HomeMy WebLinkAboutII. A. FY 2024- 25 RESOURCE MANAGEMENT PLAN ( BUDGET) OPERATING AND CAPITAL IMPROVEMENT PROGRAM (CIP) 7. COASTAL CIP 4.2.24FY 2024-25 to FY 2029-30
Capital Improvement Program
Dan Adams, PE | April 2, 2024
COASTAL
Coastal Overview Neighborhood
Navigational
Dredging
67%
29%
4%Beach Replenishment & Access Years 1-6: $51.3 M (67%)
Navigational Dredging Years 1-6: $22.3 M (29%)
Neighborhood Navigational Dredging Years 1-6: $3.3 M (4%)
→7 Projects/Programs
→10 Projects/Programs
→9 Projects/Programs
Navigational
Dredging
Total
Coastal
Funding
Years 1-6
Beach Replenishment
Total Funding in Years 1-6: $76.9 M
26 Total Projects/Programs
Total Coastal Program Cost: $207.3 M
2
Coastal Projects with No Change
Beach Replenishment & Access:
Programs:
Project Project
#
Council
District
Appropriated
to Date FY25 FY26 FY27 FY28 FY29 FY30 Total
Beach Replenishment II 100038 5,6 18,441,921 2,550,000 2,550,000 2,550,000 2,550,000 2,550,000 2,550,000 33,741,921
Sandbridge Beach Access
Improvements II 100349 2 3,800,000 400,000 400,000 400,000 400,000 400,000 400,000 6,200,000
Sandbridge Beach Restoration III 100351 2 21,239,390 ------21,239,390
Sandbridge Beach Restoration IV 100510 2 27,679,124 4,276,341 4,276,341 4,276,341 4,276,341 4,276,341 4,276,341 53,337,170
3
Coastal Projects with No Change
Navigational Dredging:
Programs:
Project Project
#
Council
District
Appropriated
to Date FY25 FY26 FY27 FY28 FY29 FY30 Total
Lynnhaven Inlet Maint. Dredging II 100258 8 2,169,184 375,000 375,000 375,000 375,000 375,000 375,000 4,419,184
Rudee Inlet Federal Dredging II 100344 5 6,360,000 600,000 600,000 600,000 600,000 600,000 600,000 9,960,000
Rudee Inlet Outer Channel
Maintenance Dredging II 100345 5 3,863,433 650,000 650,000 650,000 650,000 650,000 650,000 7,763,433
Various Minor Dredging Projects II 100450 Citywide 4,035,354 500,000 500,000 500,000 500,000 500,000 500,000 7,035,354
WBLR Maintenance Dredging II 100552 8,9 3,714,040 ------3,714,040
Projects:
Project Project
#
Council
District
Current
Phase
Appropriated
to Date FY25 FY26 –
FY30 Total
Dredge Operations Rehab and Modifications 100149 6 Design 2,000,000 1,190,700 -3,190,700
Eastern Branch Lynnhaven River Dredging 100152 8 Construction 11,294,602 500,000 -11,794,602
Pleasure House Point Mitigation 100304 9 Design 426,492 -2,593,508 3,020,000
Replacement for Rudee Inlet Dredge 100334 5 Procurement 8,788,769 1,000,000 -9,788,769
Rudee Inlet Weir Replacement 100617 5 Design 754,824 4,227,015 -4,981,839
4
Coastal Projects with No Change
Neighborhood Navigation Dredging:
Programs:
Project Project
#
Council
District
Appropriated
to Date FY25 FY26 FY27 FY28 FY29 FY30 Total
Neighborhood Dredging Spur Channels 100274 Citywide 1,177,797 309,300 -----1,487,097
Projects:
Project Project
#
Council
District
Current
Phase
Appropriated
to Date FY25 FY26 –
FY30 Total
Bayville Creek Neighborhood Dredging II 100253 9 Design 436,000 137,099 -573,099
Chesopeian Colony Neighborhood Dredging II 100277 8 Planning --1,744,796 1,744,796
Gills Cove Neighborhood Dredging 100193 8 Construction 1,018,009 180,063 -1,198,072
Harbour Point Neighborhood Dredging II 100201 5 Construction 130,000 83,747 -213,747
Hurd's Cove Neighborhood Dredging 100210 8 Construction 2,905,719 --2,905,719
Old Donation Creek Area Dredging II 100534 8 Design 759,107 364,748 -1,123,855
Shadowlawn Area Dredging II 100550 5 Construction 251,000 38,918 -289,918
Schilling Point Neighborhood Dredging II 100643 8 Planning --445,000 445,000
5
Coastal Projects with Modifications
Project Project
#
Council
District
Appropriated
to Date FY25 FY26 FY27 FY28 FY29 FY30 Total
Bay Beaches Restoration 100030 9 5,855,804 ----125,000 2,875,000 8,855,804
Croatan Beach Replenishment 100142 5 2,997,674 78,000 78,000 78,000 380,000 380,000 380,000 4,371,674
6
Bay Beaches Restoration
Project # 100030
Council
District(s):
9
Total Project
Cost
$8.9 M
▪Program funded design and permitting for Ocean
Park & Cape Henry Beaches and the first
renourishment of Ocean Park Beach in July 2022
▪The initial beach restoration of Ocean Park was
completed in July 2022.
