Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout03-06-2018 MINUTES 1y01411±•BF,q
rer-i'''"afRc4
u.
_-_ per
s
4
8 OF oUR NAr�44
VIRGINIA BEACH CITY COUNCIL
Virginia Beach, Virginia
March 6, 2018
Mayor William D. Sessoms, Jr., called to order the City Council's Briefings on the CITY HALL/CITY
COUNCIL SPACE PROGRAM REVIEW in the City Council Conference Room, Tuesday, March 6,
2018, at 2:30 P.M
Council Members Present:
Jessica P. Abbott, M Benjamin Davenport, Robert M Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms,Jr.,John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane family vacation
2
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
2:30 P.M.
Mayor William D. Sessoms, Jr., welcomed Thomas C. Nicholas, Facilities Engineer—Public Works. Mr.
Nicholas expressed his appreciation to the City Council for their continued support. Mr. Nicholas
introduced and turned the presentation over to Tony Bell—Mosely Architects.
CITY OF VIRGINIA BEACH
NEW CITY HALL
PROJECT UPDATE
March 6,2018
Virginia Beach
MOSELEYARCHITECTS
City Council selected Option 2 for the City Hall site location:
City Hall Selected Option
• City Council Resolution resulted in the selection of Option 2
•
. Opp
ir
c= v
---_.- - -- ---- a' /
March 6, 2018
3
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
City Hall will provide for possible expansion from 134,000 to 149,000 square feet:
Building Gross Square Footage
• Space needs assessment determined 149,000
square feet needed by 2070
• Approximate size of the building to be 134,000
square feet.
• Design and construction budget of$50,250,000
currently in the CIP.
• Provide for possible expansion from 134,000 to
149,000 square feet
Here is an overview of the Space Needs Development:
Space Needs Development
• July 2017,space needs development session with
the City Council liaisons,Vice Mayor Jones and
Councilman Wood established space
requirements for:
• Informal Session Conference Room
• Council Chambers
• Mayor,Vice-Mayor,City Council Member
offices,and meeting spaces
March 6, 2018
4
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Here is an Overview of the Schematic Design Process:
Schematic Design Process
• Moseley Architects began Schematic Design(SD)of the new City Hall.
The design process includes the following key milestones:
February Confirm occupant space needs
February Confirm City Council space needs
February Conduct workshop to develop site and building concepts
March Meet with staff to select conceptual design plan and massing
April Review conceptual design of City Council Space
April Meet with staff to review 50%SD drawings
April Meet with staff to review 95%SD drawings
May Complete Schematic Design,submit for review and approval
May Update City Council
August Complete Design Development Phase
Here is an Idea of Future Design Development Review:
An idea of Future Design Development Review
LL ! 1 4L1I .,I
I 1, ._
. ....
1
. _
•, ...... _, y.__ _ ___ 4.00,...�
, . lik„,..._ , ,
i.
ti
March 6, 2018
5
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Today's presentation will confirm the space to be provided for each Department/Agency located in City
Hall:
Why is Moseley Here Today?
• Schematic Design starts with confirming the
space to be provided for each
Department/Agency to be located in new City
Hall.
• Review the City Council, Mayor,City Manager,
and staff space needs
• Revise/confirm the City Council, Mayor,City
Manager,and staff space needs
City Hall-Space Needs Confirmation
Mayor/City Council Quantity Square Feet Total
Each
"Room 234"Conference Room 1 1,200 1,200
"Room 234"Conference Room 1 120 120
Kitchenette
Council Chambers 1 4,800 4,800
Mayor's Office 1 300 300
Vice Mayor's Office 1 300 300
Council Offices 9 90 810
Conference Room 2 144 288
Assistant to the City Council-Office 1 150 150
March 6, 2018
6
CITY COUNCIL'S BRIEFINGS
CITYHALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Here is a rendering of City Council Conference Room design/layout:
Room 234 Conference Room/Kitchenette/1,200 Square Feet
'� arc�*re
I__-;. # 7
) ) )
�` } ) ) }
€ _ ) 1
£ ) ) ) _)
( .: ) _) ) 3
4 ..) _) ) )
' J ,) 3 3
wc. j__): ) ) 1
)ri_n_== V
Here are the specifics for City Council Conference Room:
Room 234 Conference Room/Kitchenette/1,200 Square Feet
1,200 Square Foot Conference Room Example
• 60 people meeting 2-3 times per week.
• Seating for 45 people in three elevated rows.
• Audio/video recording and space for media
viewing.
• Space for three cameras with connections for
power,data,audio connections.
• Existing room 234 is approximately 700 square feet.
March 6, 2018
7
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Council Conference Room/Photo Example
411\0.
a
r
� � orf
•
Here is a rendering of City Council Chamber Room design/layout:
Council Chambers/4,800 Square Feet
•
7 1 - 111111- -
Ain . in
� 1
March 6, 2018
8
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Here are the specifics for City Council Chamber:
Council Chambers/4,800 Square Feet
4,800 Square Foot Council Chambers Example
• Fixed seating,audio, and video recording,
monitors, projection screens, podium,vote
board,and timers.
• Telescoping podium for ADA access.
• Current chambers seat 144.
• Existing chambers approximately 2,400 square
feet.
Council Chambers/Photo Examples
*vet (i . ���f AIM
March 6, 2018
9
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Council Chambers/Photo Examples
*om
0
--my
—„yam=
our. , ,.
/ ,..m _ ,. , ,„,, _
,...
Council Chambers/Photo Examples
�1 _ ,�- '_
r_T vor_
}
ter__r,._,� 1_'� ��
:t i
March 6, 2018
10
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Council Chambers/Photo Examples
i • _
Here are the specifics for the Mayor/Vice Mayor Office space:
Mayor/Vice Mayor Office/300 Square Feet
)(r1) 1
El 171 ..dmo
r-H 1-1
For reference the current Mayor's office is approximately 325 square feet
March 6, 2018
11
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Here are the specifics for the City Council Member office space:
City Council Member Private Office/90 Square Feet
ti
••a
Here are the specifics for an additional Conference Room to be used by City Council Members:
Conference Room/144 SF
_J
1:1
OL
J
• Typical of two spaces provided
• Vice Mayor and City Council members to meet with the public.
• Provide two exits,one public and one staff.
• Small refrigerator.
• Used primarily on Tuesdays.
• The current conference room is approximately 200 square feet
March 6, 2018
12
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Here are the specifics for the Assistant to the City Council Office space.
Assistant to the City Council-Office/150 Square Feet
lir
Nil
N
it Ill
1
• Two staff in one office.
Here are the space needs for City Hall:
City Hall-Space Needs Confirmation
City Manager Quantity Square Peet Total
Each
City Manager Office 1 300 300
Deputy City Manager Office 4 250 1,000
Executive Assistant to the City 1 150 150
Manager
Assistant to the City Manager 2 150 300
DCM Executive Assistant— 5 80 400
Workstation
Executive Receptionist 1 100 100
Shared Workstations 2 64 128
March 6, 2018
13
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Here are the specifics for the City Manager's Office space:
City Manager Office/300 Square Feet
-1)
LIC01)
[ H10 14111
EH
• For reference the current City Manager's office is approximately 425 SF
Here are the specifics for the Deputy City Manager's Office space:
Deputy City Manager Office/250 Square Feet
Q1) ifgb
• For reference the current Deputy City Manager Office is approximately 160
square feet
March 6, 2018
14
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Here are the specifics for the Executive Assistant to the City Manager Office space:
Executive Assistant to the City Manager/150 Square Feet
IU 4
404
�►t
• The current Executive Assistant to City Manager office is approximately 160 SF
Here are the specifics for the Assistant to the City Manager Office space:
Assistant to City Manager/150 Square Feet
ik.
I�
III�
,►_, .�
• For reference the current Assistant to City Manager office is approximately 160
square feet
March 6, 2018
15
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Here are the specifics for the Executive Assistant to Deputy City Manager:
DCM-Executive Assistant-Workstation/80 Square Feet
;iiiiiiia
r 1 '
i 71 1
OCP
4011101e,11, 11041
• Five stations total.Open office format to cover for each other.
• For reference the current Workstations are approximately 80 SF
Here are the specifics for the Executive Receptionist:
Executive Receptionist-100 Square Feet
X><>00< -
A A A A A
■ I * 4
• In the open office reception area
March 6, 2018
16
CITY COUNCIL'S BRIEFINGS
CITY HALL/CITY COUNCIL SPACE PROGRAM REVIEW
ITEM#67844
(Continued)
Here are the specifics for the Shared Workstations:
Shared Workstations/64 Square Feet
i,1
N__.,. ,
��
_ ,__ 1 .
1
. ______ ______
I
, .
• Shared Workstations for staff to come in and work remotely.
Here are the specifics for the Additional Support Space Requirements:
City Hall-Space Needs Confirmation
Additional Support Space Requirements
Support Space Quantity Square Feet Total
Each
Visitor Waiting-Seat 20 1 400 400
Council Chambers Waiting Area-Seat 40 1 800 800
A/V recording and broadcast room 1 150 150
Staff Restrooms 2 50 100
Coffee Niche 1 60 60
Files/Supplies/Workroom 1 225 225
Copier 1 50 50
Files-Wall Units 8 12 96
Microfiche Reader 2 36 72
Break Room 1 200 200
Coat Closet 2 10 20
Mayor Sessoms expressed his appreciation to Mr. Bell and the entire Team working on this project.
March 6, 2018
17
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
3:15 P.M.
Mayor Sessoms welcomed Phil Pullen, Transportation Division Manager — Public Works. Mr. Pullen
expressed his appreciation to the City Council for their continued support and distributed a copy of the
full presentation which is made a part of this record:
cry,,r
Virginia Beach ,■
i ,� �
k iii
IIIW. » I.1t4 CCf
��t
,i kit
kh iii
jam. -- V
,
,+ _ 1 1 - -• .--,41
r
;r _
FY 2019-2024 ROADWAYS CI P
CITY COUNCIL BRIEFING
MARCH 6,2018
Here is an Overview of today's presentation:
OVERVIEW
I. Proposed FY 2019-2024 CIP
• Summary
• New Projects in the CIP
• Major Projects/Programs in the CIP
• Key Projects Supporting Economic Development
• New Fully Funded Projects
II. Accomplishments
• Projects Recently Completed
• Projects Currently Under Construction
• Upcoming Construction
Ill. SMART SCALE
IV. Requested—Above Target Projects
V. Requested—Not Funded Projects
2 V�Virginia Beach
March 6, 2018
18
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
I. PROPOSED FY 2019-2024 CIP
❑ SUMMARY
❑ NEW PROJECTS IN THE CIP
U MAJOR PROJECTS/PROGRAMS IN THE CIP
❑ KEY PROJECTS SUPPORTING ECONOMIC DEVELOPMENT
U NEW FULLY FUNDED PROJECTS
Here is the Summary of the Proposed FY 2019-2024 CIP:
PROPOSED FY 2019-2024 CIP
Summary
• 47 CIP Projects and 10 Programs
• 4 New Projects
• 6-Year Funding
D City Funding- $194.9M
o State Funding- $ 44.6M
o Federal Funding- $ 50.3M
o Total- $289.8M
• Total Project Cost - $1.5B
• All Projects Previously Fully Funded Remain Fully Funded
4 NB Virginia Beach
March 6, 2018
19
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
This pie chart shows the six(6)year City funding split by five (5)categories:
PROPOSED FY 2019-2024 CIP
•Congestion Relief&Capacity Improvement
Projects-$102.SM(52.7%)
142'.
1.9°, s Specie!Programs&Projects-$15.8M(8.1%)
17.1% a Safety Improvement Programs-$33.4M(17.1%)
52 7%
■Bridge Projects-$15.3M(7.9%j
ifp.t.1%
■Maintenance Progrems&Projects-$27.7M
(14.2%)
Total City Funding in Years 1-6:$194.9M
BVirginia Beach
There are four(4)new projects/programs being introduced into the CIP:
PROPOSED FY 2019-2024 CIP
New Projects/Programs in the FY 19 CIP
• Elbow Road Extended Phase ll-D
• Dam Neck Road/Holland Road Intersection Improvements
• General Booth Boulevard/Camp Pendleton Entrance
• Traffic Signal Retiming II
a Virginia Beach
March 6, 2018
20
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
There are twenty-eight(28) "Major Projects"in the CIP with more detailed information on each project
provided in the attached presentation:
PROPOSED FY 2019-2024 CIP
Major Projects in the CIP
• Centerville Turnpike Phase II • Laskin Road Bridge Replacement
•
• Centerville Turnpike Phase III Laskin Road Phase I-A
• Cleveland Phase IV • Laskin Road Phase I-B*
• Elbow Road Phase II-B • Laskin Road Phase II*
• Elbow Road Phase II-C • Laskin Road Phase III*
• Elbow Road Phase Il-D• • Lesner Bridge Replacement
• First Colonial Rd/Va.Beach Blvd.Intersection • Nimmo Parkway Phase VII-B'
Improvements • Princess Anne Road Phase VII
• Greenwich Road Crossover/Cleveland Street • Rosemont Road Phase V
Improvements
• 1-264/Independence Interchange Improvements* •
Sandbridge Road—Nimmo Parkway Phase VII-A
• Indian River Rd/Kempsville Rd Intersection • Sandbridge Road Bridge Replacement
Improvements • Shore Drive Corridor Improvements Phase III
• Indian River Road Phase VII-A • Shore Drive Corridor Improvements Phase IV
• Indian River Road Phase VII-B • West Neck Road Phase IV
• Landstown Road Improvements Phase I • Witchduck Road Phase II
*Project is not Fully Funded __--
li NB Virginia Beach
In addition to the twenty-eight(28)previously mentioned projects, the below seven (7)Major Programs
continue to be funded in the CIP:
PROPOSED FY 2019-2024 CIP
Maior Programs in the CIP
• City Wide Street Lighting Improvements II
• Major Bridge Rehabilitation II
• Rural Road Improvements II
• Street Reconstruction II
• Traffic Safety Improvements (TSI) IV
• Traffic Signal Rehabilitation II
• Transportation Network Modeling and Analysis
12 3 Virginia Beach
March 6, 2018
21
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
II. ACCOMPLISHMENTS
❑ PROJECTS COMPLETED
❑ PROJECTS CURRENTLY UNDER CONSTRUCTION
❑ UPCOMING CONSTRUCTION
Below is an overview of the Projects Recently Completed:
PROJECTS RECENTLY COMPLETED
• Buckner Boulevard Shared Use Path
o$569K(COF Funds)
o November 2017
• Greenwell Road Sidewalk
o$453K(COF Funds) T
o November 2017 `�
22 Yi/Virginia Beach
March 6, 2018
22
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
PROJECTS RECENTLY COMPLETED a
• Greenwich Road Crossover/
Cleveland Street Improvements
o Phase I-B
o SLIM
o November 2017
• S. Independence Boulevard/ N
Silverleaf Drive Intersection
Improvements -
o Phases I&II
o$370K(TSI)
o September 2017
23 3 Virginia Beach
PROJECTS CURRENTLY UNDER CONSTRUCTION
• Bus Stop Infrastructure&
Accessibility Improvements
`!1411
• Greenwich Road Crossover/ y411Ir•_`
Cleveland Street Improvements
o Phase 11* .. V
• Holland Road Phase VI
• Lesner Bridge Replacement
• Witchduck Road Phase II
• Indian River Road/Kempsville 1
Road Intersection Improvements*
`Award Pending
24 VB Virginia Beach
March 6, 2018
23
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
BUS STOP
����� - INFRASTRUCTURE&
- �,, ACCESSIBILITY
_____
IMPROVEMENTS
CIP 2-094
Ili., -.....", 1 rx." _ • Funding began FY 17
,r, , � • First 8 of 15 complete
-[i k ''ti • 7 under design/
iiii�V- ^ `' "° construction
1! • Goal is 100 sheltered bus
�� �/i �� l stops
: �� _J
• Ongoing Phased
H lEI - Construction through FY23
. _.�,i Total Project Cost-$2.5M
-'--c s - 1_ I o Includes$400K of Federal/
State RSTP programmed
FY21 funding
&3 Virginia Beach
There are twenty-one (21)projects going to construction valued at$194-Million:
UPCOMING NEW CONSTRUCTION[FY191
Project Construction Start Construction Cost
Indian River Road/Kempsville Road Intersection imp. March,2018 $ 9,686,408
Greenwich Road Crossover&Cleveland Street Imp.—Phase 2 March,2018 $ 2,108,400
First Colonial Rd&Virginia Beach Blvd Intersection Imp. July,2018 $ 11,096,509
Princess Anne Road Phase VII July,2018 $ 18,731,900
Pungo Ferry Bridge Rehabilitation July,2018 $ 3,250,000
Sandbridge Road Bridge Replacement July,2018 $ 5,094,670
l Shipps Corner Road Improvements July,2018 $ 1,337,184
Upton Drive Extended and Dam Neck Station improvements July,2018 $ 800,000
Buccaneer Bulkhead Replacement October,2018 $ 4,500,000
Laskin Road Bridge Replacement October,2018 $ 21,440,500
Laskin Road Phase I-A October,2018 $ 23,607,850
Providence Road Sidewalk October,2018 $ 659,500
Landstown Road Improvement Phase I November,2018 $ 6,374,580
West Great Neck Road Sidewalk November,2018 $ 670,000
Rosemont Road Phase V January,2019 $ 11,124,000
Nimmo Parkway Phase II-A March,2019 $ 2,518,000
Independence Boulevard/Baxter Road Sidewalk March,2019 $ 771,416
Centerville Turnpike Phase II July,2019 $ 22,812,300
Elbow Road Extended Phase II-B July,2019 $ 25,360,500
Shore Drive Corridor Phase III August,2019 $ 15,459,672
West Neck Road Phase IV October,2019 $ 6,660,000
Total $194,063,389 _.
31 —�' `t13 Virginia Beach
March 6, 2018
24
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
SMART SCALE is one of the State Funding Programs that began in 2016:
III. SMART SCALE
Here is an Overview of the funding the City has received:
SMART SCALE SUCCESS
Projects Award
Round 1-2016
Indian River Road Phase VII-A $20,000,000
Laskin Road Bridge $10,000,000
Centerville Turnpike Phase III $6,000,000
Total $36,000,000
Round 2-2017
Indian River Road Phase Vll-B $5,000,000
Laskin Road Phase 1-A $15,000,000
Cleveland Street Phase IV $10,000,000
Total $30,000,000
Round 3-2018
TBD-Developing List of Candidate Projects
36 +r Virginia Beach
March 6, 2018
25
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
Here is an overview of the criteria the State developed to "score projects":
SMART SCALE-PROJECT EVALUATION
• Understanding Evaluation Measures&Weighting Frameworks
o 13 overall Measures based on 6 Factor Areas
o Hampton Roads Area(Category A)
• Congestion Mitigation—45%
• Economic Development—5%
• Accessibility—15%
• Safety—5%
• Environmental—10%
• Land Use-20%
596
37 - - VELD v t rola Beach
The City is expected to submit three (3)or four(4)applications for 2018:
SMART SCALE ROUND 3
• Round 3 Applications Process - March 1st—August 1st
• Kickoff Meeting—January 19th
• Transportation Committee
o Transportation Engineering,Planning,SGA,Traffic Engineering
• Discussed 20+possible projects
• Developed list of 9 Candidate Projects
• A/E Analyzing 9 Candidate Projects
o SMART SCALE Round 3 Criteria
o Modeling
38 B Virginia Beach
March 6, 2018
26
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
IV. REQUESTED—ABOVE TARGET PROJECTS
REQUESTED-ABOVE TARGET PROJECTS
Project Unfunded Amount
1. Elbow Road Extended Phase II-D $ 17,691,900
2. General Booth Boulevard/Camp Pendleton Intersection Improvements $ 2,279,000
3. Indian River Road/Princess Anne Road Intersection Improvements $ 6,386,950
4. Laskin Road Phase I-B $ 23,130,463
5. Laskin Road Phase II $ 17,974,400
6. Laskin Road Phase III $ 33,478,352
7. Nimmo Parkway Phase VII-B $ 29,012,794
8. Princess Anne Road Phase VII-A Existing Pros in CIP w/BTC $ 8,393,979
9. Clearfield Avenue 3-9,802,000
10.Pungo Ferry Road Improvements(Rural Road Recurring Flooding) $ 11,500,000
11.New Bridge/Sandbridge Road Intersection Imp.(Rural Road Recurring Flooding) $ 7,200,000
Total $166,849,838
40 J Virginia Beach
March 6, 2018
27
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
V. REQUESTED—NOT FUNDED PROJECTS
There are approximately sixty(60) "Not Funded Projects"totaling approximately$2-Billion:
REQUESTED-NOT FUNDED PROJECTS
Project Name Description TOW Estimated
Cast
1 Bay Colony Drive Sidewalk North Bay Shore Drive to A0t ntk Avenue S 2.542.000
2 Birdnetk Road 1.264 to Virginia Beach Boulevard $ 13,970.880
3 Clearfield Avenue Virginia Beach Boulevard to Cleveland Street S 9.802.000
4 Dam Neck Road-Phase I Princess Anne Road to Holland Road S 31,000,000
5 Dam Neck Road-Phase II Holland Road to Drakesmile $ 34,800.000
6 Dam Neck Road Phase III Orakesmiie to London Bridge bad S 411,900.000
7 Drakesmke Road Extended Dam Neck to Holland Rood $ 15,335.020
8 Dokesmile Road Extended-Phase II Holland road to Princess Anne road $ 12.000,000
9 Extension of the Municipal Area Network IMAM 30 additional miles of fiber optic cable S 1.500,000
10 F,nrell Parkway Indian Lakes to Pleasant Valley $ 33444.160
11 Ferrell Parkway Pleasant Volley to Salem Road S 37,693,920
12 First Colonial Road Old Donation Pkwy to Laskin Road $ 41,432.160
13 Geneol Booth Boulevard Blydneck Road to Oceans Boulevard 9 44,858.880
14 General Booth Boulevard Oceans Boulevard to Dam Neck Road S 29.240,640
15 General Booth Boulevard Dam Neck Road to London Bridge Road S 52,646,880
16 General Booth Boulevard London Badge Road to Nimmo Pkwy S 18,068,160
17 Holland Road South Independence Boulevard to South Plata Trail 5 15,576,000
18 Holland Road South Rata Trail to Rosemont Road $ 29,415,040
19 Holland Road Dam Neck to Rosemont Road $ 69,030,000
20 Holland Road/Rosemont Road Intersection Widen Intersection to accommodate Dual lefts $ 56385,000
51 bi7 Vi g$nia Beach
March 6, 2018
28
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ROADWAYS
ITEM#67845
(Continued)
