HomeMy WebLinkAboutMARCH 24, 2015 WORKSHOP MINUTES -1-
60°8, rr
ti
4y4s vt vt„e
OF OUR 1416,O
VIRGINIA BEACH CITY COUNCIL
Virginia Beach, Virginia
March 24, 2015
Mayor William D. Sessoms, Jr., called to order the CITY COUNCIL'S WORKSHOP in the City Council
Conference Room, Tuesday, March 24, 2015, at 4:00 P.M.
Council Members Present:
M. Benjamin Davenport, Robert M Dyer, Barbara M Henley, Vice
Mayor Louis R. Jones, Shannon DS Kane, John D. Moss, Amelia N.
Ross-Hammond, Mayor William D. Sessoms, Jr., Rosemary Wilson
and James L. Wood
Council Members Absent:
John E. Uhrin family vacation
March 24, 2015
-2-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
4:00 P.M.
Mayor Sessoms welcomed John Fowler, City Engineer — Public Works. Mr. Fowler expressed his
appreciation to City Council for their continued support:
CITY OF VIRGINIA BEACH
PUBLIC WORKS / ENGINEERING
NPDES MS4 PERMIT
(Clean Water Act Section 402)
Summary of Draft Permit
Presentation to City Council
March 24,2015
Below is the Executive Summary of the Program:
EXECUTIVE SUMMARY
• `NPDES M54 is our single most important WQ
Regulatory Program
• EPA/ DEQ propose significant additional
requirements with the draft 5-year permit
• City will challenge certain of the requirements&
negotiate as favorable terms as possible
• Final Permit will still likely include significant
additional requirements
• Second briefing to Councilon final permit,its
requirements,and associated resource impacts
March 24, 2015
-3-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
CONTENTS
I. NPDES MS4 Overview
II. NPDES MS4 Draft Permit Status
III. NPDES MS4 Relationship to Other Water
Quality Programs
IV. Requirements of the Draft Permit
V. Next Steps
Below is a large map of the City:
NPDES MS4 OVERVIEW
Ir
Ni)
March 24, 2015
-4-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
Below are the Storm Drain Pipes within the Municipal Center. City-wide, there are approximately 2,200
miles of Storm Drain Pipes, 600 miles of ditches, `thousands of Stormwater Inlets and 5,000 Stormwater
Outfalls :
Municipal Center
y' r
Y / 44(
Under the Clean Water Act, Storm Drain Pipes are considered a Pollution Discharge System and
requires an EPA permit:
•
ilt-*.*" "If
i
March 24, 2015
-5-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
Below is an overview of National Pollutant Discharge Elimination System (NPDES):
NPDES MS4 OVERVIEW
• NPDES—National Pollutant Discharge
Elimination System
• NPDES—a Federal Regulatory program under
Section 402 of the Clean Water Act
• NPDES—requires a permit to Discharge
Pollutants
• NPDES—initially focused on Industrial "point
source" pollutant discharges
NPDES MS4 OVERVIEW
• In 1987,the NPDES program expanded to address
stormwater discharges
• Municipalities must obtain an NPDES Permit to
discharge stormwater from the Municipal
Separate Storm Sewer,System (MS4)
• Virginia Beach has h"ad an NPDES MS4 Permit
since 1993
• Permit Issued by DEQ, Monitored by EPA& DEQ
• Permit valid for 5—years
• Fines can be substantial
March 24, 2015
-6-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
The current permit expired in 2006 and DEQ issued a Draft of the new Permit on January 26, 2015, and
asked the City provide comments by the end of March. The Hampton Roads Planning District
Commission (HRPDC)serves as a Facilitator and has developed a "baseline"regional response:
Draft NPDES MS4 Permit Status
• Current permit expired 2006
• Administratively continued
• DEQ issued draft new permit 26 Jan 2015
• Asked for comments by 27 Feb 2015—an
extension granted until 31 Mar 2015
• HRPDC Regional Environmental Committee
has developed a "baseline" regional response.
NPDES now covers all other permits. If any violation occurs within the other permits, it will also violate
the MS4 permit—Possible double indemnity fines for NPDES are up to $32,500 per day/per violation. It
is the City's belief the largest fine assessed to a MS4 in the Commonwealth is$82,000:
NPDES MS4 Relationship to Other
Surface Water Quality Regulatory
Programs
• NPDES MS4 is the Overarching Regulatory
Program
• The Draft NPDES MS4 Permit specifically
requires compliance with other surface water
quality regulatory programs.
March 24, 2015
-7-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
The rendering below depicts the stormwater maintenance for residential neighborhoods on the
Lynnhaven Watershed:
SURFACE WATER NONAGE RT
NEGULA ORE MOGRAMS Y
STORM WATER MANAGEMENT •,i,)
• OESWvOESI-CWA4OA
• ERs roof CO VA Eva 4
FEMA'NNvlvuLOCAL IN
ICWA SOS(
ESAPEASE BA
(CODE CA VAI S
TMOAV
(EXEC am(A)
CHESAPEAKE
Below are the high effort and high cost measures required in the "Draft Permit". As a major theme, the
Permit requires the City to generate significant "self-reporting", essentially following the rules and
procedures established by DEQ and EPA:
MAJOR REQUIREMENTS OF THE DRAFT
PERMIT
I. Administration Requirements
II. Inventory, Mapping and Analysis
III. Stormwater Pollution Reduction
IV. Operational Requirements
March 24, 2015
-8-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
Below are the Administration Requirements:
ADMINISTRATION REQUIREMENTS
• Comprehensive MS4 Program Plan
• Annual Reports
• Training
• Public Education
• Pesticide, Herbicide and Fertilizers Plan
13
The City must develop a NPDES MS4 Program Plan and, in no way, will this be a small undertaking:
DEVELOP NPDES MS4 PROGRAM PLAN
• A Comprehensive Program Plan must be
developed
• The Program Plan details processes and
responsibilities
• A Program Plan is a detailed written record of
how the City of Virginia Beach operates its
MS4 and how it will meet all permit
requirements.
14
March 24, 2015
-9-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
Currently, the Initial Report must be complete by October 1, 2015, for Fiscal Year 2014/2015. The
Annual Report will consist of approximately forty (40) items,followed by numerous other items that must
be reported within 12, 15, 18, 24, 36, 48 and 54 months:
ANNUAL REPORTING
• Annual Compliance.Reports Required
• The annual report will include:
—List Of inspections
-List of Maintenance
-List of repairs
-Total number of SW facilities-operated by City
-Total Linear feet of storm sevver.owned
Total linear feet of storm sewer inspected
Existing-City prepares annual report.
Proposed—Significant additional reporting is required
It is important to relate the emphasis on staff training in the proposed permit. Much of this is already
done, but the new requirement is broader in scope and more regimented:
REQUIRED TRAINING
• Biennial training:
vor.ow\ea
— on illicit discharges useculeb'1
ty.1ckANO0.0 c a
— on pollution prevention practices co.vct,��c
—for employees at maintenance and PW facilities
—for employees at recreation facilities
• Training on applying pesticides and herbicides
• Training on spill response
• Training/certification of City employees for
pollution prevention, E&S, plan reviews and
inspections
Expanded—City sends employees to training for required certifications
March 24, 2015
-10-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
The permit requires the City to estimate the number of individuals reached through the educational
programs offered by HRPDC, askHRGreen and Lynnhaven River Now. However, whether the existing
level of those activities will satisfy the new permit is questionable. The City must report annually a
summary of the voluntary retrofits on private property:
PUBLIC OUTREACH/EDUCATION
• Promote and publicize proper:
—disposal of FOG
—disposal of pet waste
—residential car washing '''
—disposal of pesticides, 4=
herbicides,and fertilizers
• Promote anders
• Promrt
litter prevention
Existing—Programs with HRPDC—
HRStorm and Lynnhaven River NOW
Below is an overview of inventory, mapping and analysis:
INVENTORY, MAPPING AND ANALYSIS
• Inventory Entire System
• Outfall Inventory
• Public BMP Inventory
• Private BMP Inventory
• Roadways
March 24, 2015
-11-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
To inventory the entire system is a huge technical administrative task as approximately only 1/ of the
City's stormwater system is in GIS and will cost in the range of multi-million dollars and NOW must be
completed within 18 months:
INVENTORY ENTIRE SYSTEM
Existing-inventory was op going task but had no deadline
--;T!`1, lU
e 1
rpt- * .
s f. ;
r t r
Prqposed—must be complete within 18 months
EVERY OUTFALL
• Determine service area
• Determine amount of pervious area
• Determine amount of non-pervious area
• Approx. 5,000
Existing—many outfalls,locations mapped
Proposed—Calculate service area,and
pervious/non-pervious areas for each
outfall a-
March 24, 2015
-12-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
Most of the BMPs in the City are "wet ponds". So, essentially, the design documentation has to be
recovered or post processed for every public BMP in the City with a database created so Summary
Tabulations can be performed:
EVERY PUBLIC BMP
• Determine service area
• Determine amount of pervious area
• Determine amount of non-pervious area
• Determine adequacy
• 400 known BMPs W
F rc
Existing—many public BMPs are mapped.
