HomeMy WebLinkAboutMARCH 10, 2015 WORKSHOP MINUTES g41A BE,44A
440Y,DAZ 1414441.117
• r
It:
VIRGINIA BEACH CITY COUNCIL
Virginia Beach, Virginia
March 10, 2015
Mayor William D. Sessoms, Jr., called to order the CITY COUNCIL'S WORKSHOP in the City Council
Conference Room, Tuesday, March 10, 2015, at 4:00 P.M.
Council Members Present:
M. Benjamin Davenport, Robert M. Dyer, Barbara M Henley, Vice
Mayor Louis R. Jones, Shannon DS Kane, John D. Moss, Mayor
William D. Sessoms, Jr., John E. Uhrin, Rosemary Wilson and James
L. Wood
Council Members Absent:
Amelia N. Ross-Hammond
-2-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
4:00 P.M.
Mayor Sessoms welcomed Phil Davenport, Director — Public Works. Mr. Davenport expressed his
appreciation to City Council for their continued support. Today's presentation will provide an update to
the Stormwater CIP:
ftl‘
11
1
Stormwater
Management
Update to City Council
k
March 10, 2015
u
Below is an overview of today's presentation:
(.1\
Overview
• FY12-15 Stormwater Utility
Increases & Fund Summary
• Functional Components
• Summary
• Discussion
k
z
March10, 2015
-3-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
•
FY12-15 Stormwater
Utility Increase & Fund
•
Summary
•
3
This provides the FY2012-2015 Stormwater Utility Increase and Fund Summary:
FY12-FY15 Stormwater Resourcing
Project/Program Funding
Coal Rpuired FY12 FY13 FY14 FY15 Nob,
North Lake Holly(CIP 7-005) $1711 $3.2211 .50 Restores FY11 cut(Committed thin
2020)
South Lake Holly)CIP 7-015) $12.7M $4.98M .80 Restores FY11 cut(Committed this
2020)
Cape Henry Beach Drainage $50M $6.9M 1.00 1.50 Restores FY11 cut(Committed thin
)CIP 7-151)(E Shore Dr Drainage) ($71M( (558M) 2018)
Stand-up Two(2)Off-Road $1.7M $.85M .90 .90 Increases response to cltizen
Ditch Crews requests
Stand-up Additional Pipe $311 $.eM .90 Increases response to citizen
Structure Crew(Cave-in) requests for infrastructure restoration
Lake Management(CIP 7-152) $84M $3.25M 2.00 1.00 1.06 Restores FY12 cut/Initiates a 100
(pond/lake/canal dredging) year Maintenance Cycle
Neighborhood Infrastructure $37M $7.25M 1.550 1.35 1.55¢ Prevents FY12 cull Initiates en 180
Rehabilitation)CIP 7-004) year Maintenance Cycle
Partial Debt Serviced
Stormwater Enhancements $8M $857K .350 .550 .950 Prevents FY12 cut
Sub-basin retrofits(CIP 7-183) Begins to address Chesapeake TMDL
Stormwater Pump Maintenance 8 $3.011 $50ns .300 .20 Initiates a Maintenance,Repair and
Repair(CIP 7-412) Replace Program
Oceanfront Stormwater Facilities $1.5M $250K .20 Initiates a Monitoring.Maintenance
Maintenance)CIP 7-411) end Repair Program
Virginia Stormwater Management Initiates a Program to meet the State
Program(VSMP)Compliance 1.70 VSMP Compliance Requirements
TOTAL 7.50 50 ny 1.70
4
March10, 2015
-4-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
Below is the FY2015 Fund Summary:
FY15 Fund Summary
• SWU Generates $39,062,647 Annually
• 1 Cent per Year= $897,867
• ERU's (FY 15) = 245,991
• ERU Annual Fee = $158.05
• ERU Daily Fee = $0.433
5
The Sources of Fees are provided below:
tW Sources of Fees
zx x.b..bi
Of.bmP
1 Residential lot=1 ERU(equivalent residential unit) 6
1 ERU=2,269 square feet of impervious area
Marchl0, 2015
-5-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
This provides the twenty-five (25)year Bonds that have been issued with the Total Debt Service payments
for FY17 Proposed Budget of approximately$3.1-Million:
TN
f. '` Stormwater Debt
Debt Amount Interest Rate Debt Service
Payments(FY16)
2010B Storm $5,520,000 2.607%
Water Revenue
Refunding Bonds
2010A Storm $17,860,000 3.171% $1,747,655
Water Revenue
Bonds
2015 Storm Water $23,500,000 2.871% $1,357,556
Revenue Bonds
Total $46,880,000 $3,105,211
7 Truw '
ti,
, �f Stormwater Debt
Year Authorized Authorized and Series 2015 Remaining
Unissued Bonds Authorized and
Unissued
2006 $ 448,400 $ 448,400 $0
2008 $6,000,000 $ 6,000,000 $0
2011 $16,300,000 $16,300,000 $0
2013 $12,500,000 $751,560 $11,748,440
2014 $9,000,000 V0 $9,000,000
Total $44,248,440 $23,500,000 $20,748,440
8
March10, 2015
-6-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
The sale of the remaining $20.7- Million in authorized and Unissued Debt will allow for the following
changes in financial strategy for the program:
.µ : Stormwater Capital Financing
Strategy Change
• CIP has been funded at high levels from pay-go
• Proposing to reduce pay-go and increased bond
funding
• Allows for increased capacity to fund CIP
projects
• Allows additional cash to fund street sweeping
1 expansion
v___ . ,
4i1.1..,,,,,,,,i,
Functional Components
10
March 10, 2015
-7-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
The program consists of three (3) major functional components, they are: Flood Control, Water Quality
and Operations and Maintenance:
��a
Program Overview
. g
•
Functional Components
Flood-Control
o w,ater§Quality
c Oper,-atio $....8i Maintenance
11
For example, Flood Control projects include Water Quality measures and often resolve on-going
Operations and Maintenance issues; Water Quality projects contribute to system effectiveness, keeping
pipes and channels clean; and, effective Operations and Maintenance of the system preserves Flood
Control capacity and enhances Water Quality measure efficiency. All three are done in concert to meet
citizen expectations and to maintain compliance with State and Federal Mandates:
Three Major Components
Fully Integrated
Water Flood Control
Quality -
Operations &
Maintenance
12
March10, 2015
-8-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
