Mayor Louis R. Jones called to order the CITY COUNCIL'S WORKSHOP in the City Council
Conference Room, Tuesday, October 9, 2018, at 4:00 P.M.
Council Members Present:
Jessica P. Abbott, M. Benjamin Davenport, Robert M. Dyer, Barbara M.
Henley, Mayor Louis R. Jones, Shannon DS Kane, John D. Moss, John
E. Uhrin, Rosemary Wilson, and Vice Mayor James L. Wood
Council Members Absent:
None
2
CITY COUNCIL DISCUSSION
FOREST CONTRIBUTION TO STORMWATER
4:02 P.M.
Mayor Jones welcomed Council Lady Henley. Council Lady Henley expressed her appreciation to City
Council for their continued support:
City Council Workshop-October 9,2018
Forest Contribution
to Stormwater
Council Lady Barbara M.Henley
Princess Anne-District 7
Here is a comparison of"Evapotranspiration"between Natural Ground Cover and Impervious Cover:
Forests and Flood Reduction
00%evapotranspiration 10 evapotranspiration
s• s= r.■r•
s• Ms <,■s•
!Ay °
11 L%%ti
h
gy m iii{
25%shapow 10%shallow
infiltration - Infiltration
2de5%deep
infiltration4r infiltration
Natural Ground Cover 75%400%Impervious Cover
US EPA(2003)
October 9, 2018
3
CITY COUNCIL DISCUSSION
FOREST CONTRIBUTION TO STORMWATER
(Continued)
Council Lady Henley provided the following two slides explaining how the forest can contribute to flood
reduction and is part of the stormwater system. There is 43,000 acres of forest cover in the City, half of
which is unprotected:
Forests and Flood Reduction
STORAGES=Interception+Surface+Soil Infiltration
Interception
cza
5 t 70, Runoff A
P.
Infiltration Unsaturated Zone
Saturated Zone
Forests and Flood Reduction
ET Replenishes Storage Capacity
Evapotranspiration\
t ` ! 4
.141
unsaturated zone
4 4 4 +
saturated zone
October 9, 2018
4
CITY COUNCIL DISCUSSION
FOREST CONTRIBUTION TO STORMWATER
(Continued)
Council Lady Henley provided a proposal, "Conserving Urban Forests to Reduce Flooding"drafted by
Dr. Daniel McLaughlin, Department of Forest Resources and Environmental Conservation- Virginia
Tech, which is attached hereto and made a part of the record. The cost of the study is$40,000 and
would be complete in December 2018. Council Lady Henley advised Virginia Tech will waive$15,000,
the Nature Conservatory will donate$10,000 and the Agriculture Department could possibly cover the
remaining amount.
October 9, 2018
Conserving Urban Forests to Reduce Flooding
Daniel McLaughlin, Dept. of Forest Resources and Environmental Conservation, Virginia Tech
Brian van Eerden, Virginia Pinelands Program, The Nature Conservancy
Introduction:
Conservation and restoration(i.e., afforestation)of urban forests are potentially significant tools for
local and landscape-scale planning aimed at reducing flood risk. Here, we address two key ways
that forest provide flood risk reduction, specifically by: a) decreasing stormwater runoff through
rainfall interception and enhanced soil infiltration; and b) increasing flood storage via"pumping"
large volumes of water from the ground into the atmosphere in a process called
evapotranspiration (ET). A better understanding of these functions and their drivers will inform
planning and conservation strategies for urban flood mitigation.
Forests comprise roughly 38%of VA Beach's land area and, as the City confronts the challenges
of increased coastal flooding, it is wise to evaluate all possible solutions to reduce flood risk—
engineering approaches as well as strategies that conserve and restore flood management
services provided by forests and other"green infrastructure". Forest canopies and soils intercept
and infiltrate water, increasing groundwater recharge and decreasing surface runoff. At the same
time, water pumping(via ET) from forest canopies is a powerful force that can be harnessed to
increase soil storage for flood waters, calling for a better understanding of urban forest ET and
its drivers. Considering both flood reduction functions,there is a need for informed planning
strategies that prioritize locations for both forest conservation and new afforestation efforts based
on forest structure and composition, soil conditions, and landscape position(e.g., adjacency to
urban areas, water movement and storage features). Towards that end, our ongoing work in the
southeastern coastal plain documents key controls (tree leaf area, depth to water table, soil type)
on forest rainfall interception and ET rates, and provides important field-based and modeling
tools to extend this work to urban settings.
Here, we propose to conduct a preliminary assessment of forest conservation and restoration
scenarios in the City of VA Beach with the aim of flood risk reduction. The project will involve
three elements: 1)build a conceptual overview of forest infiltration and ET and their role in the
landscape context of Hampton Roads; 2) apply this framework to conduct a specific analysis of
VA Beach's forests, including forest conditions, soil cover, landscape position, and ultimately
flood reduction potential; and 3) identify additional parcel-level analyses and different strategies
to conserve and restore the highest priority forest blocks for flood risk reduction.
Element 1: Provide conceptual overview of forest interception, infiltration and ET.
• Explain: 1)how forest rainfall interception and infiltration decrease surface runoff, and 2)
how ET subsequently decreases soil moisture and groundwater levels, increasing flood
storage. Compare the magnitudes of these processes under forest cover vs. other land uses
(developed land).
• Describe how forest interception, infiltration, and ET vary with soil types, landscape settings,
and forest type (pine vs. hardwood) and condition (tree density, age).
Element 2: Analyze extent and flood reduction potential of VA Beach forest cover.
