
2
•
I
Department of Public Utilities
Strategy
• CIP Budgets designed to address the following:
— Regulatory Compliance
— Aging Infrastructure
— Leverage Work to Meet Capacity Needs of
Strategic Growth Areas
— Coordination with other departments & agencies
Water Section
3
Department of Public Utilities
Water Section
FY 2011- FY 2016 CIP Budget
■ Evaluation / Planning,
55,175,000
13.9%
• Cost Participation
Agreements,
$180,000
0.5%
❑ Neighborhood Projects /
51% Program, $4,422,000
11.8%
• Aging Infrastructure
$17,000,700
45.5%
0 Operations & Support,
51,502,000
4.0%
0 Roadway & Stormwater
Coordination
$8,043,300
21.5%
• System Expansion -
General
$1,040,000
2.8%
Sanitary Sewer
Section
4/20/2010
4
•
Department of Public Utilities
• Aging Infrastructure
$138,417,837
78.9%
Sanitary Sewer Section
FY 2011- FY 2016 CIP Budget
• Cost Participation
Agreements,
$224,000
.1%
• Evaluation / Planning,
$3,800,000
2.2%
• System Expansion -
General,
$2,600,000
1.5%
0 Roadways &
Stormwater
Coordination,
7,916,200
4.5%
❑ Neighborhood Projects
/ 51% Program,
$16,010,000
9.1%
Operations & Support,
6,535,963
3.7 %
4/20/2010
5
u'ee� ti1,1
Storm Water FY 11
CIP Request
Program Highlights
April 20, 2010
Flood Control,
$2,234,090, 9%
Storm Water FY 11
Functions of the Program
Program Distribution - $23,947,441
Debt Services,
Transfers,
Reserve &
Customer Operations &
Services, Maintenance,
$4,307,866, $14,279,902,
18% 60%
SW Water_
Quality,
$3,125,584,
13%
2
1
m
m
Storm Water FY 11
Source of Funding — $23,947,441
SW Fees,
$21,058,267,
87.9%
Transfers,
$72,258, 0.3%
General
Funds,
$2,656,916,
11.1%
Interest,
$160,000,
0.7%
3
008
Debt Services,
Transfers,
Reserve &
Customer
Service,
$4,307,866,
18.0%
Storm Water FY 11
Funding Distribution - $23,947,441
CI P,
$8,626,574,
36.0%
Operating
Budget,
$11,013,001,
46.0%
4
2
Storm Water FY 11
Full Program
True Staff,
$2,874,328
$26,821,769
Original Budget,
$23,947,441
5
Storm Water FY 11
Full Program Distribution - $26,821,769
Debt Services,
Transfers,
Reserve &
Customer
Service,
$4,307,866,
16.1%
True Staff,
$2,874,328,
10.7%
Operating
Budget,
$11,013,001,
41.1%
OP,
$8,626,574,)
32.2%
6
3
CIP
Cash
Flow
16
14
12
10
8
6
4
2
in 0
o -2
-4
-6
<n -8
-10
- 12
-14
- 16
-18
-20
r.
Storm Water FY 11
SWU Cash Projection
•
•
•
25% LiquidityGoy_
FY 10 FY 11 FY 12 FY 13 FY 14 FY 15 FY 16
1) Based on FY11 Proposed Budget
2) Based on FY12 Proposed Budget to remove all GF subsidy
3) Based on FY12 Proposed Budget to add 30 existing GF FTE's to SWU
Debt
Services,
Transfers,
Reserve
Customer
Service
18.0%
CIP
Storm Water FY 11
CIP Section
CIP Distribution:
Original Total = $11,376,574
Revised Proposal = $8,626,574
36.0%
Returned to
General
Operating Fund,
Budget $2,750,000,
46.0% 24%
SW Water
Quality
Projects,
$2,441,494,
21%
Flood
Control
Projects,
$1,550,000,
14%
Operations &
Maintenance
, $4,635,088,
41% 8
4
•
Storm Water CIP Section
Operations & Maintenance
• 7.004 Storm Water Infrastructure Rehabilitation
— Addresses Aging Infrastructure through cleaning, repairs, and rehabilitation
• 7.067 Primary System Infrastructure Improvements
— Supplements the off road ditch cleaning program in the operating budget to
help achieve an 8 to 10 year cleaning cycle
• 7.152 Lake Management
— Includes lake maintenance activities for both dams and spillways and
sediment removal for water quality
• 7.091 Residential Drainage Cost Participation Program