Using a combination of Operating Budget funds and Capital Improvement Plan with debt service the
program's total financial resources total nearly$58-Million allocated as follows:
•- '_ FY15 Resource Allocation
t `i
ttt
Operating and CIP
Flood Control 22% $13,014,976 Total Program
Water Quality 22% $12,459,804 1 $57,873,659
Operation and Maintenance 56% $32,398,879 -
OOP
Flood Control
22%
Operations&
Maintenance
56%
13
•
‘rar----/- --
Flood Control
Water \ /Flood Control
Quality
i
'?---- operations&
Maintenance
14
March10, 2015
-9-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
These are the Flood Control Recent Accomplishments representing almost$28-Million:
!� Flood Control
Recent Accomplishments
CIP Project Name Cost Completed
7-902 61st Street Pump Station and Drainage $18.000,000 8/31/2012
7-010 Elizabeth River Shores $2,100,000 10/31/2012
7-016 South Lake Holly Watershed-Section III $2,300.000 9/30/2013
1 7-151 Eastern Shore Drive Interim Drainage Improvements $125,000 1/31/2014
IIS Ocean Park Tidal 8 Rainfall Flooding Evaluation 8 Interim
l 7-063 Improvement $500,000 6/30/2014
7-005 North Lake Holly Drainage Improvement-Section II $4,700,000 12!31/2014
Totals $27,725,000
15
The requested Flood Control Program FY2016 Budget is $5.35-MILLION. The funding will be used to
support the following thirteen (13) CIP projects. Specifics regarding each project are identified in the
next several slides:
tr-
,CFY 16 Requested — Flood Control
7-400 Aragona Drainage Improvements
7-036 Baker Road Culvert&Ditch Improvements
7-037 Bellamy Manor Outfall Ditch
7-030 Citywide Sea Level Rise/Recurrent Flooding Analysis
7-402 College Park/Level Green Drainage Improvements
7-151 Eastern Shore Drive Drainage
7-035 Lawson Forest Drainage
7-413 Neighborhood SW Infrastructure Improvements II
7-005 North Lake Holly Watershed
7-024 Southern Canal/Lead Ditch and Culvert Improvements
7-016 South Lake Holly Watershed
7-038 Thoroughgood Drainage
7-028 Windsor Woods Drainage
16
March10, 2015
-10-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
Aragona Drainage Improvements is scheduled for completion in June 2019, totaling$2.4-Million:
Flood Control
7-400 Aragona Drainage
Improvements
_' — Storm drain
{~ : 4 . improvements to address
severe roadway and
• F-j ? property flooding
�, throughout Aragona
�''r Village
- Completion in June 2019
1 -
�, �., $2.4M
17
Baker Road Culvert and Ditch Improvements are in the acquisition phase totaling$450,000:
Flood Control
7-036 Baker Road Culvert &
Ditch Improvements
z
- Storm drain pipe and ditch
improvements from Baker
Rd.to Diamond Spring Rd.
north of Northampton Blvd .
- Coordinating with Burton
. I Station SGA
- Acquisition phase
5450 K is
March10, 2015
-11-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
Bellamy Manor Outfall Ditch is scheduled for completion in June 2016, totaling$750,000:
•
Flood Control
'" •
\ 7-037 Bellamy Manor
Outfall Ditch
- Drainage
improvements to the
existing primary
drainage system within
Bellamy Manor
° —Under design
-Completion in June
2016 $750 K 19
Citywide Sea Level Rise/Recurrent Flooding Analysis and Study is a three (3) year study of major
watersheds within the City, totaling$3-Million:
44).
� Flood Control
7-030 Citywide Sea Level Rise/Recurrent
Flooding Analysis and Study
- First phase Lynnhaven River
watershed
- Identify the probable extent of
SLR/RF impacts
- Evaluate appropriate
adaptation strategies in the
vulnerable areas; and
- Develop Implementation Plan
$3.O M 20
March10, 2015
-12-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
College Park/Level Green Drainage Improvement Project is scheduled for completion in June 2019,
totaling$1.6-Million:
,T,
,
Flood Control
7-402 College Park/Level
Green Drainage
t
Improvements
• Drainage improvements
of neighborhood storm
a "", , drain system
, 1 • Design begins FY 2015
• Completion in June 2019
If*
$1.6 M 21
Eastern Shore Drive Drainage Project is continuing with design and acquisition for Phase I and II;
however, construction will not move forward pending the results of the three (3)year Citywide Sea Level
Rise/Recurrent Flooding Analysis and Study:
T,f
li.
Flood Control
7-151 Eastern Shore Drive Drainage
• Drainage study July 2012—June 2014
• Total project cost >$70M
• Phase I and II design & acquisition underway
• Construction pending outcome of SLR study
i , -
hc -4,
,,:-., r_ , __
I
$17.7 M _-
22
March10, 2015
-13-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
Lawson Forest Drainage Project is scheduled for completion in the Fall, totaling$1.0-Million:
`�- Flood Control
7-035 Lawson Forest
Drainage
„or,'" t — Neighborhood drainage
improvements
— Existing storm drain systems
cleaned and evaluated
- Completion in Fall 2015
•
$1.0 M
- r
23
This provides an overview of the Neighborhood Stormwater Infrastructure Improvements II project:
Flood Control
7-413 Neighborhood Storm Water Infrastructure
Improvements II
Current Projects Completed Projects
• 24th-1/2 Street Drainage Imp'ts •Ocean Park Drainage Imp'ts
• Indian River Rd. and Muddy •Southside Rd.Drainage Imp'ts
Creek Rd.Culvert Imp'ts •Oak Street Drainage
•Goodspeed Road
•Cosgrove Drainage Imp'ts
41 , $8.0M
24 .°. _.
March10, 2015
-14-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
North Lake Holly Watershed is scheduled for completion in June 2018, totaling$17.9-Million:
gTT
, Flood Control
7-005 North Lake Holly Watershed
Legend Completion in June 2018
Completed
_ Section I-A $1.43M
$1 l 9 M
Section I-B $2.47 M #
Section II $4.7 M
"fon
Advertise for Construction
Section IV $z of M 114 � '� -
Const.512015-5/2016 Y I t'• �� ^r
Under Design
-Section I-C s1.81 M 1 ,...
