Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout06-12-2018 WORKSHOP MINUTES ate.
-attl
*Cit-
o�ywn
9
Gp OUR MI'n°
VIRGINIA BEACH CITY COUNCIL
Virginia Beach, Virginia
June 12, 2018
Mayor Louis R. Jones called to order the CITY COUNCIL'S WORKSHOP in the City Council
Conference Room, Tuesday, June 12, 2018, at 4:00 P.M
Council Members Present:
M Benjamin Davenport, Robert M Dyer, Barbara M Henley, Mayor
Louis R.Jones, Shannon DS Kane, John E. Uhrin, Rosemary Wilson, and
Vice Mayor James L. Wood
Council Members Absent:
Jessica P.Abbott Sick
John D. Moss Out of Town—Navy Business
2
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA - UPDATE
4:00 P.M.
Mayor Jones welcomed Dustin Rinehart, Director — State and Local Government Affairs, Port of
Virginia. Mr. Rinehart expressed his appreciation to City Council for their continued support:
Port ofVirginia Update
Virginia Beach City Council Update
June 8,2018
VIRGINIA A sr«wm dr w
This map shows all of the Terminals in Virginia:
OUR TERMINALS
••
MARYLAND
tl �
rm..,
•
WEST VIRGINIA _ _+ E 1 DE
. .. ..s..awy .Aal'�
vw
KENTUCKY a1 VIRGINIA[� •-`
....a.,, �•KichApKl
VIRGINIA 2
June 12, 2018
3
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA - UPDATE
(Continued)
Here is the Port of Virginia's Mission.
Port ofVirginia's Mission
Guided by our company values,The Port
of Virginia will achieve our shared vision of
operational excellence,fiscal responsibility,
and sustainable growth. Above all,we will
remain responsible members of the ,4— .
communities we serve,a valuable resource ff
to our customers,an excellent place to
work, and an economic engine for the ,*
region. ', , r
R� A
C.IMI PORI Of siawama d r��a,�w
•,-VIRGINIA
The size of ships increased 69%in the past five (5)years:
Vie lase a hhtoly of wdcoanp bio ships
A 69%increase in size in under five years. a w
I2014:8,500TEUs
,pan r
:2015:9,000 TEUs
2016: 10,500 TEUs
Milili:=4111. ''...
2017(May):13,098 TEUs
,,l•.. 'I
2017(July): 13,300TEUs
2017(Aug):14,400TEUs 38I01N,.'9(Gw(q(
June 12, 2018
4
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA- UPDATE
(Continued)
The next several slides detail the 2018-19 planned improvements as a result of a $320-Million
investment:
THE NEW NORMAL
90%OF CARGO at
THE PORT OFVIRGINIA is
CARRIED BY THREE ALLIANCE
' 1 L t_ GROUPS
R.. \s. '
••
1
IHE PORI OF sra.,,,n:,,,,,b„ow 5
-VIRGINIA
The improvements will increase the Port's capacity to over 1-million containers:
VIRGINIA INTERN01NAL GATEWAY
-,yam,- -
'- ..
Increases cap..R'' ;:,,,,,,:•4 '` .A,.- s
Expanded rail operation .s+.; _/ .- FG
Extended berth t ,.. 4.,3,2a. :...
4 new Ship to Shore cranes ;44,
CIHi PORI OF I ''''"", '''''',ow
�'-VIRGINIA
June 12, 2018
5
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA - UPDATE
(Continued)
Here is an Overview of the NIT South Expansion:
NIT SOUTH EXPANSIOT'
• ` •
Increase capacity by 0 c
40CF,005ntainers "• - 1►r
2018:first stacks complete
Ott 202,0:all 30 stacks complete
s
+1.e1,;' 350 million investment
eVIRGINIA I
f s'""°'dT 7
Here is an Overview of the four(4)phases of the project:
A MINDFUL APPROACH
�• /•
4081-410
�.� ._:'74a�. - •
PHASE 1B
_ -•. • Ot: PHASEIA ..
J : - --�f a•'•"�r„•+`�
s
•
�=�..
Allp THE PORT Of I se.a�as oir Tanana.,VIRGINIA 8
June 12, 2018
6
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA - UPDATE
(Continued)
The 40%increase of containers, results in 286,000 new jobs across the state:
I ,000,000 ADb TIO t„AL
C ONTAI S 4 6 •
• . SE)'
Or•i 1.4,1A4)44: I • * T Azo a. t•.
Alf rt4'
286,000 NEW JOBS ACROSS THE STATE ,- r a ,�
$38 BILLION IN SPENDING
NIP
$1.I BILLION IN NEW STATE&LOCAL TAXES 4,6, > ,/
NI/IAI IF I Source£ ,.0 Impacts mm
pef Veg.Mee industry 2013 Raymond A Mason School of Business WWII am&Mary
WI
VIRGINIAsrmwda dr o,. 9
The timeline below shows the progressive increase to 1-Million containers:
3 yeas To tooals.One mllioa coitus.
We are budding the capacity for greatness.Every day.
Apr 18 May 18 Jun 18 Aug 18 Sep 18 Oct 18 Nov 18 Dec18 Jan 19 Feb 19 Apr 19
1111711'171111(11,11,7,11,11M,
P'uerA0d1 VIG VIG VIG NIT VIG VIG NIT NIT VIG II6aw1kIt
0116 Stacks Rail Stacks Stacks Wharf Stacks Stacks Stacks Rail
24-26 Bundle 18-20 7-9 Done 10-12 13-15 16-18 Bundle
&1a' #1 VIG #2
CRMG &VIG Stack VIG
Stacks 1 STS
21-23 online
NIT NIT NIT NIT NIT
Stacks Stacks Stacks Stacks Stacks
22-27 28-30 19-21 1-3 4-6
=alaiminmSep/Oct 19Dec 19 Jan 20 Apr 20 May 20
imiimminsim
June 12, 2018
7
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA - UPDATE
•
(Continued)
Here is an Overview of the Port of Virginia's impact on the economy:
HOW WE'RE MOVING THE ECONOMY
62%
1.34 million containers for Fiscal Year to Dace 2018
35%
N n '1- 012
M �n
os.