- Cost sharing program for residents to install pipe to replace roadside ditches
9
•
CIP 7-004
Neighborhood
Infrastructure
Rehabilitation
Princess Anne Plaza Subdivision
Rehabilitation in Progress 65%
— Estimated Completion in 2011
Rehabilitation Process:
Review maintenance records in
work management system
• GPS Locate & identify structures
and pipes
• Clean & perform closed circuit
television inspection (CCTV)
• Review inspection and develop
repair plan
• Perform repairs
$ 3,238,800 /\
$19,432,800
m
Neighborhood Rehabilitation
Prioritization Schedule
NEIGHBORHOOD
Princess Anne Plaza
Green Run
• Aragona
• Glenwood
• Ocean Lakes
• Kings Grant
• Windsor Woods
• Indian Lakes
• Salem Woods
• Fairfield
• Salem Lakes
• Red Mill Farms
• Lagomar
• Magic Hollow
• Malibu
• Southgate
• Foxfire
• Courthouse Estates
ESTABLISHED / POPULATION
1960's/ 11,000
1970's / 19,000
1950's / 9,000
1980's / 10,000
1980's / 7,000
1960's / 9,000
1960's / 5,000
1970's / 8,000
1980's / 6,000
1970's/ 6,000
1980's/ 10,000
1980's/ 19,000
1980's/ 4,000
1970's/ 10,000
1960's/ 5,000
1980's/ 3,000
1990's/ 5,000
1990's/ 8,000
PROJECTED COMPLETION
2011
2013
2014
2015
2015
2016
2016
2017
2018
M 2018
2019
2019
2020
2021
2022
2022
2023
2023
$36.5
COST
$5.5M
$4M
$2M
$2M
$2M
$2M
$2M
$2M
$2M
$2M
$1M
$2M
$1M
$2M
$1M
$1M
$1M
$2M
11
7-067 Primary System
• :•_ Infrastructure Improvements
Storm Water Ditch Maintenance Cleaning:
• Goal is an 8 to 10 year cleaning cycle
• Typically involves heavy tree removal,
sediment removal, and permitting
237 Miles in inventory
uF
$ 810,00
$4,860,000_
6
1,
7-152 Lake Management
BMP Lake Maintenance for Water Quality
• 700 Wet Ponds and Lakes Inventoried
• Sediment Removal for Water Quality
not for Recreation or Navigation
• Inspection process used to identify
eligible lakes for prioritization
• Criteria
• Depth (less than 2.5 feet)
• Water Quality (discharging
to impaired waters)
Eligibility/Maintenance
Agreements
(ownership/responsibility)
• Easements/Property
(dedicated easements from
owner)
• Service Request and
Maintenance Cost (flood
calls/citizen impact)
$536,280 / $4,798,680
13
BMP Lake Maintenance
Prioritization Schedule
LAKE NAME PROJECTED COMPLETION
• Kingston Lake 2010
• Brigadoon Lake 2 2014
• Brigadoon Lake 3 2015
• Brigadoon Lake 4 2015
• Brigadoon Lake 5 2016
• Brigadoon Lake 6 2016
• Green Run Lake 1 2018
• Green Run Lake 2 2020
• Green Run Lake 3 2022
• Green Run Lake 4 2024
• Green Run Lake 5 2024
• Brookside Lake 2025
• West Lake Pembrook 2035
• Stratford Chase 1 2036
• Stratford Chase 2 2036
• Stratford Chase 3 2037
• Level Green Lake 1 2037
• Level Green Lake 2 2038
• Reedtown Lake (Wishart) 2039
• Rock Creek 1 2039
$17.0 Mil
COST
$0.4M
$1M
$0.5M
$0.25M
$0.2M
$0.3M
$1.5M
$1.5M
$1M
$0.75M
$0.5M
$0.5M
$6M
$0.25M
$0.5M
$0.15M
$0.5M
$0.25M
$0.75M
$0.25M
14
7
m
Storm Water CIP Section
Water Quality
7-153 Lynnhaven Watershed Restoration
(Council Priority)
7-159 Water Quality Participation Projects
(ACOE, State)
7-183 Storm Water Quality Enhancements
7-027 SWM Master Planning, Analysis, and
Inventory
15
fE
N
Storm Water CIP Section
Water Quality
$385,000 / $1,898,568
7-153 Lynnhaven
Watershed
Restoration
(Council Priority)
— Targeted Funding
Stormwater Quality
Improvements to
address elements in
the TMDL
Implementation Plan
16
8
m
Storm Water CIP Section
Water Quality
Oyster Reef
$100,000 /
$600,000
7-159 Water Quality Participation Projects
(ACOE, State)
Provides Matching funds for State and Federal