Const.9/2016-6/2018
Section III $3.99 M .✓t -4..,`'{
Covet.5/2016-6/2018 -!'- tai
25
South Lake Holly Watershed is scheduled for completion in November 2018, totaling$14.7-Million:
. % Flood Control
7-016 South Lake Holly Watershed
Legend
Completed Completion in
Section III $2.3 M
Const.912013 November 2018
Under Construction •
Section II $3.91 x /'
Const.9/2014-2/2017
Section I $0.60 M C
Const.912014-2/2017 iry 1h
Under Design
t,.�,
Section IV ss.oax A „� t�1 4°�
Const.5/2016-1112018
$14.7 M 26
March10, 2015
-15-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
This provides an overview of the Southern Canal/Lead Ditch and Culvert Improvements:
M.-- Flood Control
$3.2 M
7-024 Southern Canal/Lead Ditch
$300 K annually
I Wad I and Culvert Improvements
o' . r '. ' Completed
OK Princess Anne Rd./Morris Neck Rd
1 ;r : Under Construction
1 Head River Rd
�,-,% Crags Causeway
Indian Creek Rd
II Indian River Rd
I,- 4 ill,. Future Construction
�
c: Muddy Creek Rd
LEGEND Before After
oProposedDitch s Culvert Improvements
Completed ',r
0 Improvements 27
Thoroughgood Drainage is scheduled for completion in December 2015, totaling$870,000:
Cr%
Flood Control
IIM 7-038 Thoroughgood
(CO Drainage
;7- - Drainage
S••„14
el, .0
• $870 K improvements of
neighborhood storm
drain system
— Under construction
'''"4
'1040.?-' —Completion in
December 2015
' y
28
March10, 2015
-16-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
Windsor Woods Drainage Project preliminary design should be complete in June 2015 with the first
phase to include improvements to Presidential Canal. Currently, $8.2-Million is allocated; however, it
will take approximately$30-Million to complete:
Flood Control
7-028 Windsor Woods Drainage
Rt 'li���s'�_✓
�'Jt 1,,kEOft
- Drainage improvements to
�e4w11 ��,,,, alleviate wide spread
4
`E" $8 2 M repetitive storm water •
to A • flooding
- Under preliminary design—
�r,: r
• completion June 2015
•
— First Phase will include
improvements to
Presidential Canal
— Budget to Complete$30 M
Rosa neer Clubhouse 29
This provides the FY2016-2021 Program Review, totaling$80-Million:
Storm Water FY 2016-21
Program Review - Flood Control
FY 2016
CIP Proposed Anticipate;:
Project Total Budget Corn pletrm
7400000 Aragon Drainage Irrprovemants 2880800 625,000 06/30/19
7036000 Baker Road Culvert 8 Ditch k provements 458000 0 11/30/16
7037000 Bellamy Manor Outfall Ditch 758000 300,000 06/30/16
7030000 Cityw de Sea Level Rise/Recurrent Flooding Analysis 3.000.000 0 01/30/18
7402000 College Park/Level Green Drainage Improvements 1,598887 273,687 06/30/19
7151000 Eastern Shore Drive Drainage-Phase I 17339.356 0 Not Fully Funded
7035000 Lawson Forest Drainage 1,080,000 0 11/30/15
7413000 Neighborhood SW Infrastructure Improvements II 7,998995 1,458,066 Annual
7005000 North Lake Folly Watershed 17,871,135 300.000 06/30/18
7016000 South Lake Holly Watershed 14,738,000 900,000 11/30/18
7024000 Southern Canal/Lead Ditch and Culvert Improvements 3,250,000 300.000 Annual
7038000 Thoroughgood Damage 870,000 0 12/31/15
7028000 Windsor Woods Drainage 8,200.000 1,200,000 Not Fully Funded
Report Total 79,907,173 5,356,753
30
March]0, 2015
-17-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
V".1)
L
i
Water Quality
Water /Flood Control
Quality
•
operations&
Maintenance
i31
These are a few of the Water Quality Program Drivers:
Water Quality
Program Drivers
l• Federal Clean Water Act
— NPDES / MS4 Permits
—TMDL's
• State Stormwater Laws &
Regulations
• VSMP
• E &S
• Virginia Beach Citizens'
Expectations
• Environmental Committees
and Organizations 32
March10, 2015
-18-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
These are the Water Quality Recent Accomplishment, representing almost$1.65-Million:
Water Quality
Recent Accomplishments
CIP Project Name Cost Completed
7-414 Lynnhaven Middle School BMP Retrofit $100,000 12/31/12
7-183 Municipal Manna Pump-Out Conversion $200,000 12/31/12
7-183 Larkspur Middle School BMP Retrofit $400,000 12/31/13
7-410 Southern River Bacterial Source Identification $200,000 06/30/14
7-153 MO Dam Creek Bacterial Source Identification $600,000 10/31/14
7-183 Private Boater Pump-Out Program $150,000 10/31/14
Total= $1,650,000
33
i TRecent Accomplishments
„..„...,,i
Larkspur Middle School Lynnhaven Middle School
Lynnhaven Municipal Marina - - i
Boater Pump-out
34
March10, 2015
-19-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
The Capital Improvement Plan currently includes the following Water Quality Projects for FY 2016:
Water Quality
Program Review
7-406 Elizabeth River TMDL Implementation Plan
7-153 Lynnhaven Watershed Restoration
7-410 Southern River TMDL Implementation Plan
7-414 Storm Water Quality Enhancements II
7-027 SWM Master Planning,Analysis,and Inventory
7-159 Water Quality Participation Projects(USACE,State)
35
The Elizabeth River is also part of the Chesapeake Bay Watershed. The City is developing an
Improvement Plan:
f Water Quality
`,LPg)^TH .RSD
7-406 Elizabeth River TMDL
yImplementation Plan
• R*sfotaOwr River • i
•
— Elizabeth River impaired by bacteria,
PCBs,nutrients,sediment fluabNh w...
— Develop improvement plan •
— Public participation,education and f y
information
— Target Stormwater retrofits,bank
stabilization and wetland creation •
— Woodstock Cove
$200 K annually - ` 36
March10, 2015
-20-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
The Lynnhaven River is a high priority Watershed located in the Chesapeake Bay. The City is working to
address the Total Maximum Daily Load(TMDL) and the Improvement Plan:
%i Water Quality
7-153 Lynnhaven — Address Lynnhaven TMDL and its
Watershed Restoration improvement plan
— Dey Cove
— Mill Dam Creek stream bank
restoration
— Municipal marina pump out
— No Discharge Zone
— New Federal Authority—
"Lynnhaven River Basin
{ , Ecosystem Restoration"
• — Wetlands restoration
— Oyster reef creation
$800 K annually — Bank stabilization 3,
The Southern River Watershed includes the Back Bay, North Landing and Northwest River secondary
watersheds. There are permit requirements to implement projects and programs to address local TMDLs
for these waterways and this CIP will be used to meet those requirements:
Water Quality
7-410 Southern River
•
• " TMDL Implementation
nib_ r Plan
— Meeting implementation required by
new VPDES permit and TMDL
— Public participation,education and - ^^
information
— Watershed monitoring analysis,study,
design and construction of retrofits
$200 K annually38
March10, 2015
-21-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
The Stormwater Quality Enhancements II Project serves as a catch-all for several projects including:
fr,,,.T.)