• Using GIS analysis, available spatial data(e.g., soil classes, land cover classes) and new
remote sensing data(LiDAR, leaf area), quantify total forest cover, stratified by:
— Leaf area index (principal forest attribute for interception and ET potential)
— Major soil types (for infiltration potential)
— Land cover and upland vs. lowland landforms (for adjacency to flood prone areas)
— Topographic relief(for water movement direction and depressional water storage areas)
• Conduct scenario analysis of flooding risk for different degrees of forest loss and
afforestation.
Element 3: Identify additional analyses needed to prioritize most important forest blocks to
conserve and restore for flood risk reduction.
• Building from Element 2, identify additional data, decision tools, and hydrologic modeling
needs to prioritize blocks based on such factors as land ownership and zoning, adjacency of
flood prone areas, and water movement and storage potential.
• Propose an analytical framework to develop in future work for more spatially explicit
quantification of forest flood reduction, including hydrologic models that predict time-
varying water storage and transport across specific locations and with various forest cover
and conditions.
Deliverables: This project will have three deliverables:
Element 1: a preliminary report and presentation describing a conceptual model of forests and
flood reduction potential,December 30, 2018.
Element 2: geospatial data and scenario analysis for flood reduction potential disseminated in
tables (locations and area extents), maps, and as a GIS layer,March 30, 2019.
Element 3: final report with our conceptual model, results from geospatial analysis, and a
proposed analytical framework for further quantification of prioritized forest conservation and
restoration,June 30, 2019.
Budget: Initial funding is requested to support salary for a postdoctoral researcher(total =
$20,000) and D. McLaughlin ($5,000).
S
I
CITY MANAGER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
4:39 P.M.
Mayor Jones welcomed Phil Roehrs, Water Resources Engineer and Daniel Adams, Coastal Engineer-
Public Works. Mr. Roehrs expressed his appreciation to City Council for their continued support.
Neighborhood Dredging SSD
Program Update
City Council Informational Briefing
October 9, 2018
Phil Roehrs,P.E.
Daniel Adams,P.E.
Public Works Engineering
Here is an Overview of the Neighborhood Dredging SSD Program:
Neighborhood Dredging SSD Program
Individual neighborhood SSD Projects
specific scopes
Standard frequency(3 cycles,16 years)
Includes City-funded Spur Channels (early
appropriations allow for 1St dredging in year 2)
Those who receive the benefit help pay for the project-
Cost sharing (3 sources)
[a
City management of effort- formulation, funding,
design, permitting, construction, maintenance
Creates a viable solution to reclaim navigation&
prove water quality
Establishes a reasonable timeline with visible resul
October 9, 2018
6
CITY MANA GER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
(Continued)
Nieighborhood Dredging SSD Program
Mechanical Dredging
Potential for neighborhood dredged material transfer
City/Neighborhood Dredged Material Transfer Station
Deposition at City Disposal Area: Whitehurst Dredged
Material Management Area (DMMA)
Mitigation:Vegetated & Non-Vegetated Wetlands
Requested by the community
Requires 8o%approval by participants
Here is a map showing all the Neighborhood SSD Active Projects:
iro Neighborhood SSD • tive Proje �
10/01/2018 L�
`.
406 11,47
loriii'_ -
mn Mk.n
_, s•sonw'uxa
IlkLands y
- Apponon PA...U) '� LA•wLR P•ISI
...,�...h e..r s, t
October 9, 2018
7
CITY MANAGER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
(Continued)
Here is an Overview of the(42)Neighborhoods In Play:
Neighborhoods In Play
Island Lane
Channel Points Lane
Greensboro Avenue
Old Shell
Owls Creekj
Pembroke Manor _ d�
Lynnhaven Acres = 1 iL a
Cedar Lane t*'�!`.
Brock Cove F.tts a,
Buchanan Creek West Broad Bay -
Schilling Point Little Haven Cove t
Sea Breeze Cove Jody Cove
Dix Creek 11 Witchduck Cove _-�
Robin Hood Forest II Witchduck PI `- `'
dredging Completed/Underway
Riverhaven -- K-Thoroughgood Cove ` �'��' `� SSD Ordinance Established in
Bayville Creek West - __-- _ Permit Application Phase
Hebden Cove - Petition Phase
Witchduck Bay oroughftood'(o,-
Witchduck Point - tecent Public Interest Meeting
Oyster Bluff _ Interest Phase
WinthropeCove -
Little Neck Cove t '11o%Interest Not Achiev-
BrownCove -- -
Here is an Overview of Old Donation Creek with sixty-one (61)properties involved:
Old Donation Creek
�-
...,, ,. l� i - • CIP#8_500
.,w ik �© ���o,11lj`7 • SSD Adopted
i:._: MOO ®trOola ©�e�-, 9/13/11
aM Ej®®i„t a a4" • 61 properties
di •"► 4. Vic ' involved and
�i���♦4 410 rag
approximately
♦"♦ ♦ i `4p a6,000 CY of
�♦♦♦♦6�IIinet 1 **� 1 dredging
104 ��8:14-N.f 41 I14De 4 �o, law ■ •First cycle
ib, 'VI dredging
��N�.�����,* `v.•♦♦♦%♦A ; completed late
• tt� ��' ♦ ► ♦ • ` Spring x016
iui0.... 00 I •,♦♦ •a Pi1g
6 X14 `444*- ��� f�
Adopted 9/13/2011
6
October 9, 2018
8
CITY MANAGER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
(Continued)
Here is an Overview of Bayville Creek with twelve(12)properties involved:
irill
111.raM :sorre�ol
ca_so� • cIP#8-501
a 404Aryl
• SSD Adopted 3/27/zon
IQ*4/��A�'11�Ov= •• 1z properties involved and
, �•���`'0 4 approximately 14,000 cY of
