HomeMy WebLinkAboutII. A. CIP RETREAT PRE-BRIEFING BUILDINGS & ASSETS 12.10.2024Building and Assets CIP
Pre-Retreat Brief for City Council
Brian C. Delfenthal, Facilities Administrator
December 10, 2024
1
CIP Section Overview
FY 2024-25 Adopted CIP - 39 projects
totaling $483.37 million, including appropriations to
date.Funding Sources:
•General Fund
•Fire Grant Funds
•Tourism Advertising Program
•Tourism Investment Program
•Federal Contributions, including the American Rescue Plan Act (ARPA)
•Medicaid Cost Settlement
•Private Contribution
•SPSA Reimbursement
p2
General Fund Projects (1/5)
Project Number/Name District Year of
Origin Status ATD FY26 FY27-30 Total BTC
100047: Facilities Access Systems Citywide 2019-20 Ongoing 1,950,000 425,000 1,700,000 4,075,000 0
100165: Energy Performance
Contracts –Phase II Citywide 2019-20 Ongoing 3,300,000 550,000 2,200,000 6,050,000 0
100168: Euclid Yard Facility
Replacement 4 2019-20 Pending
Funds 0 0 14,532,300 14,532,300 0
100170: Facilities Planning
Services Citywide 2018-19 Ongoing 1,620,467 500,000 1,000,000 3,120,467 1,500,000
100175: Fire Apparatus – Phase
IV Citywide 2018-19 Ongoing 22,933,475 2,265,975 9,063,900 34,263,350 19,520,026
3
General Fund Projects (2/5)
Project Number/Name District Year
of Origin Status ATD FY26 FY27-30 Total BTC
100176: Fire Facility Rehab &
Renewal – Phase III Citywide 2011-12 Ongoing 8,309,731 1,000,000 4,000,000 13,309,731 280,000
100203: Heritage Building
Maintenance Phase II Citywide 2018-19 Ongoing 3,375,000 300,000 1,200,000 4,875,000 440,000
100437: VA Aquarium Building
Systems & Facility 6 2019-20 Ongoing 8,607,240 1,434,540 5,738,160 15,779,940 0
100463: Virginia Aquarium
Renew & Replace – Phase II 6 2018-19 Ongoing 4,271,019 600,000 2,400,000 7,271,019 0
100445: VAR BLDGS HVAC Rehab
& Renewal – Phase IV Citywide 2018-19 Ongoing 17,500,000 2,500,000 10,000,000 30,000,000 0
100446: VAR BLDGS Rehab &
Renewal – Phase IV Citywide 2018-19 Ongoing 29,904,656 3,800,000 15,200,000 48,904,656 0
4
General Fund Projects (3/5)
Project Number/Name District Year
of Origin Status ATD FY26 FY27-30 Total BTC
100225: Judicial Center
Maintenance 2 2016-17 Ongoing 2,244,372 70,000 280,000 2,594,372 0
100291: Operations Facilities
Renovations 2 2020-21 Construction 93,081,844 0 0 93,081,844 0
100325: Public Safety Equipment
Replacement Citywide 2014-15 Ongoing 12,535,572 1,450,000 5,800,000 19,785,572 0
100503: Judicial Center Escalator
Replacement Citywide 2017-18 Construction 10,614,900 0 0 10,614,900 0
100392: City Security
Enhancements Citywide 2020-21 Ongoing 3,729,818 500,000 2,000,000 6,229,818 0
100678: Library Automated
Materials Handler System Citywide 2024-25 Pending Funds 0 3,119,950 0 3,119,950 0
5
General Fund Projects (4/5)
Project Number/Name District Year
of Origin Status ATD FY26 FY27-30 Total BTC
100614: Leroy Rd. Impound Lot
Remedial Action 2 2022-23 Construction 1,443,700 0 0 1,443,700 0
100608: Virginia Aquarium
Animal Holding Facility
Renovation*
6 2022-23 Construction 4,321,715 0 0 4,321,715 0
100535: Corrections Center -
Renewal and Replacement 2 2020-21 Pending Funds 0 0 14,198,889 14,198,889 2,635,954
100260: Beach Maintenance
Facility 6 2017-18 Study
Complete 250,529 0 0 250,529 20,449,471
100651: Court Modernization
Study 2 2023-24 In Progress 350,000 0 0 350,000 0
100653: Housing Resource Center
Renovations 4 2024-25 Construction 3,525,950 0 0 3,525,950 0
* Federal Grant Funds Applied 6
General Fund Projects (5/5)
Project Number/Name District Year
of Origin Status ATD FY26 FY27-30 Total BTC
100655: Law Enforcement
Training Academy
Replacement
6 2023-24 Study
Complete 350,000 0 0 350,000 31,382,902
100675: Central Plant Loop
Replacement 2 2020 Design 12,007,627 11,979,181 0 23,986,808 5,825,844
100652: Mounted Police