17% 111111
o
co v v
3%oclio
Volumes are Vessel calls are
7 up 3.9%
n down 5.3%
over FYTD 2017over FYTD 2017
Truck Rail Barge RMT Barge
+6.6%over -0.7%over +5.4%over Wean mowed
FYTD 2017 FYTD 2017 FYTD 2017 almost 23'000
cm
rs this 11
yrzr.
We are the East Coast's leading rail port
121%growth over market growth in Fiscal Year 2017
laual4I8l ,
WE ARE THE EAST COA
•BAL GAT:• 56,650
containers -
•1� MaYGfnitl
25.650
containers
..11111.11111.11111 k
VIRGINIA 12
June 12, 2018
8
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA - UPDATE
(Continued)
Here are the locations the Port of Virginia reaches by rail:
QUICK ACCESS BY RAIL
/�
YIR6NU 1 s*"""""-- 13
Here is an Overview of the Port of Virginia's impact on commerce this Fiscal Year:
r
We are Catalysts for Commerce
rklnk together to drive Virginia's Economy:FiscalYear-to-Date 2018
•
.. 47 m
Businesses jet Morethan
� announced they �y�^ ��� � ,
"S
were locating or , �t � }x '-��`' '�`
expanding theft y._ - Q '
business in Vii gin;a. - K' .pp
.
jobs `P 1.3 Rr +y'r- ''
ka ; s 2.4 lobs created I billion
million across Vugnaa
•:. vested act nss tAe
sq ft eu�, nnweatu
kit
June 12, 2018
9
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA- UPDATE
(Continued)
Forty-seven (47) businesses either located or expanded since July 1, 2017, as a result of the Port's
growth:
WE ARE SPARKING GROWTH ACROSS
THE COMMONWEALTH
0 New business announcement
O Existing business expansion
Ifo •
47 businesses
either located or expanded their
�� 0 business in Virginia since July 1,2017
•v• A reinvigorated Richmond
APO AI r Marine Terminal is helping
•Ir O •1 spark growth
v •
•O 12 SWVirginia's port users
%Or ID- 4014 expanded this year.
If As or Fr 11io.ieie
1y1�[�IIIyI
11116 ri. r 14
Global Technical Systems is one of many businesses increasing due to the growth of The Port of Virginia:
Virginia Beach Global lechnicalnew, Systemselectro-mechanical is investingenergy$54sto.7rage millionsystein ma
manufacturing operation-creating 1.110 new jobs
4,4
r . `
•
4t, .r.3
.Ill roily
yignNu
June 12, 2018
10
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA - UPDATE
(Continued)
Here are the City's Top 10 Port Users:
City's Top 10 Port Users
Company
STIHL Inc • Total$837,502,500 of cargo
Haynes Furniture
OHL
NEXCOM • 163,528 tons of cargo flowing
Hermes Abrasives to/from the City ofVirginia Beach
Pinnacle International Freight
Capitol Foundry ofVirginia through the port
Haulotte US
TTS Worldwide
American Borate
Y
IRGINIA
fI S'••""dT 17
Mr. Rinehart explained the opportunity for Grants to be awarded for future projects and encouraged the
City to submit requests:
lot
Nos "
1111
_-_-�— R-�-fi=r , -
p.THE VIRGINIA I Stewards dTamar
18
June 12, 2018
11
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA- UPDATE
(Continued)
Here are a few of the City's Organizations supported by the Port of Virginia:
STEWARDS OF TOMORROW
oa Communities VBIFH
l In Schools 00EFfsfikiti -
c ) c *Jf' *
Z
s * *1
licr SitiCE 191's 1. - �
VIRGINIA
AQUARIUM
Val I -"m--
The Port's Mobile Unit assisted during College Beach Weekend:
Vie ore there when our rommunity needs us the most
Z', 1Nf POAIoi i O$ '
r* tw
Our Marine Incident Response Team(MIRT)
From coordinating dive team, creatgng and strateginlly placing disaster recovery bailers.to our routine pail iupauon nreglonsaI
commrttees.MIRT's 24-7-365 mission is helping to supplement the area's Is responders•gnat antes contmuny of open t,aia and olkv
the kind d insight necersary to keep the port and art comm��005 sate and sustauublr.
Ixtvoalor 51„�rdselTnn,�nw
'-YIRGINII I 20
June 12, 2018
12
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA — UPDATE
(Continued)
INVESTING IN THE FUTURE
_.A! __ �� Y^ '.,��..S.:b•:-tea sf. _ 6i�_�r 9�'_+a.
INE PORI OF sYewa,e2 oTr,...c.
VIRGINIA 2/
Here are the East Coast Port Depths:
EAST COAST PORT DEPTHS
WON
so'eeepe��.g mmpl«e��Sepeember 2016
5
�- 1110New York/Newt
S2 1B i./roeto(roughly sexl<a<.aue6x ea tom„na.q Jersey Bahe
o9 tl 5' 2t
_ 50/50
SI lB tool mot
--' �Bakimpre 50/50 COMPLETE
Charleston
•The Port of Virginia 52 mYaWaY WM 2016
( I 50155 •sewn.a+ma($22m w..,rszn5n lei)
as
1ppnnpire 202
rr..+ .a$port..d$3 SIP 201 iW.dee a IlSaCE FYI)won,.6x mnw.cew
•Cmm.mnn m B.0* mw uGY pr
Savennell
` -•Charleston 45/52 4T..nra.e In WARM 2012
-W pp prao.a$20224 d<wtn bon0,<�
�•Savannah 42147• 0.e.rw,00(00n.v..mne.p.S2010..d.ar.ba m,a,sn.c.e
Jacksonville 40/47 name
sa meals mrnpon Y Snpmnl.r 2015
-$2200,mol ma($1120,FU61a Morn Dade(
R weer$n laderY pp
Miami 50/50
glip THE VIRGINIA ( Stewards dT 20.aw 22
June 12, 2018
13
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA - UPDATE
(Continued)
The Channel improvements will reduce the impact to US Navy operations due to congestion-related
channel closures and allow two-way traffic:
NO' 1•1_ _,-ARBOR DEEPENING &WID G('
!r:
-'
. 00 55.. .iir.... /
T S,
iii
. , •OSx 3 %.,,,,
COCA sr.saamr o.o,. 23
There is a pilot program which pumps the dredged sand back on the beach which will help reduce costs:
Investing in Virginia Beach
III
' _ Beneficial Sediment Reuse
_ i
g, 1 1
,..14 ift •
a `
VIRGINIA 24
June 12, 2018
14
CITY COUNCIL'S BRIEFINGS
PORT OF VIRGINIA - UPDATE
(Continued)
Here is an Overview of the Future Craney Island Marine Terminal:
FUTURE CRANEY ISLAND MARINE TERMINAL
.� ems
• 522 acre state-of-the-art terminal , `.
