HomeMy WebLinkAboutJANUARY 6, 2009 WORKSHOP MINUTES-1-
MINUTES
VIRGINIA BEACH CITY COUNCIL
Virginia Beach, Virginia
January 6, 2009
Mayor William D. Sessoms, Jr. called to order the CITY MANAGER'S BRIEFING re Planning Items in
the City Council Conference Room, City Hall, on Tuesday, January 6, 2009 at 4:00 P.M.,
Council Members Present:
Harry E. Diezel, Robert M. Dyer, Barbara M. Henley, Vice Mayor
Louis R. Jones, Mayor William D. Sessoms, Jr. John E. Uhrin, Ron A.
Villanueva and James L. Wood
Council Members Absent:
Glenn R. Davis [Entered: 4:03 P.M.J
William R. "Bill " DeSteph [On Vacation -out of CountryJJ
Rosemary Wilson [Entered: 4:10 P.M.J
January 6, 2009
-2-
CITYMANAGER'S BRIEFING
PLANNING ITEMS PENDING
4:03 P. M.
Jack Whitney, Director of Planning, detailed the Planning Items to be heard by the City Council in
January, 2009.
January 13, 2009
Howard Tabor
O'Doherty Enterprises
Frankee Love
January 27, 2009
Valentine and Shafer
Drescher
Barbara Irving
Barton Heritage
City
Gateway Enterprises
January 6, 2009
-3-
CITY MA NAGER `S BRIEFING
ROADWAYPROGRAM-Update
The City Manager advised the Urban Roadways Program has been identified as the City Council's top
priority. The Virginia Department of Transportation (VDOT) early in 2008, cut the State funding to the
Urban Road Program by forty four (44%) percent. Last year, during the Budget deliberations, the projects
were rearranged to make up a significant amount of that shortfall. During 2008, the City had twelve (12)
citizen information meetings on the Comprehensive Plan. The number one priority in the citizens' minds was
transportation, traffic and congestion. Just last month, the City learned the State is cutting the Urban Road
Program an additional forty-five (45%) percent. This cut is on top of the forty four (44%) percent earlier
reduction. The City is "back to the drawing board and square one "with the Urban Road Program. The City
Manager distributed correspondence of January 6, 2009, re a Public Meeting being held at the Hampton
Roads Planning District Commission to discuss the proposed revisions to the FY 2009-2014 Six-Year
Improvement Program (SYIP). Correspondence to the Hampton Roads District Administrator for the
Virginia Department of Transportation outlining priorities related to the Interstate Program and the Urban
Program was attached to this correspondence. The City Manager asked the City Council to discuss options
and provide a recommendation re the response.
John Fowler, City Engineer Public Works, discuseds Local Roadways: CapitallmprovementPrngram and
the Virginia Department of Transportation Urban Roadways Program.
Overview
Local Roadway System
Categories of Projects in the Roadway Capital Improvement Program
Funding Local Roadways
The Virginia Department of Transportation Urban Program
Reduced Urban Program Funding
Impacts of Reduced Urban Funding
Response Options to Reduced Urban Funding
The Local Roadway System is comprised of the arterial, collector and local streets in the City. The Roadways
Capital Improvement Program primarily addresses the Local Road System. There are currently 3,400 lane
miles within the Local Roadway System. within the Capital Improvement Program (CIP), there are four (4)
general categories of projects: Maintenance, Safety Improvement, Special (Lesner Bridge, Shore Drive, et
cetera) and Congestion Relief and Capacity Improvement Projects.
Local Roadways Funding Approach
To the Extend Possible
Fully Fund
Maintenance Projects
Safety Projects
Special Projects
With remaining funding, fund priority Congestion Relief and
Capacity improvements Projects (Urban and Local)
January 6, 2009
-4-
CITY MA NAGER `S BRIEFING
ROADWAY PROGRAM -Update
Mr. Fowler displayed a Chart from the Associated General Contractors of America (Change in Producer
Prices for Construction Segments, 2003-2008). The bottom line is the Consumerprice index, which is more of
a measure of general inflation, followed by the various types of construction with highways and streets the
highest increases of 66%. The long term `forecast "from Associated General Contractors ofAmerica is that
as the economy improves and construction picks up, highway construction is expected to increase 6 to 8% a
year. Mr. Fowler displayed slides depicting Funding Local Roadways and Roadways Construction.