Maintenance and Repair 2 2023-24 Pending
Funds 0 240,000 2,000,000 2,240,000 3,076,440
Total:---$246,227,615 $30,734,646 $91,313,249 $368,275,510 $85,110,637
7
Projects w/ non-General Fund Contributions (1/2)
Project Number/Name District Year
of Origin Status ATD FY26 FY27-30 Total BTC
100670: Voter Registrar Facility
General Fund + American
Rescue Plan Act (ARPA)
3 2023-24 Design 17,250,000 0 0 17,250,000 0
100676: Mosquito
Control Replacement
Stormwater Lockbox
2 2024-25 Design 262,500 3,891,776 0 4,154,276 0
100681: Stormwater
Operations Center
$3M in Federal Contributions
2 2024-25 Funding
Required 3,000,000 0 0 3,000,000 22,841,110
100536: Creeds Training
Center Renovations
General Fund + Federal
Contributions
2 2020-21 Bid 13,632,126 0 0 13,632,126 0
8
Projects w/ non-General Fund Contributions (2/2)
Project Number/Name District Year
of Origin Status ATD FY26 FY27-30 Total BTC
100138: Convention Center Capital
Maintenance Tourism investment Program
(TIP)
6 2012-13 Ongoing 14,025,549 3,600,000 3,393,060 21,018,609 38,685,722
100178: Fire Training
Center Improvements Phase IV
Fire Programs Fund – Aid to Locality (ATL)
5 2018-19 Ongoing 3,455,751 300,000 1,200,000 4,955,751 0
100224: Intermediate Care Facility REN/REP -
Phase 1
Medicaid Cost Settlement
Citywide 2011-12 Ongoing 1,549,776 0 482,508 2,032,284 0
100677: Waste Management Facility
Replacement
Waste Management Enterprise Fund
8 2024-25 Design 294,040 1,968,205 0 2,262,245 0
100233: Landfill #2 - Phase 1 Capping
General Fund + SPSA Reimbursement 7 1999-00 Ongoing 21,677,000 0 0 21,677,000 0
Total ---$75,146,742 $9,759,981 $5,075,568 $89,982,291 $61,526,832
9
American Rescue Plan Act (ARPA)
Project Number/Name District Year
of Origin Status ATD FY26 FY27-30 Total BTC
100588: Recreation Center
HVAC/Replacement/Repair -
ARPA
Citywide 2021 Construction 4,400,000 0 0 4,400,000 0
100589: Central Utility Plant
Enhancements - ARPA 2 2021 Construction 4,750,000 0 0 4,750,000 0
100590: Courts Building Direct
Digital Control ARPA 2 2021 Construction 3,966,254 0 0 3,966,254 0
100591: Parks and Rec.
Construction Yard Relocation
ARPA
2 2021 Construction 12,451,244 0 0 12,451,244 0
Total:---$25,567,498 0 0 $25,567,498 $0
10
Next: Projects with Flexibility
11
Projects with Flexibility (1/2)
Project Number/Name Funding Source Local
ATD FY26 FY27-30 Total BTC
100260: Beach Maintenance Facility General Fund 250,529 0 0 250,529 20,449,471
100675: Central Plant Loop
Replacement General Fund 12,007,627 11,979,181 0 23,,986,808 5,825,844
100678: Library Automated Material
Handling System Replacement General Fund 0 3,119,950 0 3,119,950 0
100676: Mosquito Control
Replacement
General Fund –
Stormwater Lockbox 262,500 3,891,776 0 4,154,276 0
100677: Waste Management Facility
Replacement
Waste Management
Enterprise Fund 294,040 1,968,205 0 2,262,245 0
100535: Corrections Center Renewal
and Replacement General Fund 0 0 14,198,889 14,198,889 2,635,954
12
Projects with Flexibility (2/2)
Project Number/Name Funding Source Local
ATD FY26 FY27-30 Total BTC
100168: Euclid Yard Facility
Replacement General Fund 0 0 14,532,300 14,532,300 TBD
100681: Stormwater Operations
Center Federally Funded 0 0 0 3,000,000 TBD
100164: Leroy Rd Impound Lot
Remediation General Fund 1,443,700 0 0 1,443,700 0
100652: Mounted Police Maintenance
and Repair General Fund 0 240,000 2,000,000 2,240,000 3,076,440
100165: Energy Performance
Contracts - Phase II General Fund 3,300,000 550,000 2,200,000 6,050,000 0
100170: Facilities Planning Services General Fund 1,620,467 500,000 1,000,000 3,120,467 1,500,000
Total:-$19,178,863 $22,249,112 $33,931,189 $75,359,164 $33,487,709
13
100260: Beach Maintenance Facility
•Project to study resolutions for the existing 40+ year old Beach
Maintenance Facility, completed by Kimley Horn in August 2024.
