Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutSEPTEMBER 24, 2024 FORMAL SESSION MINUTES �4
q tr
,t O
S Op OUR NA�O�'
VIRGINIA BEACH CITY COUNCIL
Virginia Beach, Virginia
September 24, 2024
Mayor Robert M. Dyer called to order the CITY COUNCIL FORMAL SESSION in the City Council
Conference Room, City Hall, on Tuesday, September 24, 2024, at 2:00 P.M.
Council Members Present:
Michael F. Berlucchi, Mayor Robert M. Dyer Barbara M. Henley, David
Hutcheson, Robert W. "Worth"Remick, Dr. Amelia N. Ross-Hammond, Jennifer
Rouse, Joashua F. "Joash" Schulman, Chris Taylor, Vice Mayor Rosemary
Wilson and Sabrina D. Wooten
Council Members Absent:
None
2
CITY COUNCILS BRIEFINGS
FLOOD PROTECTION PROGRAMAND CAPITAL IMPROVEMENT UPDATE
ITEM#76185
2:01 P.M.
Mayor Dyer welcomed Jeff Waller, Chair — Flood Prevention Bond Referendum Oversight Board and
Leisha Pica,P.E.,Program Manager—Jacobs Engineering.Mr. Waller expressed his appreciation to City
Council for their continued support and distributed copies of today's presentation, attached hereto and
made a part of the record.
Mayor Dyer expressed his appreciation to Mr. Waller and Ms. Pica for the presentation.
September 24, 2024
i
Flood Protection Program
City Council Update
Jeffrey Waller, P.E., Flood Prevention Bond Referendum
Oversight Board Chairman
Leisha Pica, P.E., Jacobs Engineering
September 24, 2024
Q3 2024 Board Updates
f -
■ July: Staff Report on update for the Seatack
Drainage Improvements Project
■ August: Staff Report on Water Sensors
Program and how linked to projects Seatack Drainage Level Green/College Park
Improvements Project Pond dredging
construction
■ September: Staff Report on update for the
Eastern Shore Drive Phase 1 Master Project Eastern Shore Drive
.._.
NET
Phase 1 Master Project
- proposed Lynnhaven
Drive pump station
The Board meets on the second Tuesday of the month at 2:00 pm at Town i rendering
Center. Our meetings are open to the public and the public can provide
comments. The Board webpage is accessible from the Ripple Effect website,
and we can be contacted at the email address posted on our webpage.
FPP Active Construction Projects
'' � '' -, '� • South Plaza Trail Presidential Blvd Drainage
-- • Windsor Woods Tide Gate near 1-264
• Bow Creek Stormwater Park Phase I
• ,: • Seatack Drainage Improvements
r
• Old Forge Road and Red Lion Road
t
Presidential Blvd looking north between Silina
Drive and South Plaza Trail in Windsor Woods
3
FPP Project Milestones Met During Q3 2024
Planning2 3 4 _ 5
Preliminary Engineering Detailed Design, Some FPP permits may Advertise Design-Build or Commissioning
Report (PER) 30%. 60%, 90%, require 24 months to Construction Bidding and Testing
100% obtain Complete
✓ West Neck Creek ✓ Eastern Shore Drive ✓ ESD Phases IF-1G ✓ Lake Bradford
Bridge - Draft PER Drainage Bundle Phases Chubb Lake Pump
1 B-1 E - 100% design Station & Outfall
✓ Pungo Ferry - Draft Design-Build -
PER second ✓ Bow Creek Stormwater RFP Issued
revision Park Section 2 - 90%
design
✓ First Colonial Road &
Oceania Blvd
Drainage Improvements
PS&E
4 L�� theRippteEffect
VIRGINIA BEACP FL000 PROTECTION PROGRAM
How It Works-Windsor Woods Tide Gate,A Project Milestone
FPP Communicationsto
C it U,Va Bea;, o i rIt:v,,- ::ays aye
it •
rt- f4
• City published 24 videos about the Flood How It Works-StormwaterPipeCleaningandInspections
Protection Program available to the public.
How It Works- Flood Sensors&Monitoring
Communications Metrics from June to _ City ofVa Beach. ' views•2 months agc,
August 2024 Q3 2024 Videos Published
• >18,000 video views How It Works-How the City Drains Pt. 2
4 City of Va Beach•64 views•2 months agc
• >1.1K video engagements (likes,
comments, shares, saves, clicks) How It Works-How the City Drains
• 5.8% engagement rate 5 ` City of Va Beach. - 5 months agc
• Videos and blogs reached >48,000 users
on all social platforms with more than 2024 Episode 5 How It Works-Linkhorn Bay Drainage Basin
ZT-7,
City of va Beach• 104 views•6 months ago
77,000 views
5
The Board is here to serve our Community!
■ Future activities of the Board include site visits FPP Grant Funding
to Bow Creek Stormwater Park and a return
visit to Lake Windsor.
■ The Board will advise City Council members
when the topic of our monthly Board
meetings is in your district so you can join us.
■ Some Community Meetings include updates
regarding the Flood Protection Project, but
this could probably be increased. a Awarded a Futurp Submittals
6
Flood Protection
Program Update
Q3 2024
Leisha Pica, P.E., Jacobs Program Manager
5 j
w
Program Update
VA
FPP Risk Reduction
Resulting from
Process
Improvements
w.Y
NOW
. :�ti
43 2024 Program Update
PreliminaryFuture ,, • /, • , 1 , / ' • Design- Construction • •
Projects Engineering Design Design Design Design PS&E Build In-Progress Complete
Sandbridge/ Eastern Elizabeth River Windsor Wood,
Vista Circle West Neck New Bridge Shore Drive Floodplain PAP,The Lakes Windsor Woods Club House
Pump Station Creek Bridge Intersection (ESD) Drainage Bundle Tide Gate Road Drainage
(On Hold) Bundle Restoration
(In design)
Lake South Plaza Cape Henry
Pungo Ferry ESD Roadway Bradford/Chubb
Road Drainage Back Bay Marsh Lake Pump Trail, Canal Gravity
Improvements 1 F& 1 G Restoration Station &Outfall Presidential Blvd Sewer
Drainage Relocation
(RFP Issued)
Central Resort Poinciana First Colonial Bow Creek Lake Pleasure
District Drainage Rd Oceana Blvd Stormwater Park
Pump Station House Outfall
Improvements Drainage (Section 1)
Churchpoint/ Bow Creek
Thoroughgood Stormwater Old Forge Road Lake Bradford
BMP& &Red Lion
Conveyance Park(Section 2) Drainage Dredging
(Design NTP)
FPP Project Status Q2 2024 rai a
Draig
nage
10 4�,] theRippleEffect
VIRGINtA @ .)TECTION PROGRAM
Future
Projects PreliminaryEngineering Design Design - • • Build In-Progress C• •
Sandbridge/ Bow Creek Elizabeth River First Colonial Windsor Wood,
Vista Circle West Neck New Bridge PAP, The Lakes Windsor Woods Club House
Pump Station Creek Bridge Intersection Stormwater Flotorati n Rd DraiOcenage
na Blvd Bundle Tide Gate Road Drainage
Park(Section 2) Restoration Drainage
(On Hold) (In design)
Lake South Plaza Cape Henry
Pungo Ferry ESD Roadway Back Bay Marsh Bradford/Chubb Trail, Canal Gravity
Road Drainage Lake Pump
Improvements 1 F& 1 G Restoration Station &Outfall Presidential Blvd Sewer
Drainage Relocation
(RFP Issued)
Central Resort Eastern Bow Creek
Poinciana Shore Drive Lake Pleasure
District Drainage Pump Station (ESD) Drainage Stormwater Park House Outfall
Improvements Bundle (Section 1)
Churchpoint/
Thoroughgood Old Forge Road
Lake Bradford
BMP& & Red Lion
Conveyance Drainage Dredging
(Design NITP)
Seatack
FPP Project Status Q3 2024 Drainage
10
Lam] thERippteEffect
.)TFCTION PROGRAM
Program Spending through September 17, 2024
Total $83.2M
$12.6M since last quarter
Expenditures by Master Project
WINDSOR WOODS/PAP/THE LAKES MASTER $64.3
EASTERN SHORE DRIVE MASTER S6.6
LAKE BRADFORD, CHUBB LAKE MASTER 55.4
CENTRAL RESORT DISTRICT MASTER I 51.5
SOUTHERN RIVERS MASTER ■ $1.5
STORMWATER GREEN INFRASTRUCTURE MASTER ■ S1.6
LINKHORN BAY DRAINAGE BASIN MASTER 0 $2.3
SOM S20M S40M 560M
Program Estimate Q3 2024
Program Variance 5%
MASTER PLANNING • ' $1,200
$1,000 $982M $1030M
WINDSOR WOODS, PRINCESS ANNE PLAZA,THE LAKES $337.9 $129.3 $496.5 $29.4 $800 $221M $269M
EASTERN SHORE DRIVE $61.5 $29.8 $90.9 -$0.4 $600
LAKE BRADFORD/CHUBB LAKE $146.3 $2.7 $152.3 $3.3 61 C'
CENTRAL RESORT DISTRICT $113.0 $0.0 $113.0 $0.0 $400 C $761M CL76
T T
SOUTHERN RIVERS $102.2 $8.0 $110.2 $0.0 5200 a
STORMWATER GREEN INFRASTRUCTURE $0.0 $37.5 $53.3 $15.8 $0
LINKHORN BAY $0.0 $13.9 $13.7 -$0.2 BENCHMARK CURRENT
TOTAL .0
r 13
FPP Programmatic Risks
Identified in Implementation
Plan (February 2022 )
FPP Program Risks
Critical & High Risks
2 ' 1 . Staffing Levels
Conflicting
Policies 7
4 2. Procurement
Private Utility 3 Coordination
Relocations '<
• "Regulatory - 3. Real Estate
Impacts 5 6 Timing
4. Project
F Management
5. Project Controls
Climate Tourism 6. Communications
Change Impact & Public Trust
7. Operational
Readiness
x 15 Low Risk Moderate Risk I* High Risk Critical Risk
Staffing & Workforce Working
Group
We asked what resources issues could impact
implementation of the FPP over the next 10 years.