REQUESTED-NOT FUNDED PROJECTS
Project Name Description Total Estimated
Cost
21 Independence Boulevard Northampton Boulevard to Haygood Road $ 61,369,440
22 Independence Boulevard Pembroke Boulevard to V,rg,nra Beach Boulevard S 58,106,400
23 Indian River Road West Neck to North Landing $ 79.812,000
24 Indian River Road Elbow Road to North Landing Road $ 89,424,000
25 Indian Rwer Road Centerville Turnpike to Ferrell Pkwy $ 58.106,400
26 Jeanne Street Consttution Drive to Independence Boulevard $ 5,566,000
27 Landstown Road Phase II Extend Landstown 0.8 in South horn 90'Bend S 18,886,000
26 Landstown Rood Phase III Eotend from Landstown Phase II to North Landing Rd(0.54 in) S 12,817,000
29 Landstown Road Phase In Extend from Landstown Phase Ill to Indian River Rd(0.76 m) 5 18,000.000
30 London Bridge Road Dam Neck Road to Shipps Corner Road g 40,809,120
31,Lynnhaven Parkway Holland Road to Pnncess Anne Road S 73,830,240
32 Lynnhaven Road Bridge Replacement South Lynnhaven Road over London Bridge Creek S 3000,000
33 Newtown Road Baker Rood to Virginia Beach Boulevard $ 28,000,000
34 Nrno Parkway Phase RI intersection of Landstown Road Phase 1I1 to North Landing S 34,217.061r
Rrl
35 North Great Neck Road Virginia Beach Boulevard to WONsnare Road S 32,398,080
36 North Lynnhaven Road Virginia Beach Boulevard.to Lynnhaven Pkwy S 14,572,800
37 North Lynnhaven Road Virginia Beach Boulevard to Rings Grant Road S 13,358,400
39 Pacific Avenue-Phase II 18th Street to 20th Street S 3,500,000
39 Pacific Avenue-Phase III 15th Street t0 38th Street 5 14,000,000
40 Pacific Avenue-Phase Iv 20th Street to 23rd Street S 15.000,000
52 MEI Virginia Beach
REQUESTED-NOT FUNDED PROJECTS
Naiad Name Description Total Estimated
Cost
41 Princess Anne Commons Road A Landstown Center Way East 1200 feet $ 3.349.
42 Princess Anne Road Providence Road to Salem Road 5 17,000,000
43 Providence Road Rempwille Road to Princess Anne Rood $ 49,790,400
44 Rosemont Road South Plata Trail to Holland Road 5 42,678.240
45 Rosemont Road Virginia Beach Boulevard to South Plaza Troll S 26,479,200
46 Salem Rood Independence Boulevard to Elbow Road $ 21,068,000
47 Salem Rood Elbow Road to North Landing Road S 62.606.000
48 Salem Rood Extended Landstown Rd 5E 15 m to Nimmo Pkwy Phase RI S 35,614,000
49 Sandbrldge Road Princess Anne Road to Atwoodtown $ 67,573,440
50 Seaboard Road Princess Anne Road(North)to Princess Mule Road(South) $ 20.665,680
51 Shore Drive ECL Norfolk to Diamond Springs Road S 6,072,000
52 Shore Drive-Phase II Pleasure House Road to Treasure Island Drive $ 24.288,000
53 Mina Dr Rosemont Road to South Lynnhaven Road $ 24,773,760
54 South Independence Road Holland Road to South Plaza Trail S 20.401,920
55 Speed Fentress Bridge Bridge Replacement along Indian River Rd(spans West Neck Creek) S 4.350000
56 Virginia Beach Boulevrd 1-264 to first Colonial Road 5 70.435,200
57 West Neck Parkway North landing to Elbow S 62,726,400
58 West Neck Parkway(old North Landing Rood to Indian River Road S 35,100,000
59 West Neck Rood North lending_Road to Indian River Road $ 20,842,965
$1.888,627,886
53 VINPI Virginia Beach
Mayor Sessoms expressed his appreciation to Mr. Pullen and the entire Public Works Department for all
their work and dedication to the City.
March 6, 2018
29
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
3:46 P.M.
Mayor Sessoms welcomed Daniel Adams, Coastal Program and Project Manager—Public Works. Mr.
Adams expressed his appreciation to the City Council for their continued support
Cry„r
Virginia Beach
eco
r
�orpr - "
` -
IrigolfiggliElp
Ii r
- 11I111 .
Mag,10191!
6 '
FY 2019-2024 COASTAL CI P
COUNCIL INFORMATIONAL BRIEFING
MARCH 6,2018
Below is an overview of today's presentation:
COASTAL CIP SECTION
PRESENTATION OUTLINE
• Program Overview
• CIP Project Details
• Emerging Issues and Needs
z Virginia Beach
March 6, 2018
30
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
Below are the "Core Programs"of the Coastal CIP:
COASTAL CIP SECTION
CORE PROGRAMS
• Beach Replenishment
• Provides storm protection
• Supports tourism industry
• Provides recreational opportunities
• Navigation Dredging
• Keeps our inlets and main channels navigable
• Supports waterfront/marine industry
• Provides recreational opportunities
• Underpins waterfront property value
• Neighborhood Navigation Dredging
• Restores navigation
• Revitalizes neighborhoods
• Th eive services pay `�
a fit)Virginia Beach
This series of slides are the Beach Replenishment and Navigation Dredging Projects--the "true core"of
the Coastal Program:
COASTAL CIP SECTION
BEACH REPLENISHMENT&NAVIGATIONAL DREDGING PROJECTS
8-409 Chesapeake Beach Restoration
8-010 Sandbridge Beach Restoration II
8-026 Sandbridge Beach Restoration III
8-021 Croatan Beach Restoration
8-025 Beach Replenishment II
8-020 Bay Beaches Resiliency Study and Restoration
8-015 Beach Profile Monitoring Program II
8-406 Rudee Inlet Federal Dredging II
8-407 Rudee Inlet Outer Channel Maintenance Dredging II
8-402 Replacement for Rudee Inlet Dredge
8-013 Lynnhaven Inlet Maintenance Dredging II
8-011 Various Minor Dredging Projects II
8-110 Eastern Branch Lynnhaven River Maintenance Dredging
8-405 Sandbridge Beach Access Improvements II
8-408 Pleasure House Point Mitigation
8-024 Pleasure House Point Mitigation Funds `�
VD Virginia Beach
March 6, 2018
31
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
Chesapeake Beach Restoration is the most erosive and vulnerable portion of the City's shoreline without
a Nourishment Program in place. This project is critical to provide storm damage reduction and
resiliency to this reach of shoreline with construction planned for this Spring:
8-409 CHESAPEAKE BEACH RESTORATION
• beach restoration project
_ Majorproposed with periodic
maintenance
r- �, - • Critical for coastal protection and resiliency,most erosive
" section City's coastline without a funded nourishment
project in place
"*` • VIMS sand study completed in December 2011
• Favorable court ruling that public interest in beach does
- exist
■ Final design and permitting nearly complete
1 " • Construction planned for Spring 2018
_ O
ct ,_: .
0-0
Wsi
$7,470,000 $4,020,000 So�_ S0 S0 S0 $2,490,000 So
11/44"1
5 _ - 7 Vllgi[li3 Beach
Sandbridge Beach Restoration II is scheduled for this Spring 2018. Sandbridge Beach was awarded the
ASBPA 2018 Best Restored Beach Award:
8-010 SANDBRIDGE BEACH RESTORATION II
• • Long-term federal beach restoration and
f4 ' maintenance project
,
• Local funding provided by the Sandbridge Special
Service District(SSD)and Tax Increment Financing
'•PDistrict funds(TIF)
- '` -`� • Three-year(estimated)cyclic beach replenishment
-r-- and maintenance
7
1 -.'.„ :c,,.. • Last replenishment completed in June 2013,2.18
- million CY
'43C-.: • ASBPA 2018 Best Restored Beach Award
xs
• This project will fund the next replenishment cycle
"'a'•" planned for late 2018
Pregramn,,dFundatg Appropriated to Date FY19 FY20 FY21 FY22 FY23 i FY24
Requested
522,550,000 $22,550p00 $0 SD SO SO SO SO
s B Vagina Beach
March 6, 2018
32
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
8-026 SANDBRIDGE BEACH RESTORATION III
• Long-term federal beach restoration and
maintenance project
{ • Local funding provided by the Sandbridge Special
Service District(SSD)and Tax Increment Financing
+'�s, District funds(TIF)
r ` "`�. • Three-year(estimated)cyclic beach replenishment
and maintenance
s • Last replenishment completed in June 2013,2.18
million CY
` ■ ASBPA 2018 Best Restored Beach Award
• This project will fund subsequent replenishments
beyond the 2018 cycle
Programmed Footling Rppropruroa ro Daae FY19 FY20 -_.iTn FY22 i FY23
$43,875,000 $6,050,000 $6,050A00 $6,355p00 $6,355p10 $6.355,000 $6,355,000 $6,355,000
7 E Virginia Beach
Croatan Beach Restoration provides funding for design,permitting, and initial placement to maintain the
minimum recreational beach width. Construction is planned for this Fall:
8-021 CROATAN BEACH RESTORATION
• Provides funding for design,permitting,
4 and initial placement
Maintains minimum recreational beach
width of 100-120 feet between toe of
m dune and MHW
Restores dune volumes at erosional"hot
spots"to minimize potential for wave
omssa overtopping during 1%annual probability
storm event
�n sam Final design underway
Construction planned for Fall 2018
Programmed Funding Appropraned m Date FY19 FY20 FY21 I FY22 FY23 F124
6equemd
$1,740,000 51.740,000 $0 So so $o $0 $0
""y""' Vnginia Beach
$
March 6, 2018
33
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
The Beach Replenishment II Project's funding is critical to leverage Federal "matching"funds:
8-025 BEACH REPLENISHMENT II
• This project replaces CIP 8-008
• Big Beach 2001-2002,4.1 million CY
" • Resort Beach from Rudee Inlet to 89tH
^—` Street
"" • Last replenished in August 2013,1.44
- million CY
■ Fully funded project critical to leverage
Federal matching funds
• Condition surveys indicate a need for a
2019 replenishment project
---
woErammea woes nproprNme to 0,o srls crz0 FY21 FY22 FY23 ;rza
512.930,000 $2.050,00• $2.222,000 $2,090.40 $Zs$o,02o $7.ssoms So m
„ Beach
g14114111141" Virginia a
With the funding found for the Resort and Sandbridge Beaches, the City should focus on the increasingly
vulnerable Bay Beaches:
8-020 BAY BEACHES RESILIENCY STUDY AND RESTORATION
• Initiates preliminary planning,design,and
permitting framework necessary for a
programmatic shore protection and beach
management strategy for Cape Henry and
I Ocean Park beaches
• Determines need and level of protection
required
• Provides an"engineered beach”required for
eligibility for federal disaster relief funds
4,
• Preliminary design underway
94,125,000 025,000 $2,000,000 SA000.000 $0 SO $0 $0
10 yap virgins Beach
March 6, 2018
34
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
8-015 BEACH PROFILE MONITORING PROGRAM II
• Periodic beach profile surveys of portions of the
`} City's coastline from the NC border to Little Creek
It • Surveys provide data used to monitor our beaches
ea,,, for sand replenishment projects and programs
�,\
}
J ik
Programmed Funding i Appropriated m Date i FY15 FY20 I 0021 , Fru FY21 0024
5715,0000yr►....F..—' 5160,000 $110.000 $125,000 $123,000 $125,000 $75,000 MOS
_ _-_
likloaw
.10001111111.11"
11 Vuugmia Beach
Rudee Inlet Federal Dredging II allows for maintenance dredge to take place approximately 3 to 4 times
per year based on condition surveys:
8-406 RUDEE INLET FEDERAL DREDGING II
• Periodic maintenance dredging of Rudee Inlet and connecting
waterways
$4 , • Cost participation with U.S.Army Corp of Engineers
---• y Maintenance dredge approximately 3-4 times per year based on
condition surveys
• Latest USACE dredging attempted January 2018,volume dredged was
,- -' Minklimited due to rough sea conditions
Future maintenance dredging visit by USACE Currituck planned for
April 2018
Full depth USACE contract dredging planned for Fall 2018
Programmed Funding Appropriated to Date - FY39 FY20 FY21 FY22 FY23 ! FY29
1 FR,queated t
$5,110,000 $2,135,000 $425,000 $450,000 5450,000 050,000. $450,000 $450,000
r7 Virginia Beach
March 6, 2018
35
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
The last dredging for the Rudee Inlet Outer Channel Maintenance Dredging II was completed in
December 2013:
8-407 RUDEE INLET OUTER CHANNEL MAINTENANCE DREDGING II
• Maintenance dredging of
deposition basin in the outer
portion of Rudee Inlet
• Planned two year maintenance
"r w cycle subject to federal
appropriations for contract
g` s dredging
• Latest dredge completed
December 2013
• Next dredging planned for Fall
2018 in conjunction with USACE
full depth federal channel
' dredging.
$0.075.070 $3.575,070 $770.077 $750.000 $780.000 $750.000 $750.000 $787.000
13 - Virginia Beach
The Replacement of Rudee Inlet Dredge is necessary due to an "overhaul"every five(5)years:
8-402 REPLACEMENT OF RUDEE INLET DREDGE
Rudee II is a"River Class"dredge vessel
built in 1987 and put into operation in
1988
3 - _ Requires overhaul every 5 years,for
engine servicing and re-painting
1' 5 =- x Rudee Inlet inner channel and sand trap
t� . __ r-'�' dredged daily
0 416_ •��-+
Funding needed to purchase a
replacement dredge and for major
bulkhead repairs at the dredge
operations berthing facility
s..ac.•`
$5.077.070 $0 $0 $5.777.077 �.�$0 $0 $0_.. $0
14 -Virginia Beach
March 6, 2018
36
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
The last dredging for the Lynnhaven Inlet Maintenance Dredging II was completed in December 2013:
8-013 LYNNHAVEN INLET MAINTENANCE DREDGING II
• Periodic maintenance dredging of Lynnhaven
Inlet and connecting waterways
• Cost participation with U.S.Army Corp of
Engineers
• Planned three year maintenance cycle subject7rit __a- �c
op
to federal appropriations
• Last full channel dredging completed December _
2013 i,f'` f _ «w
• Minor dredging completed November 2017 /'
• Next major dredging planned for Fall 2018
• City is pursuing a contributed funds agreement
to allow full depth dredging
$307.45*
51,751.450 $30,000 $95.000 595.000 $575,000 $375,000 $375,000
111/4114111.4"
- YttgtQta Beach
8-011 VARIOUS MINOR DREDGING PROJECTS II
• Dredging of navigational channels in various
• internal waterways located throughout the
City
•
• Crab Creek dredging last completed in
3
February 2018
-y Next Crab Creek dredging planned for
February 2019
$3,75,040 $1,500,000 3375,000 5400,000 5400,000 5400,000 $400,000 5400,000
7s MU Virginia Beach
March 6, 2018
37
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
The Eastern Branch Lynnhaven River Maintenance Dredging is under design with construction of the
Transfer Facility to begin this Spring:
8-110 EASTERN BRANCH LYNNHAVEN RIVER MAINTENANCE
DREDGING • Dredging of Eastern Branch Lynnhaven River
main channel
r
• Project includes:
• Mechanical dredging and truck hauling to
Whitehurst Dredged Material Management
Area(located off Oceana Blvd.)
• Design Underway
Constructionpof transfer facility planned for
• Spring 2018
MINA= 55.150.000 $0 $0 S0 $O S0 $0
Nomim
1, NE Virginia Beach
There have been fifteen (15)Sandbridge Beach Access Improvements funded by the Sandbridge SSD:
8-405 SANDBRIDGE BEACH ACCESS IMPROVEMENTS II
aV Iii !;
• Beach Access improvements to provide sa a access to ■ 2 to 3 access ways slated for improvement each year
the beach • 60 access ways total identified for improvement(15
• Project funded by Special Service District completed to date)
Programmed Funding Poor[quieted m ow Fra arm Frzi snz F.23 Find
$5.700,0m $1,773.000 $300.000 $500,050 $50QO00 $34000 $wMea sssosao
18 1/Virginia Beach
March 6, 2018
38
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
The Pleasure House Point Mitigation allows the City to keep "mitigation dollars" in the City with
construction planned for this Fall:
8-408 PLEASURE HOUSE POINT MITIGATION
App._.Mau.PaintM....enDonk
• Development of a wetlands mitigation iy '10
facility on City owned property
• Mitigation Banking Instrument Under
♦ 8 ^ t.�
Agency Review .-,� .:;g7.'7 ,.• .gra
• Potential use for Neighborhood Dredging
SSD projects as an option for mudflat
impact mitigation r
• Construction planned for Fall 2018 • (,-
$3,010,000 $3,020,000 $0 $0 $0 $0 $0 $0
19 �J�irginia Beach
8-024 PLEASURE HOUSE POINT MITIGATION FUNDS
.tea.m..nsa.e. mon sow
• Implementation startup funding
• Provides financial assurance required by
approval agencies for perpetual
maintenance �' "� '+•�'
• Provides required funding for pre-release of r ',
credits
}
Programmed emoting Appropriated to Date FV/.9 ! MO FY31 p. 392$,>._- -. :_.`--
0•099.1.0
-R.q,. d
$$7sA10 $0 $311.000 $116A00 $121.010 $11s,000 $11s.000 5o
20 rginia Beach
March 6, 2018
39
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
The Coastal CIP also includes the Neighborhood Dredging SSD Programs:
COASTAL CIP SECTION
NEIGHBORHOOD DREDGING SSD PROGRAM
• - _ ;■ Supports City Council Goal#4:
3 r ( �T; .' Revitalize Neighborhoods and Plan
for the Future
• Re-establishes Use of Navigable
Channels
• Program continues to present many
challenges(real estate,wetland
- mitigation and dredging in leased
oyster grounds)
lel talk
21 \Virginia Beach
The City has seven (7)adopted SSDs;four(4) have the first dredging cycle completed and three(3)are in
the Design/Permitting Phase:
Neigh_ borhoods In Hay
Old Donation CGeend Lane
Bay-vine Creek =.y nel Points Lane
Shadowlawn Greensboro Avenue
Harbour Point ,
3r }.
:.:uchana t(leek,..
u ix Creek 11 ,a Breeze Cove
billing Point " Legend:
otoughgood u", Dredging Completed(4)
yville Creek SSD Ordinance Established in
ebden Cove Permit Application Phase(3)
_,. itchduck Bay; Petition Phase(z)
Witchduek Po'
Requesting Petition(3)
Oyster Bluff goes 8
Winthrope Cove Buchanan Creek Interest Phase(a4)
Little Neck Cove Thoroughgood(Cs. area 8o%Interest Not Achieved(6)
Brown Cove -.. Ba cliff
River Haven' - - Forest
March 6, 2018
40
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
Old Donation Creek's first dredging was completed in Spring 2016:
8-500 OLD DONATION CREEK NEIGHBORHOOD DREDGING
• SSD Adopted 9/13/2011
• 62 properties involved and aQa@��
approximately 26,000 CY of dredging ����. 1• First cycle dredging completed late prepiAir.
, rt411c
Spring 2016
.oma ..,
is�rwai��� t�\7
Programmed funding N0r00N•t•d t6 Date FY19 FY20 FY21 -...FY22 FY23 FY24
Ra4uabd - ,
$1.366.473 $622.479 $0 $0 $0 $114.070 $310.000 $0
23 - W Virginia Beach
Bayville Creek's first dredging was completed in February 2016:
8-501 BAYVILLE CREEK NEIGHBORHOOD DREDGING
• SSD Adopted 3/27/2012 .■ •
• 12 properties involved and ����: �1�•16• �®�.,.op`f
�®� � .
approximately 14,000 CY of =`s*wsr���,.► '�8=
dredging , \WV%'i��`elefse �
• First cycle dredging completed `0' jkte
February 2016
Miff
-
$1.366.233 $1.000.733 $0 $0 $0 592,070 5436.000 50
24 VIJ Virginia Beach
March 6, 2018
41
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
Shadowlawn's first dredging was completed in February:
8-502 SHADOWLAWN NEIGHBORHOOD DREDGING
• SSD Adopted 3/12/2103
s*s ,71"1:3-11141111-0*
__Isst siso4 j„� _V2.. - \ • 31 properties involved and
"It E 1"1 :111411 l '-0* ` approximately 9,000 CY of
--.' :10111 0111-- tt►�'��rit € dredging
\ sot-,..soon. foo._ •
g t s� ��,fit telltS��,j' jProject was bid with Harbour
011 �oqn �i�
1111 ,`:ise3t.4 001tot.1., 1111 Point
{�' 7��j�� `��� �1 First cycle completed February
1 I ' .1 i, -_--•.,,� V 2017
•
Programmed Funding I Appropriated to Dab i FY19 4420 FY21 FY22 1 FY23 FY24
5657,310 $405,510 $0 $0 $D $0 $42,000 uokoos
25 -. Yi7 Virginia Beach
Harbor Point's first dredging was completed in February:
8-504 HARBOUR POINT NEIGHBORHOOD DREDGING
' n ti"+,«„y i -__--` • SSD adopted 1/14/2014
const im..`. \\''`�1� ■ 46 properties involved and
piesvO" .'41:&,
' �►, approximately 5,000 CY of dredging
is D a rs
�l ,• Project was bid with Shadowlawn
O� i' Ev�e4��1k ..*4.: ■ Dredging underway
7:�)�'1 a.- / �1'c�i;C ra' g g Y
w QO�OQ��� 4.��t �� • first cycle completed February 2017
MI
Programmed Funding j pee,.j...ad to Date FY. FY20 FY21 FY22 FY23 FPH
Paaaemd f _
$452302 $282.162 $0 $0 $0 SD..- - 522.000 5255,050
26 NE Virginia Beach
March 6, 2018
42
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
Chesopeian Colony is scheduled to begin construction this Spring:
8-503 CHESOPEIAN COLONY NEIGHBORHOOD DREDGING
< • SSD adopted 8/13/2013
/�iir 4 e�i ,`
�.�--1 Vo- ;' ■ 131 properties involved and
.6._t1,. o�?3. approximately 30,400 CY of dredging
�� � o:11--',.-.4%, ■ Dredging plans are complete,permits
Ogi�a
0! �,t $ ,y.�o,`L ,_1 issued
j.� ( p o- akI ■ Dredging planned for Spring 2018
ca vio i
�� 6a <<...�`. !i start
,4p i- !
fir M, 4 '�
MT ..ti'ii< Inti :ri `1
-- --7e6m6 .