Proposed—Calculated service area and
pervious/non-pervious areas for each Public BMP
va
z:
Most of the Private BPMs include wet and dry detention ponds. But the same requirements are the same
as the Public BMP:
EVERY PRIVATE BMP
• Determine service area
• Determine amount of pervious area
• Determine amount of non-pervious area
• Determine adequacy
• Approx. 2,200
Existing—few locations are mapped
Proposed—Calculate service area and
pervious/non-pervious areas for each private
BMP
March 24, 2015
-13-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
The costs are estimated at over$10-Million just for inventory and$32-Million for the drainage studies:
INVENTORY
• The combination of outfalls, public BMPs and
private BMPs is approximately 8,000
• Each one must have a drainage analysis
including:
—Survey
—Mapping
—Pervious area
—Impervious area
29
The City must have written protocol for maintenance, equipment maintenance and material storage. The
City currently has 3,450 lane miles within the City, 8,500 acres of linear watershed; and, again, a
database must be created and maintained:
Roadways
• List of roads, streets and
parking lots
—3450 lane miles $
ate`=' n ®e
—street name
—miles of roadway not ' • '' _ M1
treated by BMP's
—miles of roadway treated
by BMP's.
New Activity-
March 24, 2015
-14-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
STORMWATER POLLUTION.
REDUCTION
• Chesapeake Bay TMDL Action Plan
• Order of Magnitude Analysis
• TMDL Action Plans for Other Waterbodies
•
6 26
NPDES MS4 ACTION PLAN FOR THE
CHESAPEAKE BAY TMDL
• Pollutants of Concern(POC)—Nitrogen, CI)
Phosphorous,and Total Suspended Solids
• Determine total POC loads generated in City
watersheds draining to the Chesapeake Bay as of
June 30, 2009
• Reduce the 2009 pollutant loads for the POCs
(reductions range from 6%-20%)
• Generate and execute a plan to reduce the 2009
POC loads by the required percentage within 15
years
- 2
March 24, 2015
-15-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
ORDER OF MAGNITUDE ANALYSIS
• Total acres in the watershed draining‘to the
Chesapeake Kay:=40,960. -
•-Total Phosphorous Load=71,700 lb/yr
• Total Required Phosphorous Reduction=.8,801.
lb/yr
• Total Nitrogen Load=356,593 lb/yr
• Total Required Nitrogen Reduction= 18,585 lb/yr
• Total Sediment Load = 12,818,015 lb/yr
• Total Required Sediment Reduction=3,355,165
• lb/yr
NPDES COMPLIANCE WITH
CHESAPEAKE BAY TMDL FOR MS4
PERMIT
• The water quality "deficit" created by all
public and private developments occurring
between 2009 and July 2014 must be offset.
• Includes grandfathered projects not yet built
Proposed-This is a new program
March 24, 2015
-16-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
The City has additional TMDLs that must meet these requirements as a condition of this Permit, including
54 impaired waters, 150 impairments, 3 TMDLs and 2 Implementation Plans:
TMDL ACTION PLANS FOR OTHER
WATERBODIES
• Develop TMDL Action Plan within 24 months
after effective date of permit to meet TMDLs
• Identify means and methods to address
discharges from new sources
• Estimate the annual Pollutants of Concern
discharge loads
Proposed-This is a new program.
3L
The 5 retrofit projects cost is approximately$2-Million,plus an additional 7 will be an additional$5-
Million:
RETROFIT PROJECTS
• Complete no less than 7 retrofit projects
within the first 5 years.
• Target projects to
b.
water bodies with
issued TMDLs --
Existing retrofit projects:
Alanton Elementary
Lynnhaven Middle
Bow Creek BMP expansion
Thalia Creek Retrofit
Mill Dam Creek Retrofit
New activity
31
March 24, 2015
-17-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
Below are the operational requirements:
OPERATIONAL REQUIREMENTS
• Maintenance and Inspections
• Illicit Discharges
• Monitoring
• Monitoring Industrial Outfalls
• Municipal Facilities
31
Inspection would include all manholes, drop inlet, curb inlets, pipes, ditches and BMPs. Storm/Sewer
problems, such as cave-ins or flooding are reported by the public allowing the City to improve the
problems without inspecting 100%of the system:
STORMWATER MANAGEMENT
FACILITY MAINTENANCE
• Maintain or cause to be maintained EACH AND
EVERY public and private storm water
management facility within the City
• City BMPs must be inspected annually
• The City will inspect ALL privately maintained
facilities no less than once every 5 years.
• The City will implement program to insure proper
maintenance of privately maintained SWM
facilities
• Inspect 100% of the Storm Sewer System in 5
years
Existing—City maintains and inspects its BMPs and reports number maintained
Proposed-
March 24, 2015
-18-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
The sanitary sewer falls under the Special Order by Consent (SOC). Unlike Northern Virginia, the City
does not have a large discharge of floatables (trash):
ILLICIT DISCHARGES AND IMPROPER
DISPOSAL
• Inspect 280,000 linear feet of sanitary sewer
• Reduce discharge of floatables
• Prohibit dumping of oil, grease,fat, grass
clippings, leaf litter and animal/human waste
.
`"
Existing—City has an Illicit Discharge Detection Program
Public Utilities is under a Consent Order 34
The City is currently required to do dry weather screening at 25 good locations out of 60-75 originally
picked. This is performed by an annual Service Contract. Areas of concern are commercial car washes,
car dealerships,pet kennels, restaurants, upstream of sensitive ecosystems and areas with a history of
complaints:
DRY WEATHER DISCHARGE
MONITORING
Requires screening a minimum of
100 outfalls each year to check for
illicit discharges
CII
j' If outfall is submerged or
'� - tidally influenced then
. , screen upstream until no
longer tidally influenced and
visible.
Existing City cw rently screens 25 location per yea'
Proposed—Four fold increase ss
March 24, 2015
-19-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
Wet Weather discharge monitoring are "grab samples"with no value whatsoever:
WET WEATHER DISCHARGE
MONITORING
• Report will include:
— Location
— Results
— Weather conditions t • 11111111/1111r
— Most recent storm event
— Long term trends
— Follow-up action for
maintenance or repair
Proposed—New Activity
MONITORING VPDES INDUSTRIAL
PERMIT OUTFALLS
• Requires the-City to obtain.a listall
VPDES industrialstormwater
permits-35
• Requires inspection of all permitted
outfalls _ ;,_ ._
• Review Discharge Monitoring
Reports(DMR)
• Maintain list of stormwater
dischargers NOT regulatedf gas , lib, 4,
stations) $•A . .
• Include list of referrals to DEQ
New Activity—Begins to shift responsibility to the City
3:
March 24, 2015
-20-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
SPECIAL FOCUS ON
HIGH PRIORITY MUNICIPAL FACILITIES
• High potential of discharging pollutants are:
—Using,storing and cleaning machinery
—Spills or leaks
—Handling of equipment
—Loading/unloading or transporting activities
—Products stored outdoors
—Waste in covered, non-leaking containers
—Disposal of waste water
Existing—Major yards are currently inspected,use good
housekeeping
Proposed—New major focus 3£
The City's industrial type facilities were previously regulated under the general MS4 permit. This
requires the City to determine, and self-report, which of the facilities should be governed under an
industrial Stormwater Permit and to apply for and comply with separate Permits issued by DEQ:
SEPARATE PERMITS OF MUNICIPAL
FACILTIES DEEMED INDUSTRIAL
• Requires the City to screen our facilities and
identify those that fit DEQ's definition of
Industrial
• Apply and Operate Under Industrial Permits
—Fueling Facilities ,
—Garages
—Storage Yards
—Central Heat Plant t =`-
3,
March 24, 2015
-21-
CITY MANAGER'S BRIEFING
MS-4 STORMWATER MANAGEMENT RENEWAL
(Continued)
Below are the next steps:
NEXT STEPS
• The draft permit is being reviewed by all
impacted City offices
• Regional Coordination through HRPDC with sister
cities
• Provide Comments to DEQ by March 31, 2015
—Intention is to challenge many of the requirements
—Request redundancy relief
• Establish City Negotiation Team to negotiate final
requirements
• Brief Council on the results of negotiations
40
Mayor Sessoms thanked Mr. Pullen and the entire Team for their continued hard work.
March 24, 2015
-22-
CITY MANAGER'S BRIEFING
INTERIM FINANCIAL STATEMENT
4:42 P.M.