Water Quality
7-414 Storm Water Quality Enhancements II
— Funds storm water quality City
wide
—Dry weather field screeningPI w >-
— Illicit discharge detection and *Q4 a
elimination
—Boater education and pump out W,
program C3
— Owl Creek Boater Pump-out to ,,.-
— Rudee Inlet Watershed Retrofit FjV
Study 's
- Turtle Lake Retrofit(Chesapeake
ET-0
Bay TMDL) Public Information
$ 1.7 M annually 39
The Stormwater Management Master Plan was created in the 1990's. Public Works is working to update
the Plan to ensure the City is meeting regulatory compliance standards:
.0,-,,i; ,.....___
Water Quality
7-027 SWM Master ,,Y,,• .':A- ,y
Planning,Analysis, and - '� ,;�_,
Inventory l Al-1
- Maintain existing Citywide model
and update inventory r
— Embarked on new stormwater `'47 :<
master plan for entire City >
— Update Inventoryy 64
1"",...7 bZ
— Focus and emphasis on
regulatory water quality s,':,.i. L ,'S ,
requirements
— GIS based
— Ultimate goal i iC:14C4. --" ='''.41. ' 41?-
- Identify opportunities for
system improvements
— Regulatory compliance $8.6 M 40
March10, 2015
-22-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
Below are the specifics regarding the Water Quality and Restoration Participation project:
C)
Water Quality
$100 K
annually
Picture from
i'::".*,. ..,,, , .;.:7 phragmites
- harvesting report
-r-p, '...w.-I
7-159 Water Quality Participation Projects(USACE, VA)
— Provides matching funds for State and Federal stormwater quality
grants&programs on a 50/50 basis
— Funding studies of oyster reefs and dredging usage for compliance
with TMDL's 41
The requested FY2017 Budget is just over $4.2-MILLION for this CIP, consisting of these six (6)
projects:
".. � Storm Water FY 2016-21
Program Review — Water Quality
CIP FY 201b
Project Total Budget
7406000 Bizabeth River TMJL Implementation Ran 2,000,000 200,000
7153000 Lynnhaven Watershed Restoration 9,206,480 809,068
7410000 Southern River TMDL hlplementation Ran 2,000,000 200,000
7414000 Storm Water Quality Enhancements II 16,179,704 1,402,694
7027000 SWM Master Ranning,Analysis,and Inventory 8,570,906 1,500,000
7159000 Water Quality Participation Projects 1,886,499 100,000
Report Total 39,843,589 4,211,762
42
March10, 2015
-23-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
56%of the CIP is allocated for Operations &Maintenance:
f.T
r -
E Operations and
Maintenance
Water ,./) ,Flood Control
Quality1
I , •perations &
Maintenance
43
Operations and Maintenance
• Funding Overview
• Accomplishments & Requirements
• Resourcing I Backlog
1 44
March10, 2015
-24-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
This provides the specific information for the FY2015 Stormwater Operating and CIP Budgets:
` Operations FY15
Operating & CIP Budget
Dams, BMP/WC) Stormwater
Spillways, Inspection Pipe
• Stormwater Pipe Lake Weirs 3% Maintenance
Maintenance 2% f24%
Maintenance 14%
• Off-Road Ditches
• Roadside Ditches Pump
• Street Sweeping Stations
5%
• Cave-in Repairs
• Pump Stations
• Lake Maintenance Cave-in
Repairs• OH-Road
Dams,Spillways,Weirs 17% Street Roadside
• BMP/Water QualityDitches R° lde 21%
Sweeping Dehes
Inspection 5% 9%
Total FY15 Funding:$32,398,879] 45
Here are the specifics regarding the Stormwater Pipe Maintenance:
(WStormwater Pipe Maintenance
.)Stormwater Pipe:Approximately 2200 miles
•
•
Scoping includes:
• Large neighborhood system rehabilitation
• Stormwater system condition assessment W
• Aging infrastructure&strategic planning
• Asset information management •
• Isolated system failure repairs
Capability:
• Current cycle-180 years($5.2M/yr)
(FY11:550 years)
• Rehabilitation cycle goal:100 years($10M/yr)
• Typical design life:50 years
Accomplishments:
• Neighborhood Pipe Rehabilitation Accomplishments:
- FY13:Princess Anne Plaza,13.1 Miles,Cost:$5.5M
- FY14:Aragona,12.9 Miles,Cost:$2.8M
- FY15:Green Run,18.9 Miles Under Const.,Estimated Cost:$2.8M
46
March10, 2015
-25-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
The Stormwater Infrastructure Rehabilitation and Improvements project includes these seventeen (17)
projects totaling$6.57-Million each year:
A
1 Stormwater Pipe Maintenance
CIP 7-416 SW Infrastructure Rehab & Improvements
Neighborhood Est. Pop. Cost Const. $6.57M annually
Green Run 1970s 19,000 $4M FY15
Glenwood 1980s 10,000 $3M FY16
Pine Ridge/Hunt Club/Middle •
Oaks/Strawbridge 1980s 6,000 $1.5M FY16
Kings Grant 1960s 9,000 $2M FY17 F*
Magic Hollow 1970s 10,000 $2M FY17 "),P6,
Fairfield 1970s 6,000 $2M FY18
Southgate 19805 3,000 $1M FY18
Ocean Lakes 1980s 7,000 $2M FY19
Windsor Woods 1960s 5,000 $2M FY19 _.W
Indian Lakes 1970s 8.000 $2M FY20
Salem Woods 1980s 6,000 $2M FY20 ~--
Salem Lakes 19805 10,000 $1M FY21
Red Mill Farms 1980s 19,000 $2M FY21
Lagomar 1980s 4,000 $1M FY21
Malibu 1960s 5,000 $1M FY22
Foxfire 1990s 5,000 $1M FY22
Courthouse Estates 1990s 8,000 $2M FY22 47
Here are the specifics regarding the Off Road Ditch Maintenance Plan:
A
Off Road Ditch IVA
Maintenance
Plan
Council Districts Off Road Ditch
Miles of Ditch Mainlonancs Program
with Milos by Fiscal Year
Bayside-12.0 YEARS) MILES
Beach—13.7 --FY14: (F,J) 21 4.11
Centerville-4.6 —FY15 (13,1.1) 23 •
!)
Kempsville—14.6 FY16. (C.N) 16
—FY17: (0,1.1 25
Lynnhaven-5.4 —FY18 (E,10 17 1
Princess Anne—90.9 —Fv19. (A,1) 10
Rose Hall—9.6 —FY20. (0,01 17
—FY21. m.P) 23
TOTAL 152 48
March10, 2015
-26-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
rct.-,.,x,4,
Off-Road/Roadside
Ditch Maintenance
Off-Road Ditches: 152 total miles _
- Capability(3 crews) "
• Current Cycle:15 years,10 miles/year ,
• Goal Cycle:8 year cycle,19 miles/year
-- Accomplishments
• FY12-FY14:13.9 Miles = .
1I • FY15:3.8 Miles(YTD) Holland Rd at Barberry Rd Before
• Production Factors: z
- VSMP regulations
-- Weather • "
- Heavy Vegetation - , ''
Roadside Ditches:450 total miles
• Average 45 miles/year .. ,
• FY12-FY14:134 miles maintained '' ``s
• Current cycle-10 years -4,.........,libHolland Rd at Barberry Rd After 49
Here are the specifics regarding the Street Sweeping program:
f Z ti)
Street Sweeping
Street Sweeping Inventory:Over 2500 Curb Miles
- Capability:
Sweeping Schedule(Chesapeake Bay and Atlantic Ocean):
I • Residential Sweeping(Lynnhaven Watershed)
- 18 month cycle
• Arterial Sweeping(major roadways)
- 60-90 day cycle
• Oceanfront Sweeping 10; '��
- 7 nights per week,May to September _
• Town Center Sweeping
- One night per week
- Accomplishments:
• FY12-FY14:16,978 CY of Material Removed
- Goal:
I • The Street Sweeping Program targets water quality and works to
maximize TMDL responsiveness.
