Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutJANUARY 10, 2017 WORKSHOP MINUTES -1-
uzu,.
6
r44 is
LyN. ec
VIRGINIA BEACH CITY COUNCIL
Virginia Beach, Virginia
January 10, 2017
Mayor William D. Sessoms, Jr., called to order the CITY COUNCIL'S WORKSHOP in the City Council
Conference Room, Tuesday,January 10, 2017, at 4:00 P.M
Council Members Present:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer,
Barbara M. Henley, Vice Mayor Louis R. Jones, Shannon DS
Kane, John D. Moss, Mayor William D. Sessoms, Jr., John E.
Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
None
January 10, 2017
-2-
ADD ON
Councilman Wood advised on Sunday, May 7, 2017,from 12:00—5:-00 P.M, at Mount Trashmore, EMS
is hosting "ROCK THE SQUADS!" From 12:00— 1:30 P.M. The event is for all Virginia Beach EMS
Volunteers and their families ONLY; however,from 2:00 — 5:00 P.M., the event is open to the public.
Councilman Wood distributed a copy of the invitation for each City Council Member to sign, a copy of
which is made a part of this record. Councilman Wood expressed his appreciation to Joel Rubin and the
Virginia Beach Volunteer Rescue Squad for all their hard work putting this event together.
Mayor Sessoms expressed his appreciation to the entire City Staff for the hard work during this past
weekend's major snow storm. Jim Cantore gave kudos to the City for a job well done during his live
broadcast on the Weather Channel.
Vice Mayor Jones stated he drove to Richmond today and was shocked to see the City's roads are in
better condition than the roads in Richmond.
January 10, 2017
-3-
CITY COUNCIL'S BRIEFING
NORFOLK AIRPORT
PARALLEL RUNWAY
4:03 P.M.
Mayor Sessoms welcomed Robert Bowen, Executive Director— Norfolk Airport Authority. Mr. Bowen
expressed his appreciation to City Council for their continued support:
.}.
N. ■
NORFOLK
INTERNATIONAL
AIRPORT
Robert S.Bowen,A.A.E.
Executive Director
Norfolk Airport Authority
Below is an aerial view of the Airport showing proximity with the Amphibious Base:
Norfolk International Airport- Present
4r.
..
I1
January 10, 2017
I ~ +
-4-
CITY COUNCIL'S BRIEFING
NORFOLK AIRPORT
PARALLEL RUNWAY
(Continued)
The primary runway runs North to South:
Norfolk International Airport- Present
• a
"RIPP1 ! ' '
111
•
1/41
•
e,
11,4'.1/(
The first Environmental Impact Statement (EIS) began in 2000; however, in 2004, the FAA halted the
project. The 2nd EIS began in 2014, only to be halted again in February 2015:
Parallel Runway Environmental Impact Statement(EIS)
First EIS conducted 2000-2004.Halted by the FAA upon
determination that the draft EIS contained a number of deficiencies.
This EIS was never completed.Total cost-$2.9 million.
Second EIS started in 2014.FAA halts the EIS in February 2015.
Airport Authority meets with the FAA in March 2015.At the end of
the meeting the FAA agrees to complete Phase 1 Purpose and
Need.
FAA halts the EIS in September 2015 upon completion of Phase 1.
FAA makes the decision that the EIS Purpose and Need is not
supported by the current or anticipated needs of the airport.
Airport Authority meets with Representative Scott Rigel'at the
airport in November 2015 to discuss the matter.
January 10, 2017
-5-
CITY COUNCIL'S BRIEFING
NORFOLK AIRPORT
PARALLEL RUNWAY
(Continued)
The Airport Authority continues to work with the Congressional Delegation in hopes of resuming the EIS:
Parallel Runway Environmental Impact Statement(EIS)
(continued)
Airport's congressional delegation(Senators Warner and Kaine,
Representatives Rigell,Forbes,Scott and Wittmann)sends a joint
letter in December 2015 to the FAA requesting that the EIS be
resumed and completed.
FAA responds to the congressional letter in January 2016 affirming
its decision to halt the EIS
Airport Authority meets with the FAA and congressional delegation
staffs in Senator Warner's office in June 2016.FAA does not
change it's decision.