Workforce & Staffing Risk
Work force availability was one of the highest ranked risks identified for
successful implementation of the FPP. FPP Workforce
Working Group
Engineering Procurement Operations
Human
✓ ✓ ✓ Resources •
• •
• Several vacancies • Concern losing staff. • Multiple retirements
at the beginning of • Leadership
the FPP • Staff absences and vacancies
losses have had a
• Multiple retirements significant impact on • More staff needed
• Leadership processing to overcome
vacancies procurement backlogs
documents
• More staff needed • New FPP assets
to accelerate work require more staff
simultaneously and specialists
What strategies were employed to mitigate this risk? The Result
Full compliment(1 ) Project Manager
• Hiring bonusesFFSupplel—, • • "
for Engineering
ct
• - Relocation mental • (1 ) Project Engineer Managers
assistance Staff for Operations
Engineering
• Placed ads on Linkedln & Indeed Operations
Recruiting • Partnerships with 7 engineering schools leadership
• Staffed booths at community events positions _ •
• Military transitioning programs Most
Networking Industry websites & professional organizations have been _ •
(ASCE, SWE, NSBE, etc)
18
Procurement Working Group
We asked how can we align and implement streamlined,
consistent process, roles, and toolsets across Purchasing
& Public Works.
User Division provide
Increased FPP workload incomplete project
on top of existing work documentation
1 More projects require 1 Incomplete submittals
more people to maintain waste time and impact
schedules schedule
Historically long Concern about
1 procurement durations 1 legal & SWaM
Procurement Extended procurements schedule impacts
elated
- • shorten timeframes for Staff uncertainty leads
design and construction to project delays
Challenges
Inconsistent procedures
Leading to noted by user Divisions Unknown status of
1 • contracts
Potential
- Staff uncertainty leads to Lack of communication
to
project delays impacts project
Risks schedules
What strategies were employed to mitigate this risk?
1. A Working Group was established with staff from Finance, Procurement,
Engineering, and the Jacobs Team specialists.
PROCESSESNEW 2. A Service Level Agreement was signed between Public Works and
Design Procurement Steps Procurement Departments to clarify roles and duration expectations.
•
• Design-Build Procurement Steps
• Processing Construction Change Orders NEW DOCUMENTS
• Legal Procurement Aspects
• SWaM Training for PMs & Contracts Team Construction Invitation to Bid (ITB)
• Annual Service Contracts — streamlined Front End Documents (align with VDOT)
• Procurement Training Manual
• Procurement Tracking Report on BeachNet
• Contracts SharePoint Site all forms & manuals
• 60-day Procurement Forecast for FPP projects
TOOLSL NEW
©Jacobs[Year]
',pc
The Results of the Procurement Working Group
Procurement
' Standardized ProcessesWorking Group
Training sessions are available to staff. All Project _
Managers & Contract staff have been trained.
sutts
Improved Collaboration & Alignment
"ThStronger working relationships with • • - -
alignment of process needs. made for the Flood
Protection Programare
Realistic and Efficient Activity Durations providing • " "
All parties were part of the vetting process and our implement other capital
standard schedule durations have been adjusted. programs f•
Transportation and
Facilities." U Hansen,
Commitment for Continuous ImprovementPublic • _ •
Listening sessions continue to be held with staff
to identify areas for clarification.
Project Management
We asked how can we help City staff have the tools and
processes needed to effectively implement the FPP
Schedule Delays from
Design Review Bidding Timeframes
Competing priorities and Delay Construction Start
lack of resources can lead Bidding to Award to
to incomplete reviews and NTP
late comments, conflicting
comments
Permitting Impacts to
� Design Schedule ' Change Orders
Project
Slow processing can
• - Long review times, hold up construction for
additional testing months
Managementrequirements delay bidding
Challenges
Real Estate Activities Invoicing
Leading • Were Taking Longer Cumbersome process,
than Anticipated not uniformly utilized by
Potential Resource limitation, design vendors
status, design changes
The core underlying challenge for Project Managers
Project Management Process Flow Continuous Process
Manual Diagrams Improvement
Original 1995, 200 pages, Interactive files on
minor update 2002 SharePoint Design process to
meet outcome
Design Post-Construction Project Management
Working Group
Results
Procurement Pr(oxure
✓ Updated PM Manual
Public ` ✓ Standardized Processes
lmrokerriert �. ����der
regEgred) ✓ Alignment with VDOT
a Environmental ✓ 19 total processes and
�� Closeout
sub-processes
documented
Real Estate ✓ Interactive & Clickable
Acquisiteon(i1
required) reference documents
✓ Power BI On-line Project
Private Utility Status Reports
Adjustment(it
required)
Project Controls
We asked what processes and tools are available to
streamline delivery of the FPP
The Importance of Project Controls for Risk Mitigation
,,F-Program Monthly Variance
Schedule Progress Report Documentation
Activitschedules
_ Monthly City Council PM Progress Report
•Linkages Program Reports Schedule Slippage
• ' Project Dashboards Estimates Increase
projects
& Monthly PM Risks Monitored
Critical Path Reports Supply Chain
ProjectEconomics, etc
Forecast
ProgramReviews
• - •
• •wn forecast forMeetings
financial planning Debrief Meetings
Coordination Cha • - Mgmt
• Grant • • •
28 ©Jacobs[Year]
Project Controls
& Engineering
TPROGRAM PROGRESS
HIGHLIGHTS • • Groups
FLOOD NofVrrgmraBearhr i n
utAiration areale tyros Passed a hontl referendum Dory
state taxes to funtl 0
the oesrgn antl consbuction ootl Prote
N fPP),S^e the °t Flood protection straagproje k^the er �m0" allow the Results
OT E CT I O even 7 aPProvareRhereferendu a'gam Pe ihGlf
P Master Pro e a 10• g dP the Floo Y mrfotlad
ryootlmg rm J ctx was Bevel vear(2022*2032)r Protecton Program Pacts on the oPetl to des;gn antl r ntPlementatyon
M comm�mty. onstruct prolerts ci Plan comprisurg
PROG^ ns monthty rePott mten tv-wrdo to m
K d5 tam agate
,'light Board,P1'."B)of the ram the Cprogresz ahsn on Bond
uire CWnlllS
ProBram'S YCWncal.,the"Id Preventr oPport. 8 wrth rIlk an ee/erendum
AU USt 2024 d strategy!densions that ma Status Report� B
r • of
*All asterisks rep
resent updated information.
PowerBI
driven
�.Prepared for monthLy
Project
C'rtV of Virp,�nia Beach
Reports
Issued SeOtember 9,2024
j .
V I +- RiPPleEffect YCj/ •
•
Cashf Low Forecast
rx II
/ ' • ModeL
'tar gild III " ,¢king north between Silrne p�-d S v,
eras ..�.. v/ SuppLy Chain
Updates
BaseLine Cost Metric
Eng i neering-Operations
Working Group
We asked how can we better align the Operations
team with the FPP planning, design, and
construction teams.
Coordination to avoid FPP risks Engineering
Operations
It is important the Stormwater Operations staff be provided with sufficient
resources to operate and maintain the new FPP assets for successful program Working Group
implementation.
. -
suLts
Identify
resources
Projects to • Formalize Strategic
neeon Operations and equipment Operations
QuarterLy
•
• • • Planning
✓ ✓ a ✓
meetings
• • •
• Discuss asset Existing resources • Align modeling with discussions
commissioning needed to maintain operation strategies Confirmation of
processes desired level of
service for assets • Expand technology existingasset
• Increase to understand storm a • system
coordination during • Improve asset impacts as they
design reviews management program occur information
• Forward looking • Ramp up of resources • Focused Agreement on
technology such as and equipment for discussions on best practices SCADA & controls FPP project needs various storm • r FPP • •
jects
conditions
Jacobs Operational Assessment
Staffing Findings & Recommendations
Jacobs ■ 19 new staff positions
Operational Assessment Findings ■ 1 new CCCTV truck
Equipment and Recommendations Final Report and 1 new excavator
Ve.aon fvwl 7esueC Relw�t
CITY of VOQa Beech ■ Replacement cycle
D<Dartmer[.1 Wblrc wawc.0o .,—Grow.St.—I.Drv—
Pt—1 FtMd Pmtmmn AeOre Oowxuon.l lbseie wffl for existing equipment
New Stormwater
Operations Center
Facilities Facility rehab at three
locations
■ Standard operating
procedures (SOP)
Process Improvements
Asset Management Program Enhancements
D. . Visualization
Virginis 6"ch RRPS "°° Arcadis Rehabilitation and Replacement Planning System 011ARCADIS AARCADIS
Fac,My Praess Subprocess Group Assets Replace cost LOF coF R Rrsk 61aa Rnk
02 1 $9.68M 5.00 [2 97 14.851114.85
Asset ID by LO Facility;1 Process and Risk Score(groups) 1 Risk Risk lekllbot - —_-- _
00,
Risk 94we se
lgrou • • `� '�1a4 1r/0 95121,2fl 0111.5 02)6 10-.e 1' 11.15 04)1ti 20 05,2145 LOP I 1 { 2 3 4 s Total ��
PO4t . Virginia Beach.Virginia
j 3 '� "! CITY OF VIRGINIA BEACH
s tot I Punp Stations'Operation Manual
� r
:0Total 33 97 86 66 102 3&1
dfi,12 04! Julia 2023
Asset ID Count FaGhty process Sub•>r0c"s Group Asset Name Hyperlink Risk RUL Asset instaF YM W COF R•Factor CoF•R LOF LOF 1
unpecbon lost
473 1 V8 DP'°ti SuOmrs+Gt PS 16th Street PS C-151 uctural Wee WNl 1 9 2000 100
482 1 VS DPW Su'Jrwsibe PS 16th Street PS Eiectrical ano t.arge Fuel Tank .4 2000 100 0
InStrumentatron
248 1 V8 DP'.V' Subntmoe PS 16th Street PS EW!r,cal and ',tc;, 2: 20M 100
insr—ntatror
27e 1 VO DPW $Subrnersibe PS 1Sth Street PS Mecharxcai Pimp 1 .9 2000 100 0
275 1 VB DPN Subr w ibie PS 16th Street PS 1.lecram<al 'ump 3 -9 2000 100 0
_ _ _ -_ - __ .. _
Tots) 102 ._. ...