� ', 10 dredging
.01°"410
��4 • First cycle dredging
`�si
1�O�' completed February 2016
LP 4
velit w
Adopted 3/27/2.m2
Here is an Overview of Shadowlawn with thirty-one(31)properties involved:
Shadowlawn
s irdio s Toon P ASOI :,va •111
N lop• 0011101111� `� •� cIP#8-5oz
�%�� !! 1.! � 11 SSD Adopted
!!'��`!'��!!!� , !!!l� ��, 3/12/2103
‘ -,-,11�1*�!!0!!�t t{�lltw�-�!j*. 31 properties
t3/��!!!!� X111; `ilir � involved and
r U/ 4110114.10111...,101•111
�/l\'N111/1� ,'� �' i ,''. approximately- -
•!!��/Qi Mt//��/• % 9,000 cY of
t ....S.'ltr1,.111!!!!1,1 Wow , ) dredging
�� �'•�!t!�!! }� /4.41J
Project was bid
6 �jwith Harbour
'` `',.v. 1111110 Point
'� -7,4101- •,� .,' First cycle
���� mmpletle
al / i .'$ February zo_ E`
A,./4
Adopted 3/12/2013
October 9, 2018
9
CITY MANAGER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
(Continued)
Here is an Overview of Harbour Point with forty-six(46)properties involved:
Harbour Point
oil „Ar, s2 -
goo•v /` on
- CIP#8-So4
p,� � SSD adopted 1/14/204
..QO�.•� ,�, t 46 properties
/� © �C• �h involved and
!JU\II ��©®�®V'1' A** •y. approximately 5,000 'y
�� 4® 40.x*4;t w��� CYof dredging
•4,4„-../....G4Q 6�4f% Project was bid wi ,
�j Shadowlawn
4 .�'�, wk First cycle comple
a--_) �� kp `40 February zoic
Adopted 1/14/2014
9
Here is an Overview of Chesopeian Colony with one hundred twenty-one(121)properties involved:
Chesopeian Colony -
4w� .4.„---,------, ``-y. CIPS 8-5o3
14'414' e�7`p SSD adopted 8/13/2013
1- •
r"3 �.-- N��, iza properties involved and
+j► r� *�
'4"z°SIP' ��'/y approximately SS.000 CY of
1 Oq. o�� '', i ' '^; dredging
O . :
74-�, v o e°I'�i1D -1.f First cycle of dredging began
Li ��. • ,....1.4';0:V = August 2018,completion by
' a' Air January 2019
"
,'-'e.S7-----=: ' b _,.,,,,no ii——.---,..,A
7i-Tr ""--r ,JT�l =;
IPJ Adopted 8/13/2013
October 9, 2018
10
CITY MANAGER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
(Continued)
Here is an Overview of Hurd's Cove with seventy(70)properties involved:
Utrds Cove
dati CIP#8-5o5
� "I
SSD adopted 1/20/2015
1 70 properties involved and
I4.1(1"1 approximately 53,000 CY of
��;_ , dredging
�®t,/'�
® `� Permit application under review,
6!4).Af� Real Estate issues
,`� Dredging early 2010•
6,...;;;;b
Adopted 1/20/2015
Here is an Overview of Gills Cove with twenty-four(24)properties involved:
Gills Cove
CIP#&016
SSD adopted
3/25/2014
24 properties
.®i* a involved and
41.111 approximately
/ 13,000 CY of
-4, 740 ® dredging
11i,r•,� Dredging early
""ft 2019
Adopted 3/25/2014
October 9, 2018
11
CITYMANAGER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
(Continued)
Here is an Overview of Brock Cove with seventy-seven (77)potential participants:
Brock Co‘,
; .
Petition Request
ae
• T7 Potential Participants l
• Held Community Briefing on February ` `14f p N
24,2017 ,�
• Total SSD FY18 assessed value: %PatoPA*.$175,383,700 .01
• Total SSD neighborhood channel ' 4 #
dredging cost:$6,283,548 414 Qa
• SSD rate covers costs for 16 year life: _® �0
cz.l¢/Sioo of the FY18 assessed value * tO
• 5o%interest in moving to petition A A
phase
• No known oyster lease consent
requirements Okt%
..
There are potentially six(6) Oyster Leases this project will transect across:
Brock (-nye
Oyster Leases
• City and SSD channel will transect
across potentially 6 oyster leases. :•
• Oyster lease consent agreements
will need to be acquired in order
to dredge. '
LEGEND: / t 4 t�
Commercial or Ripari. �•
Oyster Lease Areas
Proposed City Spur
Channel
1 t
Proposed SSD Channel pima,
v
October 9, 2018
12
CITY MANAGER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
(Continued)
Here is an Overview of Buchanan Creek West with seventy(70)potential participants:
Buchanan Creek West.
.4.
Petition Request -
• 70 Potential Participants .
• Held Community Briefing on May 11, �0'�
2017 O
• Total SSD FY18 assessed value:
$37,372,600 a�
• Total SSD neighborhood channelakiP%��
Wo 1
dredging cost:$2,899,010
• SSD rate covers costs for 16 year life: 0�4�,00a O
48.5e/$10o of the FY18 assessed value �o o
4000� -
L``:5o%interest in moving to petitionpQo p�
Kase �` 4
known oyster lease consent
equirements
Here is an Overview of Schilling Point with eleven (11)potential participants:
Schilling P.,"..4-
Petition Request '
• u Potential Participants •
• Held Community Briefing on October
18,2017 \/p4 0
• Total SSD FY18 assessed value:
$otal ,too ��
• Total SSD neighborhood channel
dredging cost:$593,400
• SSD rate covers costs for 16 year life: $`c
17.74/3100 of the FY18 assessed value _-. ./
L
interest in moving to petition
seknown oyster lease consent —_uirements ,.• .*--. +.�..,"• •°
October 9, 2018
13
CITY MANAGER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
(Continued)
Here is an Overview of Sea Breeze Cove with five (5)potential participants:
Sea Breeze Cr"
Petition Request ¢e
• 5 Potential Participants s„,"
• Held Community Briefing on January 25, Irvtih
2018 "4
• Total SSD FYi8 assessed value:
S4,S90,5o0 ©
• Total SSD neighborhood channel � ` .�dt ,/
dredging cost:$a9z,9o5 r+0410.44e:
• SSD rate covers costs for 16 year life: 6,`�ee*k' 0
39.981 o of the FY1•7 assessed value `,�* 0*
• 5o%interest in moving to petition phase NT*�**4� I
t" 4,1
0 •
There are potentially six(6) Oyster Leases this project will transect across:
Seabreeze Cove
Oyster Leases
• City and SSD channel will transect
across potentially 6 oyster leases.