• 8,400 ft of wharf;7 berths '
• 28 Suez class container cranes
• On-dock intermodal rail access by CSX&NS
• 5 Million TEU Capacity
IWIRT Of I s7•wam dr o.
VIRGINIA
Irk. -
fillk
IKEP : EACL AR
4111 - YIR` PATH FORWARD
l
IVIERGINIAPORE OE s''''''''..ra,dr
Mayor Jones expressed his appreciation to Mr. Rinehart for the informative presentation.
June 12, 2018
15
CITY COUNCIL'S BRIEFINGS
HISTORIC PRESERVATION COMMISSION- UPDATE
4:22 P.M.
Mayor Jones welcomed Bill Gambrell, Chairman — Historic Preservation Commission. Mr. Gambrel!
expressed his appreciation to the City Council for their continued support.
Oil
Virginia Beach
Y
Historic Preservation Commission
City Council Update
Bill Gambrell, Chair
June 12, 2018
Here is an Overview of the Commission:
Historic Preservation Commission
Overview
Commission — Active and Productive
J
• Last Report to Council was in September 2016
• Appreciate continued support for Historic Preservation
especially Council Liaison RosemaryWilson
•
Barry Frankenfield and Planning Department very supportive
• FT Historic Preservation Planner position funded FY18
• • Commission has focused on advocacy,raising awareness and
encouraging public participation
June 12, 2018
16
CITY COUNCIL'S BRIEFINGS
HISTORIC PRESERVATION COMMISSION- UPDATE
(Continued)
Public Meeting attendance doubled between 2017 and 2018:
Public Meetings and Publicity
• Commission held Public Meetings in 2017 and 2018
• 65 persons attended in 2017
• 110 persons attended in 2018
• Publicity
• Planning Department staff develops news releases
3_*. • Newspaper and TV media have run numerous stories related
to research grant projects;local state and national registers;
' historic markers and more.
Nineteen (19) Grants were awarded totaling$31,640 during FY 2016-2018:
Research Grant Program
• City Council supported initiative
• 19 grants totaling$31,640 awarded FY16—FY18
• Ground-breaking research,especially regarding the history
of our African-American communities
VIM r • Awards include 6 state highway markers,local history
curriculum development,numerous research papers,oral
history interviews,and website and video development
covering a diverse range of topics
June 12, 2018
17
CITY COUNCIL'S BRIEFINGS
HISTORIC PRESERVATION COMMISSION- UPDATE
(Continued)
The Courthouse Village and Municipal Center were added to the National Register of Historical Places:
Virginia Landmarks Register
National Register of Historic Places
• Two National Register Historic Districts-
Honorary Recognition
Ail tab- • Oceana Neighborhood(September 2017)-the
city's first residential National Register historic
—isimiEgigi ` district
- i,- • Courthouse Village&Municipal Center-currently
pending placement on the National Register
Iii - • One Preliminary Information Form Submitted
jc to determine eligibility
Vivo n \ • Cavalier Shores Neighborhood(December 2017)-
`.. .d determined to be eligible for listing;Nomination
project underway.
Nineteen (19) new properties have been added to the Virginia Beach Historical Register since 2016:
Virginia Beach Historical Register
19 Properties added since Sept. 2016
74 now listed
• Whitehurst-Buffington House
• Ewell Farmhouse 813 Simpkins Lane
_,�-_,.. • 216 Cavalier Drive
• Jefferson Manor Motel 3300 Pacific Ave.• 429 26th Street
• 318 27th Street
4_iii- - • 13 National Register properties
ifir,,,,
Commission pursued an initiative to add all NRHP properties and
we have achieved 100%
June 12, 2018
18
CITY COUNCIL'S BRIEFINGS
HISTORIC PRESERVATION COMMISSION- UPDATE
(Continued)
Here are the current and planned State Historic Highway Markers:
Historic Markers
Ko®N State Historic Highway Markers
TROROW�OOD JR.
" Dedicated in 2017
• Col.John Thorowgood Jr.
e_ "` • Cape Henry Railroads
Funded by 2016 Research Grants
Planned Dedications in 2018
• Skirmish at Kemps Landing
• Camp Ashby POW Camp
• Meeting of the Three Commanders
. - - Funded by 2017 Research Grants
Here is an Overview of how students are selected for recommendation to the Historical Preservation
Committee:
Student Members
Student Involvement Growing
" 2017/18
' • 10 Students Interviewed
V • 2 Appointments by Council
• Student Leaders Committee established
ca
' Met w/Gov.Northam and legislators
Made local entries for Clio app
• Led activities at Strawberry Festival booth
2018/19
• 7 Students Interviewed for the 2
appointments
June 12, 2018
19
CITY COUNCIL'S BRIEFINGS
HISTORIC PRESERVATION COMMISSION- UPDATE
(Continued)
Here is the basis for the Historic Preservation Program:
Certified Local Government (CLG)
Basis for our Historic Preservation Program
• Planning Dept.takes the lead to meet requirements
• Two new Historic and Cultural Districts established (first since 1996)
• Historic Resources surveys are underway—Planning staff received
$18,700 grant for one of them
Honoring Our Heritage
_ - • Native American Heritage
Month 2015, 2016 and 2017
t • • African American Heritage
Month 2018
June 12, 2018
20
CITY COUNCIL'S BRIEFINGS
HISTORIC PRESERVATION COMMISSION- UPDATE
(Continued)
Here is an Overview of the Commission's work on the Cavalier Hotel:
Cavalier Hotel
• HPC Cavalier Hotel Task Force assisted
with incentive development
• City holds Preservation and Green Space
s - easements
• Listed on National Register of Historic
`` _ £ 1 Places 2014
# '• • One of the largest state Historic
Rehabilitation tax credit projects ever
• Re-opened in March 2018
The Commission will provide recommendations to the City Council this fall regarding the Princess Anne
County Confederate Monument:
Princess Anne County Confederate Monument
• Sept. 2017-HPC received public comment
• Dec. 2017- HPC formed Princess Anne County
Confederate Statue Roundtable(PACCSR)formed
to assist with formulating recommendations
T • Jan. -May 2017-monthly PACCSR meetings held
• Summer 2018-PACCSR to hold public input mtg.