Airport Authority continues to work with local,state and
congressional elected officials and staffs to have the EIS resumed
and completed.
The Airport Authority continues to work with the Congressional Delegation in hopes of moving forward
with the Parallel Secondary Runway Project:
Norfolk International Airport
Parallel Secondary Runway Project
Norfolk International Airport(ORF)has two runways-a 9.001primary
runway(5/23)and a perpendicular 4.875'crosswind runway(14/32).A
congressional mandate in December 2015 requires that airport runways
have a 1,000'Runway Safety Area(RSA)at each end.One end of ORF's
runway 14/32 cannot reasonably meet this requirement.This runway is
currently closed for operations as the Airport Authority works with the FAA
to mitigate the safety deficiencies which likely will include shortening and
diminishing the useful length of the runway.
For this,as well as many other reasons.the Authority has been working
with the FAA for over 15 years to construct a replacement runway for
14/32 which would be 6,500'long and located parallel to runway 5/23
After the replacement runway is builtplans call for runway 14/32 to be
demolished and the land re-purposed for other aviation activity.
The FAA has undertaken the first phase of an Environmental Impact
Study(EIS)to evaluate"Purpose and Need".This first phase has ended
and the FAA will not continue to the second phase of the EIS with their
determination that the primary runway has sufficient capacity to meet
expected demand for several years.However,they do support demolition
of runway 14/32.
January 10, 2017
-6-
CITY COUNCIL'S BRIEFING
NORFOLK AIRPORT
PARALLEL RUNWAY
(Continued)
Norfolk International Airport
Parallel Secondary Runway Project
The airport authority strongly takes issue with the FAA's reasoning:
The EIS is not a capacity study,but rather a study to relocate
the secondary runway.
The EIS is not a funding study but rather an environmental
study and the FAA should not disapprove of the runway project
based on the perception that the FAA will not be in a position to
fund the project in future years.
Existing runway 14/32 does not meet congressionally mandated
design standards and is currently closed.Even if the design
deficiencies were mitigated,the airfield suffers from limited
operational efficiency,safety and flexibility.Runway 14/32 has
long had airspace conflicts which are incompatible with nearby
Oceana Naval Air Station and Naval Air Station Norfolk.The US
Navy supports the relocation of 14/32 because of this reason.
Without the relocation of 14/32 we will be the busiest small hub
airport in the nation with only one runway.
The airport will undergo a required milling and paving project in two (2)years. Without the additional
runway, the airport will have to be closed for several months:
Norfolk International Airport
Parallel Secondary Runway Project
The airport authority strongly takes issue with the FAA's reasoning:
The planned 6,500'length of the replacement runway is long
enough to handle any aircraft currently using the 9,001primary
runway. For runway maintenance,the flexibility of having a second
runway onto which aircraft operations can be shifted cannot be
understated.Currently,when major maintenance is performed on
runway 5/23 workers have to labor in a 4-6 hour period at night,
thereby increasing the cost and lengthening the project.
In approximately two years,the primary runway 5/23 will undergo a
milling and paving project which extends the life of the runway
about 10 years.Our engineers have advised that this is the last
milling and paving that can be done before the runway needs to be
reconstructed.This is a major project which involves excavating
into 24-36"of concrete&asphalt and rebuilding the runway.This
means that in about 12 years,if we do not have a secondary
runway in place that can handle commercial air service operations,
we will effectively have to close the airfield to all aviation activity for
several months while runway 5/23 is reconstructed.
January 10, 2017
-7-
CITY COUNCIL'S BRIEFING
NORFOLK AIRPORT
PARALLEL RUNWAY
(Continued)
The rendering below shows the proposed new parallel runway:
ORF 2021
•
i
The Airport entered into a Memorandum of Understanding(MOU) in 1971 with the United States Navy to
protect the airspace over the harbor. The MOU allows the Navy and shipping companies continue
working in the area:
Norfolk International Airport
Parallel Secondary Runway Project
e4 i. `. ., • ' .
Pjace- 1: v4000
✓ 4
S � EX 4TRIG RWY CENTERLINE I••60`
t 7 '
,'r •.... CENTERLINE M1 si�. ^ .