33
Communications Working Group
We asked how can we effectively
communicate the vision and value of the FPP
to the community.
Vision: What does success look like for the FPP?
Flood Public Transparency 03
Protection Confidence
Sustainable infrastructure Goodwill in the community. Transparent and open
for generations to come. Citizens understand their communication about the
Less flooding citywide. role in financing the FPP. FPP, execution, and
External recognition. delivery.
Program Staff 05
Efficiency Engagement
IQ Employees are inspired
Proactive with clear roadmap and feel part of the legacy
for the future. Staff are of the work. Staff see
accepting of change. success and have
Increased City-wide efficiency. tangible achievements.
Comprehensive On-Line Project Information LOCATION MAP
18 Web Pages
A PROGRAM
OF PROJECTS
< ...•i ` X M �a —..... "\"�1�a 1'. (n� \`'�`.n�.,\e.� . - .. .. .. • 11 'l� "'.wWr
w�
��+• �`' \ w.... «.�......—..,.. .r ti~�'ti�` .• (.. laUn[:wB :�i0R5 td:EPnHENT SfMlfEq
����" r.� � "O tB c-...n....m wr. ..>.e.ea.,>r.ee.,....u..Aar><.n..znanwwrw. / - •�M
theRIPPIeEffect
•i'�/.-%
•-,�,,,� ��„� ,.,, I Eastern Shore Drive—Phase I n,e�k�gt.,unmyae
ProtectinE Saleguarding FortlHing 4 �.. 9kS.Baalmq iry<n.w<a,n„q<�,,00.<m<m.a,<oa...m ro,•,<e�«<w„w,enp nmmsmn om<.rmm Henry Canal Phase 11
ti AAIIIUU Lrpl�q Penwtn<eeztrotyn�nevm lMet an the wnt.TM animate nn�nge urv�ro arcs
Homes Businesses Resilience `� �1•' Ju«�91.me.„m.,na e,enaa t,me nenn.ro rontnnsro2 o•I�<m,<rve a,n,onm rn,,,.e,„„
m Ix,groe.noeea
.n^e%�P~ �,1i=.,�\, e"++A icautsu.. o,IgNtal:re<ve:oo<o.la„t,a,mP«n<ns�+u,�m..autnm.ymem antem tglP<a.anwa.
4�'�"'Y�.�"'.,.� x�)Ste'¢ I <tt.I.ane,sartwle nos ueen,mgaeE try.e,e�nin rarest noaainq Wnnq rsM,ll evens over ne
e+fr" '`^`"+,.`�.�,.,,, �. vean.autq<Pomon atn<oeve�nProcn�nge,non�s maaz:r towneinatlon anon
I t Drainage improvements.IG
r5 �� Ilgcatimmm PaeIER/MNKf1l:erv.iw.r.nLO.>t.........r e}e�p.�vgm
The WiikAhead
gq n
ea umBla
ne...teen
snm„p cam i <.M,PanP..ao�
3ay��
I spas, uK=,..•P aTM
1 5 -
unpTe
a===wh n
.................... ............. .e w BEACH
36
Leh
How It Works-Windsor Woods Tide Gate,A Project Milestone
Videos Explaining Technical Topics ,�•s;aBec bi r,a a;s yu
How It Works Stormwater Pipe Cleaning and Inspections
�a_
_ How It Works-Flood Sensors&Monitoring
3 City of Va Beach• 108 views•2 months ar
How It Works How the City Drains Pt. 2
Cit of Va Beach• .-.....,•2 months a c
4 Y 9
How It Works-How the City Drains
cc • e 5 C tY of Va Beach•72 views•5 me:)- a,
How It Works - How the City Drains
Elizabeth River&Lynnhaven Watersheds 2024 Episode 5 How It Works- Linkhorn Bay Drainage Basin
https://wwwyoutube.com/watch?v=FeQBinpb6RU&list=PLnHoAf8Pr Lp6PP 5 City of Va Beach•104 views•6 months agc
RuXS6bWgs9E_n7h9yQ&index=1
37
Outreach through Local News, Radio, and Internet Articles
Ltf■. spore ,FRIer
YPM'G
„Fro. Lnn._ R.nR_ <.Ea�LE,_ F�A,.A_ „.ro•F_ .AP aFminnx a�rW., Network of cameras monitoring 656 F P P Media Mentions
water levels in Virginia Beach
Virginia Beach marsh terrace receive national awards
project to be first on East Coast FloodVISION•Al uses U-resolution web cameras capturing water-levels
In real time.
WIIRoIRr*Fcf nr4^1— ppq©... QLIVE NOW YOMSIDE
R
nM aNu .
•
TI),411rninia-Vilm 1'ugm,a R-h r<ai..sr,m 11..n I,n...t.. f s Video Weather Traffic Investiptive Sports - More -� 0.Search
W EATN ER ALERT 3 xORI K[fllf v
Virginia Beach receives$25 million for flood mitigation project in Special Weather Statement:Camden Caunty,Eastern Currituck County,NamptonlPoquoson,Isleol Wight County,James City County,Newport News,...>
national competition
1
1 • park in VB
aims 1 prevent the
flooding
Matthew wavv Lrwro vMcatu�lACN•¢ox
brought
by: M.uhm
HURRICANE MATTHEW:LESSONS LEAK
LINII-E� Posted:Oct 2,2023/05:38 PM
F
ypdalled�/07.01 PM EDT
38 RV TRIBVNE NEWS SERVICE Trida.e News Se Ke
r11M-ED,A -11M u1.—;UPEWTF 0,M-118 A1R.n Via)ou,
Exposure • • nal Publications
THE •
MunicipalAMERICAN
EN INFRASTRUCTURA'U'
WALL STREET news Inform-Ing
JOURNAL.
THE WALL STREET.lOURYAt.. ,°�
39
w v
V
I
p :
,
��Large Portion of"Phis I3asc Is going to Bc L'nder�tiuter':li.S.iVlilitary llub 1 �:"`" "-
_ '�- Adapts to Climate �"
- Vlrginiati Hampton Roads region,ul.l � :'olk,isj,reparing for hyhar zea levels amid deUaMs an strah�ny anainsls
Presentations at Industry Conferences
V LWA wef tec
• the water quality event`
Virginia lakes and Watersheds Association
E N V I R O N M E N T
I WotA
s Y N{ P O s I U M '\\
CENTER FOR
WATERSHED
PilECTION
40
The FPP has an Active Social Media Presence
You '
The Ripple Effect: Five Things Residents
Should Know About Coastal Flood
Vulnerability
facebookPart of coastal living is understanding factors that make our
community vulnerable to flooding.
f•.
�a.
kipo
How It Works-Stormwater Pipe Cleaning and Inspections
City of Va Beach
Linked ®
A�
24 Ripple Effect Videos _ ----�-
25 Ripple Effect Blogs
41
Additional Communications Resources
Quarterly
Flood Model Vsualization and Exposure Tool *McRippleEffect
Scenario Selection ° Flood 6cposure Council
1.*rwd�xdmTnrwna Evme �` EPPY�E
Briefings
District
■ _ RT
r i ;� , ,_ _ GINczEatliNirtx '
UNDERSTANDING
©®® Meetings &
ro
for Fourth Grade Students
Flood Model Visualization
Exposure • •
Learned
` Ripple Effect (Baltimore)
Winners of 7 Leading Industry Awards Communication
Working Group
• 2022 3CMA Savvy Award .1 Results
• 2022 3CMA Diamond Award ,
� 02
• 2022 VML Innovation Award
2 � s
• 2022 Hampton Roads VIRGINHA MUNICIPAL LEAGUE
Chapter PRSA Pinnacle •INNOVATION• • PRoPEcrs Transparency
Award
Outreach
• 2023 PRSA National Silver ,.