• Summer 2018-PACCSR to craft
recommendations for HPC
• Fall 2018-HPC to provide recommendations to
City Council
June 12, 2018
21
CITY COUNCIL'S BRIEFINGS
HISTORIC PRESERVATION COMMISSION- UPDATE
(Continued)
The Commission has completed the Princess Anne County Courthouse Historical Structure Report and
recommends this report be accepted as a general guide for future maintenance and repairs:
Princess Anne County Courthouse
Historic Structure Report
-µms
?• i,__ #tl• Commission requested funds in FY16
.i _u l i ( • Commonwealth Architects performed the study
- Y • Know more about the building than ever before
• Has changed significantly over time
' • Structurally stable
• HPC recommends that this report be accepted as a
r general guide for future maintenance and repairs
I-1I
Here are the Projects for 2018-2019:
Projects For 2018/2019
Cape Henry Historic Site
• Lighthouse restoration project
• 100th consecutive annual observance of the First Landing
National Register Nominations
• CompleteCavalier Shores nomination
4#
• Develop recognition signage for historic districts
City Council
• ConfederateCavaliMonument Recommendations
Research Grants
• Accept Completed FY17 and FY18 projects
• Award FY19 project grants
June 12, 2018
22
CITY COUNCIL'S BRIEFINGS
HISTORIC PRESERVATION COMMISSION- UPDATE
(Continued)
Projects For 2018/2019
Complete CLG Initial Historic and Cultural District Standards and
Requirements Guidelines
• Coordinate with City architect and property owners
••• • Produce draft document
�4 - City-wide Resource Surveys
# • Complete Archaeological Assessment(northern half)
D _ • Complete Reconnaissance Level Architectural Survey
rvsi
Update(northern half)
—I • Initiate Archaeological and Architectural studies in city's
southern half
Update Historic Resources Management Plan
• Hold public input sessions and produce draft document
Questions?
r '1
' kms / s}'r
...k.,710177:,
rosi
ot
.:. _.mss•
0
Mayor Jones expressed his appreciation to Mr. Gambrell for the informative presentation and to
everyone on the Commission for their hard work and dedication to the City.
June 12, 2018
23
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
4:52 P.M.
Mayor Jones welcomed Lyndon Remias, City Auditor. Mr. Remias expressed his appreciation to the City
Council for their continued support:
Audit of the
Marketing and
Sale of City Real
Estate -_
Presentation to City Council
Tuesday,June 12,2018
Lyndon S.Remias,City Auditor
Here is the Purpose and Scope of the Audit:
Purpose and Scope
The purpose of the audit was to determine compliance
with City policies and proper conduct over the marketing
and sale of residential real estate acquired by the City
under the Accident Potential Zone-One(APZ-1)/Clear Zone
(CZ)Program.
The scope of the audit covered marketing and sale of the
residential real estate acquired by the City from 2008
through April 6,2018.
June 12, 2018
24
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
(Continued)
The Objectives of the Audit are outlined below:
Objectives
vsto
- The objectives of the audit were to determine whether 4413.
the:
City real estate acquired through the Base Realignment and
Closure(BRAC)Program were properly disposed according to City
Council and management's decisions.
City real estate sales were adequately marketed to ensure that
interested parties were given equal opportunity to participate.
Bid proposals were adequately safeguarded to ensure the
confidentiality and integrity of the process.
Bidder selection process was properly performed to ensure the
absence of preferential treatment to any party.
City sold real estate at prices that were reasonable and provided
the best value for taxpayers.
Here is the Background of the 2005 BRAC Commission:
Background
-In response to the 2005 BRAC
Commission's condition to
remove Naval Air Station(NAS)
Oceana from the list of base "r-
closures,City Council adopted T�r_
theAPZ-t/CZ Program(BRAC
Program),a comprehensive plan {'
to stop additional encroachment P • -
and reduce existing
encroachment around NAS -Oceana.
The City deemed this program
more effective and fair to -
affected property owners than _
invoking the power of eminent
domain to condemn houses and
other incompatible uses. •uni ion converted o a Nei
June 12, 2018
25
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
(Continued)
The table below shows the Navy's land use recommendations for new development within the CZ and
APZ-1 areas:
The table below shows the Navy's recommended land use
compatibility for new development within the CZ and APZ-1 ar
Table 1•Air Installations Compatibility Use Zones
Land Use Compatibility in Accident Potential Zones-Residential ';.
a APL-1 •
Single-family dwellings No No
Semidetached dwellings No No
Attached dwellings Ho No
Attached dwellings/townhouses No No
Multi-family dwellings No No
Dormitories and other group Quarters No No
Hotels end motels No No
Mobile home pyla No No
Other residential No No
The City determined that the APZ-1/CZ Program best addressed the
needs of all stakeholders(e.g.Navy,property owners)in that it
reduces density while preserving the stable neighborhoods within
APZ-1 for land owners that did not want to sell.
This Program is made up of three (3) components:
The program is made up of three
components:
APZ-1 Ordinance: Prohibited new development deemed
incompatible with military flight operations at NAS
Oceana.
APZ-1 Acquisition Program:Allows the purchase of
residential properties at cost that the properties would
have retained if the APZ-1 Ordinance had not been
adopted.
Roll Back Plan: Incorporates aspects of acquisition as
well as retention and disposition of properties.
June 12, 2018
26
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
(Continued)
Here is an Overview of the Disposition Committee:
Disposition Committee
The city created the
disposition committee to (or .
evaluate each acquired
property.
