HomeMy WebLinkAboutCentral Beach Small Area Plan Design Concepts City Council Briefing Nov 21 2024Central Beach
Small Area Plan Design
Concept Alternatives
City Council Briefing
November 21, 2024
Joseph Strayer
Urban Design Practice Lead
Renaissance Planning
jstrayer@citiesthatwork.com
1
01
02
03
04
05
06
07
08
09
10
Central Beach
Small Area Plan Design
11/21/2024
Overview
•Project Overview
•Task 1
•Existing Documentation Review
•Previous Engagement Takeaways
•Engagement Key Takeaways
•Key Stakeholder Engagement
•Community Open Houses
•Future Sessions
•Task 2
•Conceptual Alternatives
•Diagrams
•Alternatives
•Next Steps
2
Study Area
311/21/2024
Scope of Work
•Task 1 – Existing Conditions Analysis
•Document the existing development, infrastructure, and planned conditions within the study area. It will
summarize opportunities and issues and serve as the basis for a Conceptual Small Area Plan created in
Task 2. The task will include:
•Existing Document / Plan Review
•Existing Conditions Analysis
•Stakeholder Engagement (Open House / Key Stakeholder / Conceptual Preference)
•Task 2 – Conceptual Alternatives
•Task 2 will involve creating two Small Area Plan scenario that aligns with the RASAP vision. The scenario
will illustrate development and infrastructure concepts that address Task 1 opportunities and issues in the
study area. The scenario will illustrate enhanced street networks, open spaces, and parking concepts, and
include generalized 2D illustrative renderings of existing and proposed buildings. It will focus on differing
possibilities for the Convention Center and Sports Center and surrounding areas, such as complementary
uses and parking strategies. The task will include:
•PDRC Meetings
•Conceptual Small Area Plans
•Task 3 – Preferred Alternative (To Be Completed)
411/21/2024
Schedule and Timeline
511/21/2024
01
02
03
04
05
06
07
08
09
10
Central Beach
Small Area Plan Design
11/21/2024
Plans were reviewed for relevance to
the Central Beach study area and are
not presented as exhaustive
summaries of earlier efforts.
City of Virginia Beach City of Virginia Beach
2016 Comprehensive Plan2016 Comprehensive Plan
Active Transportation PlanActive Transportation Plan
Resort Area Strategic Action Plan 2008 and 2020 (RASAP)Resort Area Strategic Action Plan 2008 and 2020 (RASAP)
Current Zoning Ordinances Current Zoning Ordinances
APZ-1 / AICUZAPZ-1 / AICUZ
Current Applicable Ordinances Current Applicable Ordinances
Ocean Resort Form-Based CodeOcean Resort Form-Based Code
Resort Area Mobility Plan (RAMP)Resort Area Mobility Plan (RAMP)
Parking Parking
2013 Resort Area Parking Strategy 2013 Resort Area Parking Strategy
2009 HQ Hotel Shared Use Parking Report 2009 HQ Hotel Shared Use Parking Report
Municipal Parking Garage Priority AreasMunicipal Parking Garage Priority AreasParks and Recreation Outdoors Plan Parks and Recreation Outdoors Plan
Development / StrategyDevelopment / Strategy
Sports Center As BuiltsSports Center As Builts
Maintenance Facility Plan Maintenance Facility Plan
17th and 18th Street CIP17th and 18th Street CIP
17th Street Engineering Study17th Street Engineering Study
Central Resort Drainage DistrictCentral Resort Drainage District
Resort Area Signage and WayfindingResort Area Signage and Wayfinding
Housing Study Housing Study
Sports StudySports Study
Neighborhood PlansNeighborhood Plans 17th Street Workshops 17th Street Workshops
ViBe Connectivity PlanViBe Connectivity Plan
Private Development Private Development
Capstone ProposalCapstone Proposal CBRE Market StudyCBRE Market Study
Atlantic Park Shared Use Parking ReportAtlantic Park Shared Use Parking Report
2011 Convention Center Hotel2011 Convention Center Hotel
Task 1 - Plans and Document Review
6
01
02
03
04
05
06
07
08
09
10
Central Beach
Small Area Plan Design
11/21/2024
Review Previous Planning
Study Engagement
Review Previous Planning
Study Engagement
Public Open HousesPublic Open Houses
June 24th 4-8p @ Convention CenterJune 24th 4-8p @ Convention Center
June 25th 12-4p @ Atlantic BoardroomJune 25th 12-4p @ Atlantic Boardroom
Key Stakeholder
Interviews
Key Stakeholder
Interviews
AssociationsAssociations
Atlantic Avenue AssociationAtlantic Avenue Association
Hotel Association Hotel Association
Restaurant AssociationRestaurant Association
ViBe Creative DistrictViBe Creative District
Old Beach Civic LeagueOld Beach Civic League
Seatack Civic LeagueSeatack Civic League
Tidewater Veterans Memorial ParkTidewater Veterans Memorial Park
Business and Property OwnersBusiness and Property Owners
Wave Riding VehiclesWave Riding Vehicles
Chaplain PropertyChaplain Property
Double Tree HotelDouble Tree Hotel
Mt. Olive Baptist ChurchMt. Olive Baptist Church
1081 19th Street1081 19th Street
Developers Developers RunnymedeRunnymede