50
March10, 2015
-27-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
c„., ,:„ Cave-In Repairs
Capability(5 crews): Service
• 5 in-house crews FY Requests
—700 work orders per year
11-12 1434
Accomplishment:
• Average of 870 work orders 12-13 1701
over the last three years
13-14 945
Backlog: 14-15 YTD 457
• Current Cave-In Repair
Backlog:450
' 9 \',,,,;,,,1*.'"e "
Y
Here are the specifics regarding the Pump Stations at the Oceanfront:
l
Pump Stations
CIP 7-411 Oceanfront Stormwater Facilities Maint.
Project includes inspection,design,rehabilitation $0.5M annually
&repairs to the storm drainage infrastructure
under and around the boardwalk
Accomplishments(FY13-FY15): I ill
• Inspected submerged oceanfront outfalls at i;+Ilii i.
16th,42nd,and 79th Street,Inspection Cost tt{
$200,000F !
1,
• Cleaned and CCTV main trunk line from
Rudee Inlet to 16th Street,Cost$100,000
• Completed 1,000 feet of Joint Sealant ;', -
Repairs,Construction Cost$45,000 ,
• Must maintain an"Acceptable rating from j , _
USAGE during annual inspection of `
h -
oceanfront stormwater facilities
'
r:''
52
March10, 2015
-28-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
F(4)
,
Pump Stations
es
CIP 7-412 Storm Water Pump Station Modifications
Project to perform rehabilitation and major $0.75M annually
maintenance modifications to the City's storm
water pump stations. _
Accomplishments(FY12—FY15):
• Pump Station Conditions Assessment
Report,Cost$107,000 Fl I ri
• Performed 5 year overhaul and inspections
at 16th and 42nd Street,Cost$300,000
• Cape Story repairs,modifications,and r,.- i 4"„
•
pump replacement,Cost$460,000 r
• Implementing SCADA into 16 Storm Water 1 .,11 , 1 11
Pump Stations,Construction currently
ongoing,Estimated Project Cost$500,000 4
� 0.
53
The CIP and Operating Budgets play into maintenance of the lake systems. The City is responsible for
maintaining 492 lakes and the greatest maintenance need is dredging to restore the lakes to healthy
depths. The Department developed annual services contracts with a dredging contractor and design team
to move these projects more efficiently:
. Lake Maintenance
CIP 7-415 Lake Management II $4.95M annually
BMP Maintenance Dredging Capability: yrs #
• ASC Contractor&Design team for efficiency
• Prequalify Contractors
Accomplishments: - �-
• Dredged approximately 53,455 cubic yards rfli - !r
(FY12 to FY15 YTD) - ` :',,
• Top 50 priority lakes programmed to be
completed by 2026 -Brigadoon Lake#2
• FY11-950 year cycle time
• FY15-95 year cycle time `-` .,,..,441
Scoping includes: .+Y
• Lake dredging maintenance +�J
• Dam and/or spillway repairs &maintenance K,
• Inlet/outlet repairs&maintenance ,,
• Shore/bank tree removal&maintenance '."
Cinnamon Ridge Lake 54
March10, 2015
-29-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
This is the top fifty(50) based on silt depth with lake in similar areas grouped together:
CO) Lake Maintenance
CIP 7-415 Top 50 Lakes Dredging List
TOTAL COST CONSTRUCTION
RANKING ASSET DESCRIPTION ESTIMATE START(FISCAL
YEAR)
1 CINNAMON RIDGE/TIMBERLAKE $1,654,557.38 2014. ,..
2 BRIGADOON LAKE#2 $1,621,335.00 201481111..
3 BRIGADOON LAKE#8 $ 445,969,00 2014(
4 SALEM LAKES#2 $1,772,859.09 2014.
5 BRIGADOON LAKE#1 $ 285,315.00 2014
6 BRIGADOON LAKE#3 $ 469,890.00 2014.
7 BRIGADOON LAKE#4 $ 25901000 2014'.
8 BRIGADOON LAKE#5 $ 200,365.00 2014,
9 BRIGADOON LAKE#6 $ 323,085.00 20154
10 BRIGADOON LAKE#7 $ 188,350,00 2017
11 GREEN RUN LAKE#2 $1,698,804.72 2010
12 GREEN RUN LAKE#3 $1,086,248.04 2010
13 GREEN RUN LAKE#4 $ 312,458.04 201411.1114 GREEN RUN LAKE#5 $ 340,498.59 2D17
15 BROOKSIDE#1 $ 170,800,00 201'7
16 GREENVIEW LAKE $ 234,578.09 2017
17 CENTRE POINTE#1 $ 210,281.87 2017~(
55
f
Lake Maintenance
CIP 7-415 Top 50 Lakes Dredging List
TOTAL COST CONSTRUCTION
RANKING ASSET DESCRIPTION ESTIMATE START(FISCAL
YEAR)
18 CENTRE POINTE#2 $ 144,212.74 2017
19 LYNNHAVEN WOODS LAKE#1 $ 154,179.20 2017 ,„„
20 STRATFORD CHASE#1 $ 266,000.00 2017411t
21 STRATFORD CHASE#2 $ 380,400.00 2017(
22 STRATFORD CHASE#3 $ 178,600.00 2017411
23 TURTLE LAKE $1,838,863.91 20184.
24 LEVEL GREEN 1 $ 325,800,00 201&(4
25 LEVEL GREEN 2 $ 298,000.00 2018A.
26 KINGS LAKE SOUTH $ 806,615.30 2017
27 WEST LAKE PEMBROKE 52,550,400.00 2020
28 SOUTHGATE LAKE#1 $ 319.937.55 2021
29 SOUTHGATE LAKE#2 $ 295.941.65 2021
30 SOUTHGATE LAKE#3 $ 542,87053 2021
31 THREE OAKS LAKE#1 $ 489.320,00 2021
32 SABRE STREET EXTENDED#2 $ 398.777.40 2021
33 ROCK CREEK#1 $ 205,600.00 2021
34 ROCK CREEK#2 $ 582.088 04 2022
56
March 10, 2015
-30-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
A---"(''''');..