Whenever possible,an r ` ;:,
acquired property is • `
retained for public use to I 1 , �•
protect and enhance the .L�. •
health,safety,welfare,and 'L i
quality of life of persons ' ' , 1 L.,14112
around the neighborhoods. —
The need for future
roadway projects,
neighborhood parks,and
open space are among the Rebuilt House in APZ-1 Neighborhood
factors considered when _
retaining the properties.
The Chart shows how the BRAC Program reduced the number of zoned dwellings:
BRAC Program Illustration
aw:
Certks.,,,,Obentiallyby the Oly
Ord'".* 0L1-—1 —,... A M ••
s+.ea.a:�a anm prt enrcd ll114. ' tl_._ tae _ ted..n.Mr ^rye
-
Acquisition
rwo vacant pmpettks t -.<t^`I
awree I y.tire
yhree Mgt,units.11,.d m�ly
•*Imbed ���ssssiiii
Rol Back: 011e- !i/e.
fslsposttirl B Rebuild Fay ram�h
Acqulrcdprapertksmmbined Results.
and so,as two sink-family Density It Reduced bya Net of Seven Incompatible DwelIIne'.. .._I
bu,Winpsires Neighborhood Integrity Is Maintained
16 prevented and I rolibacyl
June 12, 2018
27
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
(Continued)
Here is an Overview of the results from the BRAC Program:
BRAC Program Results
Prior to the BRAC Program's implementation in 2005,there
were 4,520 existing and potential incompatible residential
dwelling units in the APZ-1 and CZ areas.
As of the first quarter of 2018,the City was able to reduce
that number by 1,292 dwelling units(net of 39 single-family
rebuilds)through:
APZ-1 Ordinance-909 dwelling units prevented
Acquisition and Roll Back-383 dwelling units removed
� x
BEFORE AFTER
i� \.
P i
248 London Street
SIN: 2407-02-1454
June 12, 2018
28
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
(Continued)
r ilk
BEFORE AFTER
I; III ii
40 London Street
PIN: 2407-02-3405
BEFOREAFTER
r .„:, fi r k t
a 4 e :' I®.1 11.11._1 It-d --
,_17 Reuben Street
Current GRIN: 2407-02-8707
former GPINs: 2407-02-8738 & 7758
June 12, 2018
29
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
(Continued)
Here is an Overview of the Request for Proposal(RFP)Process:
RFP Process
Public Works Real Estate receives all Request for Proposals
(RFP)and compiles them for presentation to the Disposition
Committee,the Special Real Estate Acquisition Disposition t
(SPREAD),and the City Council.
SPREAD oversees the processes for acquisition and disposition
of real estate. The purpose of the SPREAD meeting is to
further evaluate the proposals made by the Disposition
Committee and to make sound recommendations to City —
Council.
The information discussed in the SPREAD meeting is
subsequently presented in a formal City Council session.City
Council makes the final decision as to which company or
individual is awarded the contract to purchase and build on
theerro
P P >Y•
Here is an Overview of the Finding 1:
Finding 1: RFP Did Not Expressly Include.
Individuals As Potential Bidders
• The sale of City real estate acquired through the APZ-1
Acquisition Program for construction of single-family homes is
conducted through the Request for Proposal(RFP)process.
Construction of a single-family dwelling must adhere to
stricter building requirements and deadlines.
The RFP is worded to solicit proposals from building
contractors or developers who have a Virginia Class A or B
contractor license only.
The wordings in the proposal inadvertently disqualifies other
willing participants who do not have the requisite building
license yet are willing to work with those who have them.
June 12, 2018
30
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
(Continued)
RFP Sales for Rebuilding Single-Family
Houses
Number of Percentage
Purchaser Properties (rounded)
1.Ocean Bay Homes/BRIBRA Building 44 50%
2.Bishard Homes 19 22%
3.Murray Homes 10 11%
4.Cashvan Homes 9 10%
5.Franciscus Homes 6 7% Tr:
6.individuals 0 0% .r
Total 88 100% • e
39 net rebuilds after properties combined
Here is the Recommendation for Finding 1:
Recommendation
- Management should revise the wording in the
RFP to ensure that participation is open to all
interested parties as intended in the program.
June 12, 2018
31
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
(Continued)
Here is an Overview of the Finding 2:
Finding 2: Deficiencies In The
Receipt Of Bid Proposals
- Bid proposals for an active RFP usually arrive at the
Public Works Real Estate Division in the final two days
of the submission deadline.The designated staff
member:
Documents the receipt using a date-stamp
machine,affixing it on the package.
Solely opens the package after the submission
deadline.
We reviewed a sample of 10 RFPs,comprising 30
properties,and found the following:
Two RFPs did not have any of the bidders'packages and
proposals. Thus,we could not:
Trace the bid price and other relevant information to their
proposals to validate them.Management stated that the
documents might not have been retained because the RFPs
were beyond the document retention period. However,we
deem it was not the case since other documents related to
the two RFPs were still available.
Verify if proposals were received within the deadline.
Accepting late submissions may indicate preferential
treatment and improper practices. :
In one RFP,one of the four packages was opened the day before
the May 30,2013 deadline;the main page was stamped May 29,
2013.
wer
June 12, 2018
32
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
(Continued)
Here is the Recommendation for Finding 2:
Recommendation
Management should keep all pertinent documents related to the
sate of City real estate,including date-stamped packages and
proposals,until no longer necessary or according to the applicable
document retention policy.
Include in the Proposal Requirements section of the RFP that
bidders should place their documents in a sealed envelope. If
delivered without an envelope,Public Works should provide one
and,as much as possible,request the bidder to place the
documents inside and then seal the envelope to protect the
confidentiality of the proposal. _
The designated staff member should open the package only after
the submission deadline in the presence of another employee,as
I, witness. Annotate the time and date of opening the package on
• the main page of the proposal,accompanied by signatures from
both employees.
It was determined that the process was properly and appropriately conducted in accordance with City
policies:
Conclusion
• Based on our analysis and tests of transactions for the
sale and marketing of City residential real estate in the
APZ-1 area acquired under the BRAC program,we
determined that the process was properly and
appropriately conducted in accordance with City
policies.