▪A partial beach restoration of Cape Henry Beach
utilizing sand from the Lynnhaven Dredged Material
Management Area was completed in July 2023.
▪A follow-up restoration of Cape Henry Beach will
utilize sand from the planned USACE dredging of the
Lynnhaven Federal channel in 2024.
▪Proposed FY 29-30 funding is for a planned
renourishment of Ocean Park Beach in FY 2030
ATD FY25 FY26 FY27 FY28 FY29 FY30 Total
5,855,804 ----125,000 2,875,000 8,855,804
7
Croatan Beach Replenishment
Project # 100142
Council
District(s):
5
Total Project
Cost
$4.4 M
▪Last sand placement of 50,000 cy of sand was
completed in April 2022 with the Rudee Inlet
Federal Channel and Outer Deposition Basin
Dredging Project.
▪Next major restoration of 130,000 cy of sand
will be placed along Croatan Beach as part of
the Atlantic Ocean Channel Deepening project
administered by the USACE. The project is
scheduled to begin in spring 2025.
▪Future sand placement and maintenance of
Croatan Beach is planned to occur under this
CIP.
ATD FY25 FY26 FY27 FY28 FY29 FY30 Total
2,997,674 78,000 78,000 78,000 380,000 380,000 380,000 4,371,674
8
Coastal New Projects
Project Project
#
Council
District
Appropriated
to Date FY25 FY26 –
FY30 Total Balance to
Complete
Chesapeake Beach Restoration II 100674 9 --3,580,000 3,580,000 -
9
Chesapeake Beach Restoration II
Project # 100674
Council
District(s):
9
Total Project
Cost
$3.6 M
▪Continuation of CIP 10030
▪The initial beach nourishment
occurred in May 2018
▪The first renourishment is scheduled
to begin in late June 2024.
▪This new project is for the next
renourishment cycle that is
scheduled to start in FY 2028-29.
FY25 FY26 FY27 FY28 FY29 FY30 Total
---80,000 3,500,000 -3,580,000
10
Coastal Projects Requested but Not Funded
Project Project
#
Council
District
Appropriated
to Date FY25 FY26 –
FY30 Total Balance to
Complete
Croatan/Bay Beaches ADA Access Improvements N/A 5 ----2,307,200
Maintenance of the Dredge & Support Equipment ($225K/Yr)N/A 5,6 ----1,350,000
11
Croatan/Bay Beaches ADA
Access Improvements
Council
District(s):
5
Total Project
Cost
$2.3 M
Requested But
Not Funded
$2.3 M
▪In response to citizen requests for public beach
access improvements along Croatan and the
city’s Bayfront Beaches
▪This project will provide funding for the design
and construction of two (2) new beach access
structures at Croatan, Chesapeake, and Cape
Henry Beaches. A total of six (6) beach access
improvements are proposed to be constructed
within existing city rights-of-way or easements.
▪Specific locations will be determined through a
public engagement process.
FY25 FY26 FY27 FY28 FY29 FY30 Total
-270,000 2,037,200 ---2,307,200
12
Maintenance of the Dredge &
Support Equipment
▪The Project will fund the maintenance of the dredging vessel,
two tugboats, the replacement of the underwater pipeline at
the Rudee Inlet, and two small push boats at five-year
intervals. Additionally, the bulldozer will be replaced on a
six-year cycle.
▪The maintenance of the dredge vessel requires service at a
local shipyard to address any defects and perform routine
maintenance, such as inspecting the hulls for rust and holes,
replacing zinc anodes, replacing the cutter head motor, servicing the engines, replacing
all hydraulic hoses, replacing the suction pipe, blasting and applying antifouling and
painting the entire boat, repairing or replacing electrical components, servicing the spud
gates and gears, and all critical components to avoid degradation of the vessels.
Council
District(s):
5,6
Requested But
Not Funded
$225K/Yr
FY25 FY26 FY27 FY28 FY29 FY30 Total
225,000 225,000 225,000 225,000 225,000 225,000 1,350,000
13
Coastal Projects Under Way
and Coming Soon
Under Way
•EB Lynnhaven River / Gills Cove / Hurds Cove –
Navigation Dredging
•Rudee Inlet Inner Channel / Shadowlawn / Harbor
Point – Navigation Dredging
Coming Soon
•Lynnhaven Inlet Federal Channel System / Cape Henry
Beach Renourishment
•Chesapeake Beach Renourishment
•Resort Beach / Croatan Renourishment
•WB Lynnhaven River / Old Donation / Bayville Creek –
Navigation Dredging
14
Coastal Major Challenges
•Funding for shore protection
programs is vital to maintaining
and sustaining resilient beaches
•Maintaining Federal Partnerships
with USACE & BOEM
•Regional Sediment
Management (RSM)
•Beneficial Use of Dredge
Material (BUD)
•Identification of new sand
resources
Chesapeake Beach Nor'Ida 2009
Sandbridge Beach 1991 Nor'easter
15
Discussion
16