Lake Maintenance
CIP 7-415 Top 50 Lakes Dredging List
TOTAL COST CONSTRUCTION
RANKING ASSET DESCRIPTION ESTIMATE START(FISCAL
YEAR)
35 ROCK CREEK#3 $1,776,047.73 2022
36 SALEM VILLAGE#2 $ 368,960.00 2022
37 GLENWOOD LAKE#7 $ 530,750.00 2023
38 LAKE PLACID#3 $ 209,523 60 2023
39 CHIMNEY HILL#1 $ 931,881.33 2023
40 CHIMNEY HILL#2 $ 804,650.00 2024
41 REEDTOWN(LAKE)AKA WISHART LAKE $1,287,222.00 2025
42 INDEPENDENCE PH 4A $ 161,800.00 2025
43 LAKE#2(GREAT NECK AREA) $ 681,738.49 2025
44 JOHN B.DEV $ 452,128.05 2025
45 ROSEMONT FOREST#5 $ 269,360.00 2025
46 ROSEMONT FOREST#B $ 327,600.00 2025
47 LAKE#4(THOROUGHGOOD AREA) $1,337,930.00 2026
48 LAKE RIDGE AREA LAKE#1 $ 354,803.72 2026
49 DODD DRIVE LAKE $ 274,366 85 2026
50 HOLLAND WOODS LAKE $ 674.031.01 2026
57
The City also provides operation and maintenance offifty-eight(58)dams and spillways in the lakes:
,,: Dams and Spillways
Inventory:58 dams/spillways
, '.= .---'A
v [.� ; Requirements:
—r.-"L:--+ L t • Condition assessed on a 1 to 3 year cycle
,,... dependent on hazard rating
x' 'v • Tabletop exercises reviewing emergency
( ,'e
action plans required
,,,,I.:;' Accomplishments:
• FY 14/15:Kingston Dam and Spillway
Major Reconstruction
, r
--- 43 7 • FY 15/16:Regulatory Dam Assessment
." 's
Backlog:
-- • Update State regulated dams to meet
om� State requirements
1� 58
March]0, 2015
-31-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
The Operation Department maintains the inventory of Stormwater BMPs and performs inspections
required by the MS4 Permit as well as physical maintenance of these structures:
F.�
TBMP/WQ Inspections
Responsibilities: BMP 2015 Inventory of
• BMPs
• Water Quality Support Type Public and Private
• VSMP Support Infiltration 452
Ponds/Lakes 1394
BMPs: Filtration 21
• BMP as-built plan reviews Outlet Control 14
(75-100 annually)
• BMP inspections(criteria varies Other 293
depending on BMP type). Total BMPs 2174
Average 785 per year.
• BMP maintenance with minority
contractors b , S, 4
• BMP compliance/enforcement '_
-a
a
59
2 BMP/WQ Inspections
Water Quality support: VSMP Support:
• Spill responses&reporting • Assist with the permitting process
• Fish kill response • Inspect land disturbing activities
• Dry weather screening • Program documentation
investigations • Assist inspection staff and
• Industrial Site Inspections contractors on permit compliance.
• Public Works&City facility/yard • Develop,implement,and maintain
inspections program process work flows
• Training of Citywide Staff
111 3l1-11/ ,I
60
March]0, 2015
-32-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
Here is an overview of the Operations Backlog of projects:
Operations Backlog
FY11 FY15
Budget Category FY12-14
Backlog Backlog
Stormwater Pipe Maintenance CIP 7-416 4.450 $37.0M $32.5M
Off-Road Ditch Maintenance 1.80 $10.2M $11.5M
Cave-In Repairs 0.9$ $18.0M $3.6M
Lake Management II CIP 7-415 4.0$ $84.0M $82.3M
Oceanfront Stormwater Facilities Maintenance I CIP 7-411 0.20 $1.5M $2.0M
Stormwater Pump Station Modifications CIP 7-412 0.50 $3.0M $3.0M
Total: $153.7M $134.9M
61
Here is an overview to Expand Street Sweeping Capabilities due to PayGo/Debt Adjustment:
fi Expand Street Sweeping
Capabilities due to PayGo/Debt
Adjustment
Street Sweeping Program
• The Street Sweeping Program specifically targets water quality and works
to maximize TMDL responsiveness and safer streets.
• Sweeping Schedule:
— Sweeping in Chesapeake Bay and Atlantic Ocean Watersheds
• Reduce cycle time in residential neighborhoods to every 3 months
• 12 Sweepers and 17 FTEs needed
— First Year Cost:$2.1 Million
— Second Year Cost:$2.4 Million
- Third Year Cost:$2.8 Million •+".yl Y_I
— Fourth and Subsequent Years'
Cost:$1.5 Million
62
March10, 2015
-33-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
Here is an overview of the Additional Projects to be Accomplished due to PayGo/Debt Adjustment:
,,, Additional Projects to be
Accomplished due to
PayGo/Debt Adjustment
Project FY 16
7037 Bellamy Manor Outfall Ditch 300,000
7415 Lake Management II 594,372
7413 Neighborhood Storm Water Infrastructure Improvements-II 1,400,000
7411 Oceanfront Storm Water Facilities Maintenance 323,000
7023 Primary System Infrastructure Improvements II 1,500,000
7016 South Lake Holly Watershed 700,000
7412 Storm Water Pump Station Modifications 307,500
7416 SW Infrastructure Rehabilitation&Improvements II 775,128
7027 SWM Master Planning,Analysis,and Inventory 700,000
7028 Windsor Woods Drainage 400,000
7,000,000
63
i
Summary
• FY12-15 Stormwater Fee increases have allowed us to
initiate an"effective"stormwater management program
• Regulatory requirements are continuing to grow and
add cost and time to getting work accomplished
• Additional resources are required to tackle backlogs
• SLR& Recurrent Flooding are emerging as potential
large resource requirements
64
March10, 2015
-34-
CITY MANAGER'S BRIEFINGS
STORMWATER MANAGEMENT PROGRAM
(Continued)
Discussion
Mayor Sessoms thanked Mr. Davenport and the entire Team for the hard work and dedication to the City.
March]0, 2015
-35-
CITY MANAGER'S BRIEFINGS
STRIVING FOR EXCELLENCE
4:55 P.M.
Mayor Sessoms welcomed James Spore, City Manager. Mr. Spore expressed his appreciation to City
Council for their continued support and advised this Report provides an opportunity to catalog some of
the organization's results in an effort to continue to improve operations and service offerings:
Striving for
E•X•C•E•L•L•E•N•C•E
Virginia Beach: A Quality Government Organization
dettig~gray
h4r y
r� i
la
un,�e��lilt` •
►r
2014
Below are the City's Efficiency Efforts:
Virginia Beach Efficiency Efforts
Current Efforts
• Governor's Task force for Local Government Mandate
Review
• City Council Process Improvement Committee
• Hampton Roads Partnerships Shared Services Project-
Phase II
➢Virginia Beach
➢Chesapeake
➢Norfolk
• ICMA Insights Benchmarking/Best Practices Project
• Striving for Excellence Process
2
March10, 2015
-36-
CITY MANAGER'S BRIEFINGS
STRIVING FOR EXCELLENCE
(Continued)
Below are the City's Cost Savings for FY2014:
Cost Savings
• Automated Material Handling in Libraries $250,000
(Libraries,ComIT,Public Works)
• Phase II Solid Waste Route Optimization $784,000
(Public Works)
• Paperless e-Bill(Public Utilities) $130,000
3
Below is the City's Cost Avoided for FY2014:
Cost Avoided
• State Contract for Regulated Medical $ 1,500
Waste Costs(Human Resources,Occupational Health)
• Agriculture Marketing Strategy(Agriculture) $ 15,179
• Reimbursement of Hurricane Irene $597,135
(Finance)
March10, 2015
-37-
CITY MANAGER'S BRIEFINGS
STRIVING FOR EXCELLENCE
(Continued)
Below is the City's Funds Raised/Donations for FY2014:
Funds Raised/Donations
• Second Grade Students on the Swim(SOS) $ 16,500
(Parks&Rec)
• Special Events Process Improvements(SGA) $ 30,000
• Public Art(c„u„r,raff,) $250,000
Below is the City's New Grants Realized for FY2014:
New Grants Realized
• Growing our Future—Trees for Clean Water(Parks&Re) $ 6,250
• Virginia Dept.of EMS—Lifepak 15 Updates(EMS) $ 75,856
• Virginia Economic Development Access Fund— $ 453,000
Roadway(ED)
6
March10, 2015
•
-38-
CITY MANAGER'S BRIEFINGS
STRIVING FOR EXCELLENCE
(Continued)
Below is the City's Ten Year Summary of Results:
Ten Year Summary of Results
City of Virginia Beach
MOO 20:6 1007 2004 1009 2014 10.11 2012 2013 2014 Tom
[I3,:sewed 92318 S6 4M 55718 53M $34M SI 7M $2.318 568.998 $2318 56.6M $38.9M
..rnneeaeee SIAM 2518 52918 53a6,1 53M $183 5411664 5846.700 $2.8 $3192 $31.918
F undralsIng 512.3M 5321669 526.618 53.884 5394112 52118 522.250 5560.350 9417.694 5406.500 511.588
Revenue 933/ 52.318 SIM $2763 5471,768 5624.337 S15M $571156 51.1M 5286,417 $9.5M 5191M
New $518 $2294 $7.7M 5.1984 $6892 $1.918 55.2M $2710 51518 512.5M $113118
e34V 147 132 100 121 ul l04 82 80 1. 118technolop
LLsn
im pi-examen.