Programmed Funding Appropriated to Date FY39 F320 0021 FY22 FY23 FY26
Requested
$6,716,036 $2,877,086 $0 $0 $0 $0 $960,000 $7.07.000
27 B Virgilia Beach
Gills Cove is scheduled to begin construction early next year:
8-016 GILLS COVE NEIGHBORHOOD DREDGING
� • ' ■ SSD adopted 3/25/2014
• 24 properties involved and
ie f®� / approximately 13,000 CY of dredging
`i `^,,., '+® ®��di • Dredge master plan and permit
O�p� application under agency review
11
,,,-r'
A��r submitted
• Dredging planned for early 2019
i
F i• '
$1.3370,7//19, $781,786 $0 $0 $0 $0 $98,156 $090,777
28 WI Virginia Beach
March 6, 2018
43
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
Hurds Cove is scheduled to begin construction early next year:
8-505 HURDS COVE NEIGHBORHOOD DREDGING
i�y -rte
,+ � ��a6 • SSD adopted 1/20/2015
4� ®���4��� • 91 properties involved and approximately
>a 3 �. �;'��@' `; 59,000 CY of dredging
_ V''.v` ®� 14.•,--,,, ■ Hydrographic survey completed,permit
�0 C � 0, ��l c; application is being prepared
,.1,,4"T , ■ Dredging planned for early 2019
Y
1 ttl .ice .,,.....,..& :v
,
a
Programmed funding I Approprbad to Date fy19 FY20 FY21 FY22 FY23 - FY24
OeOuetN. i .... :.•
$3,462.000 $3,462.000 SO $0 $0 $0 $0 $0
29
'11111111001111.2.11.0111$0.111110100111.11.1 B Virginia Beach
This is a "Summary"of the Coastal CIP Section:
COASTAL CIP SECTION
EMERGING ISSUES AND FUNDING NEEDS
➢Continuation of Funding for shore protection program
➢Beach nourishment provides the benefits of a wider recreational beach but
the most critical benefit is resiliency and storm damage reduction
> Beach nourishment will likely become even more critical in future years as a
first line of defense against Relative Sea Level Rise
>Interest and adoption of new Neighborhood Dredging SSD's is anticipated as
more projects are successfully completed
rw.r1101001.11111 `R
30 B Virginia Beach
March 6, 2018
44
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
COASTAL
ITEM#67846
(Continued)
COMMENTS&QUESTIONS
31 E Virginia Beach
Mayor Sessoms expressed his appreciation to Mr. Adams and the Public Works Department for all of
their work and dedication to the City.
March 6, 2018
45
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
4:13 P.M.
Mayor Sessoms welcomed Kathy Warren, Director — SGA Office. Ms. Warren expressed her
appreciation to the City Council for their continued support:
Economic'&Tourism Development CIP Projects -- - �c
FY2oty-20x4
Sty Council Briefing ,—- , -
'R aid R Williams,Jr.Deputy City manager
KathrWarrpl,SGA M pager,Department of Planning and Cos nlip Q elopment
March 6,aot8 �.+"'=Er 0.7 f {1,, f
t('
►111
"tet •
•
Here is an overview of the Recent Accomplishments:
RECENT ACCOMPLISHMENTS
* Parking Facilities * Oceanfront Capital
—, Launched Park.Modeling Software Projects Reinvestment
Program to assist with strategic —t Boardwalk Light
planning for parking demand Replacement nearing ;yy,
associated with new development at completion in
the Oceanfront connector parks
between rgf and
40'^Streets ,
•
� I
j
-� �� VIIIOIMIA TCN 1
March 6, 2018
46
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
RECENT ACCOMPLISHMENTS
* 29`"Street Improvements * Burton Station
—, Construction underway with —, In the process of awarding the contract
completion in May 2018 with construction to begin in March 2018
s
_'�m 15 � � ,
V n101M.t•tt" )
RECENT ACCOMPLISHMENTS
* Virginia Beach Development if t
Authority granted$3,778,000 ti -7
in Economic Development t
Investment Program funds, 71. Its'
leveraging$131,661,880 in
private investment. The
average annual salary of new
jobs created by EDIP Grants J
is$54,000
diti
March 6, 2018
47
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
This is an overall Summary of the CIP projects:
ECONOMIC&TOURISM DEVELOPMENT CIP PROJECTS FY2019—2024
Twenty-one(21)projects proposed within six year available funding
* Six(6)projects fully funded in previous years
* Three(3)completed and deleted projects
* Eight(8)projects funded within FY2m9 available funding: $14,874,643
* Seven(7)projects funded in previous years with a request to increase funding:$15,220,000
Six(6)projects with above available funding requests$149,900,000
Below are six(6)projects that were fully funded in previous years:
PROPOSED PROJECTS FULLY FUNDED
IN PREVIOUS YEARS
* 9-oil Rail-to-Trail Shared Use Path Development,formerly Transit
Corridor Development
* 9-021 London Bridge Commerce Center Infrastructure
Improvements I
* 9-022 Burton Station Roadway Improvements I
* 9-091 Burton Station Phase III
* 9-100 19th Street Infrastructure Improvements
* 9-108 29th Street Improvements
March 6, 2018
48
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
9-011 RAIL-TO-TRAIL CORRIDOR DEVELOPMENT
• Utilizes residual funding from Transit Corridor 110
..aa
Development Project that studied light-rail
transit-oriented development
• Studying East/West Shared Use Pathway as a top
priority of the City's Bikeways and Trails Plan w.
Status:Developing low cost approach to Improving right-of-
way for pedestrian,bicycle and other compatible uses
Programmed Appropriated Budgeted FY solo FY to 11 FY cool FY zo13 FY 2004
Funding to Date FY 0019
$1,000,000 $1,000,000 0 0 0 0 0 0
9-021 LONDON BRIDGE COMMERCE CENTER INFRASTRUCTURE
v.
anr• Phase I road and utility infrastructure ;f=
improvements to support the initial 4 3o^s.•
development of an 18-acre industrial park,
managed and marketed by the VBDA ".Y"o,•. 1
Status:Awaiting Navy approval on access
easement;working with an active prospect to
develop 13 acres /TTTr1 'ff
I4F`�
Programmed Appropriated Budgeted FY to FY Goal FY you FY 2023 FY zozq
Funding to Date FY 0019
$3,095,100 $1,095,100 O O O 0 O 0
March 6, 2018
49
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
94)22 BURTON STATION ROADWAY IMPROVEMENTS I
• Design and construction on an
improved Burton Station Road as ,t ,
well as a new Tolliver Road that
intersects with Burton Station Roadr�r:
in an effort to promote future - ` r4-•,
development as recommended in h :.j
the Burton Station/Northampton `
• /-
Boulevard SGA Plan +
Status:In process of awarding construction / ' "��
contract with NTP expected in March 2018 and � lj r'
project completion Summer 2019
Programmed Appropriated ® C x000 FY 1013 P9 0004
Funding to Date
5,1,989,931 512,989,93r 0 0 0 0 0 0
VIRGINIA BEACH y
9-091 BURTON STATION ROAD •=1.
I.;
IMPROVEMENTS PHASE III '�
• Design and construction of a new street with
utilities,lighting,landscaping,sidewalks and >. ? flY
drainage !s
• New alignment provides for commercial and .4
residential development , ,j
• New Tolliver Road from the railroad crossing to Air
Rail Ave. no
Status: Project on hold at 6o%;Design will restart Spring -t
2018
Programmed Appropriated Budgeted FY 1020 FY 1011 lin= FY 2014
Funding to Date FY 1019
510040,465 510,140,465 0 0 0 0 0 0
IRGIN1w•EwCN �
March 6, 2018
50
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
9-10019TH STREET INFRASTRUCTURE IMPROVEMENTS
• Streetscape improvements
from Parks to Arctic.
Connects the Convention
Center with the Dome Site and
supports the Resort Area
Strategic Action Plan
Status:Construction to begin Spring 2018 and be complete by Spring 2020
Programmed Appropnatedto Budgetedn, FY2o00 60003, FYaoi2 FYaoa3 FY0004
601,1mg Date 019
04,926,700 416916,700 0 0 0 0 0 0
9-108 29TH STREET IMPROVEMENTS
• Improvements to 25,6 Street as a
continuation of the Laskin Road _
Gateway Project from Arctic to Pacific fr ,
• Streetscape improvements including * 6 ~
wide sidewalks,street trees,drainage — -'
improvements and undergrounding _ ~" y, - 4111
overhead utilities a 4 ._ _
Status.Construction began Sept.2017 and
is approximately 5o%complete,will be
complete by May 2018
Programmed Appropriated Budgeted FY 2ozo Ft xoz., FY 2022 FY 2003 FY 2024
Funding to Date FY x019
0,504,771 $1,504,771 0 0 0 0 0 0
March 6, 2018
51
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
Here are the completed/deleted projects:
COMPLETED/DELETED PROJECTS
* 9-069 09th Street Corridor Improvements
* 9-015 Arena Infrastructure Site Improvements-ON SITE
* 9-017 Arena Infrastructure Development-OFF SITE
1 rlrO r.MIA ...,
9-069 l9 STREET CORRIDOR IMPROVEMENTS
• Start-up funding for study,design,property ':y
acquisition and minimal infrastructure , 177
improvements along 19th Street-Central Beach ,
District * wy
• Study and design to implement Dome Site, G----r
Convention Ctr.Hotel,Arena
• Study and design for streetscape improvements k • „°'►h
from Parks to Arctic �..
it ,
Status:CLOSED
vj'zk� 4
).
Programmed Appropriated Budgeted FY io0o FY 001, FY 0001 FY 1003 Fl 0o24
Funding to Date FY 1mg
$11,398.390 $11,398,391 a 0 0 0 0 0
s".M4'IANtrtlt” N
March 6, 2018
52
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
9-015 ARENA INFRASTRUCTURE SITE IMPROVEMENTS-ON SITE
• Design and construction of public
infrastructure improvements on 190
Street to support 500,000 SF -t:.�
entertainment and sports arena
• Site work and addition of 2,700 -
parking spaces,public plaza,lighting ar
• VS Blvd.streetscape improvements
Status:DELETED
Programmed Appropriated Budgeted FY 0011 FY zo FY 1019
Funding to Date FY zo+g
545,020,000 $45,020,000 0 0 0 0 0 0
9-017 ARENA INFRASTRUCTURE DEVELOPMENT OFF SITE
• Additional infrastructure improvements to
support 500,000 SF entertainment and sports
Arena . nay i-,- b. tE
• Acquisition for improvements along Birdneck 1M _-
Rd.and the intersection of VB Blvd.
• Streetscape for Birdneck Rd.,additional tum
lanes and traffic signal modifications �
Status:DELETED "43E4'
•
Programmed Appropriated Budgeted FY 10x0 ® C x034
Funding to Date FY 2.o+9
$18,587,500 08,587,500 0 0 0 0 0 0
March 6, 2018
53
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
These Proposed Projects are funded within the FY2018-19 Budget:
PROPOSED PROJECTS FUNDED WITHIN AVAILABLE FUNDING FY 2018—2019
CIP ID Project Amount
9-006 Winston-Salem Avenue Improvements 3,202,084
9-020 ViBe District Street infrastructure Improvements 4,749,450
9-028 Lynnhaven Parkway Corridor improvements 2,000,000
vino,wiw
PROPOSED PROJECTS FUNDED WITHIN AVAILABLE FUNDING FY 2018—2019
CIP ID Project Amount
9-059 Oceana&ITA Conformity&Acquisition II 731,522
9-082 Oceanfront Parking Facilities Capital Maintenance and 762,101
Development(Note:increased Target$412,101)
9-083 Town Center Garage and Plaza Capital Maintenance 352,726
9-096 Oceanfront Capital Projects Reinvestment 600,000
9-141 Economic Development Incentive Program(EDIP) 2,476,760
TOTAL 514,874,643
vutszlI ee�CM ,r
March 6, 2018
54
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
Construction is anticipated for November 2019 for the Winston-Salem Avenue Improvements with design
currently at 60%:
9-006 WINSTON—SALEM AVENUE IMPROVEMENTS
• Mediterranean to Pacific Avenuer-
FW -
• Design,utility easements,
construction of two-lane roadway
with on-street parking,sidewalks,
LED pedestrian lighting,landscaping, 77,
underground utilities,water,sewer _
and storm water improvements
Status:Design at 60%;Construction •,'�
anticipated Nov 2019-April 2021
Programmed Appropriated FY 10,9 FY 2010 FY 10x1 FY 1o11 FY 2o13 FY aye
funding to Date
98,710,000 53,604,516 83,101,084 49,513,400 0 0 0 0
1ao1a1.•ew<w
Construction for the ViBe District Street Infrastructure Improvements Project will begin this Fall:
9-020 VIBE DISTRICT STREET INFRASTRUCTURE IMPROVEMENTS
• Provides essential connectivity and street
improvements through new sidewalks, ylps
bike facilities,street trees,on-street i7�
parking,crosswalks,accessibility and j i •
utility and traffic upgrades
status:
• got design complete for 181"Street between
Cypress and Pacific Aves and Cypress Ave from 17'"
to 19.Streets,construction anticipated to start
October 1018
• 3o%designs will be completed for 17'"Street from
Cypress to Pacific Ave In Spring of 1018
Programmed Appropriated Budgeted FY 1010 FY 1011 FY On FY 1003 FY 1014
Funding to Date FY10,9
$8,8oy057 $4,051,607 $4,749,450 0 0 0 0 0
March 6, 2018
55
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
The London Bridge Commerce Center Infrastructure Project is currently in design with construction
expected to begin in late Summer/early Fall:
9-028 LYNNHAVEN PARKWAY CORRIDOR
IMPROVEMENTS
• Rt.264 south to Holland Road
• New gateway signage �- C1
• 5treetscape improvements to include .aii�•"11111111111,11
sidewalks,medians,pedestrian lighting, - .t` — ^p='.
landscaping and street trees,fence and - _ h
guard rail replacement,bus shelters
Status:Project in design;Construction to
begin Fall 2018;Project completion
anticipated Fall 2019 _
Programmed Appropriated Budgeted FY zoxG Fr xox3 Ft xoxq
Funding to Date Date N x019
$4,000,000 92000,000 53,000,000 0 0 0 0 0
VIRGINIA DRACH
The Oceana & ITA Conformity & Acquisition II Project is designed to retain NAS Oceana as the East
Coast Master Jet Base:
9-059 OCEANA& ITA CONFORMITY&ACQUISITION II
• Program designed to retain NAS oceana as the East
Coast Master Jet Base
• Acquisition of property and easements to complete
program goals of converting land to compatible uses
• Costs associated with zoning measures taken to Stop
and roll back incompatible development around the
base
Status:S13o,o00,00o spent,793 dwelling units acquired,
717 dwelling units reduced,087.3M spent for properties in .- -
APZ-1/Clear Zone and 535.1M for properties in the ITA
Programmed Appropriated Budgeted FY xo FY on FY ton FY 00x3 IM
Funding to Date FY conA
s o,x30,44o 54.490,9,8 5731,522 $r,000,000 0,,000,00 0,000,000 51.000,000 0,000,000
v RGiniA e x
March 6, 2018
56
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
The Oceanfront Parking Facilities Capital Maintenance and Development Project recently completed the
process of repairing the fire damage to the 31s1 Street Garage:
9-4382 OCEANFRONT PARKING FACILITIES CAPITAL
MAINTENANCE AND DEVELOPMENT
• Acquisition,development,equipment,capital
maintenance,repairs,rehabilitation, Wow , _
improvements,design,planning and engineering -,� /
services for the Oceanfront and Sandbridge 1 n
parking garages and surface lots r
Status.Repairs to 31.garage fire damage completed �•�
in Spring 2037 •'
1.
rtogrammed Appropriated Budgeted FY loan FY anal FY it FY 0003 FY x014
Funding to Date FY 1019
$8,850,092 $6,337,991 $762,101 $350,000 $350,000 $350,000 $350,000 $350,000
V1.0.14 BEACI;
Town Center Garage and Plaza Capital Maintenance Project is currently repairing the Town Center
garages to address water penetration, rust,potholes, etc.:
9-083 TOWN CENTER GARAGE AND PLAZA CAPITAL MAINTENANCE
• Parking equipment,capital maintenance,
repairs,rehabilitation,improvements,
design,planning and engineering
services for the five Town Center i
garages,pedestrian bridge,fountain, aft. l''''4441
plaza,street fixtures f'
Status'Repairs for all Town Center garages
currently underway to address water
penetration,rust,potholes,etc.
Programmed Aptteted Budgeted FY 243143 Cxox,
Funding too Date it my
55,484.535 53.368,179 $351,706 $352,726 $352,726 5350,706 $351,706 5352,726
March 6, 2018
57
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
The Oceanfront Capital Projects Reinvestments Project will continue installation of lights in "connector
parks"between 19`h and 40th Streets as well as repairing the 7th Street Canopy this Spring:
9-096 OCEANFRONT CAPITAL PROJECTS REINVESTMENT
• Reinvestment in capital projects at the oceanfront
• Replace Atlantic Ave,side streets and boardwalk lighting with LED
lighting
• Replace street fixtures,sidewalks,paver systems,boardwalk and
railing systems,etc.
Status.
• Spring 20,8-Completion of Boardwalk lights installation in connector
parks between 19'^and 400 Streets •
• Pavement replacement at 16.Street-Winter 20,8 + ..._..
• 7'^Street Stage repairs-Spring 2018
• 31•'Street Canopy replacement planned for Ff2m9 �.
• Design of Atlantic Avenue and East/West Side Streets light
replacement
Programmed Appropriat,dtnMEM FY0oa, FY1011 FYxo13 *1014
F•Ming pate
57.155877 33,555.877 5600,000 $600,000 $600,000 $600000 000,000 $600.000
The Economic Development Incentive Program (EDIP) leverages grant dollars and funds economic
initiatives, such as infrastructure improvements, to attract new businesses to the City:
9-141 ECONOMIC DEVELOPMENT INVESTMENT PROGRAM(EDIP)
• Discretionary grant program that leverages
several is te assistance programs to ctur
economic Initiatives such as infrastructure 44.111111
and training to assist existing and new __ -
businesses as approved by the VBDA on a y _
case-by-case basis .; ...
Status:$3,778,o0o in EDI P Grants incentivizing
$131,663,800 in private investment
Programmed Appropriated to Budgeted FY 7070 FY 2021 FY to FY 2023 FY tote
Funding Date FY tong
$67,o12,09 150,875,116 52,476,760 50,477,225 12,378,68, $7,331,107 50,284,485 12,038,795
March 6, 2018
58
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
These are the Proposed Projects funded in previous years with Above Available Funding Requests:
PROPOSED PROJECTS FUNDED IN PREVIOUS YEARS WITH ABOVE AVAILABLE FUNDING
REQUESTS
CIP ID Project Amount of Increase
9-008 Historic Kempsville $2,000,000
9-030 VA BEACH BIO Infrastructure I(Increased scope for $360,000
outfall and design)
9-037 APZ-1 Economic Incentives $1,000,000
9-041 Virginia Beach Sports Center(Increased scope) $10,000,000
9-08, Strategic Growth Area Projects($25o,o0o/yr) $1,500,000
9-276 Cape Henry Lighthouse Restoration(cost increases $150,000
due to schedule delays connected to successful
grant applications)
9-500 Virginia Beach Amphitheater Capital Maintenance $210,000
TOTAL $15,220,000
9-008 HISTORIC KEMRSVILLE
• Acquisition of property and infrastructure
improvements related to redevelopment dddcccrrr'''
consistent with the Historic Kempsville Plan
• Brick edging along sidewalks,interpretive
signage for the history trail,improved public 1 i 1'.I t II:14
spaces with street furniture,bus shelters
I�l.�ll S\ IL LE
Request for an additional$2,000,000 in a 1700
FY2019 funding for property acquisition t- -
Status:Gateway signage Installed;Interpretive signage
to be installed in the Spring 2018;Property acquisitions
advandng —
Programmed Appropriated Budgeted FY xo FY x0217 FY xoxx
Funding to Date FY 30179
$2,500,000 82,500,000 0 0 0 0 0 0
•
March 6, 2018
59
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
9-030 VA BEACH BI©INFRASTRUCTURE
• Includes the design and construction of a 2-
lane undivided parkway,including utility
r` ,7
infrastructure extending east from
y:+` .r- ..,
Landstown Center Way,a distance of •ti�, +=`
approximately noo feet
Request to Increase FY2o9 Budget by - ti.
S36o.000 to fund construction of new p-' - : •
outfall for the Bio Park BMP that was found '-
to be undersized and funding to study park u _ ,
In Its entirety to save on future design and RA.
eaa.vnweeraa.ro --M1,PI�®,
engineering :: -�,,...�,�..�_•-•.ter.• -..
Programmed Appropriated Budgeted FY 0000 P1 202, FY 0022
Funding to Date FY my
$5,349,000 $640,541 F0,500,188 1,86,064 0 0 0 0
VIN(.31.11A BEACH
9-037 APZ-i ECONOMIC INCENTIVES •
• Economic Incentives to businesses to convert non-conforming
businesses located In the APZ-t areas to conforming if possible
• To attract and relocate conforming businesses into the APZ-t
• Relocate non-conforming businesses that cannot convert to
other areas of the City \
Request for an additional st,000,000in FY2o19fundtng
to support ongoing goats of the program
Status:$1,428,743 of the appropriated balance has been
committed toward economic incentives and rebates to
businesses to promote compatible development,relocation
and expansion
Programmed Appropriated Budgeted FY 0000 FY 000, FY 0000 FY 0009 FT 2004
Funding to Date FY 019
3,,057,690 $,,057,690 0 0 0 0 0 0
March 6, 2018
60
CITYMANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
9-041 VIRGINIA BEACH SPORTS CENTER
• A minimum 01150,000 SF multi-sport,indoor sports
center
• Approximately:2 regulation basketball courts, S •
3
convertible to 6 collegiatesized courts or 24 volleyball - ':
urts • a•
• •Tea rooms,cont ess0ns and administrative offices
• Request for an additional Stoll in FY2o for
increase in scope to include the addition
of an
Indoor track
Status:Selecion of Design/Build and Operator Teams; "_—
FebMarch,2o18 Adoption
of
for Interim Agreement; •
\\
March,totB Adoption of Inferno Agreement
Programmed Appropriated Budgeted FY toxo FY soar FY aoee FY aoa3 FY x024
Funding to Date FY ao,9
$40,000,000 $4,000,000 $36,000,000 0 0 0 0 0
dl
1lOIMtA•lACM •
9-081 STRATEGIC GROWTH AREA PROJECTS
• Planning,design Services,consurt ng to support -" -
implementation of the eight SCA plans
• Development of detailed specific area development plans s,. •
Request to increase funding$t.5M($250,000(year a v-
FY2o19-1Y2024)to support ongoing planning and
implementation efforts in the eight SGAs
Status:Projects funded from 9-081 in FY2018 include:Burton
Station property acquisitions and Plan update,planning 'l 1a!!���► .4114efforts to revitalize Atlantic Avenue,Environmental studies 1• ►►►
and Appraisals,Neighborhood Revitalization Study •.1 *3174
IMO
Programmed AppropriatedBudgeted FY 2oao FY non FY GoFundingfuktg to DateDate Fr xma
$10,024,387 510,024,387 0 0 0 0 0 0
,rll
h v
March 6, 2018
61
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
9-276 CAPE HENRY LIGHTHOUSE
• Continue previous restorations to the Cape Henry
Lighthouse located at Fort Story
• Foundation stones to be restored,base stabilization,
improved access and repoint the exterior masonry
Y Request to increase funding by$150,000 in FY2019 to
address cost Increases due to schedule delays associated
with securing grant funding
Status:Project to be bid In March 2018
Programmed Appropriated Budgeted FY 2020 FY soul FY 2011 FY 202 FY 30 u4
Funding j to Date FY 20,9
$1,055,978 $1,055,978 0 0 0 0 0 0
nl
.R.y.IK r,o..