Mayor Sessoms welcomed Patti Phillips, Director—Finance. Mrs. Phillips expressed her appreciation to
City Council for their continued support:
•
FY15 Budget to Actual Financial lr qf, ,waS
Update as of February 28,2015 Finance
Overview - 8 Months
• FY15 General Fund Revenues
• FY15 General Fund Expenditures
• Next Steps
March 24, 2015
-23-
CITY MANAGER'S BRIEFING
INTERIM FINANCIAL STATEMENT
(Continued)
Below is a "snapshot"of the FY2015 General Fund Revenues and Expenditures:
re 15 GF Revenues& Expendani es
t.'iinti)�,s epi ti} larlct ,ct Thi ll Fen.Feb. 2 8, 2015
YTD
BadailVari
Revenues .._
_ &yd( ance
Local (03.3%of budget) $ 842.5 $ 419.7 S(422.8)
State (14.8%of budget) 149.8 57.2 (924)
Federal (1.9%of budget) 19.1 12.3 (6.8)
Total Revenues $1,011.4 $4993 $(522.2)
Expenditures
City Operations $ 655.0 S 436,8: $ 2182
School Operations 4065165 141.3
Total Expenditures $1,061.3 702.0 $.1019.
Loss Amounts Funded from Fund Balance
Bncumbrances/Carrrfprwerda at 6/30/14 S 99
Ctiy and School Capital rrOjects 23A
School's Operating Budget 2.15
Risk Management 1.0
School Reversion 11.7
Green Run High CIP 0.3_
AdlustedExpenditures. $1,0114.
Revenues do not come in equally. Revenues are at 49.1%of the estimated Budget Revenue:
FYI 5 YTD General Fund Revenues
Compared to Historic Trend at Feb. 28, 20 I S 1213
100K
YTD ACTUAL=$489.2M
ANNUAL BUDGET=$1,011.4M
75.9%
48.4% 58.3%
55.2%
'S MIS
42.3O9 %
45.0°.0
J41.8%
31.9°
31.3%
Business License due date change to
March 100 due to Inclement weather _.
14.3 resulted In delayed collection of$7M,
10.4% 14.3% which would have made collection
1.3% 3'8% 8R% percentage equal to trend
4.2%
as ,
lei Aug Sap Oot Nov Dae pa rob Mar APs Nay Ms
�HRer Trend --%of MS Rev Budge,
March 24, 2015
-24-
CITY MANAGER'S BRIEFING
INTERIM FINANCIAL STATEMENT
(Continued)
• Still need to collect 52.6% I,reeissues
- Several items are en a±li-5 Monti'lag
• Total Revenue follows the trend line
- Includes Tax Relief Mr Elderly da Disabled et SI 5.2M
- Includes delinquents from prier years
• Business license tax(BPOL)due in March 2015-$47.6M
• and Real Estate installment due June 5,2015
• Personal Property tax budget-$83.819
- Collections t%date total$20.3M
- Anneal levy due Jane 5.2015 will have rate of 54perhundred
One of the most significant Revenues for the City is Real Estate which is at 52.6%of Budget:
Rea! Estate Revenues-GE Portion Only
February 28, 2009 201:4 1113
BUDGET
fen $493.0
$463.2
$435.4 5423.1 54410 $428.2 $43.1
i.ff foY.
11260 52.3% 52.2% F
F
52.2% 124/
Iwo•
5 3 417 30.424.5 1232.9
V
�
itek
sive.
93C
f1 f%
FY NM FY2010 A'1011 FY2012 PY7113 FY2014 FY Ulf
I MIACWN Collection. oYTD —o—%of TOMI
*Total 4T Citywide Nudist 4f*Sena•
March 24, 2015
-25-
CITY MANAGER'S BRIEFING
INTERIM FINANCIAL STATEMENT
(Continued)
Personal Property Tax is due in June; and, historically, is difficult to predict:
P tr,,onal 1'r rrpt'Ft € rxe., (exclude,, PP-IPA)
Feb ttt, v S , 1009 .. of '-7 NE
BUDGET
$83.7
$78.7
so
$73.7 $74.7
w%
568'1 $65.9
1H $57.8
•
33.1% A
ip 30.7% 11
fflii :
28.5% *
22.6%
22.7%
so
M.
so 1000 or site FY0011 'Or Ss FY 001'3 FY g14 FY mai
�.a�Aotual Calbo600. C1TD .+B o/Total j
General Sales Taxes are up 3.1%from FY2014:
General Sales Taxes
February 28, 2009 201:
tem
� .
3.1%Up from FY14 I BUDGET
Ps 560.0
555.0 556.4
$53.4 00x
$51.4 550.3 $51.7
w
62.4% 61.3% 61.2% 60.5% 60.9% 60.7% ,
'1HHi1II '
0%
FY 71D0 FY L/0 FY 8011 FY Ills or ass FY nu FY 101/
M4Aatual CaMotlooa I=YTD -w%ot Total J.
March 24, 2015
-26-
CITY MANAGER'S BRIEFING
INTERIM FINANCIAL STATEMENT
(Continued)
The Utility Tax is an extremely stable Revenue Source:
11100vTaxes
lea}tr9arv21 ,. 2011 -13. Wk
`201:1
BUDGET
$25.424.9 $25.1 $25.3 $25.2
as
60.9%
11
58.7% 58.2% w%
153.6° 1540
i"iN6 14.6 4e%
iw
1.
111
M 1Y21111 FY2014 MOO FINN "VMS
L. AONYcull.lbm m7TO —4.-%*Total
Telecommunication Taxes continue to decline:
Ieleicncations Taxes
February 28, 2011 - 20 1 5 113
2x 00%
BUDGET
$20.3 =19.7
so $19.7 $19.5
$18.7 eox
55.2%
(( 50.3% 50.5% 50.8%
!w 46.4%
it tl%
•
10.9 10.2
2w. $9.9 $9.5 $9.2
>
.4
FY 1•11 M2212 FYSW2 MOTE - ET*GE
i-_wB1AGu.1 COIIMbn� CYTO ti-%or Td�l._.
March 24, 2015
-27-
CITY MANAGER'S BRIEFING
INTERIM FINANCIAL STATEMENT
(Continued)
The City continues to do well with this Tax which is a good sign that the Resort Area and hotels are doing
well overall. Specifically, taxes are up 3.8%from FY2014:
!Ii)1,-1 RoErm "t'a - GI"Port HI, Ooh
1,ebruary 28, 2009 - 201.; 1,43
3A%Up froFY14 BUDGET
m
3• $5.8 $5.9 $6.0
$5.5 184%
$5.4
$52
E5.2
84 7
6 180%
1$3
II I
AF%*
xsz
J1
w 2%
FYIOIS FY 2$12 FYnt FY21112 FYSIIU PY2064 FY21S
L p�Aotua caiwlan•_ YTD .0%01 Total
Total Hotel Room 'faxes
February 28, 2009 - 201:) 1113
BUDGET
I 3.8%Up kora FY14 I $27.2
$25.6 $26.3 $26.3
135%
126 824.2
$22.7 $22.8
20.6 21.4
20.5 105%
pt 18.9 19.1
7.9 17.6
/e % % k % /o
8/0 YGG MI 7f%
7f
0%
Ste
K II II II II II III 26%
M F%
FY2800 FY2112 FY2011 PYOSIS FY2SI3 PY2SI4 FY2SI0
taAotuul Dollottb0; =YTD —%of Total ]
March 24, 2015
-28-
CITY MANAGER'S BRIEFING
INTERIM FINANCIAL STATEMENT
(Continued)
11af��.1 Room
fit" 3M
SB$ $0.1
GF2%$4.8 ■GF2%
•CBD TIF
CBD TIF
$0.25 ■TAP 1%/$1
TIP 5%02.3
TAP 1%/$1$3.9 CTIP 5%
5B$1
amlTrB&,.B5011 a.* 111006:1011041:0•11.01611010:
8+r49'(ZflujWTR(S27BI1) 04dIU %fn
The City continues to do well with Restaurant Meal Tax and fully expects to make Budget. This tax is up
4.7%from FY2014:
Pcst< u)c:)s)t Meal Taxes - Cr Portion Orly
Fchrtniry 28, 2009 -2015
+ax
so 4.7%Up from FY14 ( BUDGET
$38.0
$36.2 +
534.0
$35.1 4ox
$32.3
$30.8 $30.9 ITD%
i■f 074
22 24.4 25.5 +00X1 .
■
•7.0 20.8 21.7 T 23.6 ae%
(2% �% 13% 1% 1% %
iiiiiiiiiiiiiii F+a M
"SON FY me FY 2011 FY PM PYN14 "2514 FY NO
...ANUN Colhlbiu =YID —a—%of Total I.
March 24, 2015
-29-
CITY MANAGER'S BRIEFING
INTERIM FINANCIAL STATEMENT
(Continued)
Total Ni-ct,tt tan€Meal 1 a .ea
E cht a,ti'!' ai, 200', - 2.01!) 1i7
BUDGET
4.7%Up front FY14
659.6
w E55.3 657.0 ,
$53.5
$50.6
Iw $48.1 $48.4
1. j3, ..