•
•
•
\'`T
January 10, 2017
-8-
CITY COUNCIL'S BRIEFING
NORFOLK AIRPORT
PARALLEL RUNWAY
(Continued)
The FAA established numerous clearances and the Airport is exempt due to an Easement entered into in
1974 to further protect the airspace:
Norfolk International Airport
Parallel Secondary Runway Project
• r >
--
:
-9-
CITY MANAGER'S BRIEFINGS
SMALL BUSINESS PROGRAM
4:22 P.M.
Mayor Sessoms welcomed Warren Harris, Director—Economic Development. Mr. Harris expressed his
appreciation to City Council for their continued support:
City of Virginia Beach
Small Business Update
The City Council appointed a Subcommittee of the Process Improvement Steering Committee to identify
barriers to small business development and expansion in the City:
uver v evv
Subcommittee of Council-appointed Process Improvement Steering
Committee(May 2014)focused on identifying barriers to small business
development and expansion in Virginia Beach.Representatives included:
-Tuck Bowie,Chair -VB Vision
-Asian Business Assoc of Hampton Roads -Regent University
-Hampton Roads Chamber of Commerce -Old Dominion University
-Professional Association of Businesses -Councilmember Dyer
-Minority Business Council -VB Taxpayer Alliance
-Hispanic Chamber of Commerce -Karen Eagle
Committee submitted report May 23,2016
January 10, 2017
-10-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN, and MINORITY
(SWaM)PROGRAM
(Continue)
Below are the concerns of the Subcommittee:
subcommittee Concern..
Doing Accessing Doing
Business Capital Business
IN the city WITH the city
•Large businesses • Not available to •Difficult
given preference small or existing procurement
•Complicated and companies process
cumbersome (Grants) • Restrictive access
regulations (Incentives) to contracts
•Restrictive tax (Loans)
policies (Financing)
•Hard-to-access
resources
Below are the Operational Stages from a systematic format to do business within the City:
- Operational Stages
I want to I am I want to do
operate operating business
a business a business WITH
IN IN the City of
Virginia Virginia Virginia
Beach Beach Beach
Economic Regulatory
Development Requirements City Procurement
Assistance
Small Business Licensing Goods&Services
Programs
Access to Capital, Planning&Zoning Small Business
Workforce,&Opportunity
Creating Climate for Health&Safety SWaM Program
Business Success
January 10, 2017
-11-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN, and MINORITY
(SWaM)PROGRAM
(Continue)
95%of all Virginia Beach businesses have 50 or fewer
employees
One of every three new business start-ups in Hampton
Roads takes place in Virginia Beach
WalletHub ranks Virginia Beach as Best City in Hampton
Roads to start a business,#46 nationally(June 2016)
15 Virginia Beach companies are on 2016 Inc 5000 list of
fastest growing firms in US(26 from Hampton Roads)
Since 2014, 450+ registrants have attended very substantive and informative workshops, as well as
annual SWaM Business Forums:
Small businesses are success,
doing business IN the city
Economic Development and Finance each have two staff
members dedicated to assisting small business and
entre.reneurs
VBDED launched a Small Business Workshop series in 2014 with
more than 450 registrants
VBDED has sponsored annual SWaM Business Forum since 2014
with more than 450 attendees total
6 L
January 10, 2017
-12-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN,and MINORITY
(SWaM)PROGRAM
(Continue)
The City has Regional Partners to enhance the Small Business Development in the City:
FII _4 4:J ii I' JJ iI' i+ f4 i1.;t
VBDA provides$12,500 funding each year to Small
Business Development Center of Hampton Roads
• Has assisted more than 420 Virginia Beach businesses
since 2012
• 1,000 more attended SBDC training
SCORE(Service Corps of Retired Executives)has counseled
more than 1,800 small business clients since 2012 in
Virginia Beach Economic Development offices
One Million Cups:more than 1,400 attendees during first
year
Barry Frankenfield, Director — Planning, advised the Department has undergone changes in order to
enhance the small business development in the City:
Doing Business IN City
Planning: Addressing Staffing
• Hired new Zoning& Planning administrators and Chesapeake
Bay/Environmental Coordinator
• Comprehensive Plan Coordinator moved to SGA/Long Range
Planning Office
Position being advertised January 2017
• Plan Review Coordinator(Ombudsman)position created,
advertised,will be hired by March 2017
• Mechanical Inspector hired
Additional position in process of being hired
• 6 new positions total in Development Services Center and
Planning Administration in process of being filled
H 1
January 10, 2017