Anvil Award v1 Exposure
• 2023 America Public Works MidAtlenticChapter
Recognition
Association-MidAtlantic
AY
Chapter Community 'AM�ANPUBLI'SAS�ATI` Legacy BuiLding
Engagement Award
• 2023 Stormwater Solutions
Top Projects Award
PINN CLE & \larke'ting Association
PR\A HAA{PTOV ROATri(HArr1 rt
43
Thank you
Leisha.pica@jacobs.com
7 Challenging today.
Saco S Reinventing tomorrow. in O
3
CITY COUNCILS BRIEFINGS
FIREFIGHTER MEDICAL SCREENING ENHANCEMENT UPDATE
ITEM#76186
2:35 P.M.
Mayor Dyer welcomed Chief Kenneth Pravetz. Chief Pravetz expressed his appreciation to City Council
for their continued support and distributed copies of today's presentation, attached hereto and made a part
of the record.
Mayor Dyer expressed his appreciation to Chief Pravetz for the presentation.
September 24, 2024
die � a�0
------ .....
Comprehensive Health & Wellness
Screening for Firefighters
Fire Chief Kenneth Pravetz I September 24, 2024
vB ; rare
�� ' Department
Physical Risks
• Firefighters do strenuous work, in dangerous environments, �•�-`
while wearing heavy personal protective equipment (PPE)
• Medical evaluations can detect underlying conditions to aid in
prevention and treatment
Physiological Strains of Firefighting
13F � H
Cardiovascular
� Hematological '
Thermoregulatory
Respiratory
' - Metabolic
* Immune/Endocrine
"
Nervous
Muscular
-� Psychological } '
try inia Beach Fire*partment
p2 ��
Cardiovascular Risk
• Cardiac claims cost the City of -Sudden Cardiac r . , Burns
Virginia Beach on average over
40
$600,000
• Imaging modalities can help identify JU
early signs of Cardio Vascular
20
10
Disease (CVD) in firefighters
i
i
• 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Year
Occupational exposure as a firefighter is
carcinogenic to humans (Group 1) �• Exposures of firefighters
on the basis of include combustion products,
sufficient evidence for cancer in humans • diesel exhaust. building
• materials, asbestos,
as
G,ro,,. ,, '_ �' • chemicals, shift work,
28 ultraviolet radiation
The IARC Monographs classification indicates • • • • • • • • •
the level of certainty that an agent can •
cause cancer(hazard identification) • • • • • • • • • • ' • • • • • •
Higher level of certainty Lower level of certainty • • • •
Cancer types with sufficient evidence for cancer • • • • • ' . • • ' see • •
in humans: • •
Meaotheliorna Bladder cancer ,
Cancer types with limited evidence for cancer in humans:
Colon Proctate Teoticular Melanoma Non-Hodgkin
cancer cancer cancer of the skin lyrnphoma • r`
Cancer Risk
Other Resp Arrest Unk Burns
As the incidence of cancer 3% 3% 4, 2%
continues to increase in Inf Dis
3/ Cancer.°
the VBFD the age at Cardiac
Trauma
diagnosis has decreased Trauma 0InfDis
4% Other
Resp Arrest
BeachSource: Virginia Cardiac Cancer Unk
Management
14% 66% Burns
, 4
I--
2012 20131 116 2017 20182020 2021 20221
of aims ,+ —Average age at diagnosis Source:International Association of p5
Firefighters fatalities 2002-2023
Preventative Efforts NFPA
h ,
"V
Standard on
• Limit Exposure Comprehensive Occupational
Medical Program for Fire
Departments
• Effective Tactics
2022
J
• Quality Training
• Improve Fitness
• Improve Sleep w .
NFPA
• Support Mental Health
4 • Regular Comprehensive
Screening
�r,� p6
Comprehensive Health Screening for Firefighters :
� a
• Occupational Medical Examinations
• Fitness Evaluations
• Respirator Fit Testing
• Behavioral Health Assessment
• Rehabilitation Services
; r -- • Immunization & Exposure Screening
• Comprehensive Disease Screening
• Data Collection and Reporting
p7 Ire
Improvement Highlights
Current State Enhancements
• 23 diagnostic and assessment modalities • 47 diagnostic and assessment modalities
• No ultrasound assessments • 12 ultrasound screenings
• No Multi-Cancer Tests • Multi-Cancer test for >50 cancer types
• No polyfluoroalkyl substances (PFAS) • PFAS Blood values
monitoring
• Body Composition: both total body and
• Displacement body composition: segmental data
calculated total
• Submaximal Cardiac Test & Enhanced
• Submaximal Cardiac Test Stress Test, Coronary Artery Calcium (CAC)
• Basic blood composition and cholesterol Scoring
• All existing blood chemistry plus: A1C,
Thyroid, Prostate Specific Antigen (PSA),
Testosterone
p8
Funding Options
• City Council adopt legislation directing the City Manager to cover as much as
possible with the Risk Management allocation.
• If determined to be over the City Manager's transfer authority of $250,000 a
City Council action item can be brought forth requesting a transfer for the
remaining amount needed to execute the contract.
• Provide direction for the City Manager to identify on-going funding for this
in the development of the FY 2025-26 Operating Budget
9 vt7
Thank y ou
Questions .?
CITY OF VIRGIVA BEACI-I
Fire
Department
Plo No
V--B
4
CITY COUNCILS BRIEFINGS
SPORTSPLEX OVERVIEW
ITEM#76187
2:59 P.M.
Mayor Dyer welcomed Michael Kirschman, Director—Parks and Recreation. Mr. Kirschman expressed
his appreciation to City Council and distributed copies of today's presentation, attached hereto and made
a part of the record.
Mayor Dyer expressed his appreciation to Mr. Kirschman for the presentation.
September 24, 2024
4 t � P q , .Js
ia Beach S ortsplex
Michael Kirschman September
WAOMPIAMMIWIK, .,
History
• Opened in 1999.
• Initially operated by CVB. Transferred to P&R in 2003.
• P&R operated until 2009. At that time City chose to
outsource operations. Hometown Sports Management,
LLC (HSM) took over the management, operation, and
-Meorts maintenance of the Sportsplex Stadium and USA
NOW Regional Field Hockey Training Center facilities through
4.. 2025.
• The 2009 contract is now nearing its completion. At
HSM's request & Council direction, P&R re-bid the
contract. HSM was the sole bidder.
• If the ordinance to execute new management
µ agreement with HSM for the Sportsplex and USA
Regional Field Hockey Training Center is accepted, HSM
will continue management of the facility until at least
... . . ..
2045 (20-year term).
Capital Investments by City to Date
City CIP Projects
• FY17 Sportsplex Roof Replacement ($300K)
• FY17 Sportsplex partial HVAC Rooftop Units Replacement Sports Tourism CIP Improvements - $4,138,500
($15K)
• FY18 Sportsplex Grandstand Repairs Study ($35K) • FY25 Sportsplex Artificial Turf Replacement
• FY18 Sportsplex Drainage Repairs ($25K) 0 FY25 Sportsplex Two New Turf Fields
• FY19 Field Hockey Light Foundation Cracks ($205K) • FY25 Sportsplex Flatten Berm for Training Area
• FY20 Sportsplex HVAC System Replacement ($270K) FY25 Field Hockey Lights on Field #2
• FY21 Sportsplex Structural Repairs Phase I ($2.6M)
• FY22 Sportsplex Structural Repairs Phase II (3.5M)
underway
• FY24 Sportsplex Scoreboard Replacement ($1M)
underway
• FY25 Sportsplex Electrical, Plumbing and Seating
Repairs/Replacement (TBD)
• FY26 Sportsplex Interior Painting & Flooring
Replacements, etc. (TBD, funding needed)
Current Key Operating Terms
• HSM responsible for supervision, management,
scheduling and operation, all facility utilities,
and routine maintenance / repairs of facilities
(under $10k) and parking lots. ,-
• HSM must conduct at least 35 events per
calendar year at each facility
• Revenue share — 5% of annual gross revenue
above $850,000 for Sportsplex and $400,000 for
the USA Regional Training Center (none to date)
• P&R provides agreement oversight and contract
management.
• P&R is responsible for capital maintenance,
repairs, and replacement above $10,000.
Field Hockey Complex t Practice Fields
4
Proposed Key
Operating Terms
ti.
• HSM is responsible for the supervision, management,
scheduling and operation, all facility utilities, and routine - -:
maintenance/repairs of facilities (excluding parking lots)
(under $10k). V
• HSM will be responsible for ordinary grounds and building
maintenance at the Facility.
• HSM must conduct at least 70 events per calendar year at
each facility. .�
rk
• HSM must revenue share with P&R — 5% of annual gross
revenue above $1,100,000 for Sportsplex and USA Regional '
Training Center.
• P&R will be responsible for the facilities' City parking areas,
including maintaining or replacing any landscaping, including
trees and shrubs and replacing any light poles and lights.
• City CIP funding to remain at $726,135 with $50k of that set SportsplexStadium—Exterior&Interior
aside for smaller repairs needed and agreed upon by both
parties.
5
- i! - - " rF
gall
y r �
INNOVATIVE
Upgrades & Updates
WWI
I i
i
k
k
d
2
r <,
1
T
a 6�
P ms�
Thank You .
Questions ?
S
CITY MANAGER'S BRIEFINGS
OPEN SPACE UPDATE
ITEM#76188
3:25 P.M.
Mayor Dyer welcomed Michael Kirschman, Director and Chad Morris, Planning Design &Development
Administrator—Parks and Recreation. Mr. Kirschman expressed his appreciation to City Council and
distributed copies of today's presentation, attached hereto and made a part of the record.