� 37.0
• 33.9 35.6
:. 4�2g.9 �r3�2g.7 pt
w 2 1111%_ % % I% % I.
w%
$
w
av mx
M, rr ass Ft SIM $1 Or :IIA$ -_ P12013 }x2114 FY Mg
(1
I— tiaActu.l COMotbn. ®YTD -.—%of Total
05 0.44%
$3.2
■GF 3.5%
TIP 1.06%
$7.7 '_
■TAP 0.5%
GF 3.5%$25.5 ■TIP 1.06%
TAP 0.5%$3.6
■050.44%
March 24, 2015
-30-
CITY MANAGER'S BRIEFING
INTERIM FINANCIAL STATEMENT
(Continued)
Below is a "snapshot"of the General Fund Revenues:
Su€c: 11ary of City's GF 11e emacs
1"ebru Iry 28, 2.i}1`i
•
PV2015 YID
$utis t S 'h
* Real Estate Taxes $ 443.1 $ 232.9 52.6 %
Personal Property Taxes 83.8 20.3 24.2
Pers.Prop.Tax Relief Act 53.4 6.5 12.2
General Sales Tax 60.0 35.3 58.8
Utility Taxes 25.2 14.6 58.2
Teleconmatnications Taxes 19.8 9.2 46.4
Business licenses 47.6 12.3 25.8
* Hotel Taxes 6.0 4.8 80.5
* Restaurant Taxes 38.0 25.5 67.2
Charges for Services 45.4 25.8 56.9
Other Local Revenues 56.7 30.0 52.9
* State Revenues 96.4 50.7 52.6 ••
* Federal Revenues 19.1 12.3 64.2
* Transfers 16.9 9.0 53.4
1$ .011.4 $489.2 48.4 %
•GF portion only
**%doe.not include PP11tA portion
Year-to-Date Expenditures are at 66.1%of Budget:
F`r'151'TF?General Fund YxiritudituI
Compared to historic Trend at Fel). 28,.201'..;
goal --- ----- 10..0%
lTD ACTUAL=$702.0M 91.5%
ANNUAL BUDGET=$1,061.5M 83.5%
n Oti
68.0%
60.2% 66.1%
52.6% 58.9%
1 44.5% 51.6%
36.8%
27.5°,
19.4% 28.1%
11.3° 20.2%
12.3%
11%
pl Aus Sep Oct Nov Dec ]r Feb Star Apr Nay Put
-Expenditure Trend -r-%ofFYI Bap Budget
March 24, 2015
-31-
CITY MANAGER'S BRIEFING
INTERIM FINANCIAL STATEMENT
(Continued)
I s G,neral k'un€i irIan; r;ltn "I`t
• Total at February 2
$702.0M,or 66.1%,of$1.0618 Budget
Salaries $ 262,419,190 $ 169,357,171 $ 93,062,019
Fringe Benefits 101,978,830 63,454,858 38,523,972
Operating Expenses 161,620,381 120,831330 40,789,051
Capital Oathy 8,480,307 7,391,990 1,088,317
Leases,Land Structures&Improvements 4,496,286 3,236,560 1,259,726
Debt Service 48,274,437 28,212,387 20,062,050
Transfers to Schools 406,532,167 265,180,228 141,351,939
Transfers to CIP 43,141,145 28,446,823 14,694,322
Transfers to Sheriff 15,632,103 10,421 197 5,210,706
Transfers to Parks and Rey 4,524,490 3,008,659 1,515,831
Transfers to Other Areas 2,916,649 2,451,998 464,651
Reserve for Contingencies 1,439,891 - 1,439,891
Total Expenditures by Type S 1,061,455,876 S 701,993,401 S 359,462,475
Percent of Total 100.0% 66.1% 33.9%
Below are the next steps:
Next Step
• Marco Interim Apr.28,2015
• Adopted FY16 Budget May 12,2015
• FY 2015 Fiscal Close August 15,2015
• Unaudited Financials October 2015
• CAFR December 2015
Mayor Sessoms thanked Mrs. Phillips and her entire Team for their continued hard work.
March 24, 2015
-32-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
4:54P.M.
Mayor Sessoms welcomed Jack Whitney, Director—Planning. Mr. Whitney expressed his appreciation to
City Council for their continued support:
WCity of
Virginia Beach
PLANNING ITEMS
April 7 and 21
City Council Meetings
Three (3) items are scheduled to be heard on April 77":
APRIL 7 MEETING
BAYSIDE DISTRICT
1. Simon Acquisition II,LLC Norfolk Premium Outlets(Comprehensive Plan
Consistency Review)
BEACH DISTRICT
2. Back Bay Brew House(Conditional Use Permit-Craft Brewery)
PRINCESS ANNE DISTRICT
3. McQ Builders(Conversion and Enlargement of a Nonconforming Use)
Virglnlaxeat+
March 24, 2015
-33-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
BAYSIDE
Maps B-4,5,C' 5 Simon Acquisition II, LLC
u ,uu,,
I' .9 l/ 1. I1 \;
I`5D - a 11
cif. '/ :. 1. // / ., , ,/ ip ,, �R10
c..f. /d 1216.
,: ,„,,,,,•..,
��/ . Rit '•.A
. r 5 a
•/..+.p MO C.Iw...P!S •.op.n span pw.wi.. Comprehensive Plan Consistency Review
.....
as n.
n i m
'.... ...V 01‘
N
I
�� "i�i��,n7P,1
J\-
Y \
J .0
Simon Acquisition 11,LLC.
March 24, 2015
-34-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
Relevant Information
Comprehensive Plan Consistency Review of the
Norfolk Premium Outlets Roadway Concept.
• Section 1 5.2-2232 of the Virginia Code provides
for the review by the City Council of proposed
public facilities and features to determine
consistency with the Comprehensive Plan.
• The applicant proposes to construct a public
facility, Lake Wright Boulevard, between
Northampton Boulevard and a proposed 350,000
SF outlet mall in the City of Norfolk.
• The purpose of the review is to determine if the
prop. •adway is in substantial accord with the
C. offrill, ive Plan, including thou •. „-a at; , ,
.r.._,_ � ' Burton S!>IOn RJ
fi
i •'/,-3,.-¢�5 , r ,,
$', ‘'lo�
C`
1,/ { r. ' fit
,pp f
C r
ti R W
r 7—a 8.,b'- / �• s�eraoo,
/
Interstate Hl” ay 64
6
March 24, 2015
-35-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
✓::' \ r_
4 .k
' r '
'RMS f, `', ly. �. / '
�:- . l .
•
ti
/d .
/4► t :,{a• 1
} 46
"4. cRk ,--' .9 '�' •,.Q•°�`
'-7'
GA e•
March 24, 2015
-36-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
Evaluation and Recommendation
• Planning Staff determined the proposed roadway is
not in substantial accord with the Comprehensive
Plan, including those parts adopted by reference,
such as the Burton Station SGA Plan.
• The Planning Commission, by a vote of 9-1,
determined the proposed roadway is in substantial
accord with the Comprehensive Plan, including
those parts adopted by reference, such as the
Burton Station SGA Plan.
• There was no opposition.
£Ay �' fX' e?'+ C 54
41.
BEACH
+IMts a,, Back Bay Brew House,L.L.C.
Ce
A24 7 ! .. / ''I In '''' ` i 1-
A24 .avn.emw. i.
A24* 1 =I'R54 -t
-, 1 1
,
NOT I'M X MIS NORFOLK AVENUE ---
t 5i ` \ L— -t. i 912`
A24 " �. , C, ©-75 i n \
•. SREET 1 , \=
R5$- F\ ' 1 i\ `1 ' \..
"?' rms' `i� eye
•r.wv«u r.•e.a.rwr...oo«s,..rwrro• CUP for Craft Brewery
March 24, 2015
-37-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
•
_ta
at;
'AA
00
"c .�• \ Sat,,
`` V 4
Yom' r vC�
a,M •.11'.11 fj !.
11111
Back Bay Brew House
Relevant Information
Conditional Use Permit for Craft Brewery
• The applicant currently uses1,120 square feet within an
existing multi-tenant building for the production of craft beer
and a tasting room.
• The applicant,based on the success of the business,
proposes to expand by renovating two adjacent units in the
building.The expansion will occur in two phases:
• Renovation of a second floor suite to create an additional
1,180 square foot tasting room.
• Expansion of the existing tasting room located on the first
floor by 300 square feet as well as the addition of 900
square feet for the brewing and refrigeration of the beer.
12
March 24, 2015
-38-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
Existing Production Space and Tasting Room
Existing 2"n Floor Mezzanine
1Ary
no.a. r. ."sen
A.