•Current facility, located at 1401 Parks Avenue, has exceeded its useful
life and provides challenges for adjacent residents and City programs
accessing and maintaining the resort area.
•Program study provides (4) options for complete or partial relocation,
requiring land acquisition up to 11.9 acres and 59,908 square feet of
facility.
•Presentation forthcoming to share results of study and determine a path
forward. Will need future funding.
p14
100675: Central Plant Loop Replacement
•$29,812,652 was appropriated in FY24 and FY25 to replace the 6 mile, 4-pipe hot and chilled water distribution system providing HVAC to the Virginia Beach Municipal Center.
•Project will be done in two phases: preparatory valve replacements in Phase I, and pipe replacements in Phase II.
•Phase I design is complete, will advertise January 2025 with a construction start date in March 2025. Anticipate Phase I completion in December 2025.
•Phase II design will begin in January 2025, and advertise for construction in April of 2025. Anticipate Phase II completion in December 2026.
•In FY24/25, $5,825,844 was transferred to CIP 100291 to complete renovation of Building 33. Balance to complete is $5,825,844.
p15
100678: Library Automated Material Handling System Replacement
•$3,119,950 in local funding is programmed for FY2025-26 to replace the
expiring automated material handling system, a critical material
reception and distribution system in Virginia Beach's 7 Public Libraries.
•Design pending availability of funds in FY2025-26.
p16
100676: Mosquito Control Replacement
•$4.154M in local funding was appropriated in FY24 ($262,500 design) and FY25 ($3,891,776 construction) to replace expired Public Works/Mosquito Control buildings with a consolidated multi-use facility.
•Design is awarded to VIA Design Architects, to be completed in July 2025.
•Solicitation for construction bids anticipated in September of 2025.
•Facilities anticipates award for construction in April of 2026.
•Project completion date to be determined, pending information from design.
p17
100677: Waste Management Facility Replacement
•$294,040 was appropriated in FY2024-25 for design and $1,968,205 is
programmed for FY2025-26 for construction to replace the expired
modular Waste Management Administrative Building.
•Design is awarded to HBA, to be completed in March 2025.
•Public solicitation for construction is anticipated in May 2025.
•Facilities anticipates award for construction in November 2025.
•Project completion date to be determined, pending information from
design.
p18
100535: Corrections Center Renewal and Replacement
•$14,198,889 total is programmed - $1,122,442 in FY2027-28 and $13,076,447 in FY2028-29 to address capital revitalization needs at the Virginia Beach Corrections Center.
•The Corrections Center is comprised of (3) wings, constructed in 1979, 1994, and 2005.
•This CIP targets critical systems that have reached the end of their useful life, primarily plumbing, mechanical, and electrical systems in the 1979 wing.
•Facilities aims to initiate a comprehensive program assessment in FY25 to guide sustainability and master planning of the Virginia Beach Corrections Center, with respect to overall Municipal Campus planning.
p19
100168: Euclid Yard Replacement
•$14,532,300 programmed - FY27 ($1,500,00) and FY28 ($13,032,300) to
replace the expired multi-use structures and fuel site at the Euclid
Maintenance Yard.
•Previously a VDOT property, the City acquired the site and
original 1950's buildings in 1963 during the Princess Anne County/Town
of Virginia Beach merger.
•Having received only cosmetic and minor renovations since acquisition,
these structures have exceeded their useful life.
•Program study and design is pending availability of funds in FY28.
p20
100681: Stormwater Operations Center
•Project appeared in FY25 with $3,000,000 in federal contributions from
the 2024 Congressionally directed Spending Bill, to design and construct
a new Stormwater Operations Facility focused on development and
central management of city-wide critical stormwater resiliency
infrastructure.