199 159 138 156 196 1.41 100 97 94 123 1.403
Number 24,503 23,000 21,553 19,354 .,186 17,982 20.020 16902 20.408 13.40/ 207.3C9
Value 5166 516.6M 514.918 51.3.2M 518.518 51970 519M 520M 520M 518.7M 5.17618
March 2015
7
Questions/Comments
Virginia Beach
Community For A Lime
http://www.vbgov.co m/Rove rn ment/departments/city-manage r/Documents/2014SFX report.pdf
Mayor Sessoms thanked the City Manager and his Staff for the "excellence"reported and for making
Virginia Beach the "best City in the world".
March10, 2015
-39-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
5:10 P.M.
Mr. Spore continued with the next presentation regarding the Economic Trends and Challenges Ahead:
Economic Trends and
the Challenges Ahead
The New fiscal Reality
March 10,2015
The components of Population Change are:Births, Deaths and Net Inflation:
Population and Inflation
Average Annual Growth Rates for Population & Inflation
15-20
80-90 90-00 00-10 10-14 proe«;on
Population 4.13% 0.79% 0.30% 0.77% 0.57%
Inflation-CPI 5.04% 2.92% 2.50% 2.04% 2.23%
March10, 2015
-40-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
Slower population growth, however, has not lessened the demand for services from citizens. The Demand
for Services Index attempts to measure the demand for services citizens place on the City government.
This demand is measured through the provision of selected governmental services, using 2000 as the base
year. If demand grew equally with population, the index would remain at 100 through the entire time
series. As the chart shows, the demand for services is growing about 77%above population growth since
2000:
Demand for Services Index
190
180
170
160
150
140
130
120
0 111111111111
190 1 I
00 O1 02 03 04 05 06 07 08 09 10 11 12 13 14
The Average Annual Revenue Growth Rates reflect revenues for the General Fund, Special Revenue
Funds, Schools and excluding the Enterprise Funds
Average Annual Revenue Growth Rates
16.0%
14.0% 13.8%
12.0%
10.0% 9.4%
8.0%
6.0% 4.8%
4.0%
2.0% 1.5%
-0.1%0.0%
80-90 90-00 00-10 10-14 15-20
-2.0%
March10, 2015
•
-41-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
Here is the Average Annual Growth Rates by Major Categories of Revenues. It is important to note,
every major category of revenue is underperforming since FY 2010:
Average Annual Growth Rates
by Major Categories of Revenues
80-90 90-00 00-10 10-14 15-20
Property Taxes 16.2% 5.9% 5.7% -0.3% 2.3%
Consumer Revenues 16.5% 5.6% 4.1% 1.5% 2.3%
Other Revenues 8.5% 5.0% 6.7% 1.3% 0.5%
State 13.6% 6.6% 2.1% 0.1% 0.6%
Federal 7.0% 9.3% 9.4% -3.7% -2.0%
Total 13.8% 9.4% 4.8% -0.1% 1.5%
The overall Budget has grown by a compound annual rate of 7.0%; however, a budget adjusted for only
the growth in population plus inflation would have grown at a compound annual rate of 1.8%:
Budget and Budget Adjusted for
Population and Inflation
2,000
1.800
1,600
1,400
2 1,200
1,000
800
600
400
200
0
80 81 82 83 84 85 86 87 8889 90 91 92 9394 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15
-Budget -Adj for Pop&Inflation
March10, 2015
-42-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
Here is the Relative Measures of Tax Burden:
Relative Measures of Tax Burden
Per Capita Expenditures R.E.Taxes as a%of
as a%of Per Capita Median Household
Income Income
Virginia Beach 6.1% 3.1%
Chesapeake 7.2% 3.3%
Norfolk 8.6% 3.5%
Portsmouth 9.1% 3.5%
Suffolk 8.1% 3.9%
Hampton 8.3% 3.9%
Newport News 9.1% 3.3%
This provides an overview of the Change in State and local Relationship:Reductions and Cost Sharing:
Change in State and Local Relationship:Revenue Reductions and Cost Shifting
Revenue at Historical
Level-No Growth or
Revenue Highest Year Amount FY 15 Funding Inflation Adjustment
ABC Profits FY 00 1,210,809 - 1,210,809
Wine Tax FY01 608,410 - 608,410
599 Funding FY 00 15,791,352 10,936,280 15,791,352
Local Telecom Tax FY 06 28,233,483 24,633,483 28,233,483
Roadway Funding FY 01 25,719,000 - 25,719,000
School Funding FY09 364,471,728 322,657,768 364,471,728
$436,034,782 $358,227,531 $436,034,782
Reduction in Revenue ($77,807,251)
Cost Shifting from State to City
Lab Techs in Health Department (60,000)
Indigent Burials (53,500) $91,202,471
Clerk of the Circuit Court (275,938) 7 'Y
State Stormwater Mandate (1,800,000)
Line-of-Duty (1,268,875)
Health&Retiree for Constitutional
Officers )9,936,907
($13,395,220)
March10, 2015
-43-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
Here is the Measures of Income Growth since 1980-1990:
Measures of Income Growth
Annual Average Growth Rates 80-90 90-00 00-10 10-13
Median Household Income 6.3% 2.7% 2.8% -0.7%
Adjusted for Inflation 1.5% -0.1% 0.4% -2.9%
Census Bureau's Per Capita Income 7.1% 3.9% 3.1% 1.7%
Adjusted for Inflation 2.2% 1.1% 0.7% -0.5%
Here is the City's Pay Structure:
City of Virginia Beach Pay Structure
Current Pay Structure
• Market-based system
• Open pay ranges
A-Each range has a minimum and maximum salary
Employee salary may fall anywhere between minimum
and maximum salary of the pay range
➢Open ranges provide flexibility in implementing pay
increases
➢Merit Increases move employees through the pay range
➢Without merit increases salary compression occurs
March10, 2015
-44-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
Merit Goals
• Goals:
➢4.5%merit increase every year
➢Employees reach pay range maximum within 10 years
• Years providing 4.5%merit increase:
➢FY96-FY02
• Cost to provide 4.5%merit increase FY16:
r$17.5M