9-500 VA BEACH AMPHITHEATER CAPITAL MAINTENANCE
• Provides funding for capital maintenance of the •
-a
Veterans United Home Loans Amphitheater to Include
chair replacement,roof maintenance,truss repairs and
re-painting;Also pays for a portion of structural, - - --
architectural and mechanical renovations _
Request to increase funding by$zio,000 in FYzo19 to
construct additional gravel overflow parking to
address critical parking shortage i,, y
Pila
Status.Steel painting,replacement of production trailers i. !
and asphalt replacement
Programmed Appropriated Budgeted FY 2020 FY use FY lois FY 1028 FY lila
Funding to Date FY 1019
51,700,000 $1,500,000 $200,000 $200,000 5200,000 $200,000 $200,000 $200,000
March 6, 2018
62
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
These are the Projects requested Above Available Funding:
PROJECTS REQUESTED ABOVE AVAILABLE FUNDING
OP ID Project FY 19-24 Amount
9-039 17th Street Improvements $30,000,000
9-047 Town Center Reinvestment $900,000
9050 Dome Site Streetscape $7,500,000
9-053 Dome Site Entertainment Venue $30,000,000
9-045 Central Beach and Convention Districts Parking $60,000,000
9-046 15th Street Public Pier Parking $21,500,000
TOTAL $149,900,000
PROJECTS REQUESTED ABOVE AVAILABLE FUNDING
CIP ID Project FY 19-24 Amount
9-039 17th Street Improvements $30,000,000
9-047 Town Center Reinvestment $900,000
TOTAL $30,900,000
March 6, 2018
•
63
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
9'039 if"STREET IMPROVEMENTS
• 3o%Design funded in 9-020,this will fund the
rest of design and construction -
• Extends from Cypress to Pacific and provides "`
essential connectivity for the 170'Street t - .: t • "`
Corridor
• 8o'typical section consisting of wide ft
sidewalks,street trees,bicycle lanes,curb and
gutter and 4 lanes of traffic
• Utility and accessibility upgrades ----------
Grogram Appropriated Budge FY a0:x FY 0003 FY 2004
Fundingg too Date FYY 2 102919
$30,000.000 0 5+,000,000 19,000,000 0 0 0 0
,rill
V2r2Or N1IA Ittt .
9-047 TOWN CENTER REINVESTMENT
• Funding to reinvest in,and revitalize Town
Center's streetscape infrastructure and r + _ - - -
fixtures
i
• Enhance pedestrian wayfinding systemr '. •
• Arrival gateway signage and placemaking ' ` , it
continuing to make Town Center an y— 1
attractive destination ..
EI ENIEGI FY 1020 FY 102' FT x011 FY 10x3 FY 1014
5900,000 0 5+50,000 5+50,000 5+50,000 5+50,000 5+50,000 $150,000
VIRGINIA REACH
March 6, 2018
64
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
PROJECTS REQUESTED ABOVE AVAILABLE FUNDING
CIP ID Project FY 19-24 Amount
9-050 Dome Site Streetscape $7,500,000
9-053 Dome Site Entertainment Venue $30,000,000
9-045 Central Beach and Convention Districts Parking $60,000,000
9-046 15th Street Public Pier Parking $21,500,000
TOTAL $229,000,000
VIRGINIA REA.CI4
9r041 VIRGINIA BEACH SPORTS CENTER
• A minimum of 150,000 SF mu06sport,Indoor sports
center 10
• Approximately it regulation basketball courts, -e '+A
convertible to 6 collegiate.slzed courts or 04 volleyball
courts (r
• Team rooms,concessions and administrative offices
Request for an additional Ito-15 M In FY 2019 _-_ .• #
for Increase In scope to Include the addition ^ .
of an Indoor track _r
Status:Selection of Design/Build and Operator Teams; -----
Febru,761 Bhp hearhgfor lMerkn Agreement -----�
March,xmB Adoption of lnterkn Agreement
Proanmmed Appropriated Budgeted FY zoxo FY Mt ��
landing to Date FY x0+9
$40,000,000 $4,000,000 $36,000,000 0 0 0 0 0
March 6, 2018
65
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
it
Wolii -"14,1""
;... 1.tr vprillrillpeele:..:••• . ,.
`* • 4 7.•..,•V`•
e
-404-,i-40 .,-1;„!, 4_ _ _
_4__
iii ;[T
__� o.
March 6, 2018
66
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
NCAA INDOOR TRACK AND FIELD CHAMPIONSHIPS
T�4 1`
't. . "r✓rl
4 tis •'.
! ;
A
'r-t3 _� r
at
*_i...IA 1 Tp 1 i l)
i
+..�..1, .R.4.-1 'a_ - shy _
1,1
March 6, 2018
67
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
9-050 DOME SITE STREETSCAPE
* Fundingforstreetscapes surrounding and ► v
integrated into the development.
* Proposal calls fora mixed-use,high density .
development to include residential,office ,t.`-‘
/rr '.,.
retail,restaurants,a surf park, �o�-' S•
entertainment venue and parking on ate r '
approximately 10.35 acres of City-owned
property in the Central Beach -a
Entertainment District -1
Programmed Appropriated Budgeted FY 1010 FY 1011 FY 1012 11"
Funding to Date FY 1org
27,500,000 0 53,000,000 $4,500,000 0 0 0 0
9-053 DOME SITE ENTERTAINMENT VENUE
* Provides funding for 3500 person capacity
entertainment venue --
72,
* Proposal calls for a mixed-use,high density
development to include residential,office ;
retail,restaurants,a surf park,
entertainment venue and parking on I1�` �y�■
approximately 10.35 acres of City-owned +t!` t `
property in the Central Beach rolatium
••• lll���Entertainment District
REIMBudgeted FY 1010 FY 1031 FY 1011 FY 1023 FY 1024
FY 1014
230,000,000 0 $3,000.000 517.000,000 0 0 0 0
March 6, 2018
68
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
9-045 CENTRAL BEACH AND
CONVENTION DISTRICTS
PARKING
• Funding to construct new surface
spaces in lots adjacent to the Sports
Center and for parking structures a±
distributed throughout the Central
•
Beach District to support the
redevelopment including the Dome
Site and Pier Replacement Projects.
Programmed Appropriated Budge ed FY aox2 FY ioa3 FY 1024
Funding to Date FY xorg
$60,000,000 0 $3,000,000 $57,000,000 0 0 0 0
9-04615T"STREET PUBLIC PIER
* Funding for the design and construction of f
a public pier as well as a portion to the � �`
public parking for the proposed Pier
Project
* Pier Project will consist of a base pier with ;
top side improvements,a public plaza and
park,residential development,retail space
and public parking
* The project includes demolition of the
existing pier. -
Programmed Appropriated Budgeted FY xoxo FY o MEM FY xo
Funding to Date FY xmg
$21,500,000 0 o Sit,500,000 0 0 0 0
March 6, 2018
69
CITY MANAGER'S BRIEFINGS
FY2018-19 RESOURCE MANAGEMENT PLAN(Budget)
CAPITAL IMPROVEMENT PROGRAM(CIP)
ECONOMIC VITALITY
ITEM#67847
(Continued)
SUMMARY
* Economic and Tourism Development CI P advances the City's
goals:
—*Grow the Local Economy
—* Be a competitive first class resort for residents,businesses and tourists
—> Creating a year-round resort destination
- Creating a diverse economy
- Supporting our military installations and commands
—> Improving connectivity between large employment centers and our
residents
—> Supporting a business environment that promotes economic prosperity
VIRGINIA•EACN,q
Mayor Sessoms expressed his appreciation to Ms. Warren and the Economic Development Department
for all of their work and dedication to the City.
March 6, 2018
70
CITY MANAGER'S BRIEFINGS
SPORTS CENTER OPERATING INTERIM AGREEMENT
Update
ITEM#67848
4:30 P.M.
Mayor Sessoms welcomed Ronald H. Williams, Jr., Deputy City Manager. Mr. Williams expressed his
appreciation to the City Council for their continued support:
Virginia Beach
Convention & Visitors Center
Sports Center - PPEA
City Council Informational Briefing
Ronald H.Williams,Jr.
Deputy City Manager
March 6,2018
Here is the Summary of Material Terms regarding the Sports Center PPEA Interim Agreement:
Summary of Material Terms
Sports Center (CIP 9-041) PPEA Interim
Agreement (Operating)
Parties:City of Virginia Beach and Eastern Sports
Management
Purpose:Advance PPEA process toward the development
of a comprehensive agreement to operate and manage
the Sports facility for a maximum oftwentyyears.
Term: Date of execution until November 1,2018.
However,the Interim Agreement will terminate upon one
of three thins: (a)execution of a comprehensive
agreement;(b) ither party providing notice of its intent
to not proceed with the development of the project;(c)
the expiration of the term
March 6, 2018
71
CITY MANAGER'S BRIEFINGS
SPORTS CENTER OPERATING INTERIM AGREEMENT
Update
ITEM#67848
(Continued)
Summary of Material Terms
Sports Center (CIP 9-041) PPEA Interim
Agreement (Operating)
Work Items: (1)Owner's representative consulting fee;
(2)Detailed operations pro forma;
(3)Staffing plan;
(4)Marketing plan(in consultation with CVB
Sports Marketing;
(5)Operator engagement fee;
(6)Analysis of risk sharing model,including
operator investment;
(7)Draft operating agreement:construction
period&20-year term
Cost: $150,000
Because the City received no more than three (3)submittals, all being high-quality conceptual submittals,
Staff recommends moving forward to the detailed phase:
Next Steps
1. March 20—Operating Interim Agreement
Ordinance
Mayor Sessoms expressed his appreciation to Mr. Williams and the entire Team for all of their work on
this project.
March 6, 2018
72
CITY COUNCIL
LIAISON REPORTS
ITEM#67849
4:45 P.M.
There were no City Council Liaison Reports.
March 6, 2018
73
CITY COUNCIL
COMMENTS
ITEM#67850
4:46 P.M.
Councilman Dyer advised he will host a Town Hall Meeting at Tallwood High School on April 12`h
March 6, 2018
74
CITY COUNCIL
COMMENTS
ITEM#67851
Council Lady Abbott advised she has met with the Food Truck Owners and believes she will bring a
Resolution forward prior to Memorial Day making it easier for this type of vendor to operate within the
City.
March 6, 2018
75
CITY COUNCIL
COMMENTS
ITEM#67852
Councilman Moss requested the City consider changing the time from 6:00 p.m. to 6:30 or 7:00 p.m.for
the Public Hearing scheduled on April 26`h at the Convention Center.
March 6, 2018
76
CITY COUNCIL
COMMENTS
ITEM#67853
Council Lady Henley advised the City will be hosting a one-day event at the Convention Center on April
19`"for the 2018 North Landing River/Albermarle Sound Estuarine Symposium and encouraged everyone
to attend.
March 6, 2018
77
AGENDA REVIEW SESSION
ITEM#67854
4:47 P.M.
BY CONSENSUS, the following shall compose the Legislative CONSENT AGENDA:
K.
ORDINANCES/RESOLUTIONS
1. Ordinances to AMEND City Code Sections:
a. 2-120 re Extended Sick Leave
b. 6-12, 7-1, 7-59, 7-59.1, 7-59.2, 7-59.3, 7.59.4 and 7-59.6 re the
definition of Electric Powered Utility Cart and Regulations for riding
on the beach or boardwalk
2. Ordinance to GRANT a Nonexclusive Franchise to Cox Wireless Access, LLC re install,
maintain and operate Wireless Facilities and Communications Infrastructure within the
public streets and rights-of-way
3. Ordinances to DECLARE City property to be in EXCESS:
a. 5900 Drum Lane and AUTHORIZE the City Manager to
EXECUTE all disposition and EXCHANGE documents with
Norfolk Airport Authority
b. 5833 Sandpit Road; three (3) adjacent lots in the Burton Station
Neighborhood; 1.7 acre parcel; and certain drainage rights and
AUTHORIZE the City Manager to EXECUTE all disposition and
EXCHANGE documents with DHW Joint Venture,L.L.C.
4. Resolution to ADOPT the Virginia Cash Match Plan as the Successor to the Sheriffs
Supplemental Retirement Plan
5. Ordinance to APPROPRIATE $1 Million to the Risk Management Internal Service
Fund re insurance premiums and self-insurance claims
6. Ordinances to ACCEPT and APPROPRIATE:
a. $3,000 from Geico to the Police Department re the Every 15
Minutes Program
b. $17,973 from the Virginia Department of EMS to Virginia Beach
EMS re purchase of rescue equipment/medical supplies; and,
$8,682 from Tidewater EMS Regional Council to the Virginia Beach
EMS re personnel costs associated with Hampton Roads
Metropolitan Medical Response System (HRMMRS)
MAYOR SESSOMS WILL ABSTAIN ON ITEM#3a/b
COUNCILMAN MOSS WILL VOTE VERBAL NAY ON ITEM#5
March 6, 2018
78
ITEM#67855
Mayor William D. Sessoms, Jr., entertained a motion to permit City Council to conduct its CLOSED
SESSION,pursuant to Section 2.2-3711(A), Code of Virginia, as amended,for the following purpose:
LEGAL MATTERS: Consultation with legal counsel and briefings by
staff members or consultants pertaining to actual or probable litigation,
where such consultation or briefing in open meeting would adversely
affect the negotiating or litigating posture of the public body; or
consultation with legal counsel employed or retained by a public body
regarding specific legal matters requiring the provision of legal advice
by such counsel pursuant to Section 2.2-3711(A)(7).
• Pier Project
PERSONNEL MATTERS: Discussion, consideration of or interviews
of prospective candidates for employment, assignment, appointment,
promotion, performance, demotion, salaries, disciplining or resignation
of specific public officers, appointees or employees pursuant to Section
2.2-3711(A)(1)
• Council Appointments: Council, Boards, Commissions,
Committees, Authorities, Agencies and Appointees
March 6, 2018
79
ITEM#67855
(Continued)
Upon motion by Vice Mayor Jones, seconded by Councilman Dyer, City Council voted to proceed into
CLOSED SESSION at 5:02 P.M.
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M Benjamin Davenport, Robert M Dyer,
Barbara M Henley, Vice Mayor Louis R. Jones, John D. Moss,
Mayor William D. Sessoms, Jr., John E. Uhrin, Rosemary
Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
Closed Session 5:02 P.M. - 5:58 P.M.
March 6, 2018
80
FORMAL SESSION
VIRGINIA BEACH CITY COUNCIL
March 6,2018
6:00 P.M.
Mayor William D. Sessoms, Jr., called to order the FORMAL SESSION of the VIRGINIA BEACH
CITY COUNCIL in the City Council Chamber, City Hall, on Tuesday, March 6, 2018, at 6:00 P.M.
Council Members Present:
Jessica P. Abbott, M Benjamin Davenport, Robert M Dyer, Barbara
M Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms,Jr., Rosemary Wilson,John E. Uhrin and James L. Wood
Council Members Absent:
Shannon DS Kane family vacation
INVOCATION: Reverend David Rollins
Pastor, Bayside Presbyterian Church
PLEDGE OF ALLEGIANCE TO THE FLAG OF THE UNITED STATES OF AMERICA
Mayor Sessoms DISCLOSED he is retired from Towne Bank (which has a corporate office located at
297 Constitution Drive in Virginia Beach), and no longer has any involvement in Towne Bank's
transactions. However, due to the size of TowneBank and the volume of transactions it handles, Towne
Bank has an interest in numerous matters in which he is not personally involved and of which he does not
have personal knowledge. In that regard, he is always concerned about the appearance of impropriety
that might arise if he unknowingly participates in a matter before City Council in which TowneBank has
an interest. Mayor Sessoms also has similar concerns with respect to Berkshire Hathaway Home Services
Town Realty, which is an affiliate of Towne Bank. In order to ensure his compliance with both the letter
and spirit of the State and Local Government Conflict of Interests Act (the `Act"), it is his practice to
thoroughly review each City Council agenda to identify any matters in which he might have an actual or
potential conflict. If, during his review of an agenda, he identifies a matter in which he has a `personal
interest", as defined by the Act, he will either abstain from voting, or file the appropriate disclosure letter
with the City Clerk to be included in the official records of City Council. Mayor Sessoms' letter of
January 13, 2015, is hereby made a part of the record.
March 6, 2018
81
Council Lady Rosemary Wilson DISCLOSED that she is a real estate agent affiliated with Howard
Hanna Real Estate Services ("Howard Hanna"), whose Oceanfront Office is located at 303 34`h Street
Suite 102, Virginia Beach, VA 23451. Because of the nature of realtor and real estate agent affiliation,
the size of Howard Hanna, and the volume of transactions it handles in any given year, Howard Hanna
has an interest in numerous matters in which she is not personally involved and of which she does not
have personal knowledge. In order to ensure her compliance with both the letter and the spirit of the
State and Local Government Conflict of Interests Act (the "Act"), it is her practice to thoroughly review
the agenda for each meeting of City Council for the purpose of identifying any matters in which she might
have an actual or potential conflict. If, during her review of the agenda for any given meeting of the
Council, she identifies a matter in which she has a "personal interest,"as defined in the Act, she will file
the appropriate disclosure letter to be recorded in the official records of the City
Council. Councilmember Wilson regularly makes this disclosure. Her letter of February 20, 2018, is
hereby made part of the record.
Council Lady Rosemary Wilson also DISCLOSED she has a personal interest in Dixon Hughes
Goodman and receives income from the firm as a result of her late husband's employment. The income is
proceeds from the sale of his partnership interest,paid out over an extended period of time. She is not an
employee of Dixon Hughes Goodman, does not have any role in management of the company and does is
not privy to its client list. However, due to the size of Dixon Hughes Goodman and the volume of
transactions it handles in any given year, Dixon Hughes Goodman may have an interest in matters of
which she has no personal knowledge. In that regard, she is always concerned about the appearance of
impropriety that might arise if she unknowingly participates in a matter before City Council in which
Dixon Hughes Goodman has an interest. In order to ensure her compliance with both the letter and spirit
of the State and Local Government Conflict of Interests Act (the "Act"), it is her practice to thoroughly
review each City Council agenda to identify any matters in which she might have an actual or potential
conflict. If, during her review of an agenda, she identifies a matter in which she has a `personal
interest", as defined by the Act, she will either abstain from voting, or file the appropriate disclosure
letter with the City Clerk to be included in the official records of City Council. Council Lady Wilson's
letter of June 2, 2015, is hereby made a part of the record.
March 6, 2018
82
Item—VI-E
CERTIFICATION
ITEM#67856
Upon motion by Councilman Dyer, seconded by Councilman Uhrin, City Council CERTIFIED THE
CLOSED SESSION TO BE IN ACCORDANCE WITH THE MOTION TO RECESS
Only public business matters lawfully exempt from Open Meeting
requirements by Virginia law were discussed in Closed Session to which
this certification resolution applies.
AND,
Only such public business matters as were identified in the motion
convening the Closed Session were heard, discussed or considered by
Virginia Beach City Council.
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M Benjamin Davenport, Robert M Dyer, Barbara
M Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms,Jr.,John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
March 6, 2018
cp14 .BFAc
- - c,
t1- 1\ ' )i
}, 0
OF OUR „woo
RESOLUTION
CERTIFICATION OF CLOSED SESSION
VIRGINIA BEACH CITY COUNCIL
WHEREAS: The Virginia Beach City Council convened into CLOSED SESSION, pursuant to the
affirmative vote recorded in ITEM#67855 Page 79 and in accordance with the provisions of The Virginia
Freedom of Information Act; and,
WHEREAS: Section 2.2-3712 of the Code of Virginia requires a certification by the governing body
that such Closed Session was conducted in conformity with Virginia law.
NOW,THEREFORE,BE IT RESOLVED: That the Virginia Beach City Council hereby certifies
that,to the best of each member's knowledge,(a)only public business matters lawfully exempted from Open
Meeting requirements by Virginia law were discussed in Closed Session to which this certification resolution
applies; and, (b) only such public business matters as were identified in the motion convening this Closed
Session were heard, discussed or considered by Virginia Beach City Council.
I 0 e-
Amanda BarneJ77
MC
City Clerk March 6, 2018
83
ADOPT AGENDA
FOR FORMAL SESSION ITEM#67857
BY CONSENSUS, City Council ADOPTED:
AGENDA FOR THE FORMAL SESSION
March 6, 2018
84
Item - VI-H.1
PUBLIC HEARINGS
ITEM#67858
Mayor Sessoms DECLARED A BID OPENING.•
FRANCHISE FOR USE OF CITY RIGHTS-OF-WAY
Construct, Install and Maintain Wireless Communications and Infrastructure
BIDS FOR NON-EXCLUSIVE FRANCHISE
Pursuant to Virginia Code Section 15.2-2102, the Chair will now summarize the bids that have been
received for a proposed non-exclusive franchise to use and occupy the City's streets and public rights-of-
way for the purpose of constructing, installing and maintaining wireless communications facilities and
infrastructure.
One bid has been received, as follows:
Cox Wireless Access LLC has bid:
10 year franchise term with three options to renew for five (5)years each to install small
cells on existing and new structures in the City rights-of-way
- $1,000 one-time fee for each small cell attachment to a new pole, or the wireless support
structure right-of-way use fee established by Virginia law, whichever is greater
Are there any other persons desiring to submit a bid at this time?
There being no further bids, the bidding is closed.
City staff has evaluated the bid received by Cox Wireless Access, LLC, and recommends that the company
be granted a non-exclusive franchise.
March 6, 2018
85
Item- VI-L1
PUBLIC HEARINGS
ITEM#67859
Mayor Sessoms DECLARED A PUBLIC HEARING:
NON-EXCLUSIVE FRANCHISE USE
Cox Wireless Access,L.L.C.
There being no speakers, Mayor Sessoms CLOSED the PUBLIC HEARING.