Mayor Dyer expressed his appreciation to Mr. Kirschman and Mr.Morris for the presentation.
September 24, 2024
r
s WNW
0 en Space Program Update
p
City Manager's Briefing
Michael Kirschman
September 24t", 2024
History Open of Space Program
• Created in 2000 to serve future outdoor recreational public
purposes
• Priorities included:
Cultural and natural resource preservation
x F Public access to greenways, beaches and waterways
� � - - Land for future parks and athletic facilities
• Connectivity for trails and increased community access
Funding:
• $5M transfer from Agricultural Reserve Program
' • Dedicated revenue of 0.44% of the Restaurant Meals Tax
• Overall appropriation of over $50M
• Appointment of Open Space Advisory Committee
OPEN SPACE PROGRAM UPDATES 2 VB
Pungo Ferry Landing Boat Ramp
Open Space Properties Acquired (since 2000)
OPEN SPACE SITE(DATE ACQUIRED) TOTAL LAND COST 29 properties acquired/over ' 11
ACRES
All Little Neck Road(August 2000) 7.20 $2,200,000.00
Amhurst Area(February 2001) 3.00 $159,000.00 properties - - . least • - matrix
Stumpy Lake Natural Area&Indian River Rd Parcels(June 2001) 1500.00 $13,116,330.00
London Bridge Creek/Potters Road(December 2001) 11.00 $1,500,000.00 criteria properties four or • •
First Colonial Road/Mill Dam(January 2001) 11.00 $835,000.00
Lake Edward (July 2002) 4.00 $745,344.00 •
rmwater
Norfolk Avenue(October 2002) 1.20 $238,788.00
Three Oaks Community Park(Future)(October 2003) 36.80 $1,260,000.00 Public •
Williams Farm(January 2004) 57.60 $5,000,000.00
Providence Park(February 2004) 18.00 $3,650,000.00 . •
Centerville Turnpike(October 2004) 6.700 N$850,000.00
Pleasure House Lake(April 2005) 4.60 $1,682,000.00 V
buffer Scenic
Owl Creek Preservation(February 2006) 38.60 $1,406,000.00
New Bridge Road(May 2006) 45.80 $1,925,070.00
Urban • benefit
Thalia Neighborhood Park(July 2006) 3.00 $985,000.00
Adam Thoroughgood House Expansion(May 2007) 2.50 $850,000.00
Water access
Lynnhaven Athletic Complex(August 2007) 15.60 $0.00
Woods of Avalon Neighborhood Park(August 2008) 13.20 $600,000.00 Trail/connectivity
Lake Lawson/Lake Smith Natural Area(2005-2008) 39.80 $5,192,000.00
Lynnhaven House(October 2008) 4.90 $535,000.00
Marshview Property(May 2010) 98.00 $0.00
Rock Ministries Property(November 2011) Ern 2.00 $750,000.00
Pleasure House Point Property(July 2012) 107.80 Norm,012,775.0e
Princess Anne Exec Park(June 2013) 5.00Emmffwo 0.00
Cavalier Hotel Open Space Easement(July 2013) 2.05 $2,370,000.00
3380 Head River Road Property(April 2015) 0.85 $190,000.00
Pungo Ferry Landing Park(November 2015) 22.40 $2,600,000.00
Ferry Point Park(December 2017) 9.12 $265,000.00
Washington Square Property(July 2024) 7.10 $1,500,000.00 OPEN SPACE PROGRAM" PD
Since 2016
• FY16 — 0.22% redirected to support Light Rail development �: ..
• FY18 — Light Rail referendum failed ` 1s M
• 0.22% dedication returned to Open Space Fund
• Expanded scope use for development and maintenance of open space '� *""�
and parks infrastructure "
}A
• FY23 — Use of scope for Open Space funds restored to specific
purpose of site acquisition
• $2.5M/yr. into the CIP
• New opportunities, new priorities, new focus, and a new matrix criteria
• More emphasis on:
• Stormwater and flood protection -
_
• Tree canopy preservation/enhancement
• Increased contribution from the General Fund of $4M/yr. programmed
to address parks infrastructure needs
Washington Sgutrre Pro0rtyrn
O en Space Acquisition Guide and Process
p
A
• Open space acquisition guidance provided by the Outdoors
Plan and other adopted City plans
• Staff, council members, and committee members can identify , ,`:
potential sale property, or review requests submitted by owners or
citizens
• Program is voluntary for willing sellers
• Administrative process:
• Initial research by Parks & Recreation staff: land use, City GIS data,
check with other departments that may have interest or history +„ 37
• Route the request for review and evaluation by City Departments
through the Public Works Real Estate established processes
• Assemble information and present to the committee for review and
recommendation '
• Working with Public Works and the Real Estate City Attorneys,
present staff's evaluation and committee recommendation brief to
City Manager and executive staff
• Brief City Council in Closed Session OPEN SPACE PROGRAM UPDATE S 5 V�
FY25 Space Fund Snapshot
Open
Open Space Acquisition IV
Open Space Fund CIP# 100641
x
i Current Balance:
Expenditure
°. Operating $0.61M1
1
i rCIP Transfer $0.5M
1
9
i*+s
Total ExpendituresFunds Available 1
° Added to Fund Balance $3.OM
07/2024
•
Original debt service declines yearly and ultimately retires in 2028
i 1A i • Debt service of $300K/yr. will eventually start for Seatack Park
• Amount added to fund balance annually is expected to grow as revenue to
the fund is greater than the current budgeted program
OPERtSPaCE Y VY
Marshview Park,
Potential PropertyAcquisitions
Open Space Advisory Committee is currently considering
eight properties for potential acquisition � " f
• Preservation of tree canopy and habitat
Prevent future development
• 10Y
For park space in underserved areas . ;
• Park expansion
• +- $16M ballpark cost to acquire all 'Ir
• Would expect that not all properties being considered would i i. -- �;
L
be acquired
Ability to obtain grants _
+%"sue..—1r-r•'_.... _
OPEN SPACE PROGRAMUPDATEI 7 VB
Amhurst Park 1468-40-4222 Feb-01 4 3 Save trees where possible/Local Park/High Needs Area 1
Undeveloped Properties
e 13 total undeveloped open space acquired properties
9 9 needing to be developed and to open for public use
Priority for Development (Top 4 Undeveloped Properties)
Site Name GPIN Date District Total Notes Priority Ranking
Acquired Acreage
Washington Square 2407-09-6257 2024 6 6.55 Local Park/High Needs Area 2
hree Oaks Park 2414 12-0223 Oct-03 2 36.8 Citywide Park/ex and park system amenities 3
Save trees where possible small parking area/walking
$25M estimated cost to develop four sites
OPIEMSPACE PROGRAM
Thorough ood Parcel 1489-13-1417 May-07 9 2.5 trails/education/water access 4
UPDATE
Underdeveloped Properties
9 total underdeveloped open space acquired properties
All have future planned phases that have notbeen
implemented, or opportunity fi providing additional
amenities
Priority for Development (Top 4 Underdeveloped Properties)
Site Name GPIN Acquired District Acreage Notes Priority Ranking
Pleasure House Point Pro erty Jul-12 9 107.8 Im lement com onents from PHP Mana ement Plan 2
Stumpy Lake Natural Area & Implement components from Master Plan and improve trail system
Indian River Rd. Parcels Jun 01 7 throu hout 2
Lake Lawson/Lake Smith 2005-2008 9 39.8 Im lement future phase from Master Plan 3
Formalize open field space for use and add more park amenities for
Providence Park Feb-04 1 18 all users 4
OPEN SPACE PROGRAM
en Develo ment of O Space Properties
p p
10`0
• Open Space Advisory Committee recommendation (08/26/2024): F
t4 , k ,
• Balance acquisition needs and open space development priorities ,
• Bond $30M from the Open Space Program to develop undeveloped and
underdeveloped open space acquired sites
• Pay debt service through annual existing dedication and cash within Open
Space Fund »
• Priority Projects ($30M):
• Amhurst Park (Undeveloped)
• Washington Square (Undeveloped)
• Three Oaks Park (Undeveloped)
• Pleasure House Point (Underdeveloped)
• Stumpy Lake Natural Area (Underdeveloped)
• Lake Lawson/Lake Smith (Underdeveloped) Rr
• Existing debt service repaid in 2028, creating additional funding capacity ' "
• Still retain the ability/capacity to acquire property as needed at $2.51VI/yr. into
CIP
, Auks Para
• Development of open space properties would require some level of ongoing {' =
funding for operations and maintenance (to be determined) OPEN SPACE PROGRAM
Open Space Fund Stress Test
Expenditures Adopted Projected Projected Projected Projected Projected
FY 25 FY 26 FY 27 FY 28 FY 29 FY 30
Total Operating Expenses 578,613 622,319 643,136 664,685 686,993 710,089