Stormwater Quality Grants & Programs
17
Storm Water CIP Section
Water Quality
7-183 Storm Water Quality Enhancements
Funds TMDL's and Stormwater Quality in
areas outside of the Lynnhaven watershed
Water Quality Retrofits
$ 1,806,494 /
$12,736,330
Public Information
18
9
111
Storm Water CIP Section
Water Quality
7-027 SWM Master
Planning, Analysis, and
Inventory
•Maintenance of
Management Master Plan
•Meet State Storm Water
Permit Inventory
Requirements
•Perform Preliminary
Drainage Analysis for
Future Capital Drainage
projects
$150,000 / $900,000
Storm Water CIP Section
Flood Control Projects
Active Flood Control Projects
• 7-040 Aragona Village
• 7-145 Arctic Avenue
• 7-049 Beach Garden Park
• 7-036 Baker Road Culvert and Ditch Improvements
• 7-037 Bellamy Manor Outfall Ditch
• 7-010 Elizabeth River Shores
• 7-014 Lawson Forest Drainage
• 7-039 Level Green Phase II
• 7-063 Neighborhood Storm Water Infrastructure Improvements
• 7-902 North Beach Drainage
• 7-005 North Lake Holly Watershed
• 7-034 Rosemont Forest Drainage Improvements
• 7-024 Southern Canal/Lead Ditch and Culvert Improvements
• 7-016 South Lake Holly Watershed
• 7-038 Thoroughgood Drainage
Install New SD Pipe Systems
Install New Roadway Culverts
Install New Pump Stations
Improve / Enhance Existing
Storm Drain Pipes and Ditches
$1,550,000 / $6,233,067
20
10
11
et
Storm Water CIP
Flood Control - Budget Cuts
CIP 7- 005 North Lake Holly Watershed $ 3,291,000
CIP 7- 016 South Lake Holly Watershed $ 6,289,000
CIP 7- 151 Cape Henry Beach Drainage (Partial) $ 6,920,000
2 FTE's $ 143,302
$16.6 M
21
Stormwater FY 2010-11
w„Msry
Resource Management Plan
Flood Control Beyond 6 Year Plan — North Lake Holly
Legend
Completed
Section I -A $ 1.22 M
Section I -B $ 2.11 M
Programmed
Section!! $ 4.37 M
Section IV $ 1.67 M
Not Funded
Section III $ 3.25 M
Section I -C $ 1.65 M
22
11
Stormwater FY 2010-11
Resource Management Pian
Flood Control Beyond 6 Year Pian — South Lake Holly
Legend
Programmed
Section III $ 2.33 M
Not Funded
Section II $ 3.72 M
Section I $ 0.53 M
Section IV $ 3.46 M
23
Stormwater FY 2010-11
Resource Management Pian
Flood Control Beyond 6 Year Plan — Cape Henry Beach
$10 M
Shore Drive
Great Neck Rd.
`C'
24
12
Storm Water FY 2010-11
Review of Current Fee Structure
SW Fees
Transfers General In
Funds
25
\........._÷
erest
FY 08
FY 09
FY 10
FY 11
Daily
$0.181
$0.201
$0.221
$0.241
Monthly
$5.43
$6.03
$6.63
$7.23
60 Days
$10.86
$12.06
$13.26
$14.46
Annual
$66.06
$73.36
$80.66
$87.96
Storm Water FY 2010-11
CIP Request
Questions ?
13
��
�t
�
1
w h4
5,
p;1
Coastal FY 11
r'
CIP Request y�
Program Highlights
April 20, 2010
}6�
T
Coastal CIP Section
FY 11
Original Target = $7,373,402
Revised Proposal = $6,380,842
City Funded
Projects,
$1,475,842,
Reduction, 20%
$992,560, 13%
Federal Cost
Participation,
$4,905,000,
67%
2
1
Coastal CIP Section
Federal Participation Projects
• 8-008 Beach Replenishment
• 8-014 Lynnhaven Inlet Maintenance
Dredging
• 8-282 Sandbridge Beach Replenishment
• 8-830 Rudee Inlet Federal Dredging
3
Coastal CIP Section
Federal Participation Projects
Beach Replenishment
■ Resort Beach from
Rudee Inlet to 89th
Street
■ Three-year (estimated )
cyclic beach
replenishment and
maintenance
ITTOO/$0.00
■ Next Replenishment
2011*
4
2
Coastal CIP Section
Federal Participation Projects
Lynnhaven Inlet Maintenance Dredging
■ Periodic maintenance
dredging of Lynnhaven Inlet
and connecting waterways
■ Cost participate with U.S.