March 6, 2018
86
Item- VI-L2a/b
PUBLIC HEARINGS
ITEM#67860
Mayor Sessoms DECLARED A PUBLIC HEARING:
EXCHANGE OF CITY PROPERTY
a. 5900 Drum Lane for Norfolk Airport Authority property
b. 5833 Sandpit Road/three (3) adjacent lots in the Burton Station
Neighborhood/1.7 acre parcel/certain drainage rights for DHW
Joint Venture, L.L.C.,property
There being no speakers,Mayor Sessoms CLOSED the PUBLIC HEARING.
March 6, 2018
87
Item - VI-J
PUBLIC COMMENT
ITEM#67861
Mayor Sessoms DECLARED A PUBLIC COMMENT:
SHORT-TERM RENTALS
The following individuals registered to speak:
Vicki Wilson, 3129 Lynnhaven Drive, Phone: 404-6076, did not respond
Joan Rose, 304 Ruddy Crescent, Phone: 286-2588
Donna Watson, 3213 Little Island Road, Phone: 689-8928
Bob Kugler, 2084 Bierce Drive, Phone: 430-6228
Lorrine Jones, 2313 Sandpiper Road, Phone: 721-1103
Laurence Horvat, 2505 Indian Hill Road, Phone: 284-1842
Dell Young, 2505 Indian Hill Road, Phone 650-1383
Cheryl Petticrew, 308 Swordfish Lane, Phone: 426-5221
Susan Sadowski, 312 Salmon Lane, Phone: 650-1568
Rusty Carlock, 2305 Bake Lake Road, Phone: 618-6886
Mary Elizabeth Conner, 2429 Indian Hill Road, Phone: 460-5089
Jack Fekete, 3012 Sand Bend Road, Phone 426-8184
Linda Johnson, 2816 Sandpiper Road, Phone: 514-4018
Elaine Fekete, 3012 Sand Bend Road, Phone: 435-6965
Christin Benns, 4313 Sandy Bay Drive, Phone: 630-9686
Joan Davis, 2216 Sandfiddler Road, Phone: 714-2304
Bill Macali, spoke as the Attorney for Sandbridge Beach Business Association
Molly Brown, 2232 Sandpiper Road, Phone: 721-5011
Jimmy Frost, 2240 Windom Place, Phone: 343-6768
Mary Girevendulis, 2252 Sandfiddler Road, Phone: 301-6675
John Borum, 4221 Sandy Bay Drive, Phone: 363-9132
Darrell Mckown, 4217 Battery Road, Phone: 641-2012
Barbara Imrich, 2217 Baylake Road, Phone: 460-1230
Matthew Toller, 704 Vanderbilt, Phone: 642-0144
Andrew Roper, 3020 Sand Bend Road, Phone: 426-2216
Marius Vassiliou, 3738 Sandpiper Road, Unit 235B, Phone: 703-585-4143
Cynthia Vassiliou, 3700 Sandpiper Road, Unit 418A, Phone: 703-772-5510
Chris Reckling, 2365 Sandfiddler Road, Phone: 439-4254
Sam Reid, spoke as the President Virginia Beach Council of Civic Organization
March 6, 2018
88
Item - VI-J
PUBLIC COMMENT
ITEM#67861
(Continued)
Bill Brown, 2232 Sandpiper Road, Phone: 721-5011
Victor Addison, 2708 Sandfiddler Road, Phone: 703-203-8103
David Watson, 3213 Little Island Road, Phone: 689-8928
Jim Moffat, 581 Sandbridge Road, Phone: 572-3478
Jack Drescher, 6410-A Ocean Front Avenue, Phone: 428-3344
Pat Barton, 308 Back Bay Crescent, Phone: 721-0155
Catherine Miller, 2825 Sandfiddler Road, Phone: 689-2893
Douglas Miller, 2825 Sandfiddler Road, Phone: 689-2893
Herb Jones, 2313 Sandpiper Road, Phone: 721-1103
Patrick Keenan, 601 Sandbridge Road, Phone: 426-6200,
Rebecca Kindleg, 2364 Sandfiddler Road, Phone: 426-7320
Chris Resmeier, 4301 Sandy Bay Drive, Phone: 464-1543
Michael Megge, 2036 Hackberry Road, Phone: 435-5201
Charlie Kelly, 3316 Sandfiddler Road, Phone: 355-2233
Doug Huston, 3701 River Road, Phone: 617-3360
Bruce Johnson, 4654 Lookout Road, Phone: 460-5447
Emile Palmer, 3048 Sandfiddler Road, Phone: 721-2950
Lynn Hume, 2036 Hackberry Road, Phone: 621-4370
Brad Hall, 705 23rd Street, Phone: 785-7856
Michael Davis, 2972 Sand Bend Road, Phone: 846-8968
Jean Davis, 2972 Sand Bend Road, Phone: 703-216-1335
Jim Reeve, 1476 Lotus Drive, Phone: 589-1069
Kevin Sheffield, 415 Pinewood Drive, Phone: 746-0905
Nicholas Naylor, 2625 Sandpiper Road, Phone: 477-2729
Cory Belcher, 2205 Wessington Drive, Phone: 804-592-7651
Nancy Parker, 513 23rd Street, Phone: 651-4848
Anders Hellstrom, 2841 Sandpiper Road, Phone: 635-4689
Nicholas Cleanthes, 2313 Winchester Glen Drive, Phone: 426-2278, did not respond
There being no additional speakers, Mayor Sessoms CLOSED the Public Comment.
March 6, 2018
�140141A•BE,"Li
City of Vii iriia Beach
S Op OUR NAt�ON
VBgov.com
JOHN E.UHRIN PHONE: (757)200-7005
COUNCILMAN-DISTRICT 6-BEACH JUHRIN@VBGOV COM
Refer to File No. 0062480
March 6, 2018
Mrs. Amanda Barnes
City Clerk's Office
Municipal Center
Virginia Beach, Virginia 23456
Re: Disclosure Pursuant to Virginia Code § 2.2-3115(H)
Dear Mrs. Barnes:
Pursuant to the Virginia Conflict of Interests Act, Sections 2.2-3112(A)(2) and -3115(H),
Code of Virginia, I make the following declarations:
1. I am making this written disclosure regarding City Council's discussion and vote
on proposed alternative amendments to the City Zoning Ordinance pertaining to
home sharing and short-term rentals.
2. Regulation of peer-to-peer hospitality services could impact hotel and motel owners
and employees.
3. I am an employee of Burlage Management Corporation, which is located at 801
Atlantic Avenue in Virginia Beach. Burlage Management Corporation owns hotels
in the City.
4. I am a member of a business, profession or occupation, namely Resort Area
hoteliers. If amendments are made to the Zoning Ordinance, all members of this
profession may be affected by the amendments.
5. Although the City Attorney has advised me that with respect to this transaction, any
benefit or detriment to Burlage Management Corporation is speculative and
therefore the Act provides that I may participate in this transaction without
restriction, I nevertheless have chosen to disclose this potential interest and state
215 ATLANTIC AVENUE,VIRGINIA BEACH,VIRGINIA 23451
Mrs. Amanda Barnes -2- March 6, 2018
Re: Disclosure Pursuant to Virginia Code § 2.2-3115(H)
that I am able to participate in this transaction fairly, objectively, and in the public
interest in accordance with the provisions of Virginia Code §§ 2.2-3112(A)(2) and
2.2-3115(H).
I respectfully request that you record this declaration in the official records of City Council.
Thank you for your assistance in this matter.
Sincer ly,
a
Jhn E. Uhrin
Councilmember
JEU/RRI
01•11A'BFAc
z.
City of Virginia Beach
Zo 2
S OF ova
0.00 S
VBgov.com
ROSEMARY WILSON PHONE: (757)422-0733
COUNCIL LADY AT-LARGE FAX (757)385-5669
Refer to File No.0062484
March 6, 2018
Mrs. Amanda Barnes
City Clerk's Office
Municipal Center
Virginia Beach, Virginia 23456
Re: Disclosure Pursuant to Virginia Code § 2.2-3115(H)
Dear Mrs. Barnes:
Pursuant to the Virginia Conflict of Interests Act, Sections 2.2-3112(A)(2) and -3115(H),
Code of Virginia, I make the following declarations:
1. I am making this written disclosure regarding City Council's discussion and vote
on proposed alternative amendments to the City Zoning Ordinance pertaining to
home sharing and short-term rentals.
2. Regulation of peer-to-peer hospitality services could impact short-term rental
providers and property management services providers, including Howard Hanna
Real Estate Services("Howard Hanna"), whose Oceanfront office is located at 303
34th Street Suite 102, Virginia Beach, VA 23451.
3. I am a real estate agent affiliated with Howard Hanna,and I have a personal interest
in the company because I receive commissions from the company. The only
income I receive from Howard Hanna is my own commissions from my own sales.
I do not personally provide property management services.
4. I am a member of a business, profession or occupation, namely real estate service
providers that also provide property management services. If amendments are
made to the Zoning Ordinance, all members of this profession may be affected by
the amendments.
921 ATLANTIC AVENUE,UNIT 502,VIRGINIA BEACH,VA 23451
Mrs. Amanda Barnes -2- March 6, 2018
Re: Disclosure and Abstention Pursuant to Virginia Code § 2.2-3115(H)
5. Although the City Attorney has advised me that with respect to this transaction, any
benefit or detriment to Howard Hanna is speculative and therefore the Act provides
that I may participate in this transaction without restriction, I nevertheless have
chosen to disclose this potential interest and state that I am able to participate in
this transaction fairly, objectively, and in the public interest in accordance with the
provisions of Virginia Code §§ 2.2-3112(A)(2) and 2.2-3115(H).
I respectfully request that you record this declaration in the official records of City Council.
Thank you for your assistance in this matter.
Sincerely,
Rosemary A. ilson
Councilmember
RAW/RRI
89
Item - VI-K
ORDINANCES/RESOLUTION
ITEM#67862
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council APPROVED, BY
CONSENT: Agenda Items la/b, 2, 3a/b (MAYOR SESSOMS ABSTAINED), 4, 5(MOSS VERBAL
NAY) and6a/b
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms, Jr.,John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
March 6, 2018
90
Item -VI-K.la
ORDINANCES/RESOLUTION
ITEM#67863
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council ADOPTED, BY
CONSENT, Ordinances to AMEND City Code Section:
a. 2-120 re Extended Sick Leave
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms,Jr., John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
March 6, 2018
1 AN ORDINANCE TO AMEND SECTION 2-120 OF THE
2 CITY CODE PERTAINING TO EXTENDED SICK LEAVE
3
4 SECTIONS ADDED: § 2-120
5
6 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA
7 BEACH, VIRGINIA:
8
9 That Section 2-120 of the Code of the City of Virginia Beach, Virginia, is hereby
10 amended and ordained to read as follows:
11
12 Sec. 2-120. - Extended sick leave Sick leave donation program.
13 (a) The City Manager is authorized to establish a sick leave donation program to
14 meet the needs of employees who have insufficient sick and annual leave or
15 Paid Time-Off (PTO) to cover a serious personal or family medical illness or
16 injury that qualifies for and is designated as Family Medical Leave under the
17 Family and Medical Leave Act. Donations of leave may be provided to
18 employees in accordance with established policies and guidelines.
19 (b) A "donation" shall be defined as the voluntary reduction of an employee's sick
20 leave, annual leave or PTO balance to provide another employee with paid
21 leave.
22
23 (a) There is hereby established an extended sick leave review board consisting of five
24 - - - - - - - - - -- • - •- - - - - - - -... _ __ _ _ __ .
25 ! . - _ . - - - e, e - - e . eee • e e - - - - , -
26 two (2) years and two (2) for three (3) yeas. Thereafter, members shall be
27 - - -- -- - - - •• - -- - - -- - - -
28 management below the department head level, two (2) members shall be
29 nonmanagement employees and one member shall be selected from the
30
31 - . - - • - - ---- - - - - - • - - - - --- - - --
32 a quorum. The board shall meet on an as needed basis, but no later than fifteen
33 - - - - - - - - -- - - - - - - - - - - - _ .
34 subsection.
35 (c) Applications for extended sick leave shall be submitted by the department head to,
36 - - - - - e . - , - - - - - - . .._ . . A - ee .-- - e - -
37 - - - - - •- - - - - - - - - .. • - - - - -- -
38 - - - -- - - - - - - - - - - - -
39 defined in section 2 119 of the City Code;
40 •- - - -' - :- - - - -: -- - - : • - - - - - - - -- -
41 - - - - - - - - - - - - ;
42 (3) The employee must have completed twelve (12) consecutive working months of
43 - .. - - • - - . _ _
44 - - e - - - - - - - - -- - - - - _- -
•
45 - - - =- = e - e - - e - - • =e•- =- - - - - -- •- - - •-
46 -- - - - -- - - -e " e" e - - "e e _ - - _ _ . - e - -
48 -- _ - - .2 " 2" " - e -- ' e • " " e e - - - -- . -- e _ _ e
49 - --- .. - - - - -- - - -- - _ _ -- - • - --
50 -- ' ' - ce _ - • - • - . ee -- - - e e - -- ".. • -- - e _ ee c.
51 e - - - - - - - _ - • - - - - - - - - - -
52 limited to authorizing the granting of additional paid sick leave to a qualified
53 - • - - - e - - •- - e -- - - e - -- -e • e - e - e -e -- -
•
54 - - - - - . ••• • ee_ e - - -e - .. • - - e ' • - - - ' e
55 an employee not more than twice in any consecutive twelve month period. The
56 _e e - - e, • e e, - e • - e - -e - • . • - - • - - e.
57 - - e - e - . - - - - - - ---e e ' - e - - - ey y
58 vote of the members of the board present at the meeting. The employee shall be
59 •e • • c e • ee - e • ' - • - - -- - -e _ e- - - - •• - - _
•
60 --- e - - e - e -
•
61 - ' • _ - - -- - - -- - - • - - - "• ee :e e - - e - - -
•
62 - - - e - - ' e e -- - - e - e--e - - - - - e e - - -- - e. .
63 - - - ' - - =- - - - - -- - - - - - - -- - - - - ' - - • _ .. _ . -
•
64 _ - - -- - e, - - - - - - . - - -• - e . ee- - - - - -- ee • -
65 the secretary of the board. Such rules and regulations shall be available in the office
66 of the department of personnel during regular--business hours. The extended sick
67 _ - - --- e • - - • - - _ - - - - - •- - - - - - - - - .
68 -- -
69 (f) The director of personnel or a designated alternate staff member shall serve as
70 - - - - - - - - - - - - - - - - '• -
•
•
71 - e e •- . _ _• _ •_•. - . . . _ •• -- -- -- • e e ' . - -
72 - = -- - - - - - - -
73 - - -- • ' - - - - - • - e • = *: - - ••z • • - - - - - - -- -
74 - -- - =- - - - e - --- - - • - - - - - -- - - - -
75 repayment has been made, after which time the employee shall accrue the full
76 amount of sick leave to which he would otherwise be entitled. However, the
77 employee may, at his option, repay any extended sick leave granted hereunder at
78 the rate of eight (8) hours per month of all future sick loavo accrued. Once the
79 •- • - e -- - - - - e z•-• • - - - - • - - - •-
80
81 the extended sick leave review board if they meet certain guidelines adopted by the
82 -- - c. - - -- - - - e cc. - . - - - -83 e - ' - - - - e - -
84 _ ee - - e•" - e e '- - - - - -e. - • - _ e
85 - - - - - - - - - - - - - - - - - -86 pay at the time the extended sick leave was granted. The city reserves the right, as
87 a condition to the granting of extended sick leave, to withhold from the employee's
88 final paycheck, that amount owed under this subsection.
Adopted by the City Council of the City of Virginia Beach, Virginia, on this 6th
day of March , 2018.
APPROVED AS TO CONTENT: APPROVED AS TO LEGAL SUFFICIENCY:
(4112aCk' alL 24-
Human Resources City torney's Office
CA14254
R-2
February 23, 2018
91
Item -VI-K.lb
ORDINANCES/RESOLUTION
ITEM#67864
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council ADOPTED, BY
CONSENT, Ordinances to AMEND City Code Section:
b. 6-12, 7-1, 7-59, 7-59.1, 7-59.2, 7-59.3, 7.59.4 and 7-59.6 re the
definition of Electric Powered Utility Cart and Regulations for
riding on the beach or boardwalk
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M Benjamin Davenport, Robert M. Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms,Jr., John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
March 6, 2018
REQUESTED BY MAYOR SESSOMS
1 AN ORDINANCE TO AMEND SECTIONS 6-12,
2 7-1, 7-59, 7-59.1, 7-59.2, 7-59.3, 7-59.4, AND 7-
3 59.6 OF THE CITY CODE PERTAINING TO
4 THE DEFINITION AND REGULATIONS OF
5 ELECTRIC POWERED UTILITY CARTS
6
7 Section Amended: City Code §§ 6-12, 7-1, 7-59,
8 7-59.1, 7-59.2, 7-59.3, 7-59.4, and 7-59.6
9
10 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF VIRGINIA
11 BEACH, VIRGINIA:
12
13 That Sections 6-12, 7-1 , 7-59, 7-59.1, 7-59.2, 7-59.3, 7-59.4, and 7-59.6 of the
14 City Code are hereby amended and reordained to read as follows:
15
16 CHAPTER 6 — BEACHES, BOATS AND WATERWAYS
17
18 . . . .
19
20 Sec. 6-12. - Riding horses or driving vehicles on beach or dunes.
21
22 . . . .
23
24 (c) The provisions of this section shall not apply in the resort area to conduct that is
25 explicitly authorized by a special events permit issued pursuant to City Code
26 Section 4-1 or by franchise awarded by the city council.
27
28 (d) The provisions of this section shall not apply to electric powered utility carts, as
29 defined in Chapter 7.
30
31 . . . .
32
33 CHAPTER 7 — BICYCLES AND OTHER WHEELED DEVICES
34
35 Sec. 7-1. - Definitions.
36
37 For the purposes of this Chapter, the terms "all-terrain vehicle," "bicycle,"
38 "electric personal assistive mobility device," "electric power-assisted bicycle," "golf cart,"
39 "highway," "low speed vehicle," "moped," "motor-driven cycle," "motorized scooter,"
40 "motorized skateboard," "vehicle," "wheelchair," and "wheel chair conveyance" are
41 defined as set forth in Code of Virginia §§ 46.2-100 and 46.2-1993, as amended.
42 Additionally, the following words shall have the meanings ascribed to them in this
43 section, unless clearly indicated to the contrary:
44
45 Resort area: The area, from and including, the sidewalk on the west side of
46 Pacific Avenue to the Atlantic Ocean between Rudee Inlet and 42nd Street.
47
48 Resort season: The time period from May 1st through September 30th.
49
50 Riding: This term is used interchangeably throughout this Chapter with the term
51 "operation".
52
53 Surrey:A four-wheeled pedal-powered vehicle capable of seating two (2) or more
54 persons.
55
56 Electric powered utility cart: A wheeled, externally controlled, battery powered
57 cart, used exclusively for the transportation of personal items or property and not
58 for the conveyance of persons, and that is not classified as an all-terrain vehicle,
59 as defined in Code of Virginia § 46.2-100.
60
61
62
63 Sec. 7-59. - Regulations pertaining to riding on city sidewalks and bicycle paths
64 other than the resort area.
65
66 (a) It shall be unlawful for any person to ride a moped or motor-driven cycle on any
67 sidewalk or designated bicycle route within the City.
68
69 (b) Except as otherwise provided in this Chapter, riding or operating a bicycle,
70 electric personal assistive mobility device, electric power-assisted bicycle,
71 motorized skateboard, OF motorized scooter or electric powered utility cart is
72 permitted on the sidewalks and designated bicycle paths of the City.
73
74 (c) A person riding or operating a bicycle, electric personal assistive mobility device,
75 motorized skateboard, motorized scooter, of electric power-assisted bicycle or
76 electric powered utility cart upon and along a sidewalk, or across a roadway upon
77 and along a crosswalk, shall yield the right-of-way to any pedestrian, shall give
78 an audible signal before overtaking and passing such pedestrian, and shall
79 dismount and walk the bicycle, electric personal assistive mobility device,
80 motorized skateboard, motorized scooter, or electric power-assisted bicycle or
81 electric powered utility cart when necessary to avoid physical contact with any
82 person; and
83
84 (d) A violation of this Section shall be punishable by a civil penalty of not more than
85 fifty dollars ($50.00).
86
87 Sec. 7-59.1. - Regulations pertaining to riding wheeled devices or vehicles in the
88 resort area.
89
90 (a) During the resort season, it shall be unlawful for any person to ride an electric
91 personal assistive mobility device, electric power-assisted bicycle, moped,
92 motorized skateboard or motorized scooter on Atlantic Avenue.
93
94 (b) It shall be unlawful at any time for any person to ride on any sidewalk in the
95 resort area an all-terrain vehicle, a bicycle, electric power-assisted bicycle,
96 electric personal assistive mobility device, motorized skateboard, motorized
97 scooter, skateboard, scooter, or any pedal-powered vehicle that is muscle-
98 powered or any muscle-powered device. However, the use of roller blades and
99 roller skates is permitted. A violation of this sub-section shall be punished by a
100 civil penalty of not more than fifty dollars ($50.00).
101
102 (c) It shall be unlawful at any time to operate an electric powered utility cart on
103 Atlantic Avenue or upon the sidewalks along Atlantic Avenue. An electric
104 powered utility cart may be operated on any sidewalk in the resort area other
105 than Atlantic Avenue and may cross Atlantic Avenue for the purpose of
106 accessinci the boardwalk or beach.
107
108 Sec. 7-59.2. - Regulations pertaining to riding on the beach or the boardwalk.
109
110 (a) It shall be unlawful for any person to ride on the beach, upon sand dunes or on
111 the boardwalk a motor vehicle, an all-terrain vehicle, a bicycle, electric power-
112 assisted bicycle, electric personal assistive mobility device, motor-driven cycle,
113 motorized skateboard, motorized scooter, moped, scooter, skateboard or a
114 pedal-powered vehicle that is muscle-powered or any other muscle-powered
115 device, unless specifically authorized in a special event permit.
116
117 (b) The use of roller blades and roller skates on the boardwalk is permitted.
118
119 (c) Reserved.
120
121 (d) The use of an electric powered utility cart on the beach and boardwalk is
122 permitted.
123
124 Sec. 7-59.3. - Regulations pertaining to riding wheeled devices or vehicles on the
125 grassy area or bicycle path adjacent to the boardwalk and oceanfront parks and
126 plazas.