...Ann aw an ew �e«s10°en
rwM 1WM1416 ...0,
"wen
ill
44101
wne
tao We. 1.410w
Back Bay Brew House
Existing Production Space and Tasting Room
Existing 2'Floor Mezzanine
kA'•m,. Proposed
k i"' Tasting
Proposed �pwty� tw
S. r Room
Production Zi r` 4,3,4', •
Space nw1a. ..j i a"� S
sN � twfoe' ".
Aila7A1;�"Y.e.,:.
iYr ... wwraen
4 Irl.m U.4 NS
.4 sw �im
44.t.,
A.ween ew w]
'SI sAmer C '
I ulson
10.01,001 Y.Floor
Back Bay Brew House
March 24, 2015
-39-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
NORFOLK AVEN�E
itiat Bay Brew House
Evaluation and Recommendation
• Planning Staff recommended approval with
conditions.
• By a vote of 8-0-2, the Planning Commission
recommends approval with conditions.
• There was opposition.
16
March 24, 2015
-40-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
PRINCESS ANNE
NIy I,I0 Met Builders,L.L.C.
� `
>75 'B Ldn
BR' `'I Q 82_ B2' 1111
4
8 DAM NECK ROAD AM
'I p
... ,, ,'� / Rio
A ,, .3/. . : ,, ii C12" j
.fii:s.
>7014 014 1,.i'
Ilk
•Zang*C.,..414.•,«dAn o.,,w...'a..... Non Conforming use
n
p� A6amaba
A
N nj.„
0
DA`//M NECK ROAD
zR �'t ``#ii
a
1 //< '
OLD ` I, .Op'. ;0,,,
a
18
March 24, 2015
-41-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
Relevant Information
Enlargement and Conversion of Nonconforming Uses
• The site is zoned AG-2 Agricultural District,and currently
consists of 12 units.
• The dwelling units are contained in one single-family dwelling
on one lot and four structures of varying sizes on two lots.
• The four structures were constructed during the early-1950s,
prior to the adoption of Princess Anne County's first zoning
ordinance.
• Since the AG District does not allow multifamily dwellings nor
multiple dwellings on one lot,the current use of the site is
nonconforming.
• The applicant proposes to demolish the structures on the site
and build a 12-unit single-family residential condominium
development.
• Since the current use of the site is nonconforming,the
applicant's proposal constitutes a conversion and
enlargement of nonconforming use,which may only be
allowed through the approval of a resolution by City Council.
� w
•
_ E
A
9{b
p
xTM,j� .v Suj
4 55
_ fw
Existing Site Condition 20
March 24, 2015
-42-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
it:*
,, Y l n
•
titt
41*Proposed Plan 21
Evaluation and Recommendation
■ Planning Commission does not review
Nonconforming Use applications.
• Staff will provide the City Council with an
evaluation of the request prior to the public
hearing.
22
March 24, 2015
-43-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
Five (5) items are scheduled to be heard on April 14`":
APRIL 14 MEETING
CITY OF VIRGINIA BEACH
1. Amendment to Zoning Ordinance("Small Wireless Telecommunications
Facility"and"Temporary Construction Tower")
BEACH DISTRICT
2. Tim Costen(Street Closure)
CENTERVILLE DISTRICT
3. St.James Missionary Church(Modification of Conditions)
KEMPSVILLE DISTRICT
4. G&A Properties(Motor Vehicle Repair)
PRINCESS ANNE DISTRICT
5. HOFD Ashville Park,LLC(Modification of Proffers)
Amendments to the, Zoning Ordln nce
Pertaining to`Small Wlrelets Facades,*"temporary
Communication Towers;'Antennas.BuildMp-
Mounted;and"Communication Towers."
March 24, 2015
-44-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
Relevant Information
•
The proposed amendments revise and introduce new provisions
pertaining to wireless communication facilities.Some of the
more significant changes are the following:
• Update sections of the City Zoning Ordinance pertaining to
the siting and approval processes for telecommunication
facilities to reflect new rules adopted by the Federal
Communication Commission.
• Defines and adds"temporary communication tower"as a
permitted use subject to certain standards.
• Adds"small wireless facilities,"such as small cell networks,
network nodes,and distributed antenna systems(DAS)as a
permitted use subject to certain standards.
• Revises the general standards for"building-mounted
antennas:"
• Adds a provision that applications for building-mounted
antennas and small wireless facilities that clo not meet the
revfsed standards wilI need approval of a tonditions u;e
Evaluation and Recommendation
• The amendments will be heard by the Planning
Commission during its April 8th public hearing.
March 24, 2015
-45-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
BEACH
l ii: Tim Costen
Re r ,Irisd='_ r
>F731 r�(n' L i t ELL `
I
1_.�_ /!�(///J SCOTT ENP LA.�—
7 _
C.7] ; 1,, I_ ;n L !
.. 3
3 ;� _ L t•
f}=�RSdI , � Lt1 9--Ili L iI_ A
VIRGINIA BEACH BLVD
RBD i I M (, .._ 11
•zw.q rnconwWw.n.e..open Spun PM...b. Street Closure-portion of Scott Bend Road
• rMe.en
C
"-- � ,COT1 Bf`JD I Aill_ A
,i61... --7-.--- X10..T ❑
Q
U Cc
O r C
C
_ U
.M 1
e
Tim Costen
March 24, 2015
-46-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
Relevant Information
Street Closure request for a 4,500 square foot portion
of the public right-of-way known as Scott Bend Lane.
• The applicant desires to incorporate the closed
right-of-way into the applicant's 11,326 square
foot parcel located south of the right-of-way.
• The property is located within APZ-1,where
residential development is incompatible.The
applicant has agreed to restrict use of the
combined former right-of-way and existing lot to a
single-f. u ily dwelling.Thus, no additional
d II be created through the do „,
21:nra' 1,
OCENU ;;'8
Tim Costen
March 24, 2015
-47-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
444
sM � i A
r {sip C o f �F ' RA
Ye; f .
%t-.• •
x R
Evaluation and Recommendation
• The Street Closure Viewers appointed by the City
Council met, and after discussing the pertinent
facts of the requested closure, concluded that there
would be no public inconvenience due to the
closure and abandonment of this right-of-way.
• Planning Staff recommended approval with
conditions.
• By consent(10-0), the Planning Commission
recommends approval with conditions.
• Ther- s o opposition.
•
March 24, 2015
-48-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
CENTERVILLE
2" 18,..4 St.James Missionary Church
i
J
0 i _ R10 R10 co t
rs ;
3 1 / R1� �.{�' Rio
R5D
C OLD P:• •. NCE RD
V ,i- RIO PRONOENCERO
R&D R10 I ,
•mm.yoft C.ww.eA..ae•.o•..so...Pno..b. Modification of Conditions
w L
ut. ,i,uss1 4.'%' b•
Fc
T
w , y
a 4
,F.- — - •t: .2,
OLD PROVIDENCE PD
[.t PROVIDENCE PD
St James Missionary Church
March 24, 2015
-49-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
Relevant Information
Modification of Conditions(Religious Use)for a temporary
portable structure for classrooms.
• A Conditional Use Permit allowing the church was
approved by the City Council in 1965.The Use Permit
was modified in 2002(reduction in the site area)and
2007(allowing childcare).
• The modification of the Use Permit is necessary to allow
the church to use a portable structure as classrooms for
'youth church,'Sunday school,and adult study groups.
• The structure will also be used to support the church's
community outreach activities,such as senior computer
classes,job-readiness skills,GED preparation,and
crime prevention initiatives.
• The applicant has a fundraising effort underway to
eventually replace the portable structure with a
permanent addition to the church building.
tit.Jaynes Missionary Church
March 24, 2015
-50-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
i' ♦ ‘,7',...""..4r,"t t..:,81. its 44
of dd
v' ,e4
9 :,;,..
,#.-4- -,.k.° °.... i i
,yh t/!°
._ .
,.. ,
,...,
J _> s � u
Evaluation and Recommendation
• Planning Staff recommended approval with
conditions.
• By consent(10-0), the Planning Commission
recommends approval with conditions.
• There was no opposition.
38'
March 24, 2015
-51-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
KEMPSVILLE
Ma C-6 G &A Properties,L.L.C.
A+dn _,.s:c
Al2 52iiiipS2 ' ::
R7.5
-1r '4.--
S ! R7.5_
52AV.
,z �$2 %4p A24 'e,,
82 A15
•z... a.Cm...PAn...R..s,...n..w ton CUP-Automobile Repair Garage
Relevant Information
Conditional Use Permit for Motor Vehicle Repair
• The site is currently developed with a 1,500 square foot
single-story masonry building.
• The building is currently vacant, but has been previously
used as a car wash and for motor vehicle repair(oil
change and chassis lubrication).
• A 20-foot wide drive aisle allows vehicular access to the
rear of the lot,where customers will leave their vehicle
for repair.The rear of the lot is enclosed with chain-link
fencing topped with barbed wire.
• No changes are proposed to be made to the exterior of
the existing building.