.t
-13-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN, and MINORITY
(SWaM)PROGRAM
(Continue)
Specifically, the Development Services Center (DSC) has undergone significant changes in order to
enhance the Small Business Development in the City:
11Ull lt� U11 1i i1:5 i ilii: Crt- / —
Planning: Process Improvement
• Development Services Center(DSC) Single-Family
Review Checklist revised
Weekly DSC Presubmittal and Comment Review
Meetings scheduled
Permits & Inspections fees & processes combined into
single comprehensive checklist
Review of"benchmark cities"for best permitting
practices in process
DSC audit completed; Financial audit to be completed
Spring 2017
The Planning Department continues to work and improve on customer service. Additionally, renovations
to the customer reception and counter areas in the Department will be complete in the Summer 2017:
Doing Business IN the City
Planning: Customer Service
Online Planning Department customer service survey
posted: Results to be distributed first quarter 2017
Customer service training provided to entire Planning
Department staff:Continued and required annually
Renovations to customer reception and counter areas to
be completed Summer 2017
January 10, 2017
v
-14-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN,and MINORITY
(SWaM)PROGRAM
(Continue)
The Commissioner of the Revenue has implemented new software for improving services, as well as,
providing "starter kits"for most common small businesses created:
.,.._.........---
Loving
rLoving Busin�oIN the City
Commissioner of the Revenue
office implementing new
software system for improving
services(live FY18)
New"starter kits"for most
common small businesses •
being created 10
•
City's online business portal
1 being redesigned to be more
welcoming,more user friendly,
and more substantive
Mr. Harris advised the City's Web Portal is also undergoing a major overhaul to enhance the Small
Business Development in the City:
,..Alsting Web Portal
,
_
Nov..., "
January 10, 2017
,r r
-15-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN, and MINORITY
(SWaM)PROGRAM
(Continue)
© _
•1•01 im114
Below is the redesigned Web Portal:
Tools for Business
N(wra Nar+^. .ev 1N.W Me*.Leo",
7.7
.��rur
January 10, 2017
-16-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN, and MINORITY
(SWaM)PROGRAM
(Continue)
Accessing Capital and Incentives is a top priority for companies of any size:
i-Aucessing ie(
Incentives
Accessing capital is top priority for companies
of any size
Included in annual workshop series
Connect to venture capital programs
Connect to state and federal financing resources
City does not have a business loan program
USBFA ,/ -}/
SEW
Well over one-half of the EDIP Grant Awards were to pre-existing City businesses:
Accessing capital and-'
Incentives
SWaM-Certified Companies Nearly Twice as Likely to Receive
EDIP Award as non-SWaM Certified Companies(2011-15)
Existing Companies Three Times as Likely to Receive an EDIP
243 Total Announcements
162 expansions of existing local firms(65%) 81 new locations(35%)
200 non-SWaM certified firms(82%) 43 SWaM(18%)
63 EDIP Grants Awarded
54 of 162 expansions received grant(33%) 9 of 81 new firms(11%)
18 of 43 SWaM firms received grant(42%) 45 of 200 non-SWaM(22%)
EDIP(Economic Development Investment Program): Discretionary grant-
Business License Fee Incentive Program: Entitled tax incentive
January 10, 2017
-17-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN, and MINORITY
(SWaM)PROGRAM
(Continue)
Mrs. Phillips, Director — Finance, advised the City has been working diligently on building a SWaM
Sourcing Program:
Doing Business WITH the
City of Virginia Beach:
Building SWaM Sourcing Program
Below is a brief overview of the History of the SWaM Sourcing Program:
History Highlights
1995 Created Minority Business Council and database to
track minority-and woman-owned business
expenditures and awards--first city in HR to do this
2007 Adopted policy requiring SWaM vendors included
in small procurements
2008 Adopted aspirational goal of 10%
2012 Small Business Enhancement Plan(SBEP)adopted,
requires prime contractors to distribute at least 50%
of subcontracted work on City construction projects
to SWaM subcontractors
2014-16 Held four training classes to help SWaM businesses
learn processes for bidding on city work
18
January 10, 2017
-18-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN, and MINORITY
(SWaM)PROGRAM
(Continue)
The graph below illustrates the programs the Purchasing Department has that go hand-in-hand with the
Economic Development Department:
ED
Expo Outreach onlraclas Workshop
Institute son.