CapstoneCapstone
ConsultantsConsultants
MEBMEB
AECOMAECOM
WSPWSP
City of Virginia Beach City of Virginia Beach
Sports CenterSports Center
Convention Center Convention Center
Parks and Recreation Parks and Recreation
Comprehensive PlanningComprehensive Planning
Housing CoordinatorHousing Coordinator
Traffic EngineeringTraffic Engineering
Transportation Transportation
Planning Planning
Stormwater Stormwater
FacilitiesFacilities
Concept Design Feedback Concept Design Feedback November 23rd 1-3p @
Convention Center
November 23rd 1-3p @
Convention Center
Task 1 - Stakeholder Engagement
Step 1
Step 2
Step 3
Step 4
7
Key Takeaways
811/21/2024
•In June, two open house sessions encouraged residents, business owners, and key stakeholders with the
opportunity to meet the project team, learn about the study, and share input through three engagement
activities.
•The activities aimed to understand the vision for the study area and the most desired investment areas.
•Approximately 100 people attended the open house sessions; the turnout was an equal mix of Virginia Beach
residents and business owners.
Public Open Houses
911/21/2024
Open House Information and Activities
General Information Activities
1011/21/2024
Results: What do you vision for VA Beach?
Business owners and
Residents indicated their
vision for the future of the
Central Virginia Beach Area.
While it is clear there is a
desire for all the visions
provided, a Destination for
Tourists and Place to Live for
Residents is favored, indicating
a common vision of “live-play”
for the area.
1111/21/2024
Results: Preferred Investments
Business owners and
Residents indicated
their top three areas
of preferred
investments using
sticky notes.
The top selections
were Open Space
Network (22%),
Parking (14%), and
Bike Lanes &
Multipurpose
Facilities (14%).
1211/21/2024
Results: What’s your vision?
Business owners and
Residents shared what
their vision is for the
area.
The word cloud was
created by extracting
key words and themes
from the visions.
1311/21/2024
01
02
03
04
05
06
07
08
09
10
Central Beach
Small Area Plan Design
11/21/2024
Task 2 – Conceptual DesignsTask 2 – Conceptual Alternatives
14
Conceptual Alternatives Guidance
(1) Consolidated surface parking into shared garages,
(2) Maintained and extended the street framework,
(3) Expanded open space and connectivity,
(4) Enhanced the 17
th Street Main Street
(5) Retained convention and sports tourism with necessary associated uses (hotel, commercial, residential, etc)
(1) Mixed Housing Opportunities
(2) Multimodal
(3) Safe Pedestrian Facilities
(4) Connected
(5) Clear Gateways into Virginia Beach
(6) Sports and Convention Tourism
(7) Parking
(8) Local Ownership
(9) Establish a Mixed Use “Main Street”
(10)Development Patterns
(11)Community Oriented Destination
(12)Embrace Healthy Competition
(13)Open Space Network
Creating a “Vision of a place that the community wants to visit for no reason” by
adhering to the key takeaways we heard from current and previous engagement efforts
A variety of schemes were explored that:
1511/21/2024
Conceptual Alternatives
North / South ConnectionsCentral Green
1611/21/2024
Master Plan
Central Green
1711/21/2024
Precedent Model
Central Green
1811/21/2024
Diagramming
Central Green
1911/21/2024
Phasing Diagram
Central Green
2011/21/2024
Phase 1
Phase 2
Phase 3
Phase 4
17th Street
22nd StreetMediterranean AveExisting Conditions
Central Green
2111/21/2024
(1) Central Green (Phase 1)
(1) Indoor Market
(2) Main Street Mixed Use
(2) HQ Hotel
(3) Mixed Use Buildings / Shared Parking
Garages
(4) Mixed Use Convention Center Building
(Shared Parking / Hotel or Office / Ice Rink
/ Residential)
(5) Regional Storm Water
(6) Facilities Department
5
1
2
3 4
6
17th Street
22nd StreetMediterranean AvePhase 1
Central Green
2211/21/2024
(1) Library and Visitor Center renovation at
MoCA
(2) Public Safety Building
(3) Central Green [Phase 2]
(1) HQ Hotel
(2) Standalone Retail Spaces
(4) 17
th Street “Main Street” Mixed Use
(5) Community Green
(6) Residential Community
(1) Single Family Attached
(2) Duplex
(3) Apartment Houses32
4
1
6
5
6
6
17th Street
22nd StreetMediterranean AvePhase Two
Central Green
2311/21/2024
(1) Action Sports Facility
(2) Double Tree Extended Stay expansion
(3) Central / Shared Parking Garage
(4) Office Development along 21
st and 22nd
(5) ViBe Community Infill and Mixed Use
“Main Street” on 18th, 19th, 20th, and 21st
Street
(6) Transfer Center / Mixed Use / Parking
Garage
(7) Extension of Mixed Use “Main Street” on
17th Street
17th Street
22nd StreetMediterranean Ave1
3
4 3
6
5
5
7
2
Phase Three
Central Green
2411/21/2024
(1) Mount Olive Expansion
(2) Residential Multifamily and Shared Garages
(3) Marquee office building
(4) Grocery store, office, and shared garage.