• Oyster lease consent agreements
will need to be acquired in order
to dredge.
LEGEND: -
Commercial or Riparian
Oyster Lease Areas
Proposed City Spur ti
Channel '+,4
Proposed SSD ChannelY� w \I F
( se `(pm yr t Ma Y.Alinl
October 9, 2018
14
CITY MANAGER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
(Continued)
Here is an Overview of Dix Creek II with eighty-four(84)potential participants:
Dix Creek II
-
Petition Request LYNNHAVEN BAY 64?
• Community requested another petition
attempt based on revised neighborhood
boundaries spp' •4
• 84 Potential Participants �6 ite` 1D
• Held Community Briefing on July 12,2017 wim..�
• Total SSD FY17 assessed value:$67,607,600 'Q%salt,
V\o>so0oi
• Total SSD neighborhood channel dredging p,.<00+ -
cost:$4,683,565 a°b 0 t , `/
• SSD rate covers costs for 16 year life: 0467%`
4s3c/ssoo of the FY17 assessed value Ale-
• 5o%interest in moving to petition phase , / \ t
i. _,_ Obi 0rMOIX=�i :0,1.0.1
There are potentially nine(9) Oyster Leases this project will transect across:
Div !'' rd's I I
Oyster Leases
• City and SSD channel will transect
across potentially 9 oyster leases.
• Oyster lease consent agreements will `•. 1
need to be acquired in order to i
•
dredge. a9
LEGEND: e`sr v._P ..-'
Commercial or Riparian "r
Oyster Lease Areas {. .,,,, •• vt.
t r
Proposed City Spur r �„
Channel - 4'
Proposed SSD Channel .. t c / C
iiiiii
October 9, 2018
15
CITY MANAGER'S BRIEFINGS
NEIGHBORHOOD DREDGING SPECIAL SERVICE DISTRICT(SSD) UPDATE
(Continued)
Here are the "Pinch Points"of the Program:
Neighborhood Dredging SSD Program
Pinch Points
Oyster leases
High cost of mitigation
Availability of Dredged Material Transfer Stations
Difficulty in projecting i6 year total project cost
Adjustments to rates
Neighborhood Dredging SSD
Program Update
Comments and Questions
Mayor Jones expressed his appreciation to Mr. Roehrs for the informative presentation.
October 9, 2018
16
CITY MANAGER'S BRIEFINGS
STORMWATER REGULATORY PROGRAM UPDATE
5:15 P.M.
Mayor Jones welcomed Mark Johnson, Director and Melanie Coffey, Stormwater MS4 Administrator—
Public Works. Mr. Johnson expressed his appreciation to City Council for their continued support and
turned the presentation over to Ms. Coffey:
STORMWATER
1 .0
REGULATORY
PROGRAM
UPDATE
CITY COUNCIL
INFORMATIONAL BRIEFING
OCTOBER 9,2018
MELANIE COFFEY,P.E.
STORMWATER M54 ADMINISTRATOR
PUBLIC WORKS ENGINEERING
Here is an Overview of the Stormwater Program FY 2019 Operating Budget:
Overall Stormwater Program
FY 2019 Operating Budget
Transfers $42,402,136
$11,309,761
Reserves
$338,156
Operation and
Maintenance
Flood Control $22,120,671
$3,207,764
Debt Service
$3,955,648
Stormwater Quality
and Regulatory-
$1,470,136 ria Virginia Beach
October 9, 2018
17
CITY MANAGER'S BRIEFINGS
STORMWATER REGULATORY PROGRAM UPDATE
(Continued)
Here is an Overview of the Stormwater Program FY 2019 Capital Improvement Budget:
Overall Stormwater Program
FY 2019 Capital Improvement
$48,153,514
Flood Control_y Operation and Maintenance
$16,417,652 $23,124,100
Stormwater Quality
and Regulatory
$8,611,762
Va Virginia Beach 0
There are three(3)elements of the Stormwater Regulatory Program:
Our Program
• Stormwater MS4 Permit
Compliance About US
• VSMP and VESCP ,
Compliance for Flooding, Team of dedicated and
Water Quality and knowledgeable staff ensuring
Transportation Projects Stormwater regulatory
compliance for the City
• Stormwater Utility
Adjustments for Commercial
Property Owners
October 9, 2018
18
CITY MANAGER'S BRIEFINGS
STORMWATER REGULATORY PROGRAM UPDATE
(Continued)
Here is the team in the Engineering Stormwater Management Regulatory Section:
OurTeam
Public Works Engineering Stormwater Management Regulatory Section
0Melanie Diana Tara " Kayode
Coffey St John Gallagher Aransiola
•
Samantha Tara Jim Chris
Davidson Copeland *= Milliken l Rapp
0 LaruePearl le Sadichya
Aylesworth Ashitey Amatya `
B Virginia Beach 0
By the end of June the City will have 3,290 facilities:
Implementing our programs
MS4 VSMP Stormwater
Stormwater And uta
Support
Program VESCP Program
NE v> Beach 0
October 9, 2018
19
CITY MANAGER'S BRIEFINGS
STORMWATER REGULATORY PROGRAM UPDATE
(Continued)
The Program is comprised of five (5)Areas with eleven (11)supporting staff members:
Program Resources
Stormwater Utility Support Program Staffing by Program Area
1 Member � 11 Members Total
VSMP&VESCP
2 Members
MS4 Program