Virginia Department of Transportation (VDOT) Urban Program Funding
VDOT mustfund maintenance, administration and general expenses
prior to funding new construction
Remaining funding available for new construction. After funding the
State share of interstate funding, the remainder is divided by formula
among.•
Primary roadway system
Secondary roadway system (Counties)
Urban roadway system (Cities)
Focus on the Virginia Department of Transportation (VDOT) Urban Projects
VDOT Urban Formula projects are typically major Congestion Relief and
Capacity Improvement Projects
Management of VDOT Urban projects
"Legacy" Urban projects are those managed by VDOT
"Urban Construction Initiative (UCI) "projects (formally First Cities
Projects) are projects managed by the City.
Urban Formula Projects in the FY 2009-2014
Six-Year Improvement Program (SYIP) and Capital Improvement Program
Fully Funded
Birdneck Road Phase II (Legacy -Under Construction)
Lynnhaven Parkway Phase IX (Legacy -Under Construction)
Princess Anne Road/ Kempsville Road Intersection (UCI -Acquisition)
Witchduck Road Phase 1(UCI -Acquisition)
Princess Anne Phase IV (Legacy -Utility Adjustments)
Nimmo Parkway Phase V-A (Legacy -Acquisition)
Witchduck Road Phase II (UCI -Design)
Partially Funded
Lynnhaven Parkway Phase XI (Legacy -Acquisition)
Laskin Road Phase I (Legacy -Acquisition)
Elbow Road Extended Phase II (UCI -Acquisition)
Indian River Road Phase VII (UCI -Acquisition)
Holland Road Phase VI (Legacy-Acquisition)
Laskin Road Phase II (UCI -Design)
January 6, 2009
-5-
CITY MANAGER `S BRIEFING
ROADWAYPROGRAM-Update
By State Code, VDOT has to fund maintenance, administration, and general expenses before they can fund
any new construction. With the funding left for new construction, the "first bite at the apple " is to match any
Federal Interstate Funds that are coming to the State and then their FY 09 Budget, which is approximately
$355-MILLION. Then by formula, set by State Code, 40% of the remainder goes to the Primary Roadway
System, 30% goes to the Urban Roadway System. The Urban Projects tend to be big Capacity Improvement
Projects. The City is in the First Cities Program. Eventually, the City will be completely managing al of the
Urban Projects. At the present time, approximately `half are still managed by the Virginia Department of
Transportation. Urban Projects managed by the City are entitled UCI Projects.
Birdneck Road Phase II
• Four-lane highway from Southern Boulevard to General Booth Boulevard
• VDOT managed project
• Total Project Cost.• $49.5-MILLION
• Fully funded
• Currently in construction (60% Complete)
• Construction scheduled to be complete in Spring 2011
Lynnhaven Parkway Phase IX
• Six-lane highway from Holland Road to Lishelle Place
• VDOT managed project
• Total Project Cost: $49-MILLION
• Fully funded
• Currently 1 construction (30% Complete)
• Construction scheduled to be complete in Summer 2011
Princess Anne Road/Kempsville Road Intersection
• Relocate/Reconstruct intersection to 6-lanes
• City managed project
• Total Project Cost: $73-MILLION
• Fully funded
• Currently in site acquisition (25% complete)
• Construction scheduled for Summer 2010
Witchduck Road Phase I
• Six-lane highway from Princess Anne Road to I-264
• Total Project Cost: $27.5-MILLION
• City managed project
• Fully funded
• Site Acquisition Complete
• Construction scheduled for Summer 2010
January 6, 2009
-6-
CITY MA NAGER `S BRIEFING
ROADWAYPROGRAM-Dpdate
Princess Anne Road Phase IV