17th Street
22nd StreetMediterranean Ave1
2
4
3
4
2
Phase Four
Central Green
2511/21/2024
17th Street
22nd StreetMediterranean AveMaster Plan
Central Green
2611/21/2024
Potential New Development
17M+Total SF
10,000Residential Units
19,000New Residents
9,000New Jobs
900 Hotel Keys
340,000Civic
100,000Action Sports
60,000Facilities
80,000Public Safety
100,000Ice Rink
16,000Parking Provided
8,000Structured
3,500Garage
2,500Surface
2,000Streets
+-45 AcresOpen Space
Concept Information
Central Green
2711/21/2024
Master Plan
North South Connections
2811/21/2024
Precedent Model
North South Connections
2911/21/2024
Diagramming
North South Connections
3011/21/2024
Phasing Diagram
North South Connections
3111/21/2024
Phase 1
Phase 2
Phase 3
Phase 4
17th Street
22nd StreetMediterranean AveExisting Conditions
North South Connections
3211/21/2024
(1) Regional Storm Water
(2) HQ Hotel
(3) Mixed Use Buildings / Shared Parking
Garages
(4) Mixed Use ViBe Creative District Infill
1
3
2
4
1
17th Street
22nd StreetMediterranean AvePhase One
North South Connections
3311/21/2024
(1) Commercial Business District
(2) Mixed Use / Shared Parking Garages
(3) New Library
(4) Public Safety Building
(5) 17
th Street Main Street
(6) Residential Community
(1) Single Family Attached
(2) Duplex
(3) Apartment Houses
3
2
4
1
6
5 17th Street
22nd StreetMediterranean AvePhase Two
North South Connections
3411/21/2024
(1) Central Parking Facility
(2) Convention Center expansion w/ HQ
Hotel
(3) Double Tree Extended Stay expansion
(4) Indoor Market / Food Hall expansion
(5) Residential Community
(1) Single Family Attached
(2) Duplex
(3) Apartment Houses
(6) Community Green and pocket
neighborhood commercial
17th Street
22nd StreetMediterranean Ave1
3 4
6 5
2
Phase Three
North South Connections
3511/21/2024
(1) HQ Hotel
(2) Commercial Business Core
(3) Art Museum
(4) Residential Multifamily and Shared Garages
(5) Tidewater Veteran’s Memorial Park (Partially
relocated to same site)
(6) Convention Center Green
(7) Action Sports Facility
(8) Mount Olive Expansion
(9) Commercial Business Core
(1) Grocery store, office / ground floor retail, and shared garage.
17th Street
22nd StreetMediterranean Ave1 2
4 3 4
7
Phase Four
North South Connections
6
4
8
9
4
5
3611/21/2024
17th Street
22nd StreetMediterranean AveMaster Plan
North South Connections
3711/21/2024
New Development Calcs
16M+Total SF
8,000Residential Units
14,500New Residents
8,000New Jobs
1,200Hotel Keys
643,000Civic
100,000Action Sports
60,000Library
75,000Public Safety
10,000Mount Olive Rebuilt
125,000Museum
273,000Convention / Ice Rink
17,000Parking Provided
9,500Structured
3,000Garage
2,500Surface
2,000Streets
+- 25 AcresOpen Space
Concept Information
North South Connections
3811/21/2024
01
02
03
04
05
06
07
08
09
10
Central Beach
Small Area Plan Design
11/21/2024
Next Steps
39