• The barbed-wire portion of the fencing will be removed.
• Evergreen plants will be installed along the fence for
screening purposes. +o
March 24, 2015
-52-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
A4 Ll�a
•
•
uq
Cq
To
O
G&A Properties,L.L.C.
G&A Properties,L.L.C.
March 24, 2015
-53-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
.
r
le
A Ptr ,L.L.C.
Evaluation and Recommendation
• Planning Staff recommended approval with
conditions.
• By consent(10-0), the Planning Commission
recommends approval with conditions.
• There was no opposition.
March 24, 2015
-54--
CITY
54-CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
PRINCESS ANNE
,v„L,h,-13-14 HOFD
Ashville Park,L.L.C.
4(y,, A.107,41, �.„..,,„,„,„,,,...,,„,t,„„.. _^ " 'i ., l ,� .
7, r.-7:,,:lie' 1
.. F R 14' � �
A
„,..„,,.
lt
` AG1
flrr _•�2 VAG
AG2 ,AGS
f- G,_ i ''•
I., .. d
0 B•Ld AG1 AG2
VAL
a
2 AG2
•z.+w.+c..sw..wn..,on..spwvw..M Modification of Proffers
•
D
''' r
/
Nl
l /
.1 %
1
_..,lolAE ASHVILLI VASE SIT
© ASIA PAOPOSED
Of AROFFE!S -
HOFD Ashville Park,LLC.
March 24, 2015
-55-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
Relevant Information
Modification of Proffers of Conditional Change of Zoning
approved on 5/10/2005 and modified on 2/14/2012
• The applicant requests modifications to the proffers for
the purpose of changing the layout of the three
'villages'that have not yet been developed.
• The intent of the revised layouts is to first,avoid
wetlands created as a result of improper site grading by
the previous developer,and second, provide for lot
configurations that reflect the applicant's development
and design principles.
• Lot sizes will be consistent with those currently
proffered,with the largest lots located at the eastern
end of the property,adjacent to the wildlife refuge.
• There will be no change in the number of units or
density.The area of the site devoted to open space
increases by t I acres
I.Master Plan
Iw&
um ' .
HOED Ashville Park
March 24, 2015
-56-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
• tz„
IV.Community Amenities
. ,- •
.
.,,,, k I .....
# ., •.,.,0..,,i, ,. -,0
iir .....e- 1
. e
- , /\
1 a -- —
HOFD Ashville Park
VIII General Architectural Standards
11131/ '--:72'---
'''''–'ff:?"
,
1 -,-f---5&=---- — -....--• . '7,7,...:1":, ,
HOFD Ashville Park
March 24, 2015
-57-
CITY MANAGER'S BRIEFING
PENDING PLANNING ITEMS
(Continued)
Evaluation and Recommendation
• Planning Staff recommended approval as proffered.
• By a vote of 10-0,the Planning Commission
recommends approval with proffers.
■ There was opposition.
Mayor Sessoms expressed his appreciation to Mr. Whitney and the entire Department for their work.
March 24, 2015
-58-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
5:10 P.M.
Mayor Sessoms introduced City Manager James Spore. Mr. Spore advised there are three (3) significant
items to highlight; 1: decision on the Arena; 2: extension of public transit to Town Center; and 3: the
Biomedical Initiative. Mr. Spore thanked the School Board, City Staff and the Department Directors for
their Budget submissions. Mr. Spore introduced Catheryn Whitesell, Director—Management Services, to
make the presentation:
esource Management Plan
FY 2oi5-i6 Operating Budget and Six Year Capital Improvement Plan
Below is an overview of the today's presentation:
I»
• What is Planned for Next FiscalYear
� �
.:.Where the funding Comes From
Agenda
OpenVB
...Next Steps
March 24, 2015
-59-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
The Proposed Operating Budget for City and Schools is $1.871-Billion, an increase of 2.2%from the
current year. The proposed Budget includes compensation increases, not at the level desired by the
School Board, but the same as the City has been able to do this last year. The proposed Budget reduces
staff by 242 positions:
FY zo16 a
FY Anis Proposed %Chan. hen.e
Personnel $822.4 $838.6 2.0% $16.2
Fringe Benefits 312.6 305.4 -2.3% (7.2)
The Proposed Operating Expenses 450.4 442.2 -1.8% (8.2)
Operating g Capital Outlay 13.8 15.8 14.8% 2.0
Budget Debt Service 163.8 166.8 1.8% 3.0
Compared to Pay-go CIP 48.1 58.1 20.8% 10.0
FY 2015 Reserves 20.4 44.7 119.4% 24.3
Total: $1,831.5 $1,871.6 2.2% 40.1
Includes 3%pay increase for both City and School employees
Reduces staff by 242.8 positions
Increases pay-as-you-go commitment to CIP
The graph below shows the impact of inflation and population increases on the Operating Budget over
the last three decades. One of the major drivers of the budget during this time period was the addition of
new facilities. In addition, the City was faced with meeting unfunded mandates for class size reductions
and stormwater regulations. Overall, new facilities, new mandates and new programs added over 600
new staff during this period:
,800
Budget and 6,400
,„ac.
Budget
Adjusted for 800
f-Population 600
and inflation
4"
*� � Bo 81 8,83 84 85 86 87 8889 go g,97 93 94 95 96 91 9899 oo of oz o3 o4 05060,o8 o9 io,,,,,3,4,5,6
--Budget Adj for Pop&Inflation
March 24, 2015
-60-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
As the chart below shows, since FY2000, the demand for services is growing about 77% above
population growth. The City and School System have incorporated technology and other cost saving
measures to deliver services as efficiently and effectively as possible:
i8o
X70
{
�,t a
,So
Demand for 40 `
Services Index
- r
I I I I
qa 00 01 02 03 04 o5 06 07 08 09 io ii 12 13 14
The City requires Staff meet citizen demand and though the City is delving into more and more citizen
self-service opportunities, much of what the City does requires "boots on the ground. " There are nearly
17,000 employees between the City and School System to deliver the quality services citizens have come
to expect:
To address service demands, this budget
includes:
!" 2,383 public safety positions
tTakes Staff` 1,:f, 1,161 positions to assist families
ow
Deliver
, i 996 positions providing recreation, parks and
cultural activities
r ` 1,320 positions to maintain roadways, water pipes,
• t, storm water and other infrastructure
- ••10,263 library and school personnel
March 24, 2015
-61-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
There has been a real and substantial shift in the relationship between cities and the federal/state
governments. This shift has meant less funding to support mandates and core services; and, as such, the
City must either increase local taxes or cut core local services. Efficiency efforts alone will not make up
the loss of$91-Million. Once again, State Revenues have been reduced for education, even with State
funding for a 1.5%pay increase:
„r..
-:-Unfunded Mandates
bac No Child Left Behind
• Type of Voting Machines
Virginia Public Records Act
Federal Consent Decree
Change in .:.Reduction in State and Federal Revenues
Relationship . - SAn
Reducedhared funBCadindgWine for education
with State Eliminated funding for road construction
and Federal ' Cost shift to the City
,and
f Dropped state Line Of Duty Program on localities
Requires localities to subsidize fringe benefits for Constitutional Officers
Shifted Storm Water Regulations to localities
e,t
•
,ta 3 sgs million in lost revenue/
increased expense each year
The graph below illustrates the changes in both the City and State funding to the Sheriff's Department
The City's funding strategy has always been to maximize all state, federal and fee revenues with the
City's contribution being last. That being said, the City must meet all State requirements for the operation
of the Correction Center. Proposed funding for the Sheriff's Office is increasing by 8%; and, is by far
the largest increase of any Department:
State and City Financing
for the Sheriff's Department
004-r ' ' •
NN- 4 4y 30.0
.o a'u j S.O pp
?.n erl'f , FY o, FY o9 FY oo FY to FY 22 FY,. FY2, FY's FY 26 FY�) fad 26
ing •City State
Sheriff's Fund required an additional$4.5 million in City funding
Drivers
' Flat State Funding
Underfunding of state compensation
} Very low state salaries requiring an average city supplement of
$32,000 to attract and retain qualified deputies and other staff
" State only funds io%of the 36,/o the city pays in fringe benefits
Medical contract costs increased
March 24, 2015
-62-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
As I mentioned before, we are not able to recommend a 5% pay increase for school and city
employees...though they deserve it. We are recommending that in addition to the 1% VRS mandated
increase that we provide a General Increase on July ls` to both groups. This requires nearly $15-Million
in additional funding. This was partially offset by the State's budget including $2.8-Million for a 1.5%
increase to SOQ teachers, which, as you all know, is not all of the staff in the School System. Also
included, is the second year of the three-year commitment for horizontal compression among City staff
and to provide $2-Million for adjustments to School employees on the unified pay scale as requested by
the School Board. One final thing of note is, that for the first time in 5 years, we are partially funding
tuition reimbursement for City employees:
T Pay Increase
1.34%related to the VRS mandated requirement that employees pay
5%of their retirement costs and that the City and Schools provide a
r pay raise to cover the employee's increased cost
rr a.66%general increase provided in July rather than the fall as in the
past
Health Care
•
,Compensation Maintains defined contribution strategy for the employer's
contribution
. r„.V R S
employer's contribution rate is the same as last year for city,slight
decrease for schools based on final State Budget
°: Other Compensation Adjustments
• Second year of three year commitment to address horizontal
compression
Partial adjustments for school employees on the Unified Pay Scale
As just noted, we were not able to recommend full funding of the School Board's request, however we are
recommending that 2 Cents of the recommended real estate tax increase be provided to the Schools to
provide funding for the salary increase and unified pay scale adjustments and to reduce the School
System's reliance on on-time funding to support the operating budget.
