STUDY OVERVIEW
Victus Advisors was engaged by the City of Virginia Beach in December 2023
•Analysis of potential capital reinvestment of $18.5 million in available Sports
Tourism CIP funds in existing local Virginia Beach sports facilities.
•Four (4) local facilities requested Sports Tourism CIP funding totaling $34.3
million:
3
TOTAL
REQUESTED
Facility CIP FUNDS
Hampton Roads Soccer Complex $15,000,000
Virginia Beach Sportsplex & Field Hockey Training Center $9,390,000
Princess Anne Athletic Complex $7,800,000
Pickleball Virginia Beach $2,100,000
TOTAL $34,290,000
STUDY OVERVIEW (CONT.)
Victus had two (2) primary project goals for this study:
1)Evaluate local sports facilities for re-investment consideration, and assess
which facility re-investments could yield the highest ROI for the City.
2)Make recommendations regarding contract/ordinance standards and
approaches for operations of sports facilities on City-owned property.
4
5
STUDY OVERVIEW (CONT.)
Victus interviewed current/projected users of the 4 facilities. Interview goal was
to identify incremental sports tourism impacts that could be generated by:
a)Facility improvement funds requested by the Operator, versus…
b)Any other improvements that might be preferred by the Sports User Groups
•Beach FC
•Championship 7v7 Football
•Clubwaka
•Coastal Crush Lacrosse
•Cross Country Advocate
•Friday Night Lights Youth Flag Football
•J&A Racing
•Liga Internacional de Futbol
•National Flag Football League
•OTSL
•Professional Pickleball Association (PPA)
•Southeastern Virginia Women's Soccer
Association
•Special Olympics of Virginia
•Tidewater Soccer Referee Association
•US Lacrosse
•USA Field Hockey
•USA Lacrosse
•USA Pickleball
•USA Softball of Virginia
•USSSA Adult Softball
•USSSA Baseball
•USSSA Virginia Beach Baseball
•Virginia Beach Mustangs
•Virginia Rush
•Virginia Wesleyan University Cross
Country
25 COMPLETED INTERVIEWS
FACILITY IMPROVEMENT ANALYSIS
6
Organization Expansion of Existing Events New Events
Beach FC -1
Clubwaka -1
Liga Internacional de Futbol -1
National Flag Football League 1 -
OTSL 1 -
SEVWSA 1 2
SOVA -1
VA Rush 1 1
TOTAL 4 7
Potential
Economic
Impact
IMPROVEMENTS BY OPERATOR BY SPORTS USER GROUPS
General Aesthetic upgrades (shade structures, bathrooms, etc.)Bathroom updates, more bleachers, meeting space, etc.
Lights Add lights to existing and new fields Lights on every field
More Fields 6 artificial turf fields 6-10 artificial turf fields
Parking Resurface and add lights to existing parking, develop
walkway from amphitheater for more parking More lighted parking spots and closer to the complex
Artificial Turf Fields Resurface existing artificial turf fields More artificial turf fields
REQUESTED FACILITY UPGRADES
HAMPTON ROADS SOCCER COMPLEX:
OPERATOR REQUESTS VS. USER REQUESTS
7*Note: Incremental event estimate is based solely on the sports user group improvement requests
HRSC operator requests closely align with the requests of the sports event organizers.
PICKLEBALL VIRGINIA BEACH:
OPERATOR REQUESTS VS. USER REQUESTS
8
Potential
Economic
Impact
IMPROVEMENTS BY OPERATOR BY SPORTS USER GROUPS
Court Surface Resurface and repaint courts Resurface and repaint courts
Covered Courts Cover eight pickleball courts for "Championship Court"Cover at least one court for "Championship Court"
Lights New lights throughout the complex
REQUESTED FACILITY UPGRADES
Organization Expansion of Existing Events New Events
PPA Tour -1
USAPA -2
Other Pickleball Groups -2
TOTAL 0 5
*Note: Incremental event estimate is based solely on the sports user group improvement requests
Pickleball operator requests closely align with the requests of the sports event organizers.
Organization Expansion of Existing Events New Events
US Lacrosse 1 2
USA Softball -2
USSSA Baseball 5 5
Other Endurance Groups -3
Virginia Wesleyan Cross Country -2
TOTAL 6 14
Potential
Economic
Impact
IMPROVEMENTS BY OPERATOR BY SPORTS USER GROUPS
General Bathroom updates, roadway and asphalt trail repairs and
repaving, meeting space for officials, etc.