Existing Debt Service 1,215,517 511,102 511,171 459,918 - -
TOTAL New Debt $ - $ - $ - $ 3,000 000 $ 2,925,000 $ 2,850,000
CIP Pay-Go 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000 3,000,000
Total Operating and Debt Service $ 4,794,130 $ 4,133,421 $ 4,154,307 $ 7,124,603 $ 6,611,993 $ 6,560,089
Revenue
Meals Tax 7,781,454 8,014,897 8,255,344 8,503,005 8,758,095 9,020,838
S ecific Fund Reserves - - - - -
Total Revenue $ 7,781,454 $ 8,014,897 $ 8,255,344 $ 8,503,005 $ 8,758,095 $ 9,020,838
Revenues less Expenditures $ 2,987,324 $ 3,881,477 $ 4,101,038 $ 1,378,402 $ 2,146,102 $ 2,460,749
Cumulative Fund Balance Year End $ 12,088,534 $ 15,970,011 $20,071,049 $ 21,449,451 $ 23,595,553 $ 26,056,302
i
TRAIL 7O Phase t-Funded-Newtown Transit Station to Town Center
3.2 miles funded shared-use path
Chesapeake Boy
• Design&Engineering ongoing
Phase 2-Planned-Town Center to S.Plaza Trail
• 2.3 miles planned shared-use path
• Recconnecting Communities Pilot(RCP)Program
OPhase 3-Planned-S.Plaza Trail to London Bridge Road
• 2.3 miles planned shared-use path
® Phase 4-Planned-London Bridge Road to Birdneck Road
2.8 miles planned shared-use path
ej • SMART Scale Pre-Application submitted 2024
�hoL O Phase 5-Existing-Norfolk Ave Trail&Pacific Avenue
Fo Bridge- Birdneck Road to Rudee Loop Park
�Aa 2.0 miles existing shared-use path&side path
® Hilltop/First Oceanfront
Colonial Road Resort Area
Atlantic
Ocean
Phase O Phase O Phase 0 Phase ® Phase
O
Town Center London
Newtown Transit Bridge Road
Station Rosemont Road
Lynnhaven
parkway Rudee Loop Park
VB Trail-Existing
VB Trail-Funded Virginia Aquarium
VB Trail-Planned
Boardwalk
Shared-use Paths-Existing
Side Paths-Existing
Elizabeth River Trail
12.6 Total Miles •' '•
August2024
VB Trail Funding Status
• Phase II (Newtown Road to Constitution Drive) - $19.5M
• $750K earmark awarded in December 2022
• $14.9M Safe Streets for All (SS4A) awarded in December 2023
• $3.9M City (SS4A) required grant match
• VB Trail grant application history
• USDOT BUILD 2019 — Phase I — not awarded • EPA Climate Pollution Reduction Grant 2024— Phase III — not awarded
• USDOT RAISE 2021 — Phase I — not awarded • VDOT SMART Scale 2024 — Phase IV— submitted
• USDOT SS4A 2023 — Phase I — not awarded • USDOT SS4A 2024 — Phase II — not awarded
• USDOT RCN 2023 — Phase I — awarded and rescinded
• Next grant opportunity
• Reconnecting Communities Pilot Program (RCP) — Due 09/30/2024
• Phase II (Constitution Drive to S. Plaza Trail) - $20.1M to complete
• If awarded, a City match of 50% is required
• Grant award notices anticipated in December 2024
OPEN SPACE PROGRAM UPDATE 1 13 `IB
Questions and Discussion
CITY OF
VIRGINIA
%i BEACH
6
CITY MANAGER'S BRIEFINGS
PENDING PLANNING ITEMS
ITEM#76189
4:06 P.M.
Mayor Dyer welcomed Carrie Bookholt,Deputy Director. Ms.Bookholt expressed her appreciation to City
Council for their continued support and distributed copies of today's presentation, attached hereto and
made a part of the record.
Mayor Dyer expressed his appreciation to Ms. Bookholt for the presentation.
September 24, 2024
r+
a•4n r
r`
hie
PLANNING ITEMS
October 1St & 15th CITY COUNCIL MEETINGS
September 24, 2024
CITY OF
VIRGINIA
BEACH
SUMMARY — October 1st
1 Planning Item Scheduled for City Council's Consideration
1. Adekoje PJ 22001, LLC
• Conditional Rezoning
• Recommended for Approval by Planning Commission &
Denial by Staff
2 Via
Item I — ADEKOJE PJ 22001, LLC
City Council: District 2 (Henley)
Location: Parcels west of Bluegrass Lane & east of 2044 Aloma Drive
CONDITIONAL REZONING (AG-1 Agricultural District to Conditional R-10 Residential
District)
Staff Recommends Denial
Planning Commission voted 8 to 3 to recommend Approval 3
Item 1 — ADEKOJE
GREEN PARK
Conceptual Master Plan Applicant proposing• to e
rezoning
. uiman�• • Agricultural to Conditional
i --__ _� •ee � wr•r. rsr R-10 Residential
i . .
Proposed 10-lot
mily
• •
subdivision
rrr.� w
i a._seo A.�m ani..�wr Access . extension of Bluegrass
rrgAi
aarn aua..w •
.
Site lies entirely within the 65-70 • i
_ noise zone, Sub-area
�e Density • • to Article 18
ADEKOJE PJ 22001,
Item 1 — ADEKOJE 22001, LLC
Applicant proffering a total of 8
elevations to show proposed
housing styles
t Dwellings to be designed in
accordance with green building
standards to include rooftop solar
panels
A.
House 21 ADEKOJE PJ 22001, LLC 5 VB
Item 1 — ADEKOJE 22001,, LLC
GREEN PARK • Site bisected by the 300-foot right-
of-way reservation area originally
intended for the Southeastern
WO Parkway and Greenbelt (SEPG)
Y
• Proposed plan includes the 140-foot
easement for the Dominion CVOW
project, but not full width of the
SEPG
Y
• Public Works has determined a
potential future public need for a
two-lane road within the alignment
originally planned for SEPG
ADEKOJE PJ 22001, LLC 16 VB
9
■ S1: 1-264 to Ocea na Blvd.
S2: Oceana Blvd. to Dam Neck Rd
S3: Dam Neck Rd to Princess Anne
F t Rda
s
S4: Princess Anne Rd to Indian
River Rd
S5 : Indian River Rd to Chesapeake
So°•� �xcwEw.: • • •
MGME.!)
SCGME.i4 • ♦ •• •
SEGM[w�3
Snhr ,a
Item 1 — ADEKOJE 22001, LLC
SEPG CURRENT STATUS Since Chesapeake has abandoned plans
to extend SEPG to the City line,
Segment 5 is no longer viable
• Logical terminus is Indian River Rd
• For transportation purposes, City would
retain r/w from Holland Rd to Indian
Legend River Rd
SEGMENT I
SEGMENTA
SEGMENTS • Transportation network has been
improved in this area so a two-lane
road segment will be adequate
ADEKOJE PJ 22001, LLC 1 8 VB
SUMMARY — October 15th
9 Planning Items Scheduled for City Council's Consideration I F Travis Smith
Sugar Plum Inco
1. Beach Framing and Drywall, LLC Aaron C.Davenport
• Subdivision Variance
• Recommended for Approval by Planning Commission &
Denial by Staff
2. Sugar Plum Inc. Ferber Company Central,LLC
• Modification of Proffers
• Recommended for Approval by Planning Commission & Staff
3. Ferber Company Central, LLC
• Modification of Proffers
• Recommended for Approval by Planning Commission & Staff
4. V Generation Home Builders, LLC
• Conditional Rezoning
• Recommended for Approval by Planning Commission & Staff
9 W'
SUMMARY — October 15th
9 Planning Items Scheduled for City Council's Consideration Travis Smith
Sugar Plum lnc
Aaron C.Davenport
5. Mellie Valianos-Reynolds
• Conditional Use Permit (Automobile Repair Garage)
• Recommended for Approval by Planning Commission & Staff
6. Mellie Valianos-Reynolds
Ferber Company Central,LLC
• Modifications of Conditions
• Recommended for Approval by Planning Commission & Staff
7. Aaron C. Davenport
• Conditional Use Permit (Short Term Rental)
• Recommended for Approval by Planning Commission & Staff
8. Travis Smith
• Conditional Use Permit (Short Term Rental)
• Recommended for Approval by Planning Commission & Staff
10
SUMMARY — October 15th
• • Items Scheduled
• • Consideration
Travis Smith
Sugar Plum Inc
9. City of
�Aaron G.Davenport
• •
Ordinance Beach
• (Urban • • Plan,
4th Generation Home Builders,LLC,Mellie Valianos-Reynolds
• Recommended for Approval by
PlanningCommission ♦ Staff
Ferber Company Central,LLC
VB
Beach Framing and Drywall,LLC
Item 1 — BEACH FRAMING AND DRYWALL, LLC
City Council: District 2 (Henley)
Location: Parcel on Gum Bridge Road, directly east of 1924 Gum Bridge Road
SUBDIVISION VARIANCE (Section 4.4(b) of the Subdivision Regulations)
Staff Recommends Denial
Planning Commission voted 8 to 0 to recommend Approval 12
Item 1 — BEACH FRAMING AND DRYWALL, LLC
• Subdivision Variance request to legalize parcel
• Substandard lot area (1 acre required, 0.22 ac.
c available) and lot width (150 ft. required, 74 ft.
available) for AG-2
• Improperly created by deed instead of plat
• Deed that created parcel was written in 1960,
a
not recorded with City until 1988
Mobile
• Parcel would have met dimensional requirements of
1 AG Unrestricted Zoning in 1960, does not meet AG-2
i Zoning in 1988, same zoning as today
• Mobile home present on site since 1965
BEACH FRAMING AND DRYWALL, LLC 113 VB
i
A CfiiE3 i
� � GX1N HII-rr-Illr
N 3T3!'OD'f 1SR00'
(
z �,rr nr � �; •
"9C, ,errsr M,ez.eca s
enI V!