Army Corp of Engineers
■ Three year maintenance
cycle
■ Latest dredging completed
end of Jan. 2010
$ 100,000 / $400,000
5
Coastal CIP Section
Federal Participation Projects
Sandbridge Beach Restoration
■ Long -Term federal beach
restoration and maintenance
project
■ Local funding is provided by the
Sandbridge Special Service
District and Tax Increment
Financing District funds
■ Three-year (estimated ) cyclic
beach replenishment and
maintenance
$ 4,345,000 / $27,285,000
■ Next Replenishment October 6
2011
3
Coastal CIP Section
Federal Participation Projects
Rudee Inlet Federal Dredging
• Periodic maintenance
dredging of Rudee Inlet and
connecting waterways
• Cost participate with U.S.
Army Corp of Engineers
• Two year maintenance
cycle
• Latest dredging completed
April 2010
$ 460,000 / $2,729,460
7
Coastal CIP Section
City Funded Projects
• 8-002 Beach Profile Monitoring Program (Partial)
• 8-004 Various Minor Dredging Projects
• 8-005 Western Branch Lynnhaven River
Maintenance Dredging
• 8-007 Rudee Inlet Outer Channel Maintenance
Dredging
• 8-023 Sandbridge Beach Access Improvement &
Sand Management
• 8-110 Eastern Branch Lynnhaven River Dredging
8
4
}rifr
EL
Coastal CIP Section
City Funded Projects
Beach Profile Monitoring Program (Partial)
1110 BEACH RESTORATION PROJECT
• Periodic beach profile
monitoring of portions of
the City coastline
• Surveys for Outlying
Beaches:
• Croatan Beach
• Cape Henry Beach
• Ocean Park Beach
• Chesapeake Beach
$ 0.00 / $250,000
9
Coastal CIP Section
City Funded Projects
Various Minor Dredging Projects
• Dredging of navigational
channels in various
internal waterways
located throughout the
City
• Long Creek (proper)
completed Jan. 2010
• Crab Creek completed
March 2010
$ 150,000 / $700,000
10
5
Coastal CIP Section
City Funded Projects
Western Branch Lynnhaven River Maintenance Dredging
WESTERN BRANCH
CE NNHAVEN RIVER
N
CIP OROS
cm OF VIRGINIA BEACH
PUBLIC WORKS
r
• Dredging of Western Branch
Lynnhaven River main
channel
• Project includes mechanical
dredging and truck hauling to
Whitehurst Disposal Pit
(located off of Oceana Blvd.)
• Anticipate starting project
Fall 2010
$ 0.00 / $0.00
11
Coastal CIP Section
City Funded Projects
Rudee Inlet Outer Channel maintenance Dredging
• Maintenance Dredging of
deposition basin in the outer
portion of Rudee Inlet
• Two year maintenance
cycle
• Latest dredging completed
April 2010
$ 280,000 / $ 1,629,460
12
6
Coastal CIP Section
City Funded Projects
Sandbridge Beach Access Improvements & Sand Management
• Provide improved beach
access to Sandbridge
Beach
• 54 Public beach
accesses along 5 miles of
beach front
• Construct 3 — 5 access
improvements annually
$ 225,000 / $1,650,000
13
4;47.14,
Coastal CIP Section
City Funded Projects
Eastern Branch Lynnhaven River Dredging
• Dredging of Eastern
Branch Lynnhaven River
main channel
• Project includes
mechanical dredging and
truck hauling to
Whitehurst Disposal Pit
(located off of Oceana
Blvd.)
• Anticipate starting project
Sept 2013
$ 795,842 / $3,762,637
14
7
CIP 8- 400
CIP 8- 401
Coastal CIP Section
Future Challenges
Chesapeake Beach - $8.4M
Restoration and Maintenance
Chesapeake Bay Beach Accesses $4.0M
Future Funding Requirements:
CIP 8- 008
Main Beach Replenishment $10.0M+
15
8
Coastal FY 2010-11
CIP Request
Questions ?