5 Members
MS4 Water Quality
Monitoring Program
1 Member
MS4 Water Quality Projects `�
2 Members V4 Virginia Beach 0
The MS4 Stormwater Program requires 70%of the team's effort with 25 program areas:
Implementing our programs
MS4 Stormwater Program
Local TMDL Action Design and Local Water Quality
Planning and Construction of Monitoring
Implementation Water Quality Program
Projects
Public Education Stormwater
Events and Infrastructure Data
askHRgreen Management B`�
V Virginia Beach 0
October 9, 2018
20
CITY MANAGER'S BRIEFINGS
STORMWATER REGULATORY PROGRAM UPDATE
(Continued)
Here is an Overview of the VSMP and VESCP Program Area:
Implementing our programs
VSMP and VESCP
Transportation Stormwater Flood
Project Plan Review Control Project
Plan Review
Construction Stormwater Quality
Inspection Program Off Site Credit
Program
VB Virginia Beach cd
Here is an Overview of the Stormwater Utility Support Program Area:
Implementing our programs
Stormwater Utility Support Program
Fee Adjustment Impervious Area
Program Billing Verification
Annual Reporting Customer Support
NEI Virginia Beach 0
October 9, 2018
21
CITY MANAGER'S BRIEFINGS
STORMWATER REGULATORY PROGRAM UPDATE
(Continued)
OUR PROGRESS
IA DURING THE FIRST 2 YEARS OF
OUR NEW MS4 PERMIT
VA \irginia Beach 0
Here are the MS4 Program Year 1 Accomplishments:
Developed:
• MS4 Program Plan
• SWMF Inspection and Maintenance
Manual
• Water Quality Monitoring Protocols MS4 ProgrdmYedl'
for BMP Effectiveness Monitoring
• Floatables Reduction Plan Accomplishments
• Industrial and High Risk Facility Our Stormwater Regulatory
Inspection Procedures Program
• Single Family Residential SWMF
Maintenance Strategy
• Stormwater Improvement Project List \`
• MS4 Permit Annual Report
VB Virginia Beach
October 9, 2018
22
CITY MANAGER'S BRIEFINGS
STORMWATER REGULATORY PROGRAM UPDATE
(Continued)
Here are the MS4 Program Year 2 Accomplishments:
Developed:
• First Phase Chesapeake Bay TMDL
Action Plan(Compliance by
6/30/2021)
• Memorandum of Agreement with MS4 Program Year 2
HRSD for Chesapeake Bay Accomplishments
Restoration Credit Trading SWIFT
• Bacteria TMDL Action Plan Our Stormwater Regulatory
(Compliance within 40 to 50 years) Program
• Phosphorus TMDL Action Plan
(Compliance within 35 years)
• Implemented the Adopt-a-Drain
Program
Virginia Beach
Pr-7
LOOKING
FORWARD
OUR NEXT 3 YEARS OF OUR
NEW MS4 PERMIT
VA3 h;ginia Beach •
October 9, 2018
23
CITY MANAGER'S BRIEFINGS
STORMWATER REGULATORY PROGRAM UPDATE
(Continued)
Here is the Timeline for the Three-Year Action Plan:
Timeline ' Submit MS4
Our three-year action plan Permit
Reapplication New MS4
Complete _ Permit
Annual 1 MS4 PY 3 Annual Issued by
Reporting Requirements Reporting DEQ
New Annual Submit 2nd Complete
Construction L Reporting ! Chesapeake Bay MS4 PY 5
General TMDL Action Plan 'Requirements
L Permit
Vagina Beach
Here are the MS4 Program Year 3 Requirements:
• MS4 Program Plan Update
• Complete the SWPPPs for the High
Priority City Facilities(8 identified) / MS4 Program
• Modify the Pilot Strategy for Year 3
Maintenance of SWMFs without
agreements Requirements
• Develop protocols for roadway Our Stormwater Regulatory
maintenance that minimize Program
pollutant discharge
• Ensure progress on remaining
items to meet the 5th year \\
requirements
VBVirginia Beach
October 9, 2018
24
CITY MANAGER'S BRIEFINGS
STORMWATER REGULATORY PROGRAM UPDATE
(Continued)
Here are the MS4 Program Year 4-5 Requirements:
• Complete construction of a
minimum of 5 water quality
projects i
• Complete the infrastructure data / MS4 Program
collection in all watersheds Year 4-5
• Submit the Second Phase Requirements
Chesapeake Bay TMDL Action Plan
• Identify the BMPs that will be Our Stormwater Regulatory
implemented during the next Program
permit term
• Submit MS4 Permit Reapplication
Package
VBVirginia Beach
Here are a few of the Regulatory Program Benefits:
Mr—
Regulatory
T1.' Program
Benefits
(oMP1,�A N(E Permit Compliance
f hI'�l Effective Project Delivery for
Transportation, Flood Control
and Water Quality Projects
Improved local water quality
ID 80105752®One Photo I Dteamuime.com 13 Virginia Beach
October 9, 2018
25
CITY MANAGER'S BRIEFINGS
STORMWATER REGULATORY PROGRAM UPDATE
(Continued)
THAN KYOU
Melanie Coffey,P.E. s
www.vbgov.com/stormwater-program .t
Mayor Jones expressed his appreciation to Mr.Johnson and Ms. Coffey for the informative presentation.