Storage and office space, pavilions and shaded structures,
better concessions, Wi-Fi capabilities, more seats
Cross Country Develop a cross country course
Lights Add lights to existing and new fields
Ball Fields Make fields adjustable for various age groups
More Fields 6 new artificial turf fields
Parking Resurface parking lot
Artificial Turf Fields
Resurface existing artificial turf fields and convert two (2)
rectangular grass fields to artificial turf, fencing around
artificial turf fields
Convert all rectangular grass and ball fields to artificial turf
REQUESTED FACILITY UPGRADES
PRINCESS ANNE ATHLETIC COMPLEX:
OPERATOR REQUESTS VS. USER REQUESTS
9
PAAC operator requests do not closely align with the requests of the sports event organizers.
Sports groups would prefer: a) all grass fields converted to artificial turf, b) addition of six (6) new artificial
turf rectangular fields, and c) running trails/cross country course.
*Note: Incremental event estimate is based solely on the sports user group improvement requests
*Note: There would also be transfer of
existing running/walking events from
the Virginia Beach Oceanfront >>>
Potential
Economic
Impact
10
VB SPORTSPLEX & FIELD HOCKEY TRAINING CENTER:
OPERATOR REQUESTS VS. USER REQUESTS
*Note: Incremental event estimate is based solely on the sports user group improvement requests
Organization Expansion of Existing Events New Events
Championship 7v7 Football 1 2
HRAYFL 1 2
USA Field Hockey 3 3
UYFL VB Mustangs 1 3
TOTAL 6 10
IMPROVEMENTS BY OPERATOR BY SPORTS USER GROUPS
New Field Hockey Stadium
Install stadium seating, press box, concessions,
merchandise and locker rooms at the Field Hockey Training
Center
Upgraded bathrooms and new concessions stand at Field
Hockey Training Center, Wi-Fi capabilities throughout
Lights on Existing Field Hockey Fields Lights for Field 2 Lights for Field 2
More Artificial Turf Fields with Lights Two new artificial turf fields with lights, more grass training
fields Convert grass fields to artificial turf fields with lights
REQUESTED FACILITY UPGRADES
Sportsplex operator requests closely align with the requests of the sports event organizers.
ESTIMATED ECONOMIC IMPACT SUMMARY
BASED UPON SPORTS USER GROUP REQUESTS
11
If all of the sports user groups’ requested improvements were made at each facility, Victus
Advisors estimates demand for:
•Up to 36 new & 16 expanded sports events
•Up to 49,000 more contracted room nights could be generated from these 52 events
Note: Incremental economic impact estimates are based solely on the sports user group improvement requests
Notes: Sorted by Contracted Rooms in descending order.
Incremental economic impact estimates shown above are based solely on the sports user group improvement requests.
Annual Expanded/New Total Contracted % of
Facility Sports Events Attendees Rooms Total
Princess Anne Athletic Complex 20 28,125 20,000 41%
VA Beach Sportsplex/Field Hockey Training Center 16 24,301 14,000 29%
Hampton Roads Soccer Complex 11 58,300 9,000 18%
Pickleball Virginia Beach 5 10,000 6,000 12%
TOTAL - ALL SPORTS EVENTS 52 120,726 49,000 100%
PROJECTED INCREMENTAL IMPACTS
12
Victus has identified two (2) potential options for City Council to consider
regarding how to invest Sports Tourism CIP funds in local sports facilities:
•Distribution based solely on projected economic impact of each venue’s
requested improvements
•Distribution to all facilities who submitted funding requests
RECOMMENDED OPTIONS FOR LOCAL SPORTS
FACILITY REINVESTMENT
13
* Refers to projected economic impact of the funding requests submitted by each venue operator (not the feedback from sports user groups).
** It should be noted that the recommended investment allocation in this economic impact-only model does not include any contributions to
the PAAC, because the PAAC's requests do not align with those of the sports event organizers and thus are not likely to generate material
incremental economic impacts.
RECOMMENDED OPTIONS FOR LOCAL SPORTS FACILITY
REINVESTMENT – ECONOMIC IMPACT CRITERIA ONLY
Recommended Sports Tourism CIP Fund Distribution Based Solely on Projected Economic Impact*
NOTES
Pickleball Virginia Beach:
Immediate & Short-Term Court/Venue Needs $402,000
Championship Court Improvements $1,700,000
11%Pickleball - Total:$2,102,000
VB Sportsplex & Field Hockey Training Center:
Replace Grass with 2 Artificial/Lighted Fields $2,311,000
Flatten Berm & Create Grass Training Area $102,500
Install New Lights on Field 2 $725,000
17%Sportsplex - Total:$3,138,500
Hampton Roads Soccer Complex:
Resurface Existing Artificial Turf (2)$1,000,000
Six (6) New Artificial Turf Fields with Lights $9,000,000
Parking Improvements & Storm Water Contingencies $2,100,000
Other (Accessibility, Aesthetics, etc.)$1,159,500
72%Soccer - Total:$13,259,500
TOTAL INVESTMENT AMOUNT:$18,500,000 **
100%
Improvements would directly benefit USAPA & PPA events.