I
Sheltered 1 Procurement i Building prime!Sub Bond
Bidding Opportunity Soorcing Matching I Waiver
Council Program
SWaM Project Center to Economic One Million
SCORE Business Boeing Advanced Cordoning Cups
Forum Meetings Entrepreneurshi
Blue:Finance Job outer Now°- Research
Contracting Procurement Other
Green:Econ Dev system Programs
Gold:Planned
Taylor Adams, Director — Purchasing, advised in FY16 Minority-Owned Businesses received $17.4-
Million, Woman-Owned Businesses: $19.3-Million and Veteran-Owned Businesses: $700,000.
Additionally,for FY17, the City has increased these awards by 6.28%, approximately $3-Million more
than last year at this time:
Program Performance - FY16
Vet: : _
owne.,0.7M
Minority- Woma"t
owned, owned,
17.4M 19.3M
$37.4M, a 24% increase over 2015
January 10, 2017
-19-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN, and MINORITY
(SWaM)PROGRAM
(Continue)
The City is tracking those businesses which have reached out to enhance the Small Business Development
in the City. In FY16, 1,153 SWaM Businesses were contacted:
Program Pertormance - FY16-17
All of FY 2016:
FinancelPurchasing directly solicited 1153 SWaM businesses
• 344 were minority-owned,and 78 submitted bids
• 314 were women-owned.and 127 submitted bids
Through 6 'ths of FY 201
Finance/Purchasing directly solicited 2386 SWaM businesses
• 716 Minority-Owned.and 60 submitted bids
• 482 Women-Owned.and 93 submitted bids
Mr. Adams advised it is difficult to get data from other municipalities as most do not maintain statistics
like the City. Some municipalities report Woman and Minority-Owned Business expenditures as a lump
sum. However, the City's expenditures to Minority-Owned Businesses substantially exceed most of the
other municipalities in the area:
Regional Comparisons
• Getting data from other municipalities is difficult
Portsmouth.Portsmouth Schools.and Hampton each have significantly
less minority-owned business expenditures than VA Beach
Chesapeake&Norfolk do not track women/minority procurement
• Virginia Beach spent$68.5M over the last 5 FY's with
minority businesses(more than all other Cities in the region combined)
• FY16 spending comparisons:
Virginia Beach $17.4 million
Hampton $ 3 million
Portsmouth less than$1 million(FY 13 last report)
• Ratio for State of Virginia is 6.08%,4.8%for Hampton,
6.56%for Virginia Beach
22
January 10, 2017
-20-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN,and MINORITY
(SWaM)PROGRAM
(Continue)
The City continues to be focused on giving the most accurate picture and being transparent:
V i;f yinia Beaui i is i t aiisparent
• Virginia Beach tracks Awards, Expenditures & Outreach
• Finance/Purchasing provides reporting to:
Minority Business Council- Monthly
City Council—Semi Annually
Upon request by other stakeholders like the HRC
Cooperative contracting language included in all non-
construction minority contracts
Significant increases over the last year in minority
participation that reflect program impact
The Purchasing Department has developed some new initiatives in 2017. These, of course, will be
presented to City Council for consideration:
New in 2017
Job Order Contracting
Sheltered Bidding
Develop additional reports
E-procurement
January 10, 2017
-21-
CITY MANAGER'S BRIEFINGS
SMALL, WOMEN, and MINORITY
(SWaM)PROGRAM
(Continue)
Virginia Be,,._ ,
Small Business
Contacts
Warren Harris.Economic Development Director
Scott Hall.Business Development Coedealor
Jeff Small Business Development Manager.SWah/
Ray White.Business Development Manager Entrepreneurs
Barry Fiankentiokl.Planning and Community Development
Patti Phillips.Finance Director
Enybr Adams.Purchasing Agent
Lavera Tolentino.Minority Business Coordinate!Sharon Foster.Minority Business Coordinator
Eva Poole,Virginia Beach Library Director
Phil Kellam.Commissioner of the Revenue
Eric Schmukle.Chief Deputy Commissioner
Dottie Shultz.Deputy Commmrssroner
Tom Zink.Deputy Cornnussroner
25
Bill Thomas, Hampton University, was asked by Mayor Sessoms how Hampton University had been
successful in winning competitive Federal Contracts. From 2000 — 2008, Hampton University led all
Virginia Universities in winning competitive Federal Contracts, with approximately $186-Million
awarded. Mr. Thomas conducted an analysis on the number of SWaM businesses in the City. What he
found is the City has 762 SWaM and 191 minority-owned businesses. Hampton University chose to focus
on Environment, Healthcare (precision medicine and biomedical research) and Technology or "Big
Data". Hampton University has the largest, stand-alone Proton Therapy Institute in the world. Mr.