October 9, 2018
26
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
5:40 P.M.
Mayor Jones welcomed Brian Solis, Transportation Planning Manager. Mr. Solis expressed his
appreciation to City Council for their continued support:
Transportation Planning Update 'NB
City Council Briefing
October 9,2018 mon
MEI
MIME
odalk Brian Solis,AICP,Transportation/Transit Planning Manager
t.. AMIN Tara Reel,MPA,MURP,Transportation/Transit Planner
....
1111.... 111111
Ili in .... ,. _ mg go 1!
11!11!1! 111,••.. 's"" fri+ ■ ■''• �� -MINN:NI11/s viii
11l1111� 11 it 11 .so uu �" ��w••11!■
•!111!1 1111.... a ■■ ■••• , ® 7.11! i1111111111111.11 '
o
OM MINK
0 - — 0 —
Here is an Overview of City Council Goal#3 of Improving the Transportation System:
IMPROVE THE
TRANSPORT
City Council Goal #3: SYSTEM
Improve the Transportation System
1. Secure adequate funding for transportation projects ®■
2. Reduce congestion and improve traffic flow
3. Explore more alternative modes of transportation enek
4. Advocate for high speed linking Hampton Roads to Northern Virginia and 452 r4
beyond
5. Better mass transit by improving frequency and reliability
6. Become a"Test Center"for emerging transportation technologies ■
r�a
October 9, 2018
27
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
(Continued)
Here is an Overview of the Transportation Planning Initiatives Update:
Overview
Transportation Planning Initiatives Update
Bayfront-Oceanfront seasonal shuttle
Fort Story JEB shuttle partnership and Cape Henry Lighthouse Renovation project
VB Wave Trolley mobile fare payment app
Bus stop capital improvements project
Virginia Beach Trail
Independence Boulevard/l-264 Interchange study
Latest on automated and connected vehicles
Path forward on shared-wheeled vehicles
This was the 2nd season of the Bayfront—Oceanfront Shuttle with a 90%increase of riders:
Improve the Transportation System:
Better mass transit by improving frequency and reliability
2nd season of Bayfront—Oceanfront Shuttle
First three months of 2018=20,413 riders compared to 10,861 riders for same period in 2017
✓Increase of 90%
ESL
2018 Enhancements: 1
• Extended service west of Lesner Bridge to Shore Dr.
Bus Transfer at Pleasure House Rd. 1�
• 3o minute frequency l �`
• Increased sales from First Landing State Park, p t
Virginia Beach Resort Hotel,SDCC
2019 Enhancements: ` f
• Evaluate diversion to Gate 8 Fort Story to link with •
•�', _
Cape Henry Lighthouse/First Landing monuments .2E'
• Add shelter/bike racks to Pleasure House Rdbus re l 1
transfer station a { t r issr
—wa � .r
October 9, 2018
28
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
(Continued)
Here is an Overview of the Fort Story JEB Shuttle/Cape Henry Landmarks Partnership:
Improve the Transportation System:
Explore more alternative modes of transportation t
Fort Story JEB Shuttle/Cape Henry Landmarks or::um
—
Partnership
✓MOU approved/executed by City and Preser.ation VA
v Funding appropriated "" II
A
✓Two,14-passenger mini-buses manufactured AN R'IDI'�'v
✓Preservation VA drivers trained by City
✓City Parks and Recreation donated benches
✓Wraps designed by CVB and being installed
• Shuttlevehicles to be delivered week of Oct.8
• Base providingshelter for shuttle station I
• Cape Henry Lighthouse dune restoration underway; i ____ TOWNL
complete March 2019 / _ ,
• Walking tours available throughout restoration including f I
First Landing monuments
The City hopes to become a "test center"for emerging transportation technologies such as the VB Wave
for Trolley Routes 30 and 31 Go HRT Mobile Fare Pay App:
Improve the Transportation System:
Become a "Test Center" for emerging transportation technologies
VB Wave for Trolley Routes 30 and 31 Go HRT Mobile Fare Pay App
1404 distinct ;
accounts/riders as of41°116-- '
7129/2018thru 9/25/2018
11.11110
-
Total Mobile Tickets /• '
Purchased 1388 passes
• Go i-Day Pass-389 ! t_Y
• Go 3-Day Pass-27% f . t(
• One Way Pass-35% -Goy„PIllanriaiNammmumA�, �
A
October 9, 2018
29
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
(Continued)
By the end of this year there will be twenty-eight(28)new bus shelters at the busiest bus stops, all part of
the Bus Stop Shelter and Accessibility Capital Improvement Project:
Improve the Transportation System:
Better mass transit by improving frequency and reliability
Bus Stop Shelter and Accessibility
Capital Improvement Project
Year a completed:
Bus stop ADA connections recommended by ''
Mayors Committee for Persons with
Disabilities
✓i5 busiest bus stops improved with 13 new bus t =MI
shelters,two stops with new benches and
sidewalk enhancements .-
Year 2 underway: _ _
./Four stops awaiting installation
✓Nine under design,including renovation of Before After
Pembroke/Corporation Lane BusTransfer Virginia Beach Blvd/First Colonial
Station
The Virginia Beach Trail is an East-West Shared Use Pathway and a Top Priority of the City's Bikeways
and Trails Plan:
Improve the Transportation System:
Explore more alternative modes of transportation
Virginia Beach Trail:
An East-West Shared Use Pathway is Top Priority of the City's •A
Bikeways and Trails Plan =-y -4.• .,
BIKEWAYS AND TRAMS PLAN
us../rc:.rww., D
w.