Ot!ABM y0
cr) r)
• •
• •
�• ET
• •
• n • -
• • D •
•• DID 3
• • •
• O•
un •
•
•
• rllj •
• •
• • ►
• •
• ,
D •
• • • •
•
• 0•
a
•
• •
• • • • • •
•
•
• • •
• D. •
•
• < •
.� 0D 0 0
Council:Item 2 — SUGAR PLUM, INC
City . ' -
Location: . ' • . •
p R20 C
A
I
o
P
2—
`�SK�N RO o
� O
0
� < i
3 I
INKHORN C� -------
�to Rtoj ;
m °
K
o
REYNgRD CRES F m
MODIFICATIONPROFFERS
Staff Recommends • • •
Planning Commission voted 8 to 0 to recommend Approval
Item 2 — SUGAR PLUM,, INC
• Request for a Modification of
Proffers to operate a bakery
Will accommodate expansion of Sugar
Plum Bakery operations on adjacent
4, {� parcel
1998 proffers severely restrict
allowable uses for 1361 Laskin Road
• Located in Hilltop SGA
Existing site conditions proffered
Hours of operations proffered: 8:00
a.m. to 9:00 p.m. daily
SUGARPLUM, INC. 1 16 8
Nai 6 m aim l,Ni a IUY M B•1.w<sai(iEp M PBBBERIi SIIONI aN iN6 R{i un 1Na M rBormrr U[5 a BEtom AS
40N1 R W au0k O.RR 1•!ID M•Y19 a MB BUOKS M!E E SNaM M 116 Mf.K BUMP STNO aB1.1NE SNO
eaatom uas ao MH as xo'�li nw.R�eoaoirs a oMw BBBBBaS oa M moron,aavr a siwa �py17I�I'`
LEOE1� �
a 1mIM 11R. SIWD BY
B SPIM
NaC Nr•Nc,iFYnmBc ao LLC. O.auoa
iw maiurac
ua .aRuon NNlEli ! °7i1risolt Q,.
Na W Boost ■p>f/R/wl 8U8�
A R i6FP110r(Pfa31K ).R(. /6f—Kd I1 A'i.��
-ao�am� -rmu rrrer
Item 2 — SUGAR PLUM, INC
♦ R H
' awa - Bnn Sufficient parking on -
d
`\ o ' `LOT 6�.,,.«<.a :_� o�•,■�v
4,200 square-foot building to be
reused
Cosmetic alterations to N� o«rB�• V E_mn ♦ •
axnm.«c
LN.2023 JOn971) ,.r l N/� exterioronly
LOi 3 h/ y01S z� -. �� SUGBR P111M,NC
NN:2117-29-119} y a
• known opposition
'� r�JBB[M14 atoms•
a.a Ba
e
LA�4z�AC �YA,
.a BRNMa ��
—
� N/f
� LINI(Ndd!C7Ip.E
� CIXI�ONMUMS
(EN.2o�sostB000lEs9a) SUGARPLUM, INC. 17 ,;y.
Item 3 — FERBER COMPANY CENTRAL, LLC
City Council: District 7 (Wooten)
Location: 2061 Lynnhaven Parkway
_r
i
:r
MODIFICATION OF PROFFERS
Staff Recommends Approval
Planning Commission voted 8 to 0 to recommend Approval 18
Item 3 — FERBER COMPANY CENTRAL,, LLC
Request for a Modification of
Proffers to operate a Panera Bread
Restaurant
0 Seeking to amend proffers to allow
Demolish + ' s eating and drinkingestablishment
Existing Canopy
---- - - - - _- - - � __- was • permitted
site layout, renderings, and
r
landscaping
•• +• \ �,,.�� Ito remains Minimal changes to • • to
inclu� '" Dumpster Enclosure • -
\ ' �P eview Sign& w/required screening
�� � ' Menu Board
_ ._— ,✓ locations Removal ofexisting bank teller canopy,
existing building • remain
0 Addition of clumpster enclosure
� � ExistingFreestanding5lgn
0 Install window awnings & door on east
�� (to remain)
elevation
FERBER COMPANY CENTRAL, 19
Item 3 — FERBER COMPANY CENTRAL, LLC
ELEVATIONS 2061 LYWHAWN PARKWAY
P&I • New signage proposed on the
building and the face of the existing
freestanding sign will be replaced
_ r
i Parking Requirement:
South Ele�ation
• 30 spaces required
• 22 provided on site, bike rack provided
• Reciprocal easement allows shared
" parking on the adjacent parcel;
' parking met
• Hours of operation: 6:00 a.m. to
.PCtnC -CA 10:00 p.m. 6 to 8 employees on
BREAD maximum shift
DRIVE THHU
• No known opposition
FERBER COMPANY CENTRAL, LLC 120 vie i;o
Item 4 — 4 TH GENERATION HOME BUILDERS, LLC
City Council: District 10 R .
N I Location: Parcel on Commuter Drive, directly east of 1436 S. Independence Boulevard
CONDITIONAL
0
w y Sl
� u p�
z
o q <qHo � PDH1
PDH1
R '
REZONING ' PlannedUnit DevelopmenttoConditionali Apartment
Staff Recommends Approval
Planning Commission • • 8 to torecommend Approval
Item 4 - 4TH GENERATION HOME BUILDERS, LLC
• Request for a Conditional Rezoning
from PD-H1 Planned Unit Development
to Conditional A-18 Apartment District
to develop a 25-unit residential
i townhouse condominium community
0 2.29-acre property is currently
undeveloped and is designated within
the Timberlake Land Use Plan (LUP) for
W; commercial use.
■ • Seeking to remove this parcel from the
regulations of the Timberlake Land Use
(LUP).
• Five, 3-story multi-family buildings, two
stormwater management facilities with
dog park and park benches to be
maintained by HOA
4T"GENERATION HOME BUILDERS, LLC 1 22 V
Item 4 — 4TH GENERATION HOME BUILDERS,, LLC
• Contemporary modern design
with white premium vinyl siding,
Wr horizontal and vertical lap and
shake siding, dark brown trim
accents, and earthtone brown &
gray brick veneer.
• Parking on met on site
• 1 & 2 car garages provided
2 spaces provided in driveways for
p P Y
each unit
• 18 additional guest spaces provided
n�- n-■ ■• 'e• " • 35 feet maximum height
nu nn nnna r nn n
proposed
4T"GENERATION HOME BUILDERS, LLC 123 %ib
Item 4 — 4TH GENERATION HOME BUILDERS,, LLC
TIMBERLAKE QUAY
MONUMENT
6.26.24
IDF
P"smil • 4.5-foot-tall freestanding
SINGLE FACED MONUME14T FEATURE ° monument style sign is proposed to
TOTAL HEIGHT 4.5'X 12'6"LONG match the color and materials of
the building
• No known opposition
Al IQ=
A
4T" GENERATION HOME BUILDERS, LLC 24
Items 5 & 6 — MELLIE VALIAN OS-REYN OLDS
City Council: District 3 (Berlucchi)
Location: 619 London Bridge Road
PRODUCTION RD
PREcISI. .
CY
QUALITY CT
03
CONDITIONAL USE PERMIT (Automobile Repair Garage) & MODIFICATIONS OF CONDITIONS
Staff Recommends Approval
Planning Commission voted 8 to 0 to recommend Approval 25
Items 5 & 6 — MELLIE VALIANOS-REYN OLDS
• Request for a Modification of
Conditions and a Conditional Use
Permit to build and operate an
automobile repair garage
• Site is currently used as a Bulk
Storage Yard
E
III 1978 Conditions restricted
= ►� development to accommodate
4: -
possible future development at
y N.A.S. Oceana
r
Located in the Suburban Area of the
West Oceana Special Economic
Growth Area
MELLIE VALIANOS-REYNOLDS 26
Items 5 6 — MELLIE VALIANOS-REYNOLDS
Automobile repair garage will be .
prefabricated metal building with
two roll-up bay doors and two doors
• - will • • - open • -
s_ ` . •' q� . ', III public
No additional employees
Hours of operation Monday • •
'�r• Friday •
Al
Applicant underwent • •
vy
Easement Compliance Review
MELLIE iyt
• • •'
Council:Item 7 — AARON C. DAVENPORT
City
• • '
Street
} 1TM-� HALF sT t'1 A 2 A38 Al2 -
CONDITIONAL USE PERMIT
Y�'' ��`} 1eTH 26TN 9T RSS
-,r T T �RD S� �t �• A 12
26tH r' 25TH 1{A�f S t tAJ6
1 , D
1
� —� ATH HALF ST � � 11ATH ii'.,A3S D
DG � 21 ST ST R
i v
(ShortRental)
Staff Recommends Approval
Planning Commission 8 to torecommend Approval
Item 7 — AARON C. DAVENPORT
o
.........