Thomas advised he is happy to provide his thirty(30)page report.
Mayor Sessoms expressed his appreciation to the entire City Staff and Mr. Thomas for an informative
presentation.
January 10, 2017
-22-
CITY MANAGER'S BRIEFINGS
AMBULANCES
5:31 P.M.
Due to time constraints, this presentation is rescheduled to January 17, 2017:
January 10, 2017
.' v
-23-
CITY MANAGER'S BRIEFINGS
STORMWATER PROJECTS
and FUNDING
5:32 P.M.
Mayor Sessoms welcomed Phil Davenport, Director — Public Works. Mr. Davenport expressed his
appreciation to City Council for their continued support. Mr. Davenport provided a Reference Book to
City Council, a copy is made a part of this record:
SUMMARY OF FY 2018 - 2023
STORMWATER
UNFUNDED NEEDS
JANUARY 10,2017
Below is a Stormwater Management Synopsis:
STORIWA MANAGEMENT SYNOPSIS
• Stormwater Management consists of three interconnected elements: Flood Control/Drainage,Water
Quality/Regulatory Compliance,and Operations&Maintenance
• Two of these are as old as civilization—Flood Control/Drainage and the Operations&Maintenance
needed to assure adequate Flood Control/Drainage
• Stormwater Quality/Regulatory Compliance is the newest element first appearing in the 1970's.with the
first major regulations in the 1980's,with ever more stringent regulatory requirements bringing us to the
present with many specific regulatory programs:VSMP,E&S,TMDLs,and the NPDES MS4 program
(all this the subject of the June 7.2016 presentation to Council)
• Sea Level Rise and the apparent increase in the frequency of storms with major rainfall is revealing
those areas now(or soon to be)experiencing Recurrent Flooding(this topic was included in the April
22,2014 presentation to Council)
• Recent storm events have produced major flooding in several areas such as Ashville Park,Sherwood
Lakes,Windsor Woods.PA Plaza/Pecan Gardens.the Lakes.Eastern Shore Dnve.and the Central
Resort Area(Two of these have been subject of previous council presentation:Central Beach District
Drainage—June 23,2015 and Eastem Shore Drive Drainage Improvements Project Briefing Part II—
April 22.2014.)