• Leverage existing capital funding to maximize 1 pt _
grant opportunities and partnerships f, �
ii
• Build in phases
October 9, 2018
30
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
(Continued)
Here is the Typical Section Recommendation for the Shared-Use Path:
TYPICAL SECTION RECOMMENDATION {
r-
•
• 1o'Wide Shared-Use
Path(except eastern / :=
end)
• Asphalt surface with ''
i'crushed stone k"11•hm 2;shoulders
�a� r
Here is the Study Corridor from Newtown Road to Birdneck Road:
Study Corridor
•
0 0-- --0 -a -0--
-
o--
� aw
' w�s
October 9, 2018
31
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
(Continued)
Here is the Segment Priority for the Corridor:
SEGMENT PRIORITY
Phase Segment Approx. Path Width Construction Right of Total Segment
Primitallibillallikallillitim To Length(mi) (k) Material Cost Way Cost Cost
IMPORT
®iorMarket Street Lynn Shores Drive 2.1 10 Asphalt $ 8,053,000 $ 80000 $ 8,133,000
_.. -. ii> SMR
" London Bridge
9 Road Air Station Drive 1.1 10 Asphalt 5 4,428,00C $ 4,428000
hry CCM
© Ivy Court Witchduck Road n 10 Asphalt $ 4,452,000-$ 4,452,000
$ 4,581,000 $1,200,000 IMit
hav
7 Plaza Trail Lin en 1.4 10 Asphalt 5 5551.000 -
10 Asphalt $ 2,388,000 IMP
$ 2,388,000
© WRdtdud,Road IrE2122MMEMIKEMMt±M $ 4,005,000-$ 4,005,000
Here is the map of Phase 1-Kellam Road to Lynn Shores Drive:
PHASE 1-Kellam Road to Lynn Shores Drive
Segment 4
to.... 7 I ` - I
Segment s
>e"rt,;',
October 9, 2018
32
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
(Continued)
Here is an Overview of the Path Amenities and Next Steps:
PATH AMENITIES NEXT STEPS
• Lighting • 15%Design underway
• Security cameras • Public Involvement meeting
• Emergency"Blue Boxes" • Program projects
• Fence to direct path users • Identify funding sources
• Trees and landscaping
• Parking locations
• Trail Head locations
• Signing
• Duct bank
• Accessible to EMS vehicles
Here is an Overview of the Independence Boulevard/I-264 Interchange Study:
Improve the Transportation System: Reduce congestion and improve
traffic flow/Secure adequate funding for transportation projects
Independence Blvd./I-264 Interchange Study
• JointVDOT—Citystudy } ... `r
• Model three ultimate
alternatives to cost estimates f" ;=
• Develop updated cost
estimates by segments
• Develop preferred alternative ,mataam u., a ,:.;;„,3,Nt, niet
that can be phased by early Y ``'"'"aunt a ': ., pHF,,.a,;.
t' tlFltpryn
2019 e' v `\ - `. Y r
■ Seek Interchange Modification i 401r fi
Report approval ♦ '
ti
• Identify funding for phased ``�'
improvements �" a. i
October 9, 2018
33
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
(Continued)
Here is an Overview of the Current Initiatives:
Improve the Transportation System:
Explore more alternative modes of transportation,
Become a "Test Center" for emerging transportation technologies
Current Initiatives
Automated Vehicle Connected Vehicle Smart City Task Force
• Automated • Regional Connected Co-host of VDOT Hackathon
Shuttle Corridor Participants in Smart City
• Fort Story/Cape Interoperability Reference
•Henry SPaTTechnology Architecture(SCIRA)Project
• Proposed Challenge
Re Regional Broadband Iso Standards
Entertainment • g
Corridor Ring Smart City Guidebook
Next Generation First
Responder Program
Here are the six(6)levels of Connected Autonomous Vehicles:
Improve the Transportation System:
Explore more alternative modes of transportation,
Become a "Test Center"for emerging transportation technologies
Connected Autonomous Vehicles(CAVs)
0 0 © 3 0 5
No Driver Partial Conditional High Fat
Auttunatn Assistance Automation Aotomattn Automat. Automation
Zero autonomy,the VehCM it cont.oped by VMrcie hoe combined Omar lee twee.y.Cul The rah KA Is cap*Cra of TM..hard..capab4
Ones,pe,lorma all the dnva,WI sane automated functoans to not,pored to mono, patammg all dr.mg peg fog ming all d.aod
Branny tasks debug sweet feahuen lito ennehtetan leg omercovnem The luncheon under Canaan hmcnone under
maybenu0 Bed rn the wrntg,but de dreer drn Hbeready to tons TM dleer cadmm�thed�+er
..tech deagn mum engaged take comm of the may have the opoun to may have the opt.10
aothlhn dnvug uek and eelkciu et allmes control tha vehicl camo'-thueehicu
m. to the ennoaenent tent naive
at all to.
Source.faut0onal Hgheav T•ene safety n:... ..
October 9, 2018
34
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
(Continued)
Here are some of the features of Automated Vehicles:
Improve the Transportation System:
Explore more alternative modes of transportation,
Become a "Test Center" for emerging transportation technologies
Automated Vehicles Under the bonnet
• Hardware .,..., u.m,„,.•.«.,.,., „
• Camera 010identtlOatttalk,"... „b,a
mble
• Radar .is: rq�
• Sensors .
• Software
• Mapping(GPS) it
• Artificial Intelligence
I
11=`"77. .ubmrtwn" VYy j.
dose NeMoe%,MWthe u,tra4
uh.are7aru w.trwm *Maw m4x a.POMP.1.