127
128 (a) It shall be unlawful for any person to ride or operate on the bicycle path adjacent
129 to the boardwalk an all-terrain vehicle, electric personal assistive mobility device,
130 electric power-assisted bicycle, motor-driven cycle, motorized skateboard,
131 motorized scooter, moped, electric powered utility car, roller blades, roller skates,
132 scooters or skateboards or a pedal-powered vehicle that is muscle-powered or
133 any other muscle-powered device other than a bicycle as defined in this chapter.
134
135 (b) It shall be unlawful to ride an all-terrain vehicle, bicycle, electric personal
136 assistive mobility device, electric power-assisted bicycle, motor-driven cycle,
137 motorized skateboard, motorized scooter, moped, electric powered utility cart,
138 roller blades, roller skates, scooters or skateboards or a pedal-powered vehicle
139 that is muscle-powered or any other muscle-powered device on the grassy area
140 adjacent to the boardwalk and the oceanfront parks and plazas. Provided,
141 however, that bicycles are allowed in the oceanfront plazas for the purpose of
142 accessing the bicycle path adjacent to the boardwalk and electric powered utility
143 carts are permitted in the oceanfront parks and plazas for purposes of accessing
144 the boardwalk and beach.
145
146 (c) Surreys shall be permitted on the bicycle path and the oceanfront plazas subject
147 to the provisions of this chapter.
148
149 (d) Except as allowed by section 7-9, bicycles operated on the bicycle path shall not
150 contain or convey any signage or other advertising matter unless expressly
151 permitted pursuant to a franchise granted by the city council.
152
153 (e) For purposes of this section the term "oceanfront parks" refers to the grassy and
154 non-grassy areas of the parks located at 7th, 13th, 17th, 24th, 25th, and 31st
155 Streets. The term "oceanfront plazas" or "plazas" refers to the paved areas
156 connecting Atlantic Avenue to the bicycle path.
157
158 Sec. 7-59.4. - Regulations pertaining to riding wheeled devices in Town Center.
159
160 (a) It shall be unlawful for any person to ride or operate on any sidewalk or plaza in
161 the Town Center an all-terrain vehicle, bicycle, electrical personal assistive
162 mobility device, electric power-assisted bicycle, motor-driven cycle, motorized
163 skateboard, motorized scooter, moped, electric powered utility cart, roller blades,
164 roller skates, scooters or skateboards, or a pedal-powered vehicle that is muscle-
165 powered or any other muscle-powered device.
166
167 (b) For purposes of this Section, the term "Town Center" means the area bounded
168 by and including the sidewalk on the south side of Virginia Beach Boulevard, the
169 Norfolk Southern Corporation property line, the sidewalk on the east side of
170 Independence Boulevard, and the sidewalk on the west side of Constitution
171 Drive.
172
173 (c) A violation of this Section shall be punished by a civil penalty of not more than
174 fifty dollars ($50.00).
175
176 . . . .
177
178 Sec. 7-59.6. - Regulations pertaining to riding wheeled devices in city owned
179 parking garages.
180
181 (a) Except as provided in section 7-59.5, it shall be unlawful for any person to ride or
182 operate in any parking garage owned by the city or a political subdivision, an all-
183 terrain vehicle, bicycle, electrical personal assistive mobility device, electric
184 power-assisted bicycle, motor-driven cycle, motorized skateboard, motorized
185 scooter, moped, roller blades, roller skates, scooters or skateboards, or a pedal-
186 powered vehicle that is muscle-powered or any other muscle-powered device.
187
188 (b) A violation of this section shall be punished by a civil penalty of not more than
189 fifty dollars ($50.00).
190
191 (c) The use of an electric powered utility cart in any parking garage owned by the
192 city or a political subdivision is permitted.
193
Adopted by the Council of the City of Virginia Beach, Virginia, on the 6th day
of March , 2018.
APPROVED AS TO LEGAL SUFFICIENCY:
. iy arDicr\N
City Att.rne;s Office
CA14264
R-6
February 26, 2018
e- `. _ _
•
a, . . - .
ass-
f ..I.
•
'•i/4-r- !moo ©or , , .- ;
o.
.. • �.„ec. 'D ,> ,o.t?oo• -0. f '
. ? Doo' • ,o'o; . • g I
i -....0 0.0 ..%0 0 0.. • - 0 ce,-
® `. v0n.
- C , . .
..
r_-
Jajj
• --._ .. . - .. .
., _ , ® _
{y •.
. ,
•
411111i .
1111b3,._ -. .,. .-- -. ( i . - .
A. ^.rte ', - ♦ ...
r i
•
•
<
11101.
i
•
, _ 4iik -, ,..---,
'”4.1. I ilWill 1
.4.11161111Thi I : 1
lit .- N. _
•
',.............45
ass,:
92
Item -VI-K.2
ORDINANCES/RESOLUTION
ITEM#67865
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council ADOPTED, BY
CONSENT, Ordinance to GRANT a Nonexclusive Franchise to Cox Wireless Access, LLC re install,
maintain and operate Wireless Facilities and Communications Infrastructure within the public streets
and rights-of-way
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms, Jr., John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
March 6, 2018
1 AN ORDINANCE GRANTING A NONEXCLUSIVE
2 FRANCHISE TO INSTALL, MAINTAIN AND OPERATE
3 WIRELESS FACILITIES AND COMMUNICATIONS
4 INFRASTRUCTURE WITHIN THE PUBLIC STREETS AND
5 RIGHTS-OF-WAY OF THE CITY OF VIRGINIA BEACH TO
6 COX WIRELESS ACCESS, LLC
7
8 WHEREAS, Cox Wireless Access, LLC ("Cox Wireless"), is a Delaware limited
9 liability company, with its regional office located at 1341 Crossways Boulevard,
10 Chesapeake, Virginia 23320;
11
12 WHEREAS, Cox Wireless desires to use and occupy the City's streets and public
13 rights-of-way for the purposes of installing, maintaining, and operating wireless
14 communications infrastructure to enhance the current network facilities for
15 telecommunications services within the City;
16
17 WHEREAS, the City is agreeable to allowing Cox Wireless to use the City's
18 public streets and rights-of-way for the aforesaid purposes, subject to the terms and
19 conditions set forth in the summary of terms attached hereto as Exhibit A and made a
20 part hereof (the "Summary of Terms").
21
22 NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
23 VIRGINIA BEACH, VIRGINIA:
24
25 That the City Council hereby authorizes the City Manager to execute a franchise
26 agreement with Cox Wireless for an initial term of ten (10) years, with three (3) renewal
27 options of five (5) years each, pursuant to the requirements of Va. Code §56-484.30
28 and in accordance with the Summary of Terms, and such other terms, conditions or
29 modifications, as may be acceptable to the City Manager and in a form deemed
30 satisfactory by the City Attorney.
6th
Adopted by the Council of the City of Virginia Beach, Virginia, on this day
of March , 2018.
.AP ROVED AS TO CONTENT: APPROVED AS TO LEGAL
S,UFFICIENCY:4��t_
.147 . -71
)
INFORMATION TECHNOLOGY CITY ATTORNEY'S (WF ICE
CA14197
February 2, 2018
R-1
EXHIBIT A
COX WIRELESS ACCESS, LLC
WIRELESS TELECOMMUNICATIONS FRANCHISE AGREEMENT
SUMMARY OF TERMS
Parties: City of Virginia Beach ("City") and Cox Wireless Access, LLC
("Cox Wireless")
Term: Initial term of ten (10) years, with three (3) options to renew
for a term of five (5) years each.
Fee: No fee for co-locations on existing structures'; $1,000 or fee
established by Virginia law, whichever is greater, for
construction of any new wireless support structures in the
right-of-way. All pole attachments are subject to the
applicable permitting fee.
Location: Cox Wireless will submit an individual application to the
Planning Department, Permits & Inspections, for each pole
or site attachment.
Relocation: Cox Wireless is solely responsible for paying cost of removal
or relocation of its facilities if necessitated by a public
project. Cox Wireless must remove facilities upon
termination or City may allow facilities to remain in place and
take ownership.
Installation: Cox Wireless is required to return public streets and rights-
of-way to at least the same or similar condition existing
before such work was performed to reasonable satisfaction
of City of Virginia Beach.
Insurance: Commercial General Liability (min. $2 Million); Automobile
Liability (min. $1 Million); Pollution Liability Insurance ($1
Million). Alternatively, may have $5 Million umbrella
coverage.
Termination: City may terminate the franchise at the end of the initial or
any renewal term by giving 90 days' notice; Cox Wireless
may terminate at any time with 90 days' notice.
Surety: $75,000 surety bond
1 The franchise rights to be granted herein and any fees recited in the franchise agreement do not extend
to the use of or attachment to any City-owned structures, which shall be governed by a separate
agreement between the parties.
93
Item -VLK.3a
ORDINANCES/RESOLUTION
ITEM#67866
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council ADOPTED, BY
CONSENT, Ordinances to DECLARE City property to be in EXCESS:
a. 5900 Drum Lane and AUTHORIZE the City Manager to
EXECUTE all disposition and EXCHANGE documents with
Norfolk Airport Authority
Voting: 9-0
Council Members Voting Aye:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, John E. Uhrin,
Rosemary Wilson and James L. Wood
Council Members Abstaining:
Mayor William D. Sessoms, Jr.
Council Members Absent:
Shannon DS Kane
March 6, 2018
1 AN ORDINANCE DECLARING CITY
2 PROPERTY LOCATED AT 5900 DRUM LANE
3 (GPIN: 1459-70-6057) TO BE IN EXCESS OF
4 THE CITY'S NEEDS AND AUTHORIZING
5 THE CITY MANAGER TO EXECUTE ALL
6 DISPOSITION AND EXCHANGE
7 DOCUMENTS WITH NORFOLK AIRPORT
8 AUTHORITY
9
10
11 WHEREAS, the City of Virginia Beach (the "City") is making improvements to the
12 Burton Station neighborhood and constructing Tolliver Road as part of the Burton
13 Station Phase III Project, CIP 9-091 ("the Project");
14
15 WHEREAS, the Norfolk Airport Authority, formerly known as the Norfolk Port &
16 Industrial Authority, a political subdivision of the Commonwealth of Virginia (the
17 "Authority") owns property in the Burton Station neighborhood identified as GPIN: 1458-
18 89-6908 (the "Authority Property"), which will be impacted by the Project;
19
20 WHEREAS, it is necessary for the City to acquire 23,561 square feet (0.5409
21 acres) of right-of-way and 13,185 sq. ft. (0.303 acres) of easements for the Project from
22 the Authority Property as described on Exhibit A, attached hereto and made a part
23 hereof (the "Authority Exchange Property");
24
25 WHEREAS, the City is the owner of 5900 Drum Lane in the Burton Station
26 neighborhood, consisting of approximately 43,560 square feet, further described on
27 Exhibit B attached hereto and made a part hereof the (the "City Property");
28
29 WHEREAS, the Authority desires to convey the Authority Exchange Property to
30 the City in exchange for the City Property;
31
32 WHEREAS, the City has determined that the exchange of the City Property
33 would further the City's goals associated with the Project and implementation of the
34 Burton Station Strategic Growth Area Plan; and
35
36 WHEREAS, the City Council finds that it is in the best interest of the City to
37 declare the City Property in excess of the City's needs and convey same to the
38 Authority in exchange for the Authority Exchange Property in accordance with the
39 Summary of Terms attached hereto as Exhibit C, and incorporated herein.
40
41 BE IT ORDAINED BY THE COUNCIL OF THE CITY OF VIRGINIA BEACH,
42 VIRGINIA:
43
44 1. That the City Property consisting of approximately 43,560 sq. ft. is hereby
45 declared to be in excess of the needs of the City of Virginia Beach; and
46
47 2. That the City Manager or his designee is further authorized to execute an
48 exchange agreement and any other documents needed to convey the City Property to
49 the Authority and acquire the Authority Exchange Property, provided such documents
50 are in substantial conformity to the terms set forth in the Summary of Terms attached
51 hereto as Exhibit C, and such terms, conditions or modifications as may be acceptable
52 to the City Manager and in a form deemed satisfactory by the City Attorney.
53
54 Adopted by the Council of the City of Virginia Beach, Virginia, on the 6th day
55 of March , 2018.
CA14214
R-1
2/21/18
\\vbgov.com\dfs 1\applications\citylaw\cycom 32\wpdocs\d021\p029\00453637.doc
APPROVED AS TO CONTENT APPROVED AS TO LEGAL
SUFFICIENCY AND FORM
r Ir
PUBLIC WORKS, REAL ESTATE ) CITY A • NEY
EXHIBIT "A"
Authority Exchange Property to be conveyed to City
ALL THAT certain lot, piece or parcel of land,together with the buildings and improvements
thereunto belonging, lying, situate and being the City of Virginia Beach, Virginia and being
designated and described as "PROPERTY TO BE ACQUIRED FOR RIGHT-OF-WAY
PURPOSES (23,561 S.F./0.5409 ACRE)," and further designated and described as
"PROPERTY TO BE ACQUIRED FOR RIGHT-OF-WAY PURPOSES 23,561 SQUARE
FEET 0.5409 ACRES," as shown certain on that certain plat entitled: "PLAT SHOWING
PROPERTY AND EASEMENTS TO BE ACQUIRED FROM NORFOLK PORT &
INDUSTRIAL AUTHORITY BY CITY OF VIRGINIA BEACH FOR BURTON STATION
ROAD PHASE III CIP NO. 9-091 VIRGINIA BEACH, VIRGINIA", Scale: 1" = 50', dated
February 26, 2016 and revised through April 27, 2016, prepared by Rouse-Sirine
Associates, Ltd., to which reference is made for a more particular description.
TOGETHER WITH the permanent right and easement to use the additional area
designated and described as"PUBLIC DRAINAGE EASEMENT TO BE ACQUIRED(6,552
S.F./0.1504 ACRE),"and being further designated and described as"PUBLIC DRAINAGE
EASEMENT TO BE ACQUIRED 6,552 SQUARE FEET 0.1504 ACRES,"as shown on the
above-referenced plat.
TOGETHER WITH that certain Dominion Virginia Power, Verizon Virginia Inc., and Cox
Communications Hampton Roads, LLC easement designated and described as
"PROPOSED 15' DOMINION VIRGINIA POWER, VERIZON VIRGINIA, INC., COX
COMMUNICATIONS HAMPTON ROADS, LLC EASEMENT TO BE ACQUIRED (6,633
S.F. / 0.1523 ACRE)," and further described as "PROPOSED 15' DOMINION VIRGINIA
POWER, VERIZON VIRGINIA, INC., COX COMMUNICATIONS HAMPTON ROADS, LLC
EASEMENT TO BE ACQUIRED 6,633 SQUARE FEET 0.1523 ACRES,"as shown on the
above-referenced plat.
IT BEING a portion of the same property conveyed to Norfolk Port and Industrial Authority
by deed from William T. Roberts and Willie Mae Roberts, husband and wife, dated
December 27, 1979 and recorded January 15, 1980 in the Clerk's Office of the Circuit
Court of the City of Virginia Beach, Virginia in Deed Book 1979, at page 537.
EXHIBIT "B"
City Property to be conveyed to Authority
ALL THAT certain lot, tract or parcel of land together with improvements thereon
belonging, lying, situate and being in the City of Virginia Beach, Virginia and
designated and described as: "PROPERTY TO BE CONVEYED TO THE CITY OF
VIRGINIA BEACH AREA =43,560 SQ. FT. — 1.00 ACRE" as shown on that certain
plat entitled: "PLAT SHOWING PROPERTY CONVEYED TO THE CITY OF
VIRGINIA BEACH FROM MARGARET E. CONQUEST BAYSIDE BOROUGH —
VIRGINIA BEACH, VIRGINIA ENGINEERING DIVISION SURVEY BUREAU
DEPARTMENT OF PUBLIC WORKS CITY OF VIRGINIA BEACH, VIRGINIA
DATE: SEPT. 8, 1995 SCALE: 1" = 25'." Said plat being recorded in the Clerk's
Office of the Circuit Court of the City of Virginia Beach, Virginia in Map Book 246, at
page 84, to which reference is made for a more particular description.
RESERVING UNTO THE CITY all right, title and interest of the City in and to any
and all easements, rights of way, private roads and other rights of access, ingress
and/or egress adjacent to appurtenant to or in any way benefiting the public or the
City.
IT BEING a portion of the same property conveyed to the City of Virginia Beach by
deed from Margaret E. Conquest, widow and unremarried, dated November 1, 1995
and recorded in the aforesaid Clerk's Office in Deed Book 3565, at page 295.
EXHIBIT "C"
Summary of Terms
PARTIES: City of Virginia Beach (the "City")
Norfolk Airport Authority formerly known as the Norfolk Port &
Industrial Authority (the "Authority")
AUTHORITY EXCHANGE
PROPERTY TO BE
CONVEYED TO CITY: 23,561 square feet (0.5409 acres) of right-of-way and 13,185
square feet(0.3027 acres)of easements over property identified
as GPIN: 1458-89-6908 in the Burton Station neighborhood
CITY PROPERTY TO
BE EXCHANGED: 5900 Drum Lane (GPIN: 1459-70-6057) consisting of
approximately 43,560 sq. ft. (1.0 acre)
CONDITIONS OF EXCHANGE:
• The City and Authority will each bear their own closing costs.
• The Authority will transfer the Authority Exchange Property to the City, free and
clear of all liens and encumbrances, and the City will transfer the City Property to
the Authority.
• The Authority will accept the City Property as total just compensation for the
Authority Exchange Property and damages to the residue, if any.
• Settlement shall be on or before ninety (90) days from the date of Council
approval.
• All rents, interest, taxes, and other appropriate items shall be prorated as of the
date of Settlement.
TO
LLI
W
s a ` - .,'� ` : „' 4,f4 fry" ; O,d'V fry 'yh;.. „','Z-
`Z' (x-}00
044Pr
o
to
•
arlf- 0- L1J 5 1 o ri
' .�� t+o� • µ i, 4 ° U
Ce LI-
a.
^ , kr`Ye lo,
.. „,
�` / ,�. pco
er/ � . i -�1� 6-�. i� r, �/ ° a I z.,.... _____ ,...
a 4 F' ! „ 6 Q N z
LU
col...
++� jf10444. J ° ° LL
a
t em 46 ,,, V 0
0,••• fir-: � UJ x
r
iir
.. of*i 4 ..
s • - y lc �2i I O A N N I
ir,:t „„,,,,,
1
.d ". '
-
�'.� .,0t 4 }�' .ems' �tF" y
$ � i _ 4 "
I 41 lurt::„ :' -
1'5k' , 4:111:111*-44' '
• 7,4 .
y�g�r999 ¢, r
Siott
t*
VI
Al Tii. i�.-mss `\ ' ��, ,\� `�
04.1.,0171:11:r.'
c \ \
4. .'t- '":'''''''; t%' -+i "ii 1 .44% ' "0 0
CV
K,':„..e-J-1,,, 1- �., axe 1 ' „AR 1 > 0
ri i t iMCN�' �ti P , Z 'pal , \ or..4.4;.. ..._. . ,*.r''.1 *N, iO
ta
Vo•*.. ...4• '-‘ - `.-r„_ A,11114ki-1414%-‘Vr- y i...,..il''' D .o 1 -; 2:1 tll 03
.115- ..- k '. c z
nr
-`y„' !tf`.t 'f'.`r '' XsF.' i O T O O
**Nut
4‘k4k
Ca-
yy# i t
` -¢+f *. lli
Y. .. . 'fes 6C, eta O O w
'4 xr, ~` ` x, .. 1l '�
H
_d "; 1- /�. "gyp
.Jim `�Y----f-��,__ ` }� xY
-J 001\1 k
1.12
NI v
Jo
0
�4
TNo., Zz:** n
I y4/�H 042-
� Cr CD
o
44-I
to• / -..,
J o
' il a
411p4ippp(r./1 ! I mQ ~rz u- o
apZ
°,,, - } 0 (CcLii
Z
�
' vou- rt o ct
I ; 1's J0Qo s
a
UJ a. o
w� Q
cZCZ o
co QO U
2 u.
X
- -
�NEa . , .. ,_ XW
1 v ilisiliNg viimmob,
NII
21I3 A3NNId
111.1
N; I
111%.0iN.N I ,
02:1101111
co
IN
NNN0
NNN„..Z. -, ` 1 if � co
T
I
I
U ss2
I
-13 ani
N
5Fo N \' I1 U o o can'
Q�\�G y I 11 o L L o
-�9 w \ Q Q a
��o I -t a a
rr1. 1 I n n _1C.':
Q w
bill yYbo d4NN ' I I 1 d d p p 1-./._i
IN c U U Z Z a
441 g /10'11001,- S
_ '• :Gis: 1 \ as saada l 1
Gp11A 8
E4
04,
City c i Virginia. Beach
o� e•
s Op OUR NAS10N
-4 VBgov.com
WILLIAM D.SESSOMS,JR. MUNICIPAL CENTER
MAYOR BUILDING 1
2401 COURTHOUSE DRIVE
VIRGINIA BEACH,VA 23456-9000
(757)385-4581
FAX(757)385-5699
wsessoms@vbgov.com
In Reply Refer to 0062481
March 6, 2018
Mrs. Amanda Barnes
City Clerk
Municipal Center
Virginia Beach, Virginia 23456
Re: Abstention Pursuant to Conflict of Interests Act § 2.2-3115(F)
Dear Mrs. Barnes:
Pursuant to the State and Local Government Conflict of Interests Act, I make the following
declaration:
1. I am executing this written disclosure regarding City Council's discussion and vote
on:
a. an ordinance declaring the following property to be in excess of the City's needs
and authorizing the City Manager to execute disposition and exchange
documents with DHW Joint Ventures, LLC: (1) 5833 Sandpit Road; (2) three
adjacent lots in the Burton Station neighborhood identified as GPINS 1459-81-
5016, 1459-81-7013, and 1459-81-8232; (3) a 1.7 +/- acre parcel identified as
GPIN 1459-90-0680;and(4)certain drainage rights to drain impervious surface
area into Burton Station Lake ("DHW transaction"); and
b. an ordinance declaring city property located at 5900 Drum Lane to be in excess
of the City's needs and authorizing the City Manager to execute disposition and
exchange documents with Norfolk Airport Authority ("Airport Authority
transaction").
2. MILHWY Properties, LLC, which is a property owner involved in the DHW
transaction, has disclosed that TowneBank is a financial services provider with
Mrs. Amanda Barnes -2- March 6, 2018
Re: Abstention Pursuant to Conflict of Interests Act § 2.2-3115(F)
respect to this transaction. Although the DHW transaction and the Airport
Authority transaction are separate items with separate votes, the two transactions
are part of the same overall project.
3. I have a personal interest in Towne Bank, which is located at 600 22nd Street in
Virginia Beach. I am no longer employed by TowneBank, and I am not personally
providing services to this applicant on behalf of TowneBank. Although I am able
to participate in these transactions fairly and in the public interest, as provided by
Virginia Code Section 2.2-3115(I), I am nonetheless electing to abstain from these
two votes.