Funding for Stormwater Management has not kept up with these increasing demands
• The presentation to Council on December 13,2016 identified the main current unfunded needs in
Stormwater Management
2
January 10, 2017
-24-
CITY MANAGER'S BRIEFINGS
STORMWATER PROJECTS
and FUNDING
(Continued)
There are three (3) major functional components of a fully integrated system, made up of Water I
Quality/Regulatory Compliance, Flood Control and Operations and Maintenance:
THREJNIAJOR FUNCTIONAL COMPONENTS
FULL
Water Quality I Regulatory Compliance
• Program Compliance/Ongoing Activities/Projects Flood Control
•• June 2016 Estimated Annual Program Cost$8 to$12M Programing and ManagemeStormwater
ter
Drainage Improvement Projects
• FY17 Funding$4.2M(CIP&Operating Annual Funding) • FY17 Funding$7.3M
• Unfunded Request • 8 Projects$360M
• Projects=$5.5M annually+$13M one time
• Staff for Implementation of Program Elements: • 3 FTEs—Flood Control Projects
10 FTEs
Flood Control
Center of Excellence Center of
• Stormwater Management Strategic Planning water Excellence
Quality&
• FY17 Funding$0.4M Regulatory - Operations&
/
• Completion of Citywide SWM Master Plan$2.3M Compliance Maintenance
• 5 FTEs—Center of Excellence
Operations and Maintenance
• Regulatory Compliance/Aging Infrastructure/Expanded Infrastructure
• FY17 Funding$37.1M
• Unfunded Request$55.5 M
• Operations and Maintenance Projects
• Staff for Implementation:12 FTEs
a
FLOOD CONTROL
Water / Flood Control
Quality _ �(7, ,, /—
Center of
--- Excellence
Operations&
Maintenance
January 10, 2017
-25-
CITY MANAGER'S BRIEFINGS
STORMWATER PROJECTS
and FUNDING
(Continued)
FLOOD CONTROL
• Needs are associated with new flood control CIP projects.
• Capital Improvement Program
• $359.9M of Flood Control projects
• Flood Control Projects Additional Staff
• FY18$381k(to support 3 FTEs)
• FY 19 and beyond$283K annually(to support 3 FTEs)
Below is the list of Flood Control Needs:
FL
CIP# Pro'ect Title Total Re.uested
7-400 Aragona Drainage Improvements 1,400,000
7-028 Windsor Woods Drainage 31,100,000
Princess Anne Plaza/Pecan Gardens
SW-FCA Drainage Improvements 66,000,000
SW-FC3 The Lakes Drainage Improvements 28,000,000
7-029 Eastern Shore Drive Drainage-Phase II 65,400,000
SW-FC1 Ashville Park Drainage Improvements 35,000,000
SW-FC2 Sherwood Lakes Drainage Improvements 20,000,000
Central Resort District Drainage
7-041 Improvements 113 000,000
Total 359,900,000
January 10, 2017
.
-26-
CITY MANAGER'S BRIEFINGS
STORMWATER PROJECTS
and FUNDING
(Continued)
CENTER OF EXCELLENCE
Water Flood Control
Quality
viV
Center of
&it
' - Excellence
Operations&
Maintenance
The Center for Excellence has a two- fold mission: Stormwater Strategic Planning and Special
Stormwater Services:
CENTER OF
• The Center of Excellence twofold Mission:
• Stormwater Strategic Planning
• Citywide Stormwater Master Planning
• City Comprehensive Plan for Sea Level Rise and Recurrent Flooding
• Development of Regional Stormwater Management Plans
• Development of Maximized Stormwater Practices for Tidewater Areas
• Special Stormwater Services
• Technical Support to the Planning/DSC for complex Private
Development Projects
• Technical Support for SWM Public/Private Agreements
• Development and Maintenance of Stormwater Standards
• Management and Data Analysis of the City System of Rain and Tide
Gauges
a
January 10, 2017
-27-
CITY MANAGER'S BRIEFINGS
STORMWATER PROJECTS
and FUNDING
(Continued)
Below are the unfunded needs for the Center for Excellence:
CE1111111.1111111111
• Unfunded Needs
•Completion of Citywide Stormwater Management Master
Plan:$2.3M
•Additional Staff Resources
• FY18$637K(to support 5 FTEs)
• FY 20 and beyond$518K annually(to support 5 FTEs)
The main driver of the Water Quality/Regulatory Compliance is the new MS4 Permit requirements.