Ulf lutf,
.. Y.IeBnmr05.1rM.m»n.n A•e.R.vW
brw.nd nkm 44 MMMvv....Wrt..,
Connected Vehicles features include technology that allows vehicles to "talk"to other vehicles and/or
infrastructure such as the vehicle knowing when the signal changes before the driver does as depicted
below:
Improve the Transportation System:
Explore more alternative modes of transportation,
Become a "Test Center" for emerging transportation technologies
Connected Vehicles— Insurance sink. ,G
• Vehicle to Everything(V2X) �� it„':•• 1
• Vehicle to Infrastructure k°`6Ete
Wreaks
(V2I) tl4 kY ToM� i
• Vehicle to Vehicle(V2V) d
• Signal Phase and Timing
(SPaT)data exchange �.Y.,
October 9, 2018
35
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
(Continued)
The Hampton Roads Connected Corridor objective is to create a regional roadway network to facilitate
the use of connected vehicle technologies:
Improve the Transportation System:
Explore more alternative modes of transportation,
Become a "Test Center" for emerging transportation technologies
Objective: HAMPTON R DS CONNECTED CORRIDOR
Create a regional
roadway network to
facilitate the use of
connected vehicle
technologies
tl f •
r. CI
s � m
Here is an Overview of the Smart Entertainment District:
Improve the Transportation System:
Become a "Test Center" for emerging transportation technologies
Project: Smart Entertainment District
Priority Area(s): Public Safety,Mobility,Environment,
Infrastructure
`v�l '_..
Goal:Amplify the burgeoningViBeCreativeDistrictwith �o-
^�
smart innovation projects s '
Benefits:
• Transportation:Establish an Automated Vehicle Shuttle
(59'5 Street Corridor East-West)to connect to existing
North-South public transportation routes gig`
• Transportation. Real time,dynamic smart parking
• Public Safety: Expansion of facial recognition cameras, • }x��'' ''
remote/recessed security bollards011Pmei'`
• Public Service:Street light utility for LED,5G,surveillance . i, '
• Public Information Innovative A/R kiosks
October 9, 2018
36
CITY COUNCIL'S BRIEFINGS
TRANSPORTATION PLANNING UPDATE
(Continued)
Here is the Path Forward on Shared-Wheeled Vehicles:
Improve the Transportation System:
Better mass transit by improving frequency and reliability
Path forward on shared-wheeled vehicles
Current direction on motorized foot scooters is enforcement of existing
Code which prohibits use in certain areas of the City(i-e.Resort and Town t
Center)and where unattended scooters obstruct the sidewalk or public
property - 4s
Over the past 12-18 months staff has had numerous discussions with both i y
dockless and docked bike share vendors as well as scooter-share vendors
Due to inherent conflict in higher density areas such as the Resort and Town
Center,motorized vehicles such ase-bikes and motorized scooters were not a
preferred shared service to consider in those discussion.
Staff will initiate a comprehensive process in mid-November for how wheeled-
vehicle shared services may be addressed to ensure resident/visitor safety is
at the forefront,while balancing market-demand for shared mobility choices. Photo credit-virgiroan-aaa
Mayor Jones expressed his appreciation to Mr. Solis and for this exciting presentation.
October 9, 2018
37
ADD ON
Vice Mayor Wood provided a draft Resolution for consideration at the next City Council Meeting on
October 16, 2018, "A Resolution Regarding The Effective Date Of Prospective Regulations Applicable To
Home Sharing And Short Term Rentals", which is attached hereto and made a part of the record. Mayor
Jones, Council Lady Abbott, Councilman Davenport, Councilman Dyer, Councilman Moss, Councilman
Uhrin and Council Lady Wilson support the request of this Resolution.
October 9, 2018
1 REQUESTED BY VICE MAYOR WOOD AND
2 COUNCILMEMBERS DAVENPORT AND WILSON
3
4 A RESOLUTION REGARDING THE EFFECTIVE
5 DATE OF PROSPECTIVE REGULATIONS
6 APPLICABLE TO HOME SHARING AND SHORT
7 TERM RENTALS
8
9 WHEREAS, on September 18, 2018, the City Council referred to the Planning
10 Commission an ordinance for the regulation of home sharing and short term rentals;
11
12 WHEREAS, the issues associated with home sharing and short term rentals are
13 complicated, and the Planning Commission and the City Council have conducted
14 numerous public hearings and workshops on the issues and considered many
15 alternative ordinances;
16
17 WHEREAS, public hearings and deliberation by the Planning Commission and
18 the City Council will take additional time to complete;
19
20 WHEREAS, home shares and short term rentals provide lodging opportunities for
21 out-of-town vacationers and other visitors who plan their stays well in advance, and
22 owners and operators of short term rental properties need to review and understand the
23 regulations applicable to this enterprise sufficiently in advance of the implementation of
24 such regulations in order to enter into rental contracts and operate their properties in
25 compliance with those regulations; and
26
27 WHEREAS, in order not to unduly interfere or impede the booking of home stays
28 and short term rentals for the 2019 summer season, the Council desires to provide a
29 projected effective date for the anticipated regulation of home stays and short term
30 rentals.
31
32 NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
33 VIRGINIA BEACH, VIRGINIA:
34
35 That any ordinances adopted by City Council in regard to home sharing and
36 short term rentals shall not be effective until the later of November 1, 2019, or six (6)
37 months from the date of adoption of such ordinances.
Adopted by the City Council of the City of Virginia Beach, Virginia, this
day of , 2018.
APPROVED AS TO LEGAL SUFFICIENCY:
City Attorney's Office
CA14539/R-2/October 2, 2018
38
ADJOURNMENT
Mayor Louis R.Jones DECLARED the City Council Workshop ADJOURNED at 6:14 P.M.
010-
Terri eli;s
Chief Deputy City Clerk
1)4Y1
Amanda Barnes, MMC
City Clerk
City of Virginia Beach
Virginia
October 9, 2018