School Board requested an additional$20.3 million,
understanding that this would require a tax increase.
"
•:,This budget recommends that the dedication of real estate
tax to Schools be increased from the current 4 cents,to 6
x cents to allow for the following:
Provided needed funding for a 3%increase on Julys'to School
employees.This is less than the School Board's request for funding
for a 5%increase
•
txs ` Provide$2 million to make partial adjustments to the unified pay
scale—no change from the School Board request
" Provide$4 million to reduce the School's reliance on reversion
funding and transfer the School Budget use of these funds back to
- the School S ecial Reserve fund.This will provide a"fund balance"
for School's use if needed.
March 24, 2015
-63-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
Funding is included in Economic Development's Operating Budget to provide$500,000 to match State
funding for the Bio-Medical initiative. The funding increase is supported through the proposed 5 Cents
increase in the per pack cost of cigarettes:
Based on the recommendations of the City Council
appointed Bio-Medical Task Force,the Operating Budget
includes$500,000 to match state funding of$500,000.
2-Bio-Medical
Task Force
•:This will provide funding to create a thriving health care
complex dedicated to advancing research and development
in diabetes,cardiovascular disease, neuroscience,and
traumatic brain injury.
ar
Funding is also included for $100,000 in support of the establishment of the ViBE District around 17th
Street. The funding will provide for signage and marketing for the District and to provide a micro-loan
program to assist businesses within the District. The loan program support would be matched by private
funds and be administered by a non-profit organization:
,
, . °This district located on and around 17"'Street would
promote and support creative businesses located in the
district to add jobs,expand the city's economy,and enhance
quality of life.
iBe District
Included in the Proposed Operating Budget is
$50,000 for a micro-loan grant program
We - fr • `< $5o,000 to brand and promote the district.
�� �•tiro:
March 24, 2015
-64-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
In an effort to address the backlog of lake dredging projects, it is necessary to expand the City's street
sweeping program and enhance the City's ability to meet the stormwater mandates. The recommendation
is to switch the stormwater to a balanced debt and pay-go strategy similar to what is used for the Water
and Sewer CIP:
•:°Reallocation of the existing storm water fee allows
for the following:
Additional street sweeping--The budget includes funds
forthe first phase, purchasing 4 street sweepers and 7
staff.
Storm Water Based on City Council direction on March to,2015,staff is
preparing an RFP to solicit private vendors to provide this
Enhancements service.No action will be taken on the funding until the results
of the RFP are known.
Addressing the backlog of lake dredging projects
NO Rate Increase!
Before diving into the CIP, it is important to state both the City and School System are cutting staff and
services and are looking for ways to reduce and avoid costs. The City continues to rely heavily on
Volunteers to provide services and continues working with Councilman Dyer's Process Improvement
Committee looking at ways to continue this savings effort:
Decreased positions by 242.8
Increases class size by one student
Closure of Pendleton Child Care
teducir g Elimination of D.A.R.E Program
Programs and
-savingC05ts In 2oi4 the city reduced its costs or avoided
n ; l incurring costs by $10.4 million without reducing
R services
;A*.• k aq Using volunteers to provide services rather than
;$ staff, saved over sig million
March 24, 2015
-65-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
Over the next six years, the CIP will provide over $1-BILLION in funding, with major investments in
Schools, roadways and utilities. The Capital Budget, which is year one of the CIP, authorizes $316.1-
Million in spending:
Capital Years
Bu •et 2-6 Total CIP
Schools $36.5 $187.0 $223.5
Roadways' 52.1 421.8 473.9
Buildings 51.6 84.4 136.0
Capital Parks and Recreation 21.1 33.8 54.9
Improvement Utilities 63.6 311.4 375.0
Coastal 12.7 51.8 64.5
Program x Economic and Tourisme 65.0 46.1 111.1
Funding Communications and 13.5 42.8 56.3
Information Technology
Total $316.1 $1,179.1 $1,495.2
Note:
i Includes funding for transit related projects
2 Includes funding for arena infrastructure
The proposed CIP includes funding for the infrastructure related to the Arena and is in the three (3)
projects below:
a5 The CIP includes$78.5 million for the infrastructure needed
to support the privately constructed and financed Arena
} The city's cost will be funded through the use of public facility
bonds
•
Arena °t°There are three projects
Proposed Arena Infrastructure Development
-Infrastructure
`$ Birdneck Road/3.7'Street Intersection Improvements(offsite)
r ig'r Street Infrastructure Improvements
These projects are primarily funded from current revenues
within the Tourism Investment Program Fund,with a five
year increase in the dollar per room night charge
}
March 24, 2015
-66-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
The table below illustrates the funding in the TIP fund for the next five (5)years, including the proposed
expenses. To offset the small deficit, the recommendation is to increase the Dollar per Hotel Room night
charge from the current$1 to$2:
innork , Y 21)6 ,a ! ]2018 201• Y 20 .
Fund Balance(June 2015) $ 1.10
,art.
Current Revenues $ 36.80 $ 37.90 $ 39.09 $ 40.32 $ 41.60 $ 42.81
Arena Current Expenditures $ 36.80 $ 33.50 $ 33.74 $ 33.79 $ 32.87 $ 31.66
,.;AS Debt Service on Arena $ - $ 2.50 $ 4.80 $ 4.97 $ 6.70 $ 8.84
n � rVUre Arena Related Expenditures $ - $ 3.40 $ 3.50 $ 3.62 $ 3.74 $ 3.86
Total Expenditures $ 36.80 $ 39.40 $ 42.04 $ 42.38 $ 43.31 $ 44.36
Financing „` �
p�roil�Nvr �rrxoi> $ 1.10 3 4180) $ 42460$ 42.0$) i (1J!) $ (1.60)
Addition of$1 per room night $0.96 $2.11 $2.11 $2.11 $211 $1.16
' _ rmrh tight st ilei' $ 2.06 $ 2.67 $ 1.$S 4 146$ 2.28 $ 189
For the purpose of the proposed CIP, the recommendation is to maximize the state's commitment to pay
50%of both the Extension project and the Shared Use Path costs. As such, $20-Million is included in FY
2016 for acquisition of the light rail cars, design work, and starting utility relocation efforts with the
majority of funding in the second year of the CIP:
Does not preclude the City Council decision on which,if any,
• 1.! locally preferred option to select
:. 1• The proposed capital projects matches the State's funding of$155
million with city debt for a total project cost of$310 million
',light Rail There are three projects
Virginia Beach Transit Extension Project(#2.092)
{ ,s • .
Light Rail Corridor Shared Use Path-again funded on a 5ol5o basis
with state.Total project is$17.7 million
Bus for Virginia Beach Transit Extension-funded through a state
h$.a grant at 68%state and 32%city.City's portion is$3.6million,HRT will
receive the giant
March 24, 2015
-67-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
The table below illustrates the expenses associated with the three projects in terms of debt service:
FY20 FY2017 FY2018 FY2019 FY2020 FY 021
Debt Service 0 0 $5.97 $12.17 $12.17 $12.17
Operations 0 0 0 $3.5 $7.2 $7.4
Rail
Expenses 0 0 $5.97 $15.67 $19.37 $19.57
Light Rail ARP redirection $1.74 $1.79 $1,83 $1.87 $1.92 $1.96
Financing Open Space redirection $2.42 $2.47 $2.52 $2.57 $2.62 $2.68
General Fund Support $10.76 $11.03 $11.30 $11.58 $11.87 $12.10
Total Revenues: $14.92 $15.29 $15.65 $16.02 $16.41 $16.74
Revenues less Expenses $14.92 $15.29 $9.68 $0.35 ($2.96) ($2.83)
Cumulative Balance $30.21 $39.89 $40.24 $37.28 $34.45
Several projects considered high priorities by City Council are included in the CIP:
Bus Stop Infrastructure Accessibility Improvement
Electronic Procurement System
West Neck Road Phase IV
ew Capital Fire Mobile Radio Repeaters
• Central Plant Generator
Projects
Maintain and Secure Corporate Data
Pleasure House Point Mitigation
Princess Anne Athletic Commons Multi Purpose Athletic
Field Renovation
•
March 24, 2015
-68-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
The City and Schools rely on debt as a way to finance large and long lasting projects such as schools
renovations, roadway construction, Arena infrastructure and transit. The graph below shows the debt
per capita is not expected to exceed the current standard until 2019 and that includes the Light Rail and
Arena Infrastructure projects. Debt capacity exists in the out years of the CIP to address these backlogs
as may be determined by future City Councils:
3,500
$3,000
3,000 — r r r r + +
-- $2,800
2,500 —
2,000
Net Debt Per 1,500
Capita
1.000
500
e
2016 2017 2018 2019 2020 2021
OProjected Current Standard-a-New Standard
The City is proud to be the only Triple A bond rated community in the Hampton Roads area. So,prior to
taking on these transformational projects, Staff went to the Bond Rating Agencies for their input.