WATER QUALITY ,
alma
Water Quality Flood Control
& Regulatory
Compliance
Center of
Excellence
\\ �``\
Operations&
Maintenance
January 10, 2017
-28-
CITY MANAGER'S BRIEFINGS
STORMWATER PROJECTS
and FUNDING
(Continued)
The very preliminary cost estimate of the FY18 MS4 Permit is approximately$12.3-Million:
MS4 STo
FY 201
[vim=$0.8M CIP June 2016
+$0.2M Operating j [$8M-$12M
L$1M-$1.5M Program December 2016
Administration
andReporting $8.1M=$5.5M CIP
+$2.6M Operating
Stormwater Operational
Pollution Requirement
Reduction
MS4
Program �$3.4M =$1.7M CIP
$2.9M=$2.5M CIP +$1.7M Operating
+$0.4M Operating - -
InfrastructurePublic 1-$4M-$5.5M
$2M-$3MOutreach
Data
and
Management
Education
$0.4M=$0.2M CIP $0.4M=$0.3M CIP
+$0.2M Operating Total SW Permit Program +$0.1M Operating
$0.5M-$1M $4.2M+$8.1M=$12.3M $0.5M-$1M
WATER QUALITY
FY 2018 UNFUNDED.NEEDS , •
•All needs are associated with compliance with the MS4 permit.
• Operational(Staffing and Equipment)
• FY17 Adopted$1.05M
• FY18$626k(additional to support 6 FTEs)
• FY19$474K(to support an additional 4 FTEs)
• Total FY19 and beyond$1.1M annually(to support 10 FTEs)
• Capital Improvement Program
• $5.5M annually+$13M one time
•Annual implementation costs of the new and expanded permit program
elements including Chesapeake Bay and Local TMDL projects
•Chesapeake Bay TMDL Action Plan Requirements:Implementation of
projects to meet the First Phase(5%reductions);costs associated with
the remaining 95%reductions are not included
January 10, 2017
-29-
CITY MANAGER'S BRIEFINGS
STORMWATER PROJECTS
and FUNDING
(Continued)
The City has a mature and aging drainage system and must address the maintenance of the existing
system. Only after the City is confident the system is in good repair and property cleaned and
maintained, they move to the engineering design and construction solutions:•
OPERATIONS AND MAINTENANCE
Water , Flood Control
Quality illi
or
Center of
lir
Excellence
Operations &
Maintenance
OP 41111111111.1111111 ,
Total
Project Title FY 18 Requested Program Rationale
7.011 Oceanfront Storm Water Facilities Maintenance: 900.000 5.400,000 Critical Aging Structure
7-412 Storm Water Pump Station Modifications: 500,000 3,000,000 Critical Aging Structwo
7-023 Primary Infrastructure Improvements II 500.000 3,000,000 Reduced Cycle Time
7-026 Residential Drainage Cost Participation Phase II 100 000 600,000 Citizen Requests
7-412 Storm Water Pump Station Modifications 500,000 3,000,000 Infrastructure Lifespan
7-415 Lake&Canal Management Phase II 500,000 3.000,000 Reduced Cycle Time
7-616 SW Infrastructure Rehabilitation&Improvements II 2,500,000 22,500,000 _ Infrastructure Lifespan
7-NEW Shore Drive/Hollis Road Drainage 3,000,000 3,000,000 Flooding
7-NEW Canal Management Phase I 2,000,000 12,000,000 Reduced Cycle Time
Total of All Tiers. 10,500,000 55,500,000
January 10, 2017
-30-
CITY MANAGER'S BRIEFINGS
STORMWATER PROJECTS
and FUNDING
(Continued)
Below are the unfunded needs of the Operations and Maintenance:
OPERA S:
• Unfunded Needs
• Capital Improvement Program
• $55.5M of 0& M projects
•Additional Staff Resources
• FY18$1.52M(to support 12 FTEs)
• FY 20 and beyond$880K annually(to support 12 FTEs)
DISCUSSION
NEXT STEPS
January 10, 2017
-31-
ADJOURNMENT
Mayor William D. Sessoms,Jr., DECLARED the City Council Meeting ADJOURNED at 6:25 P.M.
Amanda Finley-Barnes, MMC
Chief Deputy City Clerk
Ruth Hodges Fraser, MMC
City Clerk
January 10, 2017
-31-
ADJOURNMENT
Mayor William D. Sessoms,Jr., DECLARED the City Council Meeting ADJOURNED at 6:25 P.M.
g#14
7
manda Finley-Barnes, MC
Chief Deputy City Clerk
h Hodges `raser, MMC
City Clerk
January 10, 2017