Please record this declaration in the official records of the City Council. Thank you for
your assistance.
Sincerely,
William D. Sessoms
Mayor
WDS/RRI
94
Item-VLK.3b
ORDINANCES/RESOLUTION
ITEM#67867
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council ADOPTED, BY
CONSENT, Ordinances to DECLARE City property to be in EXCESS:
b. 5833 Sandpit Road; three (3) adjacent lots in the Burton Station
Neighborhood; 1.7 acre parcel; and certain drainage rights and
AUTHORIZE the City Manager to EXECUTE all disposition and
EXCHANGE documents with DHW Joint Venture,L.L.C.
Voting: 9-0
Council Members Voting Aye:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, John E. Uhrin,
Rosemary Wilson and James L. Wood
Council Members Abstaining:
Mayor William D. Sessoms,Jr.
Council Members Absent:
Shannon DS Kane
March 6, 2018
1 AN ORDINANCE DECLARING THE
2 FOLLOWING PROPERTY AND PROPERTY
3 INTERESTS TO BE IN EXCESS OF THE
4 CITY'S NEEDS AND AUTHORIZING THE
5 CITY MANAGER TO EXECUTE ALL
6 DISPOSITION AND EXCHANGE
7 DOCUMENTS WITH DHW JOINT VENTURE,
8 L.L.C.: (1) 5833 SANDPIT ROAD (GPIN: 1459-
9 81-6140); (2) THREE ADJACENT LOTS IN
10 THE BURTON STATION NEIGHBORHOOD
11 IDENTIFIED AS GPINS: 1459-81-5016, 1459-
12 81-7013, AND 1459-81-8232; (3) A 1.7+/-
13 ACRE PARCEL IDENTIFIED AS GPIN: 1459-
14 90-0680; AND (4) CERTAIN DRAINAGE
15 RIGHTS TO DRAIN IMPERVIOUS SURFACE
16 AREA INTO BURTON STATION LAKE
17
18 WHEREAS, the City of Virginia Beach (the "City") is making improvements to the
19 Burton Station neighborhood and constructing Tolliver Road as a part of the Burton
20 Station Phase III Project, CIP 9-091 ("the Project");
21
22 WHEREAS, DHW Joint Venture, L.L.C. ("DHW") owns or is under contract to
23 acquire property in the Burton Station neighborhood identified as GPINs: 1459-91-0373
24 and 1459-81-8488 (the "DHW Property");
25
26 WHEREAS, DHW intends to assemble various portions of property in Burton
27 Station in order to develop an apartment complex;
28
29 WHEREAS, the City needs to acquire portions of the DHW Property for the
30 construction of Tolliver Road and desires to acquire additional land area for purposes of
31 assemblage, as described on Exhibit A attached hereto and made a part hereof
32 (collectively, the "DHW Exchange Property");
33
34 WHEREAS, the City is the owner of 5833 Sandpit Road and three adjacent lots
35 in the Burton Station neighborhood identified as GPINs: 1459-81-5016, 1459-81-7013,
36 and 1459-81-8232, together with a 1.7+/- acre parcel identified as GPIN: 1459-90-0680
37 further described in Exhibit B attached hereto and made a part hereof (the "City
38 Property");
39
40 WHEREAS, the City is also the owner of an impoundment easement across
41 Burton Station Lake;
42
43 WHEREAS, DHW has requested drainage rights in Burton Station Lake to allow
44 for drainage of the water quantity of 30% of impervious surface area associated with the
45 proposed apartment development (the "Drainage Rights," further described in Exhibit C
46 attached hereto and made a part hereof);
47
48 WHEREAS, DHW desires to acquire the City Property and the Drainage Rights
49 and, in exchange, will convey or cause to be conveyed the DHW Exchange Property;
50
51 WHEREAS, DHW has agreed that the City Property identified by GPIN: 1459-90-
52 0680 shall not be developed with dwelling units and DHW has agreed to improve the
53 parcel with a trail for recreational use to serve the public;
54
55 WHEREAS, the City has determined that the exchange of the City Property and
56 Drainage Rights would further the City's goals associated with the Project and
57 implementation of the Burton Station Strategic Growth Area Plan; and
58
59 WHEREAS, the City Council finds that it is in the best interest of the City to
60 declare the City Property and Drainage Rights in excess of the City's needs and to
61 convey to DHW in exchange for the DHW Exchange Property in accordance with the
62 Summary of Terms attached hereto as Exhibit D, and incorporated herein.
63
64 BE IT ORDAINED BY THE COUNCIL OF THE CITY OF VIRGINIA BEACH,
65 VIRGINIA:
66
67 1. That the City Property consisting of a total of 134,980 sq. ft. and the
68 Drainage Rights are hereby declared to be in excess of the needs of the City of Virginia
69 Beach; and
70
71 2. That the City Manager or his designee is further authorized to execute an
72 exchange agreement and any other documents needed to convey the City Property and
73 Drainage Rights to DHW and to acquire the DHW Exchange Property, provided such
74 documents are in substantial conformity to the terms set forth in the Summary of Terms
75 attached hereto as Exhibit D, and such other terms, conditions or modifications as may
76 be acceptable to the City Manager and in a form deemed satisfactory by the City
77 Attorney.
78
79 Adopted by the Council of the City of Virginia Beach, Virginia, on the 6th day
80 of March , 2018.
CA13619
R-1
2/20/18
\\vbgov.com\dfsl\applications\citylaw\cycom 32\wpdocs\d019\p026\00453261.doc
APPROVED AS TO CONTENT APPROVED AS TO LEGAL
SUFFICIENCY AND FORM
PUBLIC WORKS, REAL ES�TE CIT A a RNE
2231v
EXHIBIT "A"
DHW Exchange Property to be conveyed to City
GPIN: 1459-91-0373
ALL THAT certain lot, piece or parcel of land, together with the improvements
thereon, lying, situate and being in the City of Virginia Beach, Virginia and
being known, numbered and designated as "PROPERTY TO BE ACQUIRED
FOR RIGHT-OF-WAY PURPOSES (13,506 S.F./0.3101 ACRE" and further
described as "PROPERTY TO BE ACQUIRED FOR RIGHT-OF-WAY
PURPOSES 13,506 SQUARE FEET 0.3101 ACRES," as shown on that
certain plat entitled: "PLAT SHOWING PROPERTY AND EASEMENTS TO
BE ACQUIRED FROM CARLESTA E. SPEARMAN & RALPH B.
SAUNDERS, II, CO-TRUSTEES OF THE CARLESTA E. SPEARMAN
REVOCABLE TRUST BY CITY OF VIRGINIA BEACH FOR BURTON
STATION PHASE III CIP NO. 9-091 VIRGINIA BEACH, VIRGINIA," Scale: 1"
= 30', dated February 26, 2016 and revised through March 23, 2016,
prepared by Rouse-Sirine Associates, Ltd., which plat is recorded in the
Clerk's Office of the Circuit Court of the City of Virginia Beach, Virginia as
Instrument Number , to which reference is made
for a more particular description.
TOGETHER WITH approximately 4,434 square feet of land in the northwest
corner of the property and separated from the remainder by railroad tracks.
TOGETHER WITH the permanent right and easement to use the additional
areas designated and described as "PUBLIC DRAINAGE EASEMENT 'A'
(1,614 S.F./0.0371 ACRE)" and "PUBLIC DRAINAGE EASEMENTS' TO BE
ACQUIRED (9,514 S.F./0.2184 ACRE)" and further designated and
described as "PROPOSED PUBLIC DRAINAGE EASEMENT `A' 1,614
SQUARE FEET 0.0371 ACRES," and "PROPOSED PUBLIC DRAINAGE
EASEMENT 'B' TO BE ACQUIRED 9,514 SQUARE FEET 0.2184 ACRES,"
as shown on the aforesaid plat and being required for the proper construction
and maintenance of drainage facilities.
TOGETHER WITH the temporary right and easement to use the additional
areas designated and described as "15' TEMPORARY CONSTRUCTION
EASEMENT TO BE ACQUIRED (2,641 S.F./0.606 ACRE)" and further
designated and described as "15' TEMPORARY CONSTRUCTION
EASEMENT TO BE ACQUIRED 2,641 SQUARE FEET 0.0606 ACRES," as
shown on the aforesaid plat for construction cut and/or fill slopes as required
for the proper execution and maintenance of work. Said temporary right and
easement will terminate when there no longer exists the necessity for
A-1
maintenance or until such time as all construction has terminated and the
Grantee accepts the work as being completed.
Also to convey to private utility companies the following:
Those certain Dominion Virginia Power, Verizon Virginia, Inc., Cox
Communications Hamptons Roads, LLC easements designated and
described as "PROPOSED 15' DOMINION VIRGINIA POWER, VERIZON
VIRGINIA INC., COX COMMUNICATIONS HAMPTON ROADS, LLC
EASEMENT 'A' (1,614 S.F./0.0371 ACRE)" and "15' DOMINION VIRGINIA
POWER, VERIZON VIRGINIA INC., COX COMMUNICATIONS HAMPTON
ROADS, LLC EASEMENT 'B' TO BE ACQUIRED (3,835 S.F./0.0880
ACRE)" and further designated and described as "PROPOSED 15'
DOMINION VIRGINIA POWER, VERIZON VIRGINIA INC., COX
COMMUNICATIONS HAMPTON ROADS, LLC EASEMENT 'A' 1,614
SQUARE FEET 0.0371 ACRES" and "PROPOSED 15' DOMINION
VIRGINIA POWER, VERIZON VIRGINIA INC., COX COMMUNICATIONS
HAMPTON ROADS, LLC EASEMENT 'B' 3,835 SQUARE FEET 0.0880
ACRES," as shown on the aforesaid plat, which shall be conveyed to private
utility companies at the direction of the City.
[If owned by Spearman on date of conveyance] IT BEING a portion of the
same property conveyed to Carlesta E. Spearman and Ralph B. Saunders, II,
Co-Trustees of the Carlesta E. Spearman Revocable Trust Under Agreement
dated November 19, 2015, by deed from Carlesta E. Spearman dated
November 19, 2015 and recorded in the aforesaid Clerk's Office as
Instrument Number 20151120001132320.
[If owned by DHW on date of conveyance] IT BEING a portion of the same
property conveyed to DHW Joint Venture, L.L.C., a Virginia limited liability
company, by deed from Carlesta E. Spearman and Ralph B. Saunders, II,
Co-Trustees of the Carlesta E. Spearman Revocable Trust Under Agreement
dated November 19, 2015, dated and recorded in
the aforesaid Clerk's Office as Instrument Number
GPIN: 1459-81-8488
ALL THAT certain lot, piece or parcel of land, together with the buildings and
improvements thereunto belonging, lying, being and situate in the City of
Virginia Beach, Virginia and being designated and described as "RESIDUAL
AREA OF GPIN: 1459-81-8488 55,001 SQUARE FEET 1.2626 ACRES," as
shown on that certain plat entitled, "PLAT SHOWING PROPERTY AND
EASEMENTS TO BE ACQUIRED FROM MILHWY PROPERTIES, LLC BY
CITY OF VIRGINIA BEACH FOR BURTON STATION PHASE III CIP NO. 9-
A-2
091 VIRGINIA BEACH, VIRGINIA," Scale: 1" = 30', dated March 7, 2016 and
revised through March 31, 2016, prepared by Rouse-Sirine Associates, Ltd.,
which plat is recorded in the Clerk's Office of the Circuit Court of the City of
Virginia Beach, Virginia as Instrument Number 20161026000969450, to
which reference is made for a more particular description.
IT BEING a portion of the same property conveyed to Milhwy Properties,
LLC, a Virginia limited liability company, by deed dated July 5, 2006 from
Yvonne D. Elliott, recorded in the aforesaid Clerk's Office as Instrument
Number 20060713001060720.
A-3
EXHIBIT "B"
City Property to be conveyed to DHW
GPIN: 1459-81-7013 and 1459-81-8232 (formerly part of 1459-81-7160)
ALL THAT certain lot, piece or parcel of land, together with the buildings and
improvements thereunto belonging, lying, being and situate in the City of
Virginia Beach, Virginia and being designated and described as: "RESIDUAL
PROPERTY `WEST' TO BE ACQUIRED 14,575 S.F./0.3346 ACRE)" and
"RESIDUAL PROPERTY `EAST' TO BE ACQUIRED (15,679 S.F./0.3599
ACRE) and further designated and described as "RESIDUAL PROPERTY
`WEST' TO BE ACQUIRED 14,575 SQUARE FEET 0.3346 ACRES" and
"RESIDUAL PROPERTY `EAST' TO BE ACQUIRED 15,679 SQUARE FEET
0.3599 ACRES" as shown on that certain plat entitled: "PLAT SHOWING
PROPERTY AND EASEMENT TO BE ACQUIRED FROM MILHWY
PROPERTIES, LLC BY THE CITY OF VIRGINIA BEACH FOR BURTON
STATION PHASE III (CIP NO. 9-091) VIRGINIA BEACH, VIRGINIA," Scale:
1" = 30', dated February 26, 2016 and revised through March 31, 2016,
prepared by Rouse-Sirine Associates, Ltd., which plat is recorded in the
Clerk's Office of the Circuit Court of the City of Virginia Beach, Virginia as
Instrument Number 20161026000969440, to which reference is made for a
more particular description.
RESERVING UNTO THE CITY all underlying fee in and to the streets, alleys,
and other rights-of-way abutting said Property, and all easements of any
description and rights of ingress and egress benefiting the City or the public.
IT BEING a portion of the same property conveyed to the City of Virginia
Beach by deed from Milhwy Properties, LLC, a Virginia limited liability
company, dated October 20, 2016 and recorded in the aforesaid Clerk's
Office as Instrument Number 20161028000975690.
GPIN: 1459-81-6140
ALL THAT certain lot, tract or parcel of land, together with the improvements
thereon situate lying and being in the City of Virginia Beach, Virginia
designated and described as "RESIDUAL AREA `WEST' GPIN: 1459-81-
6140 18,649 SQUARE FEET 0.4281 ACRES," and "RESIDUAL AREA `EAST'
GPIN: 1459-81-6140 3,296 SQUARE FEET 0.0757 ACRES," and further
described as "TOTAL RESIDUAL AREA OF GPIN: 1459-81-6140 21,945
SQUARE FEET 0.5038 ACRES," as shown on that certain plat entitled,
"PLAT SHOWING RIGHT-OF-WAY ESTABLISHED AND PROPOSED
EASEMENTS ON PROPERTY OF THE CITY OF VIRGINIA BEACH FOR
BURTON STATION PHASE III CIP NO. 9-091 VIRGINIA BEACH, VIRGINIA,"
B-1
Scale: 1" = 30', dated February 26, 2016 and revised through March 31,
2016, prepared by Rouse-Sirine Associates, Ltd., to which reference is made
for a more particular description.
LESS AND EXCEPT those certain public drainage easement areas
designated and described as "PROPOSED PUBLIC DRAINAGE EASEMENT
'A' 1,336 SQUARE FEET 0.0307 ACRES" and "PROPOSED PUBLIC
DRAINAGE EASEMENT 'B' 301 SQUARE FEET 0.0069 ACRES," and further
described as "PROPOSED PUBLIC DRAINAGE EASEMENT 'A' (1,336
S.F./0.0307 ACRE)" and "PROPOSED PUBLIC DRAINAGE EASEMENT 'B'
(301 S.F./0.0069 ACRE)," as shown on the aforesaid plat and being required
for the proper construction and maintenance of drainage facilities.
LESS AND EXCEPT those certain Dominion Virginia Power, Verizon
Virginia, Inc., Cox Communications Hamptons Roads, LLC easements
designated and described as "PROPOSED 15' & VARIABLE WIDTH
DOMINION VIRGINIA POWER, VERIZON VIRGINIA INC., COX
COMMUNICATIONS HAMPTON ROADS, LLC EASEMENT 'A' (1,562
S.F./0.0359 ACRE)" and "PROPOSED 30' DOMINION VIRGINIA POWER,
VERIZON VIRGINIA INC., COX COMMUNICATIONS HAMPTON ROADS,
LLC EASEMENT `B' (598 S.F./0.00137 ACRE)" and further designated and
described as "PROPOSED 15' & VARIABLE WIDTH DOMINION VIRGINIA
POWER, VERIZON VIRGINIA INC., COX COMMUNICATIONS HAMPTON
ROADS, LLC EASEMENT `A' 1,562 SQUARE FEET 0.0359 ACRES" and
"PROPOSED 30' DOMINION VIRGINIA POWER, VERIZON VIRGINIA INC.,
COX COMMUNICATIONS HAMPTON ROADS, LLC EASEMENT `B' 598
SQUARE FEET 0.0137 ACRES," as shown on the aforesaid plat.
RESERVING UNTO THE CITY all underlying fee in and to the streets, alleys,
and other rights-of-way abutting said Property, and all easements of any
description and rights of ingress and egress benefiting the City or the public.
IT BEING a portion of the same property conveyed to the City of Virginia
Beach by deed from Andrew Elliott, dated February 12, 1997 and recorded in
the aforesaid Clerk's Office in Deed Book 3708, at page 207.
GPIN: 1459-81-5016
ALL THAT certain lot, tract or parcel of land, together with the improvements
thereon belonging, lying, situate and being in the City of Virginia Beach,
Virginia and designated and described as "AREA 'B' = 8,421 SQ. FT. = 0.193
ACRES," as shown on that certain plat entitled, "PLAT SHOWING
PROPERTY CONVEYED TO THE CITY OF VIRGINIA BEACH FROM
BEATRICE JONES AND THELMA HERBERT ET ALS, BAYSIDE BOROUGH
— VIRGINIA BEACH, VIRGINIA SURVEY BUREAU ENGINEERING
B-2
DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF VIRGINIA BEACH,
VIRGINIA DATE: SEPT. 07, 1994 SCALE: 1" = 40'," which plat is duly
recorded in the Clerk's Office of the Circuit Court of the City of Virginia Beach,
Virginia in Map Book 251, at page 18, to which reference is made for a more
particular description.
RESERVING UNTO THE CITY all underlying fee in and to the streets, alleys,
and other rights-of-way abutting said Property, and all easements of any
description and rights of ingress and egress benefiting the City or the public.
IT BEING a portion of the same property conveyed to the City of Virginia
Beach by deed from James M. Pickrell, Jr., Special Commissioner dated June
3, 1996, and recorded in the aforesaid Clerk's Office in Deed Book 3626, at
page 1249.
G PI N: 1459-90-0680
ALL THAT certain lot, piece or parcel of land, together with the buildings and
improvements thereunto belonging, lying, being and situate in the City of
Virginia Beach, Virginia and being designated and described as: "RESIDUAL
PROPERTY TO BE ACQUIRED 74,360 S.F./1.7071 ACRES)" and
"RESIDUAL PROPERTY TO BE ACQUIRED (74,360 SQUARE FEET/1.7071
ACRES) as shown on that certain plat entitled: "PLAT SHOWING
PROPERTY AND EASEMENTS TO BE ACQUIRED FROM MILHWY
PROPERTIES, LLC BY CITY OF VIRGINIA BEACH FOR BURTON
STATION PHASE III (CIP NO. 9-091) VIRGINIA BEACH, VIRGINIA," Scale:
1" = 30', dated February 26, 2016 and revised through March 31, 2016,
prepared by Rouse-Sirine Associates, Ltd., which plat is recorded in the
Clerk's Office of the Circuit Court of the City of Virginia Beach, Virginia as
Instrument Number 20161026000969410, to which reference is made for a
more particular description.
RESERVING UNTO THE CITY all underlying fee in and to the streets, alleys,
and other rights-of-way abutting said Property, and all easements of any
description and rights of ingress and egress benefiting the City or the public.
SUBJECT to a deed restriction prohibiting development.
IT BEING a portion of the same property conveyed to the City of Virginia
Beach by deed from Milhway Properties, LLC, a Virginia limited liability
company, dated October 20, 2016 and recorded in the aforesaid Clerk's
Office as Instrument Number 20161028000975690.
B-3
EXHIBIT "C"
Drainage Rights to be conveyed to DHW
GPIN: 1458-99-5821
The right to utilize a portion of the excess drainage capacity in Burton Station
Lake (the "Lake")(GPIN 1458-99-5821) for the storm water management of
DHW's development, as follows: the right to drain 30% of impervious surface
area [30% of 14.5824 acres total] for its proposed apartment development in
Burton Station, which will encompass GPINs 1459-81-7013, 1459-81-8232;
1459-81-6140; 1459-81-5016; 1459-91-0373; 1459-91-2208; 1459-91-4202;
1459-80-5796; 1459-90-0680 (land area only and specifically exclusive of any
rights to the Lake)(collectively, the "Drainage Rights"). Said Drainage Rights
shall address only the volumetric calculations (water quantity) for storm water
management associated with the development of the parcels referenced by
GPINs in this subparagraph. All requirements for water quality measures
must either be accomplished on-site or through other approved means and
will be DHW's responsibility. Any development in excess of 30%
imperviousness on the parcels referenced in this subparagraph shall be
managed separately by DHW for both quality and quantity of storm water.
The City retains the right to assign the excess drainage capacity in the Lake,
if any, in any manner in its sole discretion.
IT BEING a portion of the same property conveyed to the City of Virginia
Beach, by deed dated October 20, 2016 from S & J Truck Terminal,
Incorporated, a Virginia corporation, recorded in the aforesaid Clerk's Office
as Instrument Number 20161028000975700.
c-1
EXHIBIT "D"
Summary of Terms
PARTIES: City of Virginia Beach ("City")
DHW Joint Venture, L.L.C., a Virginia limited
liability company ("DHW")
DHW EXCHANGE PROPERTY
TO BE ACQUIRED BY CITY:
72,941 square feet of land in fee simple, together
with easements for drainage, utilities, and
construction from parcels identified as GPINs:
1459-91-0373 and 1459-81-8488 (described
further on Exhibit "C")
CITY PROPERTY AND
DRAINAGE RIGHTS TO BE
EXCHANGED TO DHW: 5833 Sandpit Road (GPIN: 1459-81-6140) and
three adjacent lots in Burton Station identified as
GPINs: 1459-81-5016, 1459-81-7013 and 1459-
81-8232, together with a 1.7071 acre parcel
identified as GPIN: 1459-90-0680 (collectively
described further on Exhibit "A"), and certain
drainage rights to drain impervious surface area
into Burton Station Lake ("Drainage Rights")
(described further on Exhibit "B")
CONDITIONS OF SALE:
• The City and DHW will each bear their own closings costs.
• DHW will acquire and transfer, or cause to be transferred, the DHW Exchange
Property to the City, free and clear of all liens and encumbrances, and the City
will transfer the City Property and Drainage Rights to DHW, reserving to the City
all necessary right-of-way and easements for the Project.