• Four-lane parkway from Dam Neck Road to Nimmo Parkway
• VDOT managed project
• Total Project Cost: $53-MILLION
• Fully funded
• Site Acquisition Complete
• Construction scheduled for early 2010
Nimmo Parkway Phase V-A
• Four-lane roadway from Princess Anne Road to General Booth Boulevard
• VDOT managed project
• Total Project Cost: $62-MILLION
• Fully funded
• Currently in site acquisition (75% complete)
• Construction scheduled for early 2010
Witchduck Road Phase II
• Six-lane highway from I-264 to Virginia Beach Boulevard
• City managed project
• Total Project Cost: $30-MILLION
• Fully funded
• Currently in design
• Construction scheduled for Fall 2014
Lynnhaven Parkway Phase XI
• Four-lane highway from Indian River Road to Centerville Turnpike
• VDOT managed project
• Total project Cost: $31.5-MILLION
• Site Acquisition Completed
• Construction not funded
• Federalized Project/Approved NEPA document
Laskin Road Phase 1
• Eight-lane highway from Republic Road to Winwood Drive and six-lane highway to
Oriole Drive
• VDOT managed project
• Total Project Cost: $76-MILLION
• Currently in site acquisition (95% Complete)
• Construction not funded
January 6, 2009
-7-
CITY MANAGER `S BRIEFING
ROADWAYPROGRAM-Dpdate
Elbow Road Extended Phase II
• Four-lane highway from Dam Neck Road (near the amphitheater) to Indian River
Road
• City managed project
• Total Project Cost: $4.5-MILLION
• Currently in site acquisition (10% Complete)
• Construction not funded
Indian River Road Phase VII
• Four-lane highway from Lynnhaven Parkway to Elbow Road
• City managed project
• Total Project Cost.• $56.5-MILLION
• Currently in site acquisition (10% Complete)
• Interim safety improvement at the 3-way stop scheduled for construction in
January 2010
• Construction of full project not funded
Holland Road Phase VI
• Four-lane highway from Dam Neck Rod to Nimmo Parkway
• VDOT managed project
• Total Project Cost.• $53-MILLION
• Currently in site acquisition (75% Complete)
• Construction no funded
Laskin Road Phase II
• Six-lane Highway from Oriole Drive to the 31S`/30`" Street split
• City Managed project
• Total Project Cost: $13.5-MILLION
• Design start pending
• Construction not funded
VDOT URBAN PROGRAM
• The FY 2004-09 VDOT Six-Year Improvement Plan (SYIP) provided $126.5-
MILLIONin Urban Formula Funds in years 2004-09, an average of$21-MILLION
annually
• The FY 2009-14 VDOT Six-Year Improvement Plan (SYIP) provides $62.77-
MILLION in Urban Formula Funds in years 2009-14, an average of $10.46-
MILLIONannually.
• From FY 2004-09 VDOT Six-Year Improvement Plan (SYIP), Urban Formula
Funding has been reduced by just over 50%.
• The City also provides funding for urban projects and is now a major funding
partner providing $85. SS-MILLION in years 09-14.
January 6, 2009
-8-
CITY MANAGER `S BRIEFING
ROADWAYPROGRAM-Update
State Transportation Funding Reductions Continue
• Urban Funding in the FY 2009-14 VDOT Six-Year Improvement Plan (SYIP) was
already 44% less than in the FY 2008-13 Six-Year Improvement Plan (SYIP)
• An additional 45% reduction in Urban Funding is expected to the FY2009-14 Six-
Year Improvement Plan (SYIP)
• January 7, 2009 VDOT Public Hearing on Revised FY 2009-14 Six-Year
Improvement Plan (SYIP)
Mr. Fowler displayed a Chart indicating the reduced VDOT Funding Scenario. With this reduction,
Urban Formula Funding in the Six Year Improvement Plan (SYIP) will have been reduced by over
$90-MILLIONfrom the FY2004-09 Six Year Improvement Plan.