Here is the General and Merit Increase History for FY1996-201 5:
General and Merit Increase History
FY96-FY15
s
VRS Offset
z.3 / —.— _ .__�_s ____ t Merit
Inc
z -- - -- — ■General
Increase
ee,eceeeeeeeec6 see
March10, 2015
-45-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
Here is the General and Merit Increase History for FY1996-2015:
Compensation History
FY96-FY15
FY General Increase IncMreaserit e FY General Increase Merit Increase
FY15(Oct) 2%(*1%VRS 0% FY04 0% 4.05%
offset)
FY14(Oct) 2%(*1%VRS 0% FY03 0% 3.50%
offset)
FY13 0%(+1%VRS 0% FY02 0% 4.50%
offset)
FY12 2.5% 0% FY01 0% 4.50%
FY11 0% 0% FY00 0% 4.5%
FY10 0% 0% FY99 0% 4.5%
FY09 2.5% 0% MMM FY98 0% 4.5%
FY08 1.5% 2% MEM FY97 0% 4.5%
FY07 1.5% 3% MEI FY96 0% 4.5%
FY06 0% 4.5%
FY05 0% 3% -
'Structure Adjustments(adjustment of the minimum and maximum)were provided 1995-2005 to assist with market
competitiveness.Structure adjustments did not provide an increase in employee base pay
Here is a Summary of the recent Market Survey:
Market Survey Summary
• Prior Goal: Top of the market
• Revised Goal: Remain competitive
• Methodology: Comparison of benchmark midpoints
• Surveyed Cities:
➢Norfolk
➢Chesapeake
➢Hampton
➢Newport News
➢Portsmouth
March10, 2015
-46-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
Here is the FY2016 Cost of Implementing Market:
FY16 Cost of Implementing Market
Total CostNumber of employee
impacted
2.5%and more below Market $9,862,578 •
l 1862 1115%and more below Market $4,251,437 1527 -.III
10%and more below Market $772,410 189
• The City implemented market adjustments each year between 1995-2002,2004,and 2011
• Market salary surveys have been conducted multiple times since 2004 but only implemented in
2011
• Market adjustments moved impacted classifications to a higher pay range but did not result in
an increase in employees pay 1995-2004(increased earning potential); Employees in impacted
classifications received a 5%pay adjustment with the market implementation of 2011
• Market adjustments without corresponding pay increases resulted in salary compression
Here are the Costs to "Fix"Compression:
Cost to "Fix" Compression
Total Cost Number of
Employees
Horizontal $42M 4243
Vertical $994,500 151
March10, 2015
-47-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
Here is an overview of the Compression Adjustment History:
Compression Adjustment History
FY Cost #of employees impacted
FY15 $1.9M 3102
FY14 $768K 177
FY08 $3.9M 1141
FY07 $4.2M 1870
FY06 $1.4M 1638
FY05 $1.25M 1889
FY04 $1.03M 1579
FY03 $525K 900
FY02 $629K 835
FY98 $610K 300
Total Spent $16,212,000
Contributions for Health Care
FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14
Employee Contributions $18.8 $19.7 $19.8 $19.6 $20.1 $20.6 $20.6 $21.0 $26.1 $34.7
Employer Contributions $56.2 $63.6 $74.4 $81.6 $83.8 $86.9 $88.9 $86.0 $93.7 $99.5
Health Fund Reserves
Used $2.6 $0.0 $0.0 $0.0 $0.0 $0.8 $0.6 $12.0 $10.4 $3.2
Total Contributions $77.6 $83.3 $94.2 $101.2 $103.9 $108.3 $110.1 $119.0 $130.2 $137.4
March10, 2015
-48-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
This provides an overview of the Difference in Pay 2009-2015:
Differences in Pay 2009-2015
2009 2015 Salary Increase Annual Salary Adjusted for Inflation
Base Salary
No Health/Dental $47,993 $52,733 $4,740/9.9% $46,899
Example 1
Base Salary $47,993 $52,733 $4,740/9.9%
Employee Only—
Healthcare/Dental $617 $1452
VRS $0 $1582
Net $47,376 $49,699 $2,323/4.9% $44,200
Example 2
Base Salary $47,993 $92,733 $4,740/9.9%
Employee Family-Health
Care/Dental $7024 $8,043
VRS $0 $1582
Net $40,969 $43,108 $2,139/5.2% $38,338
The Turnover Rate of employees with less than three (3)years is 22.82%:
Turnover Rate
FULL-TIME EMPLOYEE TURNOVER RATES
turnover Rates 2009 2010 2011 2012 2013 2014
atWith Retirements 5.66% 6.49% 6.08% 6.43% 7.51% 8.08%
Without Retirements 3.74% 4.05% 3.79% 4.16% 4.75% 4.90%
Turnover of employees with less than 3 years of employment is 22.82%.
March10, 2015
-49-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
VRS Contribution Rates
21.35%
16.48'
13.59%
/ 11.52%
10
801%
5 In FY 2015 the employer's
VRS equals$50 million
0
80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 1E
Here are a few important Compensation Facts:
Compensation Facts
• Since the market salary survey compensation philosophy
was adopted in 1995 employees have received ten
market adjustments
• Compression has been addressed ten times and added
more than$16.2 million to our salary costs;plus
additional costs due to compounding adjustments by
structure adj/merit increases/market adjustments,etc.
• The average merit increase between FY96—FY08 was
3.97%
• There have been no merit increases awarded since FY08
• Since 1995 the average compounded salary increase
totals 92%(18%adjusted for inflation;0.8%each year)
March10, 2015
-50-
CITY MANAGER'S BRIEFINGS
ECONOMIC TRENDS and
CHALLENGES AHEAD
(Continued)
Takeaways
1. Downward Revenue Growth Trend
2. Slow Economic Growth Forecast—Next Five Years
3. Increased Demand for Services
4. State and Federal Funding Reductions and
Program Mandates
5. Increased Total Compensation Cost Pressures
Questions/Comments
Mayor Sessoms expressed his appreciation to City Manager Spore for providing this informative
presentation.
March 10, 2015
-51-
ADJOURNMENT
Mayor William D. Sessoms,Jr., DECLARED the City Council Meeting ADJOURNED at 5:58 P.M.
r,
LAmanda Finley-Barnes, C
Chief Deputy City Clerk
_tet/moi
' th Hodges Fraser, MMC
City Clerk
March10, 2015