8
Economic Vitality
Capital Improvement Program
April 20, 2010
Economic Vitality CIP Project Types
FY 2010-11
(1(, $15,000,000
Nev., Facilities
(2(,
$32,953,987
Six Year Plan
Maintenance
(1), $900,000
Rehabilitation
(1),$1,050,000
Site
Acquisition (1),
$90,000,000
2
4/20/2010
1
Economic Vitality CIP Development
Strategy
➢ Site acquisition: The State provides $7.5 million, and the city
matches.
➢ New facility acquisition funding, for two projects: Economic
Development Investment Program (EDIP) and SGA. EDIP is
funded with a 12 cent per pack dedicated cigarette tax
funding stream.
Y Maintenance: The amphitheater is 15 years old and is
requiring some maintenance.
➢ Rehabilitation is funded utilizing Parking Enterprise Fund
revenues.
Highlighted Economic Vitality Projects
9-060 Oceana & Interfacility Traffic Area Conformity &
Acquisition supports the BRAC suggestion to modify APZ-1
density.
➢ 9-500 Virginia Beach Amphitheater Capital Maintenance
meets the Virginia Beach Development Authority
amphitheater maintenance agreement to fund 56.5% of
capital maintenance costs.
➢ 9-081 Strategic Growth Area Projects support the
Comprehensive Plan and City Council's Vision.
➢ 9-141 Economic Development Investment Program supports
the City Council goal of Growing the Economy and the
economic development strategic plan.
➢ 9-082 Oceanfront Garages Capital Maintenance allows for
needed 9th and 31" St. garage maintenance repairs.
4/20/2010
2
4/20/2010
Communications
and Information Technology
Capital Improvement Program
FY2011— FY2016
April 20, 2010
Communications and Information Technology Projects
by Strategic Business Area
Safe
Community (1),
S1,900,000
Total: $4,635,376
Quality Physical
Environment
(1), $296,152
Quality
Organization
(7), 54,004,224
Quality Physical
Environment
(1), $296,152
FY11-16
Safe
Community (2),
6
Total: $43,673,792
1
Strategy for Developing the CIT CIP
Grants / Dedicated Funding
Existing system sustainment; new system acquisition and implementation
Sustain
Encompasses hardware and software changes to existing technology based services. The goal is to keep
existing systems or applications up-to-date and viable for the continued delivery of service into the future.
Enhance
Implements new or enhanced technology solutions to meet the organization's business needs. The goal is to
provide solutions that improve system performance, enhance the user experience, or add new functionality.
Highlighted CIT Projects
• 3-142 Communications Infrastructure Replacement Ph II
• 3-602 Oracle Applications Release 12 Upgrade
— Keeps Oracle modules (financials, HR, Payroll, Benefits) at
supported version and viable for the continued delivery of
service
• 3-615 Business Revenue /Personal Property RACS
Implementation
— Replaces mainframe legacy systems
• 3-613 - Analysis of Retirement of Mainframe Applications
— Define alternative solutions for remaining historical data and
legacy applications on the mainframe
•
4/20/2010
2
Project #
Safe Community (Pg.3-18)
3.142 Communications
Infrastructure
Replacement — Ph II
3.616 Communications
Infrastructure
Replacement — Ph III
Appropriations
to Date
FY11-16
2,742,000 26,330,541
Total
Programmed
Costs
29,072,541
0 5,440,682 5,440,682
3.151 COPS Law Enforcement 800,000 0 800,000
Technology Grant
3.095 Police — Integrated Public 0 7,602,193 7,602,193
Safety RMS
3.143 Urban Area Security 4,000,000 0 4,000,000
Initiative Ph II
TOTAL 7,542,000 39,373,416 46,915,416
Quality Physical Environment (Pg.4-233)
Project #
3.091
Title
Planning — Addressing
System Integration
Appropriations
to Date
220,000
FY11-16
0 220,000
3.093 Planning—Business 0 296,152 296,152
System Integration
Implementation
TOTAL 220,000 296,152 516,152
Family and Youth Opportunities (Pg.7-1)
Project #
3.349
Title
Human Services IT
Systems Integration
Appropriations
to Date
340,500
TOTAL 340,500
FY11-16
Total
Programmed
Costs
0 340,500
0 340,500
4/20/2010
3
Project #
3.613
3.615
3.119
3.617
3.068
Quality Organization (Pg.8-2)
Title
Analysis of Retirement of
Mainframe Applications
Business Revenue/
Personal Property RACs
Implementation
Cable Access
Infrastructure
Replacement Ph 1
Cable Access
Infrastructure
Replacement Ph II
IT Network Infrastructure
Replacement Ph II
Appropriations
to Date
FY11-16
0 128,226
Total
Programmed
Costs
128,226
0 952,000 952,000
1,218,930 1,252,000 2,470,930
0 626,000 626,000
564,803 207,000 771, 803
Project #
3.602
3.207
Quality Organization (cont.)