User groups indicated that the improvements shown at left would be enough
to increase/expand their event activity, whereas a new field hockey building
was viewed as a "nice to have".
The improvements shown at left prioritize renovation and addition of lighted
artificial turf fields, which are the most important factor to tournament
organizers, as well as the parking improvements necessary for tournaments.
The remaining investment budget is allocated to other accessibility and
aesthetic improvements, although not as much as HRSC requested.
14
RECOMMENDED OPTIONS FOR LOCAL SPORTS FACILITY
REINVESTMENT – DISTRIBUTIONS TO ALL VENUES
Recommended Sports Tourism CIP Fund Distribution if City Prefers to Contribute to All Four Venues
NOTES
Pickleball Virginia Beach:
Immediate & Short-Term Court/Venue Needs $402,000
Championship Court Improvements $1,700,000
11%Pickleball - Total:$2,102,000
VB Sportsplex & Field Hockey Training Center:
Replace Grass with 2 Artificial/Lighted Fields $2,311,000
Flatten Berm & Create Grass Training Area $102,500
Install New Lights on Field 2 $725,000
17%Sportsplex - Total:$3,138,500
Princess Anne Athletic Complex:
Convert 2 Multi-Use Grass Fields to Artificial/Lights $3,259,500
18%PAAC - Total:$3,259,500
Hampton Roads Soccer Complex:
Resurface Existing Artificial Turf (2)$1,000,000
Six (6) New Artificial Turf Fields with Lights $9,000,000
54%Soccer - Total:$10,000,000
TOTAL INVESTMENT AMOUNT:$18,500,000
100%
Improvements would directly benefit USAPA & PPA events.
User groups indicated that the improvements shown at left would be enough
to increase/expand their event activity, whereas a new field hockey building
was viewed as a "nice to have".
The improvements shown at left prioritize renovation and addition of lighted
artificial turf fields, which are the most important factor to tournament
organizers. This would not provide parking improvements, so alternative
parking options in the area may need to be considered for large events.
Converting two of the existing rectangular grass fields to artificial turf with
lights would help better meet local usage demand for multi-use fields.
LOCAL OPERATING AGREEMENT
ANALYSIS & RECOMMENDATIONS
15
16
KEY FINDINGS REGARDING LOCAL OPERATING AGREEMENTS
1)INCONSISTENCY ACROSS MANAGEMENT AGREEMENTS CREATES
CONFUSION
2)SPORTS TOURISM GOALS FOR OPERATING PARTNERS ARE
UNCLEAR
3)ANNUAL REPORTING REQUIREMENTS ARE LACKING FOR PRIVATE
OPERATORS OF CITY-OWNED SITES/FACILITIES
KEY VIRGINIA BEACH SPORTS
FACILITY OPERATIONS FINDINGS
17
VICTUS RECOMMENDATIONS REGARDING OPERATING CONTRACT STANDARDS
1)IMPLEMENT UNIVERSAL MAINTENANCE & CAPITAL IMPROVEMENT
FUNDING POLICIES
2)IMPLEMENT UNIVERSAL FINANCIAL REPORTING & OPERATIONAL
TRANSPARENCY POLICIES
3)ENSURE CITY FUNDS CONTRIBUTED FOR CAPITAL REINVESTMENT
ARE SPENT PROPERLY
4)ESTABLISH SPORTS TOURISM GOALS FOR VENUES RECEIVING
SPORTS TOURISM CIP FUNDS
5)IMPLEMENT SPORTS TOURISM TRACKING & REPORTING POLICIES
RECOMMENDATIONS FOR VIRGINIA
BEACH SPORTS FACILITY OPERATIONS
CONTACT INFORMATION
18
VICTUS ADVISORS LLC
2720 Homestead Road, Suite 130
Park City, Utah 84098
(435) 776-5728
www.victusadvisors.com
THINK ARCHITECTURE
7297 High Point Pkwy, Suite 300
Sandy, Utah 84094
(801) 269-0055
www.thinkaec.com