Request for a Conditional Use
Permit to operate a Short Term
z 1
Rental
Site is zoned OR Oceanfront Resort
�1
District
v'.- �4 •
Unit has two bedrooms
s
AARON C. DAVENPORT 29
• 30
' .o
� • • •
LLJ
• •
• ••
•
• ••
2 •
• •
• '
•
• •
•� • • • •
•
•� • • • .�
• • • •
• , •rlj
•
•
LU
• •� • •
EDGE OF
• ASPHALT N 82°45' E NAILS)60'
• D _60.2'
` C
GRAVEI
CO =
o
w
GRAVEL �
,';) GRAVEL � AREAj o J
AREA
WOODEN DECK 0 7
• .•o. STEPS 0.7'
• Z 1.6'
N to
w
•; STEPS �
EIFJ �� PIPE(F)
+T PS 3O'
� D WIRES'•>'�p�� 82`45'�/'SN,4LK.:
Item 8 - TRAVIS SMITH
City Council: District 6 (Remick)
Location: 304 28th Street, Unit 205
OR
-
.-
OR
CONDITIONAL USE PERMIT (Short Term Rental)
Staff Recommends Approval
Planning Commission voted 8 to 0 to recommend Approval 31 VS
Item 8 — TRAVIS SMITH
• Request for a Conditional Use
Permit to operate a Short Term
Rental
• Site is zoned OR Oceanfront Resort
District
• Unit is 974 square feet with two
bedrooms
• Located in the Playa Rana
Condominium Complex which has 9
Short Term Rentals
TRAVIS SMITH 32 V6
Item 8 — TRAVIS SMITH
f11111�1
• 1 assigned parking space for the
unit
y,
Playa Rana Condominium Complex
' has a historic exemption allowing
Short Term Rentals to operate with
only 1 parking space
No known opposition
MW
y y M
C
TRAVIS SMITH 33
Item 9 — CITY OF VIRGINIA BEACH
An Ordinance to adopt and incorporate into the Virginia Beach
Comprehensive Plan , 2016, the Urban Forest Management Plan , 2023,
which will supersede the Urban Forest Management Plan , 2014
CITY OF VIRGINIA BEACH 134 VB
Item 9 — CITY OF VIRGINIA BEACH
Urban Forest Management Plan Update 2023
The Virginia Beach Urban Forest Management Plan
I° . Update is a comprehensive strategy aimed at preserving,
expanding and diversifying the city's urban forest.
Although the city lost 1.34% of the Urban Tree Canopy
(UTC) between 2012 and 2018, the plan maintains the
goal of achieving 45% UTC by 2045.
• To achieve this goal, the plan outlines steps that include
�- tracking, education, management, and collaboration.
. ,_ Internal and external stakeholders were part of the plan
" .. creation, and public engagement was completed
through in-person meetings and an online survey.
• Planning Commission recommended approval at
September 11, 2024 Hearing.
CITY OF VIRGINIA BEACH 135 MS
7
CITY COUNCIL DISCUSSIONANITL4TIVES/COMMENTS
ITEM#76190
4.21 P.M.
Council Member Rouse advised the Minority Business Council (MBC) and through the City, the BBC
Research and Consulting firm has been retained to conduct a comprehensive Disparity Study to evaluate
and refine the implementation of the SWaM Program and will collect feedback from business owners'
experiences working in the local marketplace in the City. Council Member Rouse advised there will be
three (3) informational sessions anyone can attend to learn more as well as share their experiences. The
meetings will be:
- October 7`h, S:30— 7:30 P.M. at the HIVE
- October 8, 10:00 A.M. —12:00 P.M. at the HIVE
- October 16`h, 12:00—2:00 P.M. virtually via Zoom
Council Member Rouse advised if anyone is interested or would like additional information, go to
https:Z/inance.virginiabeach., oovvlpurchasina/minority-business-council
September 24, 2024
8
CITY COUNCIL DISCUSSIONIINITIATIVES/COMMENTS
ITEM#76191
(Continued)
Council Member Rouse advised the Clean Community Commission is requesting the City's Legislative
Agenda Package includes a Zero Waste Awareness Week initiative to be considered at the state level.
Council Member Rouse asked if there are any other Council Members interested in sponsoring this to let
her know.
September 24, 2024
9
CITY COUNCIL DISCUSSION/INITIATIVES/COMMENTS
ITEM#76192
(Continued)
Council Member Ross-Hammond advised she attended the joint Military Economic Development Advisory
Committee (MEDAL)Meeting held at the River's Casino, adding the meeting had a great turn-out with 50
— 60 people in attendance and was interesting to hear that the U.S. Navy is experiencing a shortage of
engineers as many are getting out of the service and going to work in the private sector.
Council Member Ross-Hammond further advised it was announced that on November 1?—1 S'h Lieutenant
Governor Winsome Earle-Sears will host a housing conference and will provide additional information
when she receives it.
Council Member Ross-Hammond closed by reminding the listening audience of the Neptune Festival next
weekend and encouraged anyone interested to attend.
September 24, 2024
10
CITY COUNCIL DISCUSSIONIINITIATIVES/COMMENTS
ITEM#76193
(Continued)
Mayor Dyer congratulated Naval Air Station (NAS)Dam Neck on another successful year hosting the Air
Show this past weekend with an estimated 300,000 in attendance, including 7,000 5'grade students, over
the two (2)day event. Mayor Dyer advised it was dynamic and very well coordinated.
Vice Mayor Wilson advised the U. S.Navy hosts this every year as a way to give back to citizens and people
come from allover to attend. Vice Mayor Wilson advised many people who attend stay in the City's hotels
and eat at the restaurants and while the City supports the event, it does not provide any funding. Vice
Mayor Wilson added, she took her granddaughters who wanted to stay to the very end to watch the Blue
Angels perform and were very excited to see one who is a female pilot.
September 24, 2024
11
CITY COUNCIL DISCUSSIONIINITIATIVES/COMMENTS
ITEM#76194
(Continued)
Council Member Berlucchi advised he attended the first Anything But Ordinary Festival last Saturday at
the 24`h Street Park and applauded all of the Festival organizers for their work in delivering a great
experience. Council Member Berlucchi advised he participated in a voting panel about the importance of
voting and the impact that arts, culture and creativity has on the City and Region's economy. Council
Member Berlucchi added, this highlights the importance of the Body supporting creative expression in a
way that allows and empowers young entrepreneurs to have fair and equal access to all parts of the City,
something he will continue to advocate for.
September 24, 2024
12
ITEM#76195
Mayor Robert M. Dyer entertained a motion to permit City Council to conduct its CLOSED SESSION,
pursuant to Section 2.2-3711(A), Code of Virginia, as amended,for the following purpose:
PERSONNEL MATTERS: Discussion, consideration, or interviews of
prospective candidates for employment, assignment, appointment,
promotion, performance, demotion, salaries, disciplining or resignation
of specific public officers, appointees or employees of any public body
pursuant to Section 2.2-3711(A)(1)
• Council Appointments: Council, Boards, Commissions,
Committees,Authorities,Agencies and Appointees
September 24, 2024
13
ITEM#76I95
(Continued)
Upon motion by Council Member Rouse, seconded by Council Member Schulman, City Council voted to
proceed into CLOSED SESSION at 4:30 P.M.
Voting: 10- 0
Council Members Voting Aye:
Michael F.Berlucchi,Mayor RobertM.Dyer,BarbaraM.Henley,Amelia
Ross-Hammond, Robert W. "Worth"Remick,Jennifer Rouse,Joashua F.
"Joash" Schulman, Chris Taylor, Vice Mayor Rosemary Wilson and
Sabrina D. Wooten
Council Members Absent:
David Hutcheson—Stepped out during the vote
Break 4:30 P.M. —4:34 P.M.
Closed Session 4:34 P.M. —4:38 P.M.
September 24, 2024
14
CERTIFICATION
ITEM#76196
Mayor Dyer RECONVENED the Formal Session in the City Council Conference Room at 4:38 P.M.
Upon motion by Council Member Rouse, seconded by Council Member Schulman, City Council
CERTIFIED THE CLOSED SESSION TO BE INACCORDANCE WITH THE MOTION TO RECESS
Only public business matters lawfully exempt from Open Meeting
requirements by Virginia law were discussed in Closed Session to which
this certification resolution applies.
AND,
Only such public business matters as were identified in the motion
convening the Closed Session were heard, discussed or considered by
Virginia Beach City Council.
Voting: I1 - 0
Council Members Voting Aye:
Michael F. Berlucchi,Mayor Robert M. Dyer, Barbara M. Henley,David
Hutcheson,Amelia Ross-Hammond,Robert W. "Worth"Remick,Jennifer
Rouse, Joashua F. "Joash" Schulman, Chris Taylor, Vice Mayor
Rosemary Wilson and Sabrina D. Wooten
Council Members Absent:
None
September 24, 2024
BEgc
y�
0
Z
9,,rS O K S 9t
OUR NP 0
RESOL UTION
CERTIFICATION OF CLOSED SESSION
VIRGINIA BEACH CITY COUNCIL
WHEREAS: The Virginia Beach City Council convened into CLOSED SESSION,pursuant to the
affirmative vote recorded in ITEM#76195 on Page 13 and in accordance with the provisions of The
Virginia Freedom of Information Act;and,
WHEREAS:Section 2.2-3712 of the Code of Virginia requires a certification by the governing body
that such Closed Session was conducted in conformity with Virginia law.
NOW, THEREFORE,BE IT RESOLVED: That the Virginia Beach City Council hereby certifies
that, to the best of each member's knowledge, (a)only public business matters lawfully exempted from Open
Meeting requirements by Virginia law were discussed in Closed Session to which this certification resolution
applies; and, (b) only such public business matters as were identified in the motion convening this Closed
Session were heard, discussed or considered by Virginia Beach City Council.
Ama da me),,
City C rk
September 24, 2024
15
ADJOURNMENT
ITEM#7619 7
Mayor Robert M. Dyer DECLARED the City Council FORMAL SESSION ADJOURNED at 4:39 P.M.
Terri . e ius
Chief Deputy City Clerk
Ama d_&AvesN Robert M. Dyer
City Clerk, MMC Mayor
City of Virginia Beach
Virginia
September 24, 2024