• We would like to thank the management and staff of
the Department of Public Works and the City Attorney's
Office for their cooperation and responsiveness to our
requests during our audit as well as their receptiveness
to questions, recommendations,and suggestions.
June 12, 2018
33
CITY COUNCIL'S BRIEFINGS
MARKETING AND SALE OF CITY REAL ESTATE—AUDIT RESULTS
(Continued)
Here is an excerpt from the Response to the Audit of the Marketing and Sale of City Real Estate dated
May 23, 2018:
Management's Response
Excerpt from Response to the Audit of the Marketing and Sale
of City Real Estate dated May 23,2018:
"The recommendations to(1)amend the RFP language to
expressly include individual applicants,and(2)modify RFP
intake procedures are acceptable.These
recommendations have already been incorporated to •
better enhance our business practices."
"We take great pride in our ability to be accountable,
transparent and professional for services we provide to
the City and our customers.We always welcome
recommendations to improve upon them."
Questions
Mayor Jones expressed appreciation Mr. Remias for the informative presentation.
June 12, 2018
34
CITY MANAGER'S BRIEFING
REVIEW OF FEDERAL FUNDING RECEIVED BY
HOUSING AND NEIGHBORHOOD PRESERVATION
5:10 P.M.
Mayor Jones welcomed Andrew Friedman, Director - Housing and Neighborhood Preservation. Mr.
Friedman expressed his appreciation to the City Council for their continued support:
\B-
Neighborhood
vatin
FY 2018-2019 Federal Funds Briefing
6
I , ii i 0,
it
City Council Briefing -June 5.2018
Andrew M.Friedman Director
Here is an overview of the Department's Mission:
Overview
The Department of Housing and Neighborhood
Preservation seeks and utilizes available funding from
Federal and state funding sources,along with funds
provided by City Council,to achieve our mission of:
.Expanding affordable housing opportunities
.Promoting vibrant,well-maintained neighborhoods
Making homelessness rare,brief and nonrecurring
2
June 12, 2018
35
CITY MANAGER'S BRIEFING
REVIEW OF FEDERAL FUNDING RECEIVED BY
HOUSING AND NEIGHBORHOOD PRESERVATION
(Continued)
Here is an Overview of the History and Context of Federal funding received:
History and Context
>Since 1974,the City has received Federal funding for housing,
community development and homelessness programming.
,The State of Virginia has also provided various types of funding
for these purposes
City Council has provided matching,administrative and most
recently,program funding,especially for homelessness
The Dept.of Housing and Neighborhood Preservation has
applied for,administered,and utilized funds as they have
become available
3
Here are the Federal Funding Requirements:
Federal Funding Requirements
Administrative Use Restrictions j Funding Requirements Oversight
Requirements
Multi year plans Allowable uses and Deadlines for Review/approval
who can benefit are commitment of plans
specified
Annual action plans There are not any Deadlines for Review or
designated expenditure monitoring of
organizations that programs and
must receive funding administrative
requirements
Environmental The City has Use of Federal City's external
review discretion in how and financial systems in auditor reviews
where to use funds, addition to City one program in
and who should systems depth each year
receive them,
consistent with
regulations
Reporting
requirements using
HUD systems
a
June 12, 2018
36
CITY MANAGER'S BRIEFING
REVIEW OF FEDERAL FUNDING RECEIVED BY
HOUSING AND NEIGHBORHOOD PRESERVATION
(Continued)
Here are the Sources and Allowable Uses for Federal funding:
Sources and Allowable Uses
Source Uses and Restrictions Limitations
Community Rehabilitation of affordable housing;community 20%
Development development activities in neighborhoods;public administration;
Block Grants services for low income,homeless,or special needs 15%services
(CDBG) persons;no ongoing income supports;generally not
new construction
HOME Rehabilitation or construction of affordable housing; 10%
direct housing subsidies administration;
1 5%must go to a
"CHDO"**
Emergency Homelessness 7.5%admin
Solutions Grant
(ESG)
Housing This is a regional grant to provide housing 3%admin;7%to
Opportunities opportunities for people with AIDS or HIV;it serves project sponsor
for People with people from here to James City County administration
AIDS(HOPWA)
**See appendix slides for more details on this
Sources and Allowable Uses (2)
Source Uses and Restrictions lhnhations
Housing Rental subsidies to low income households; Admin fees
Choice locality establishes priorities for who is served; earned per
Voucher— houses must pass inspection month
Section 8
Continuum of Funds programs to address homelessness that
Care(CoC) are aligned with Federal priorities and the local
plan
State CoC Funds programs to address homelessness that
are aligned with state priorities and the local
plan
State Rental Rental subsidies for people with disabilities Admin fees
Assistance. earned per
Program month
6
June 12, 2018
37
CITY MANAGER'S BRIEFING
REVIEW OF FEDERAL FUNDING RECEIVED BY
HOUSING AND NEIGHBORHOOD PRESERVATION
(Continued)
Here is an Oveview of the City's Role in Approval of Grants:
City Roles in Approval of Grants
Source City Manager and Council Review and Approval Steps
Federal Community All funds included in department's budget
Development Block Grants proposal;ordinance to authorize CM to
(CDBG) submit annual plan
HOME Program
Emergency Solutions Grant
(ESG)
Housing Opportunities for
People with AIDS(HOPWA)
Housing Choice Voucher—aka All funds included in department's budget
Section 8 proposal;ordinance to authorize CM to
submit annual plan
Federal Continuum of Care Funds not in city budget except for directly
(CoC) grant to DHNP;all other funds go directly to
non-profit organizations;city coordinates
plan preparation;approval by Governing
Board;submitted by City.