Impacts of Reductions
Remain fully funded with no schedule impact
Birdneck Road Phase II
Lynnhaven Parkway Phase L~
Princess Anne Road/Kempsville Road Intersection
Witchduck Road Phase I
Princess Anne Road Phase IV
Funding adjusted with schedule impact
Nimmo Parkway Phase V-1
Construction delayed a minimum of 18 months (087/110
Funding reduction with scheduled impact
Witchduck Road Phase II
Construction delayed beyond FY 14
Continued delay beyond FY l4
Lynnhaven Parkway Phase XI
Elbow Road Phase II
Laskin Road Phase I
Laskin Road Phase II
Holland Road Phase VI
Indian River Road Phase VII
January 6, 2009
-9-
CITY MANAGER `S BRIEFING
ROADWAYPROGRAM-Update
Possible Courses of Action (COA) in response to Urban Program Funding Reductions
COA 1: Adjusted Urban Program
A 45% reduction in Urban Formula Fund is $28,250,550
This reduces the combined VDOT/City FY2009-14 FUNDING for Urban Formula Projects form
$148, 335, 245 to $120, 084, 695
Retains top five (S) priorities
Birdneck Road Phase II
Princess Anne Road Phase IV
Princess Anne Road/ Kempsville Road Intersection
Witchduck Road Phase I
Lynnhaven Parkway Phase IX
Projects Affected
Nimmo Parkway Phase V-A -Construction delayed a minimum of I S months (8/22)
Witchduck Road Phase II -Delayed beyond the Six Year program
Continued delay beyond FY 2004
Lynnhaven Parkway Phase XI
Holland Road Phase VI
Laskin Road Phase I
Laskin Road Phase II
Elbow Road Phase II
Indian River Road Phase VII
COA2: Reallocation of Funding from other projects within the CIP
Consider reallocating funds from Non-Urban Program projects to Urban Program projects
Possible Candidates for reallocation of programmed funding to Urban Projects include:
First Colonial/Virginia Beach Boulevard (Complete Site Acquisition)
Princess Anne Road. Phase VII (Complete Site Acquisition)
Seaborad Road (Complete Utility Relocation)
Lynnhaven/International Intersection (Complete Utility Relocation)
Pembroke Area Transportation Improvements (Do not start)
Baker Road Extended (Complete Site Acquisition)
Buckner Boulevard Extended (Do not Construct)
Constitution Drive Extended (Do not Construct)
Laskin Road Gateway Phase 1 A (Do not start)
Lesner Bridge Replacement (Complete 30% Design and NEPA Document)
Shore Drive Corridor Improvements, Phases 11, III and IV (Complete Design)
SEPG (Partial site acquisition)
January 6, 2009
-10-
CITY MANAGER `S BRIEFING
ROADWAYPROGRAM-Update
COA3: Replace VDOT Urban Reductions with Local Revenues
Total: $ 128,250,550
FY 2009: $ 5, 412,150
FY 2010 $ S, 020, 650
Nimmo Parkway Phase V-A
FY2011 $ 4,867,200
Fully Funded FY 2012 $ 4, 869, 000
FY 2013 $ 4, 639, 950
Witchduck Road Phase II
FY2014 $ 3,441,600
Recommendation
CDA 1: Accept the Adjusted Urban Program
Coordinate with the Virginia Department of Transportation (VDOT) to align State and City
funding on the City's priority projects
Urban Formula Funding
Economic Stimulus funding
Urban Program - "Ready to Go "Project Candidates
Princess Anne Road/Kempsville Road Intersection)
Princess Anne Road Phase IV
Nimmo Parkway Phase V-A
Witchduck Roda Phase I
Lynnhaven Parkway Phase XI
Laskin Road Phase I
Holland Road Phase VI
January 6, 2009
-11-
ADJOURNMENT
Mayor William D. Sessoms, Jr. DECLARED the City Council Meeting ADJOURNED at 5:14 P.M.
Sandy Madis , CMC
Deputy Ciry Clerk II
th Hodge mith, MMC
City Clerk
City of Virginia Beach
Virginia
January 6, 2009