Title
Oracle Applications
Release 12 Upgrade
Phase II Permits and
Inspections Interactive
Internet
3.334 Telecommunications
Replacement
3.138 Urban Area Strategic
Initiative (UASI)
3.052 IT Service Continuity
Appropriations
to Date
2,480,355
1,927,984
2,160,000 325,000 2,485,000
3,213,780 0 3,213,780
2,687,755 513,998 3,201,753
FY11-16
Total
Programmed
Costs
0 2,480,355
0 1,927,984
TOTAL 14,253,607 4,004,224 18,257,831
•
4/20/2010
4
New Projects - Requested But Not Funded
3.607
Data Storage and
Management for
Evidentiary Audio, Video
and Photograph Files
$392,640
Storage capacity and data management capabilities for Police audio,
video and photograph files
Migrate existing RE Management database to a supported environment
3.611
PW - Real Estate
Management Database
and Reporting System
$189,480
3.609
PW - Waste Management
System Analysis
$128,226
Analysis for development of an integrated system to support the work
processes and business operations of PW Waste mnagement.
3.604
Electronic Development
Plan Online Review System
$737,280
Provide capability to accept/review/comment/store digitally submitted
development plans and convert them to GIS format
3.605
Location Based Services
$781,240
Analysis and pilot of location based services for non-public safety
agencies
3.601
Bi -Weekly Payroll
$1,157,360
Align work week with payroll frequency by converting to a bi-weekly
payroll
3.612
PW - Banner Stormwater
Billing Analysis
$78,764
Develop automated approach to updating property ownership in the
Banner billing system as it relates to Storm Water accounts
3.610
PW - Building
Maintenance - Hansen
Building Module
$336,524
Convert historical work order data to Hansen system and add additional
licenses
3.606
Spatial Image Server
$235,960
Implement technology needed to store, manage and retrieve growing
volume of geographically referenced digital images.
3.608
PW -Contracts Database
$87,160
Develop a database to support change orders, formal notifications,
payments, etc. related to architectural/engineering contracts and
construction
3.600
Business Intelligence
$2,125,200
Analysis and implementation of business intelligence Oracle module to
support performance measurement and strategic decision-making.
FY11-FY16 Programmed Projects
Information Technology
Mainframe Retirement
Analysis
Business Revenue/ Personal 952,000
Property System
IT Service Continuity 513,998
FY11
128,226
IT Network lnfrastructure
Replacement
Planning— Business System
Integration
Police Integrated Public Safety
System
Communications
Cable Access Infrastructure
Replacement
Communications Infrastructure 1,900,000 2,500,000 18,669,000 3,261,541 2,720,341 2,720,341
Replacement Ph II & III
207,000
296,152
FY12
FY13
2,734,786 4,867,407
IMO
313,000 313,000 313,000
123:1111111211113111111
313,000 313,000
313,000
Telecommunications 325,000
Replacement
4/20/2010
5
Communications and Information Technology Capital Improvement Program
FY11-16 Proposed CIP
$25
$20
$15
$10
FY11 FY12 FY13 FY14 FY15 FY16
E Communications
■ Information Technology
Summary
• The City of Virginia Beach is a service organization.
— Technology systems and information/data are fundamental
enablers for the delivery of nearly all City services
• We tend to take for granted the effectiveness and
reliability of the systems that we operate today and the
data and information that are at our disposal to conduct
business.
• In the absence of a consistent funding plan for technology
investment it is extremely difficult to tactically or
strategically plan and execute sustainment and
modernization of City systems.
• The current level of capital investment in information
technology places a growing strain on the service
capabilities and operations of the City.
•
4/20/2010
6
Questions?
•
•
4/20/2010
6
Mayor Sessoms, Jr. DECLARED the City Council meeting ADJOURNED at 6:54
P.M
666„,L
Gloria S. Winkler, MMC
Sr. Deputy City Clerk
Ruth Hodges Fraser, MMC
City Clerk
April 20, 2010