State CoC Funds go directly to non-profit organizations;
process mirrors Federal process
Here is the Funding History:
Funding History — 44 Year Estimate
Dyer S 5 HIIIDn in funding
Source 1st year 7t years Annual Average Estimated Total
CDBG 1974 44 2,675,000 117,700,000
ESG 1984 34 135,000 4,590,000
HOME 1992 26 1,200,000 31,200,000
Federal CoC 1992 26 1,000,000 26,000,000
HCV 1993 25 15,000,000 375,000,000
HOPWA 1996 22 1,000,000 22,000,000
State CoC 2014 4 250,000 1,000,000
State Rental Asst. 2017 2 1,000,000 2,000,000
Total all years/all sources $579,490,000
B
June 12, 2018
38
CITY MANAGER'S BRIEFING
REVIEW OF FEDERAL FUNDING RECEIVED BY
HOUSING AND NEIGHBORHOOD PRESERVATION
(Continued)
Here are some Selected Accomplishments:
Selected Accomplishments
Revitalization of 10 Target neighborhoods—water,sewer,
streets,drainage,housing rehabilitation,code enforcement
Creation of VBCDC and major support for VBCDC's 400+units
Owner-occupied rehabilitation financing for hundreds of VB
low income homeowners
Housing stability for thousands of households
Development of regional efficiency apartment buildings
Ongoing homeless services and housing
s
This chart provides the FY18-19 Funding for the Department of Housing and Neighborhood
Preservation:
OHNP flow of Funding
(fY IS 19) 1111
4 44 © a
+ + + + a
"ff, 7E:7 IfFf-: 7'7" 7E1 -,-.7. -
1E37E9 141 oil
R77Waif i i i +
w. w. c®®0
io
June 12, 2018
39
CITY MANAGER'S BRIEFING
REVIEW OF FEDERAL FUNDING RECEIVED BY
HOUSING AND NEIGHBORHOOD PRESERVATION
(Continued)
Here are the Proposed Uses of FY18-19 Funding:
Funding for FY 18-19/Agenda Item
Programs Appropriated Actual Award Variance
CGBG
1,824,317 2,000,832 176,515
HOME
788,573 1,122,655 334,082
ESG
160,042 164,230 4,188
HOPWA
1,345,472 1,524,127 178,655
Total
4,118,404 4,811,844 693,440
Note:Included in the ordinance but not included in the above chart is
$39,161 for additional vouchers for previously homeless veterans.
Proposed Uses of This Year's Funding
Category al Activity CUBA Home Esg HOPWA Grand total
Administration and
Program Management 424,166 119,765 12,317 45,723 601,971 12%
Services for
Homelessness 330,541 151,913 482,454 10%
Rental Subsidies 195,509 195,509 4%
Housing Development or
Rehab 807,381 807,381 15%
Owner-occupied
rehabilitation 631,319 631,319 14%
Code Enforcement 614,806 614,806 13%
HOPWA Programs 1,478,404 1,478,404 32%
Total Federal 2,000,832 1,122,655 164,230 1,524,127 4,811,844 100%
12
June 12, 2018
40
CITY MANAGER'S BRIEFING
REVIEW OF FEDERAL FUNDING RECEIVED BY
HOUSING AND NEIGHBORHOOD PRESERVATION
(Continued)
Here is an Overview of the HOME Program and Community Housing Development Organization
(CHDO):
Additional Information—
The HOME Program and VBCDC
.The following slides provide information relevant to Council's
discussion about funding going to Second Act Communities,a
subsidiary of VBCDC.
If
HOME Program and "CHDD's" - I
.The Federal HOME program was established in 1992
.Includes a provision that 15%of funds MUST go to a qualified
"Community Housing Development Organization"(CHDO).
.A CHDO cannot be controlled by a governmental entity(ie city
council)
.Therefore,in 1992/3,DHNP asked VBCDC to establish a
qualifying organization
.VBCDC did that and the new organization,Virginia Beach
Home,Inc.started receiving these funds
.That organization was the predecessor of Second Act
Communities 15
June 12, 2018
41
CITY MANAGER'S BRIEFING
REVIEW OF FEDERAL FUNDING RECEIVED BY
HOUSING AND NEIGHBORHOOD PRESERVATION
(Continued)
HOME Program and "CHDO's" - 2
The HOME program does NOT require that the funds go to any
specific CHDO
-In 1992 there were no other qualifying CHDO's,and so
VBCDC's was the only option
.Today there are also two others—Habitat for Humanity and
Community Alternatives
We have provided funding to them in recent years because
Second Act has not had projects ready to be funded
In FY 18-19,the approximate amount of funding that must go to
a qualified CHDO is$18o,00o(15%of$1,197,655).
Is
Summary of Funding for VBCDC and Second Act and Predecessors
1986 to present
Activity VBCDC Home/2nd Act/SVHC Total
Acq&Rehab of
Scattered Site Housing $ 5,631,264 $ 3,933,043 $ 9,564,307
Administration $ 893,453 $ 140,000 $ 1,033,453
Homeownership $ 1,455,540 $ 349,603 $ 1,805,143
Rehabilitation of Rental
Housing already owned $ 1,615,322 $ 1,615,322
Transition Housing for
Homeless Families $ 3,005,917 $ 3,005,917
Cedar Grove for
Homeless Veterans $ 455,449 $ 455,449
Blznet for Special Needs $ 770,000 $ 770,000
ESG&HMIS $ 229,812 $ 229,812
Owner-occupied rehab $ 1,140,811 $ 1,140,811
TOTAL $ 15,197,568 $ 4,422,646 $ 19,620,214
NOTE:This is based on reports filed with HUD;however,HOME funding for 1992-
1996 is missing so actual totals are higher. Numbers should be considered close but ri
not exact due to multiple steps involved in compiling,categorizing and analyzing.
P P P 9. 9 9 Y 9•
Mayor Jones expressed his appreciation to Mr. Friedman and the entire Department for their dedication
to this effort.
June 12, 2018
42
ADD ON
SPORTS CENTER PPEA COMPREHENSIVE AGREEMENT
5:17P.M.
Mayor Jones advised at the request of City Manager Dave Hansen, this item was ADDED to the Agenda.
Mr. Hansen read the letter dated June 12, 2018, regarding the Sports Center PPEA Comprehensive
Agreement, a copy of which is attached hereto and made apart of these proceedings.