Generally the opinions were favorable, though concerned:
:°Staff met with the Rating Agencies in the Fall to request
Credit Evaluations from each on the impact of doing these
large transformational projects
Light Rail and the Arena Infrastructure would require$233.5
tan we take million in additional city debt over the next three years($155
million for Light Rail and$78.5 million for the Arena
,on this much Infrastructure)
debt? r
? Credit evaluations provided by the rating agencies generally
were favorable,but there was concern that taking on these
projects could negatively impact our bond rating
•: The ultimate impact will depend upon the business terms and
other risk factors of these projects
March 24, 2015
-69-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
Federal Fund Balance
Revenue 6.1% 1.4%
1
s� a i Real Estate
State Revenue 28.2%
24.5%
Where the
--
Funding '''.. .. \%., , Personal
Charges for
Comes From \..
iProperty 7.7%
Other Re Service 14.69° ��
,,,
2.1°k
General Sales
3.2%
Permits,Fines, Utility Taxes
Restaurant Tax
&Use of Hotel, 3 2.7%
2
Money/Property Amusement, Business
1.2% Cigarette 2.6% License 2.5%
..:~Agriculture Reserve Program-dedication reduced from 0.9
:' `: > cent to o.56 cent of Real Estate Tax Rate
mom, '> FY201s` FY201Y., Fv20 ' FY 2010°',CY$020 FY4221.11
Debt Service 3.05 3.15 3.25 3.38 3.45 3.59
Operations 0.23 0.23 0.24 0.24 0.25 0.26
„�
Total Expenses 3.28 3.38 $3.49 $3.62 $3.70 $3.85
��,1 r Y s+`: nt
esDedication $2.87 $2.94 $3.01 $3.09 $3.16 $3.22
;u strn , L° Revenues Expenses ($0.41) ($0.44
1. ) ($0.48) ($0.53) (50.54) ($0.63)
- ` Cumulative Balance $11.13 $10.69 10.21 9.68 9.14 8.51
to Currentt,.
. ®R.Open Space Program-dedication reduced to 0.22%of
r,
Dedication ` r Restaurant Meals Tax Rate
_ FY3016 FY20 t'FY2D18 #'Y2014 FY2020 Y2021
Debt Service $2.57 $2.59 $2.57 $2.60 $2.59 $2.51
`' Operations $0.52 $0.55 $0.58 $0.61 $0.64 $0.67
1 ITotal Expenses $3.09 $3.14 $3.15 $3.21 $3.23 $3.18
`I.' Open Space Dedication $2.42 $2.50 $2.52 $2.57 $2.62 $2.68
;w- '-.1',-,.r". " ,I - %.. ",, ! Rewnnas lesExPonses ($0.67) ($0.64) ($0.63) ($0.64) ($0.61) ($0.50)
Cumulative Balance $7.83 $7.19 $6.56 $5.92 $5.31 $4.81
March 24, 2015
-70-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
The recommendation is to increase the rates for taxes:
...Real Estate Tax -- 6 cents; from 93 cents to gg
cents
2 cents dedicated to Schools
•.°Hotel dollar per room-night rate, increases to
Proposed $2 for five years
Rate increases Cigarette Tax- 5 cents per pack; from 7o cents
to 75 cents
...Automobile Licenses -- $5 per vehicle; from
$25 to $30
...Residential Parking Permits at Resort-from
$25 per year to $20 per month
Even with these adjustments, the City will have the lowest tax rates among the major Hampton Roads
Cities with the exception of the automobile license. The increases will allow the City to keep critical
services going, building for the future and growing the budget by only the rate of inflation:
Virginia these- Ports- Nig Newport
8 ach • ke Norfolk mouth H .•ton #sews.
$0.89 $1.05 $1.15 $1.27 $1.03 $1.24 $1.22
Tax Rate /
$4.00 $4.08 $4.33 $5.00 $4.25 $4.50 $4.50
e - $0.64 $1.70 $1.50 0.63 $1.23 $1.25
'Comparisons $30.00 $23.00 $26.00 $25.00 $26.00 $35.00 $26.00
,-c, $0.75 $0.50 $0.75 $0.60 $0.50 $0.80 $0.85
_ $2136 $2701 $35 $ r $1 4 $ 7.r:
5.5% 5.5% 6.5% 6.5% 6.5% 7.5% 7.5%
10.0% 10.0% 10.0% 10.0% 10.0% 10.0% 10.0%
� x
-• Note City Council eliminated the personal property tax on Machinery and Tools
March 24, 2015
-71-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
The proposed increases will impact the "average family" by bringing the annual tax burden up by $205
or$17 per month:
Real Estate Tex $2,308.66 $2,201.86 $2,110.19 $2,054.12 $2,089.05 $2,001.36 $2,054.37 $2,230.47
Personal 208.62 163.65 160.99 190.72 231.70 238.29 291.67 310.57
Property
Electricity Utility 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00
Gas Utility 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00
Tax burden on VATelecom 70 68 70.68 70.68 70.68 70.68 70.68 70.68 70.68
Waler UtilityT. 36.00 36.00 36.00 36.00 36.00 36.00 36.00 36.00
Virginia Beach Restaurant Tax 275.00 263.03 263.03 263.03 263.03 263.03 263.03 263.03
Admissions Tax 25.69 25.69 25.69 25.69 25.69 25.69 25.69 25.69
Family of 4 Vehicle License 50.00 50.00 50.00 50.00 50.00 50.00 50.00 60.00
Storm Water 73.37 80.67 87.97 115.34 133.59 151.84 158.05 158.05
Utility Fee
Residential None None None 60.00 120.00 256.32 256.32 256.32
Refuse Fee
r,.Water 8 Sewer 509.52 529.69 552.00 582.96 615.84 650.64 687.24 687.24
Annual Change $0.00 ($155.70) ($45.28) $92.00 $187.03 $108.27 $149.20 $205.00
Even with the proposed real estate tax increase, the City will go from the lowest in the region and will be
tied with Chesapeake at 3.3%of median household income:
• Per Capita Real Estate _ .
Expenditures Taxes as a
as a%of %of Median
Per Ca•ita name ;li•u.hold income..
Virginia Beach 6.i% 3.1%
elative Chesapeake 7.2% 3.3%
asure5 i Norfolk 8.6% 3.5%
TaxBurden � Portsmouth 9.1% 3.5%
Suffolk 8.i% 3.9%
Hampton 8.3% 3.9%
Newport News 9.1% 3.3%
March 24, 2015
-72-
CITY MANAGER'S BRIEFING
PRESENTATION OF PROPOSED FY2015-16
RESOURCE MANAGEMETN PLAN
(BUDGET)
The City has partnered with Socrata to provide budget data to citizens. Citizens will now have at their
fingertips the ability to create charts and graphs summarizing various levels of budget data. This project
is in an effort to provide a high level of transparency and encourage citizen engagement to promote a
better understanding of the City's overall financial picture:
tate'Otidget $2,596,380,202
Less:
Internal Service Funds $198,066,313
Transfers between Funds $526,672,314
Net Budget $1,871,641,575
l°1V13
http://www.vbgov.com
Below are the Nest Steps:
y/orkshons
Tuesday April
Tuesday April IA''
Tuesday April u"
Tuesday April 28th(special meeting)
Tuesday May 5"'-Reconciliation
:Next Steps
Public Hearings
Thursday April 23'd at Green Run High School at 6pm(special meeting)
Tuesday April 28t' in the City Council Chambers at 6pm(special meeting)
Vote—Tuesday May 12th(special meeting)
Mayor Sessoms thanked Mr. Spore, Ms. Whitesell and the entire team for their work on the proposed
Budget.
March 24, 2015
-73-
ADJOURNMENT
Mayor William D. Sessoms,Jr., DECLARED the City Council Meeting ADJOURNED at 5:55 P.M.
iAAA4i./1 £ D .r
Amanda Finley-Barnes, CM'
Chief Deputy City Clerk
a
R h Hodges Fraser, MMC
City Clerk
March 24, 2015