• The City parcel identified by GPIN: 1459-90-0680 shall be restricted from
development, other than a trail for recreational use to be constructed by DHW as
a public amenity.
• DHW will accept the City Property as total just compensation for the DHW
Property and damages to the residue, if any.
D-1
• The conveyance of the City Property will reserve to the City all right-of-way and
easements needed for the construction of Tolliver Road.
• The Drainage Rights address only the volumetric calculations (water quantity) for
storm water management. All requirements for storm water quality measures
must either be accomplished on-site or through other approved means and will
be DHW's responsibility. Any drainage obligations caused by the development in
excess of the Drainage Rights shall be managed separately by DHW for both
quality and quantity of storm water.
• The City will construct Tolliver Road, subject to appropriation by the Virginia
Beach City Council of the funds necessary to construct. The City makes no
representations as to the timing of the start or completion of the construction of
Tolliver Road or any other public improvements in the Burton Station Strategic
Growth Area. The City retains total control of all elements of design and
construction of Tolliver Road.
• All rents, interest, taxes, and other appropriate items affecting the DHW Property
or the City Property shall be prorated as of the date of Settlement.
• Settlement shall be on or before June 30, 2018.
D-2
7 f` +d� '-
. .'1 i ,ter �' ��//
ti. _.
1.*- s W u_ c,
' r• CO M o 0
• �� i �:, < Cl_ ni a,
Z
lop
_ „. . __„, ici i_ Li.
riteititeri,„---2****,-;„...t.,,b_,,_ ,. i < 0
re
o
.., ,
_ _ .. P
U fl
Pis 4
.Alit
ow
W
. . N.\\N \ c
...
..` * g
r
4 '`. . ?....-:'::t, .' i ,
-/41' ' ',..L • . i . Za-04V1 ' '
.
:'•as wu
Iif l; :
Jo: . I
it
iii N,
CD
CN
°' C. o
L U
o
U n
Iii
a ID
W j a
J
= W N e W
'
>> n a
A.- 4 W d -.,' o p a o
�— = t1 t1 R w
,.. . I_ 0-
s C
= V U [L a
7,i_,,
. ..ii,.._ _ , :rili.. b....
37E
CL
a .?,7
a) L'a:
00,
so, / Li.1 co co u_ cz) L9
O.
acr, r _ t �; N
*��14+ *lir elf* moi, oU - W
LU U-I
0 ;1E1:
���•�� �� W W Q o 0
:„*.�`*op /f O Z CL T W
__------
__ g "5 Warm .4Q = a Q o
1
a o
X g
0 N
._ \di W 1.-)
N
Nco- a
cn o
z o /tit/
o
4
X
rh..
r :: `+ *4sir tilt)Wir
o6, lilt
i# ;13. ., ..114”
1r._s�ti� f,,,
� �i•
.
a Ili Ali
0
1 t—
m
a Sc S
Q
03
K
I
r
Ni
3y V)~
J
a)N
coN6a) OU
0 °) c0 .0 n
o
Q>, c
I
L
�4, E ZCl dO7 yW 176 wm
c
0 0 c_.-
a
♦ o
CD
` e) @ 1..
aar J I E a
i a
City of Virginia Beach
sZ z
rr
S OF OUNA1
R 10N5
VBgov.com
WILLIAM D.SESSOMS,JR. MUNICIPAL CENTER
MAYOR BUILDING 1
2401 COURTHOUSE DRIVE
VIRGINIA BEACH,VA 23456-9000
(757)385-4581
FAX(757)385-5699
wsessoms@vbgov.com
In Reply Refer to 0062481
March 6, 2018
Mrs. Amanda Barnes
City Clerk
Municipal Center
Virginia Beach, Virginia 23456
Re: Abstention Pursuant to Conflict of Interests Act § 2.2-3115(F)
Dear Mrs. Barnes:
Pursuant to the State and Local Government Conflict of Interests Act, I make the following
declaration:
1. I am executing this written disclosure regarding City Council's discussion and vote
on:
a. an ordinance declaring the following property to be in excess of the City's needs
and authorizing the City Manager to execute disposition and exchange
documents with DHW Joint Ventures, LLC: (1) 5833 Sandpit Road; (2) three
adjacent lots in the Burton Station neighborhood identified as GPINS 1459-81-
5016, 1459-81-7013, and 1459-81-8232; (3) a 1.7 +/- acre parcel identified as
GPIN 1459-90-0680; and(4)certain drainage rights to drain impervious surface
area into Burton Station Lake ("DHW transaction"); and
b. an ordinance declaring city property located at 5900 Drum Lane to be in excess
of the City's needs and authorizing the City Manager to execute disposition and
exchange documents with Norfolk Airport Authority ("Airport Authority
transaction").
2. MILHWY Properties, LLC, which is a property owner involved in the DHW
transaction, has disclosed that TowneBank is a financial services provider with
Mrs. Amanda Barnes -2- March 6, 2018
Re: Abstention Pursuant to Conflict of Interests Act § 2.2-3115(F)
respect to this transaction. Although the DHW transaction and the Airport
Authority transaction are separate items with separate votes, the two transactions
are part of the same overall project.
3. I have a personal interest in Towne Bank, which is located at 600 22nd Street in
Virginia Beach. I am no longer employed by TowneBank, and I am not personally
providing services to this applicant on behalf of TowneBank. Although I am able
to participate in these transactions fairly and in the public interest, as provided by
Virginia Code Section 2.2-3115(I), I am nonetheless electing to abstain from these
two votes.
Please record this declaration in the official records of the City Council. Thank you for
your assistance.
Sincerely,
I/e-‘/'
William D. Sessoms
Mayor
WDS/RRI
95
Item -VI-K4
ORDINANCES/RESOLUTION
ITEM#67868
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council ADOPTED, BY
CONSENT, Resolution to ADOPT the Virginia Cash Match Plan as the Successor to the Sheriff's
Supplemental Retirement Plan
Voting.• 10-0
Council Members Voting Aye:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms,Jr.,John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
March 6, 2018
1 A RESOLUTION TO ADOPT THE VIRGINIA CASH
2 MATCH PLAN AS THE SUCCESSOR TO THE
3 SHERIFF'S SUPPLEMENTAL RETIREMENT PLAN
4
5 WHEREAS, § 51.1-611 of the Code of Virginia permits a political subdivision of
6 the Commonwealth to adopt the Virginia Cash Match Plan (the "Cash Match Plan")
7 administered by the Virginia Retirement System ("VRS") in accordance with the
8 provisions of Title 51.1, Chapter 6.1 (§§ 51.1-607 et seq.) of the Code of Virginia; and
9
10 WHEREAS, § 51.1-609 of the Code of Virginia permits the governing body of a
11 political subdivision to establish the amount of contributions made on behalf of eligible
12 employees; and
13
14 WHEREAS, the governing body of the City of Virginia Beach ("Employer")
15 previously approved its employees' participation in the Commonwealth of Virginia 457
16 Deferred Compensation Plan (the "457 Plan") administered by VRS in accordance with
17 the provisions of Title 51.1, Chapter 6 (§§ 51.1-600 et seq.) of the Code of Virginia; and
18
19 WHEREAS, the Employer now wishes to approve its employees' participation in
20 the Cash Match Plan and to establish the amount of contribution made on behalf of its
21 eligible employees.
22
23 NOW, THEREFORE, BE IT RESOLVED, that the Employer hereby adopts the
24 Cash Match Plan subject to the terms and conditions of such Cash Match Plan; and
25
26 BE IT FURTHER RESOLVED, that the Employer will provide an employer match
27 as determined in the Employer Adoption Agreement between VRS and the City of
28 Virginia Beach; and
29
30 BE IT FURTHER RESOLVED, that the Employer's staff is hereby directed to
31 implement the Cash Match Plan effective the first day of June 2018 but no sooner than
32 the date established and confirmed by VRS.
33
34 NOW, THEREFORE, the officers of the Employer are hereby authorized and
35 directed in the name of the Employer to carry out the provisions of this resolution, enter
36 into an Employer Adoption Agreement with VRS, and pay such sums as are due to be
37 paid by the Employer for this purpose.
38
Adopted by the Council of the City of Virginia Beach, Virginia on the 6th day
of March , 2018.
APPROVED AS TO CONTENT: APPROVED AS TO LEGAL SUFFICIENCY:
Qttiitee ei_04J
Finance DepartmentC-itr orn y's Office
CA14301/ R-1 / February 23, 2018
NOTE:The language in this resolution has been approved by VRS Benefits Counsel and is not subject to modification.
Ai., Virginia VIRGINIA RETIREMENT SYSTEM
Retirement P.O.Box 2500
Richmond,VA 23218-2500
tellOo System
Commonwealth of Virginia Cash Match Plan Employer Adoption Agreement
THIS AGREEMENT(the"Agreement"), executed this day of ,20�is by and
between City of Virginia Beach [insert Locality,
School Division, or Other Political Subdivision] (the"Employer") and the Virginia Retirement System(the
"Plan Sponsor")(hereinafter collectively referred to as the"Parties").
WITNESSETH
WHEREAS, the Commonwealth of Virginia established the Virginia Cash Match Plan(the"Plan")
pursuant to Title 51.1,Chapter 6.1 (§ 51.1-607 et seq.)of the Code of Virginia and Internal Revenue Code
("IRC") §401(a)as applicable to governmental plans as defined in IRC § 414(d); and
WHEREAS,pursuant to § 51.1-611 of the Code of Virginia,the Employer desires to enter into this
Agreement with the Plan Sponsor to permit participation in the Plan for its eligible employees; and
WHEREAS,the Employer,by a resolution of its governing body,has directed its responsible official to
enter into this Agreement;
NOW,THEREFORE, in consideration of the premises herein,the Parties agree as follows:
1) The Plan Sponsor and the Employer represent and warrant that each shall comply with all
applicable laws and policy.
2) The Plan Sponsor represents to the Employer that the Plan Sponsor shall provide sufficient services
to administer the Plan.
3) The Employer acknowledges and agrees to the terms and conditions established in the Plan.
4) The Employer shall timely remit the correct contributions under the Plan to the Plan Sponsor's third
party administrator("TPA") in accordance with procedures promulgated by the Plan Sponsor or the
TPA.
5) The Employer shall be responsible for communicating the dollar or percentage amount of the
Employer contribution to its eligible employees.
6) The Employer acknowledges that participation in the Plan is contingent upon its participation in the
Commonwealth of Virginia 457 Deferred Compensation Plan administered by the Plan Sponsor.
VRS Resolution-ELECCASH(Rev.12/17) 1
Virginia RETIREMENT SYSTEM
iyisRetirement P.O.Box 2500
System Richmond,VA 23218-2500
7) The Employer shall be responsible for ensuring that an eligible employee's aggregate contributions
across all plans in which the employee may participate through the Employer are in compliance
with federal laws and regulations. The Plan Sponsor or the TPA may assist the Employer in making
this determination.
8) If applicable,the Employer acknowledges it is solely the responsibility of the Employer to instruct
the Plan Sponsor's TPA where to map assets from the Employer's existing plan to the available
investments under the Plan.Neither the Plan Sponsor nor the Plan Sponsor's TPA will advise or
recommend to the Employer how to map assets from the Employer's existing plan.
9) The Employer acknowledges asset transfers from an existing plan with the Employer into the Plan
may need to be made over more than one day depending upon the facts and circumstances of each
case.
10)The Employer acknowledges upon termination of this Agreement asset transfers out of the Plan
may need to be made over more than one day depending upon the facts and circumstances of each
case.
11)This Agreement may be amended from time to time only by written agreement between the Plan
Sponsor and the Employer.
12)This Agreement may be terminated by either party upon written notice to the other party,which
termination shall become effective on a date established by the Plan Sponsor.
13)The Employer will provide to each eligible employee,as defined by the employer below or in an
attachment,an employer match of[insert dollar amount or percent and maximum per pay period,or
refer to attachment] $0_.
If not described in an attachment, an eligible employee shall mean:
Employee of the Virginia Beach Sheriffs Office
Employee of the Virginia Beach Sheriffs Office
Employee of the Virginia Beach Sheriff's Office
VRS Resolution-ELECCASH(Rev.12/17) 2
VIRGINIA RETIREMENT SYSTEM
Virginia P.O.Box 2500
Retirement Richmond,VA 23218-2500
System
IN WITNESS WHEREOF,the parties have caused this Agreement to be duly executed,intending to be bound
thereby:
Employer Virginia Retirement System
By: By: _._.
Title: Title:
Date: , 20 Date: ,20_
VRS Resolution-ELECCASH(Rev.12/17) 3
96
Item -VI-K.5
ORDINANCES/RESOLUTION
ITEM#67869
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council ADOPTED, BY
CONSENT, Ordinance to APPROPRIATE$1 Million to the Risk Management Internal Service Fund
re insurance premiums and self-insurance claims
Voting: 9-1
Council Members Voting Aye:
Jessica P. Abbott, M Benjamin Davenport, Robert M Dyer, Barbara
M Henley, Vice Mayor Louis R. Jones, Mayor William D. Sessoms,
Jr., John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Voting Nay:
John D. Moss
Council Members Absent:
Shannon DS Kane
March 6, 2018
1 AN ORDINANCE TO APPROPRIATE $1,000,000 TO
2 THE RISK MANAGEMENT INTERNAL SERVICE
3 FUND TO PAY FOR INSURANCE PREMIUMS AND
4 SELF-INSURANCE CLAIMS
5
6 NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
7 VIRGINIA BEACH, VIRGINIA:
8
9 That $1 ,000,000 is hereby appropriated from the fund balance of the General
10 Fund to the Risk Management Internal Service Fund, with revenue from fund reserves
11 increased accordingly, to pay for insurance premiums and self-insurance claims.
Adopted by the Council of the City of Virginia Beach, Virginia on the 6th
day of March , 2018.
Requires an affirmative vote by a majority of all of the members of City Council.
APPROVED AS TO CONTENT: APPROVED AS TO LEGAL SUFFICIENCY:
..„A0j0-1)-k,)
David Bradley Dana i armeyer
Budget and Management Services City Attorney's Office
CA14299
R-1
February 21, 2018
97
Item -VI-K6a
ORDINANCES/RESOLUTION
ITEM#67870
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council ADOPTED, BY
CONSENT, Ordinances to ACCEPT and APPROPRIATE:
a. $3,000 from Geico to the Police Department re the Every 15
Minutes Program
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M Benjamin Davenport, Robert M. Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms, Jr., John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
March 6, 2018
1 AN ORDINANCE TO ACCEPT AND APPROPRIATE FUNDS
2 FROM GEICO FOR THE EVERY 15 MINUES PROGRAM
3
4 BE IT ORDAINED BY THE COUNCIL OF THE CITY OF VIRGINIA BEACH,
5 VIRGINIA:
6
7 That$3,000 is hereby accepted from GEICO and appropriated, with miscellaneous
8 revenue increased accordingly, to the Police Department's Fiscal Year 2017-18 Operating
9 Budget for expenses necessary to support the Every 15 Minutes Program.
Adopted by the Council of the City of Virginia Beach, Virginia on the 6th day of
March 2018.
Requires an affirmative vote by a majority of all of the members of City Council.
APPROVED AS TO CONTENT: APPROVED AS TO LEGAL SUFFICIENCY:
c(10 a/Vj
David Bradley Dan ar eyer
Budget and Management Services City Attorney's Office
CA14298
R-1
February 21, 2018
98
Item -VI-K 6/b
ORDINANCES/RESOLUTION
ITEM#67871
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council ADOPTED, BY
CONSENT, Ordinances to ACCEPT and APPROPRIATE:
b. $17,973 from the Virginia Department of EMS to Virginia Beach
EMS re purchase of rescue equipment/medical supplies; and,
$8,682 from Tidewater EMS Regional Council to the Virginia
Beach EMS re personnel costs associated with Hampton Roads
Metropolitan Medical Response System (HRMMRS)
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms, Jr., John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
March 6, 2018
1 AN ORDINANCE TO ACCEPT AND APPROPRIATE FUNDS
2 TO PURCHASE ADDITIONAL EQUIPMENT AND MEDICAL
3 SUPPLIES TO ENHANCE RESCUE/MEDICAL CAPABILITIES
4
5 BE IT ORDAINED BY THE COUNCIL OF THE CITY OF VIRGINIA BEACH,
6 VIRGINIA THAT:
7
8 1. $17,973 is hereby accepted from the Virginia Department of Health, Office of
9 Emergency Medical Services, and appropriated, with state revenue increased
10 accordingly, to the Operating Budget of the Department of Emergency Medical
11 Services to purchase additional rescue equipment and medical supplies to enhance
12 rescue/medical capabilities and training capacity.
13
14 2. $8,682 is hereby accepted from the Tidewater EMS Regional Council and
15 appropriated, with miscellaneous revenue increased accordingly, to the Operating
16 Budget of the Department of Emergency Medical Services to reimburse the
17 Department for personnel costs associated with the Hampton Roads Metropolitan
18 Medical Response System.
Adopted by the Council of the City of Virginia Beach, Virginia on the 6th da
of March 2018. y
Requires an affirmative vote by a majority of all of the members of City Council.
APPROVED AS TO CONTENT: APPROVED AS TO LEGAL SUFFICIENCY:
(1' ) I d/''°e
David Bradley Dana Harmeyer
Budget and Management Services City Attorney's Office
CA 14300
R-1
February 22, 2018
99
ITEM VI-L
APPOINTMENTS ITEM#67872
BY CONSENSUS, City Council RESCHEDULED the following APPOINTMENTS:
BEACHES and WATERWAYS ADVISORY COMMISSION
BIKEWAYS and TRAILS ADVISORY COMMITTEE
BOARD OF ZONING APPEALS
CHESAPEAKE BAY PRESERVATION AREA BOARD
COMMUNITY POLICY and MANAGEMENT TEAM
GREEN RIBBON COMMITTEE
HEALTH SERVICES ADVISORY BOARD
SENIOR SERVICES OF SOUTHEASTERN VIRGINIA
STORMWATER APPEALS BOARD
TRANSITION AREA/INTERFACILITY TRAFFIC AREA CITIZENS ADVISORY COMMITTEE
VIRGINIA BEACH COMMUNITY DEVELOPMENT CORPORATION
March 6, 2018
100
Item -VI-0
ADJOURNMENT ITEM#67873
William D. Sessoms,Jr., DECLARED the City Council ADJOURNED at 8:47 P.M.
Amanda Barnes, MMC
City Clerk
William D. Sessoms,Jr.
Mayor
City of Virginia Beach
Virginia
March 6, 2018
101
OPEN DIALOGUE
The following individuals registered to speak:
B.A. Andrews, 820 Goldsboro Avenue, Phone: 971-8625, expressed concern regarding Bus Safety at the
Oceanfront.
Carol Emmons did not respond.
Ian Lichacz, 1201 Eastbay Shore Drive, Phone: 633-5765, expressed concern regarding School Safety.
•
THE OPEN DIALOGUE CONCLUDED AT 8:55 P.M.
March 6, 2018
102
ADD ON
ITEM#67874
Upon Motion by Councilman Davenport, seconded by Councilman Wood, the City Council
RECONVENED into Open Session.
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms, Jr.,John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
March 6, 2018
103
ADD ON
CLOSED SESSION
ITEM#67875
Mayor William D. Sessoms, Jr., entertained a motion to permit City Council to conduct its CLOSED
SESSION,pursuant to Section 2.2-3711(A), Code of Virginia, as amended,for the following purpose:
LEGAL MATTERS: Consultation with legal counsel and briefings by
staff members or consultants pertaining to actual or probable litigation,
where such consultation or briefing in open meeting would adversely
affect the negotiating or litigating posture of the public body; or
consultation with legal counsel employed or retained by a public body
regarding specific legal matters requiring the provision of legal advice
by such counsel pursuant to Section 2.2-3711(A)(7).
• Pier Project
March 6, 2018
104
ITEM#67875
(Continued)
Upon motion by Vice Mayor Jones, seconded by Council Lady Wilson, City Council voted to proceed into
CLOSED SESSION at 8:55 P.M.
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer,
Barbara M. Henley, Vice Mayor Louis R. Jones, John D. Moss,
Mayor William D. Sessoms, Jr., John E. Uhrin, Rosemary
Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
Closed Session 8:55 P.M. - 8:57 P.M.
March 6, 2018
105
Item—VI-E
CERTIFICATION
ITEM#67876
Mayor Sessoms RECONVENED the Open Session.
Upon motion by Vice Mayor Jones, seconded by Councilman Dyer, City Council CERTIFIED THE
CLOSED SESSION TO BE IN ACCORDANCE WITH THE MOTION TO RECESS
Only public business matters lawfully exempt from Open Meeting
requirements by Virginia law were discussed in Closed Session to which
this certification resolution applies.
AND,
Only such public business matters as were identified in the motion
convening the Closed Session were heard, discussed or considered by
Virginia Beach City Council.
Voting: 10-0
Council Members Voting Aye:
Jessica P. Abbott, M Benjamin Davenport, Robert M Dyer, Barbara
M. Henley, Vice Mayor Louis R. Jones, John D. Moss, Mayor William
D. Sessoms,Jr.,John E. Uhrin, Rosemary Wilson and James L. Wood
Council Members Absent:
Shannon DS Kane
March 6, 2018
G,Ni. B@,,e
d4c(:,,,,_....:,: .,A
imic,:-2.
vim. _ ;
;,:
„.: ,,..,
.., a f,,.SSV
J
S OF OUR N�(�0+
RESOLUTION
CERTIFICATION OF CLOSED SESSION
VIRGINIA BEACH CITY COUNCIL
WHEREAS: The Virginia Beach City Council convened into CLOSED SESSION, pursuant to the
affirmative vote recorded in ITEM#67875 Page 104 and in accordance with the provisions of The Virginia
Freedom of Information Act; and,
WHEREAS: Section 2.2-3712 of the Code of Virginia requires a certification by the governing body
that such Closed Session was conducted in conformity with Virginia law.
NOW,THEREFORE,BE IT RESOLVED: That the Virginia Beach City Council hereby certifies
that,to the best of each member's knowledge,(a)only public business matters lawfully exempted from Open
Meeting requirements by Virginia law were discussed in Closed Session to which this certification resolution
applies; and, (b) only such public business matters as were identified in the motion convening this Closed
Session were heard,discussed or considered by Virginia Beach City Council.
AA4,_ !.i
Amanda Barn:., MMC
City Clerk March 6, 2018
106
Item -VI-0
ADJOURNMENT ITEM#67877
William D. Sessoms,Jr., DECLARED the City Council ADJOURNED at 8:59 P.M.
r ,
Aman;a Barnes, M
City Clerk
William D. Sessoms,Jr.
Mayor
March 6, 2018