June 12, 2018
i
0
1.11A'BEA0
E City of Virginia. Beach
% k .T, `22
8 OF 0UR NAS°
VBgov.com
OFFICE OF THE CITY MANAGER MUNICIPAL CENTER
(757)385-4242 BUILDING 1,ROOM 234
(757)427-5626 FAX 2401 COURTHOUSE DRIVE
VIRGINIA BEACH,VA 23456-9001
June 12,2018
The Honorable Louis R.Jones
and City Council Members
Subject: Sports Center PPEA Comprehensive Agreement
Dear Council Members:
As you know, on July 25, 2017, the City solicited conceptual proposals for a Sports Center facility in
accordance with our PPEA procurement procedures. After review of the conceptual submittals, we
solicited detailed proposals from each development team and ultimately selected MEB General
Contractors, Inc. (MEB) to enter into an Interim Agreement approved by Council in February. The
primary purpose of the Interim Agreement was to select a site, develop 15% drawings and negotiate a
guaranteed maximum price(GMP) for construction of the Sports Center and associated parking.
I am pleased to report that we have reached that milestone! We recommend awarding the Design-
Build Comprehensive Agreement to MEB for a GMP of $57,776,725 for the building and
$10,364,322 for the associated surface parking. We plan to schedule an ordinance for your
consideration approving the Design-Build Comprehensive Agreement at your July 10, 2018 formal
meeting.
The Design-Build GMP predominately provides for the construction of the facility and any fixed
assets in the building. Most of the furniture, fixtures, and specialized equipment will be provided by
the Operator, and the remainder will be provided by the Convention and Visitors Bureau. We expect
to negotiate those terms and a long term operating agreement with Eastern Sports Management by
September.
The City's PPEA procedures require that details of the terms be posted for public viewing 30 days
prior to the execution of the Comprehensive Agreement. We have posted the terms today, and if
approved by you on July 10th, I will be able to execute the agreement on July 12, 2018. Details of the
terms have been posted to the Sports Center section of the City's Purchasing Division website
including a summary of terms,the construction budget, 15% drawings and the construction schedule.
DCM Williams and team will provide an updated overview of the project during the Entertainment
District briefing at your June 19, 2018 meeting. Thank you for your support of this project. We are
poised to create a unique,world-class sports tournament experience like no other in the United States.
Res ii INk,,
David L. sen
City Manager
a>
as
• o'-
11111 32
25I
.
N
Lo
tF NI
I
— III
H I-
LL1
I
_NI
1.
F
^i _ {
l
I
MI
. ■
r ■
,!, .
1 u ...1
III
, ,,- : _
.ili
1,_
Me
, -li; r
4 ,
,__ .
.„
.3h
i
: . a
ill0
U - Q
N i
t a ell
O ___,
Q x
fA 1j
c▪a
J
i, R
i
a3 w > W
m � d
'-O. N LC 0 LTJ w
_ 4 .65„,
5 0LD 0 + 63 I
W
PPEA COMPREHENSIVE AGREEMENT
FOR THE DESIGN AND CONSTRUCTION OF THE
VIRGINIA BEACH SPORTS CENTER
SUMMARY OF MATERIAL TERMS
Parties: City of Virginia Beach ("City")
MEB General Contractors, Inc. ("MEB")
Project Description: MEB will design and construct an indoor sports facility of
approximately 285,000 square feet for court sports and an
indoor articulated track with approximately 1100 surface
parking spaces to attract out-of-market tournament business
for the Virginia Beach Convention and Visitors Center.
Design—Build Cost: Interim Agreement $ 2,336,971
Building Construction $ 54,352,700
Owner's Building Contingency $ 1,087,054
Building Subtotal $ 57,776,725
Parking and Site Construction $ 10,161,100
Owner's Parking Contingency $ 203,222
Parking and Site Subtotal $ 10,364,322
Total Project Cost $ 68,141,047
Construction Schedule: Preliminary site work& clearing AUG 2018
Parking construction commences NOV 2018
Building construction commences DEC 2018
Final completion NOV 2020
Virginia Beach Sports Center MEB General Contractors, Inc.
PPEA RFP for the City of Virginia Beach CIP 9-041
Virginia Beach Sports Center
Contract#PWCN-18-0079
Cost Proposal Form- Building Summary 6/11/2018
Div/Item Description Total
Comprehensive Agreement
- Detail Design Phase,Architecture and Engineering 2,352,900
-Special Inspections and Material Testing 77,500
- Building Permit and Utility Tap Fees 325,100
- Bonds and Insurance 1,216,500
- Preconstruction Services 197,700
1 General Requirements 2,616,500
2 Site Construction 1,308,700
3 Concrete 4,700,800
4 Masonry 367,300
5 Metals 514,500
6 Wood and Plastics 307,900
7 Thermal and Moisture Protection 720,800
8 Doors and Windows 1,127,300
9 Finishes 4,615,500
10 Specialties 399,900
11 Equipment 6,344,800
Furnishings Allowance(FF&E to Include Concessions Tables/Chairs and
12 Trainer/Medical Room FF&E) NA
13 Pre-Engineered Metal Building 12,098,000
14 Elevator 200,100
15 Mechanical 8,729,500
16 Electrical 6,131,400
Building Subtotal 54,352,700
Owners Contingency(2%of Subtotal) 1,087,054
Building Total w/Contingency 55,439,754
Interim Agreement Total 2,336,971
Total Building 57,776,725
Cost Proposal Form- Parking Lot Summary
Div/Item Description Total
Comprehensive Agreement
- Detail Design Phase,Architecture and Engineering 329,900
-Special Inspections and Material Testing 16,500
- Bonds and Insurance 216,100
- Preconstruction Services 87,200
1 General Requirements 481,200
2 Site Construction 8,156,900
16 Electrical 873,300
Parking Lot Subtotal 10,161,100
Owners Contingency(2%of Subtotal) 203,222
Parking Total w/Contingency 10,364,322
Total Parking Lot 10,364,322
Total Project(Building + Parking Lot) 68,141,047
43
ADJOURNMENT
Mayor Louis R.Jones DECLARED the City Council Workshop ADJOURNED at 5:25 P.M.
Tern e ius
Chief Deputy City Clerk
/
Amanda Barnes,MMC Louis R.Jones
City Clerk Mayor
City of Virginia Beach
Virginia
June 12, 2018