•An internal program study completed in summer of 2024 provides
drawings on how a 30,000 square foot facility could fit into the existing
Landstown Public Works/Operations property.
•Facility will offset expired modular and 1960's era buildings.
•Future funding requirements are yet to be determined.
p21
100164: Leroy Rd. Impound Lot Remediation
•Project was created in FY22 to remediate the 3.6-acre small arms
training site, operated by the City since 1972.
•Soil investigations began in 2014, and groundwater monitoring wells
were installed in 2017.
•Project includes soil removal and encapsulation, and post-remediation
installment of a gravel impound lot.
•Final Certificate of Satisfactory Completion of Remediation has been
prepared and submitted to the Department of Environmental Quality,
and the project has been submitted to the City of Virginia Beach
Development Services Center.
p22
100652: Mounted Police Maintenance and Repair
•$2,240,000 in local funds are programmed for FY26 ($240,000 design)
and FY27 ($2,000,000 construction) for recapitalization of the Virginia
Beach Police Department, Mounted Patrol Farm on Indian River Road.
•Project focuses on electrical, roof, and HVAC system replacements, as
well as renovation of administrative spaces.
•Program study and design is pending availability of funds in FY26.
p23
100165: Energy Performance Contracts - Phase II
•Project began its second phase in FY19 with focus on reduction of the
City's energy consumption and net-positive recapitalization of energy
using infrastructure.
•Project enables lighting and HVAC upgrades, design and installation of
technology driven lighting and daylight harvesting systems, and direct
digital HVAC controls and variable frequency drives.
•Project also provides for auditing existing energy accounts and
negotiation and development of peak-demand utility saving programs.
•Project is a "Program CIP", with $550,000 in annual funding until FY30.
p24
100170: Facilities Planning Services
•Project appeared in FY18 to enable planning and development of the City's Facility inventory.
•Project is a "Program CIP", with $500,000 in FY26, funds and $250,000 annually until FY30.
•Facilities has requested $1,500,000 in additional funds in FY26 to support City-wide program study and master planning.
•This CIP is the primary tool for studies and analyses that drive the Building and Assets CIP section development.
p25
Next: Existing Needs and New FY26-31 Requests
Project Requests for the
FY26-31 Building and Assets
CIP are presented here for
informational purposes only,
and should not
be considered as formal
requests for adoption by City
Council.
Final requests will be
presented at the conclusion
of the FY26-31 CIP
development process.
p26
Existing Project Needs
Project Number/Name Programmed FY26-31 Balance to Complete
100675: Central Plant Loop Replacement $23,986,808 $5,825,844
100260: Beach Maintenance Facility $0 $20,449,471
100170: Facilities Planning Services $2,000,000 $1,500,000
100203: Heritage Building Maintenance II $1,800,000 $440,000
100535: Corrections Center Renewal and Replacement $14,198,889 $2,625,954
100652: Mounted Police Maintenance and Repair $2,240,000 $258,000
100176: Fire Facility Rehabilitation and Renewal III $6,000,000 $1,680,000
100655: Law Enforcement Training Academy $0 $84,000,000
100175: Fire Apparatus $9,063,900 $19,520,026
$59,289,597 $136,299,295 27
New Project Requests
Project Number/Name Balance to Complete
Building 29 Renovation $4,607,309
Fleet Mgmt. Light Duty Garage $5,752,000
Aquarium Shark, Turtle, and Seal Habitats $78,000,000
Dam Neck Ops Facility Upgrades $250,000
Corrections Center Inmate Kitchen Equipment Replacement Study $360,000
Corrections Center Relocation Study $500,000
28
New Project Requests, Continued
Project Number/Name Balance to Complete
Baffle and Lighting Replacement at Central Library $2,959,282
Animal Services Bureau Renovation $480,100
Corrections Center Real-Time Asset Tracking $8,040,000
City Fleet EV Charging Stations $3,605,000
Maintenance and Upgrades for Six Library Locations $1,298,294
Building 23 Kitchen and Restroom Renovation $750,000
Holland Road Complex Renovation – VBSO K9 Facility $1,020,000
Library Facilities Visioning Plan – M.E.O Central Library $1,860,000
Fire and EMS Apparatus Storage $17,415,610
Library Facilities Visioning Plan – Kempsville Area Library $2,885,219
Library Facilities Visioning Plan – Windsor Woods Area Expansion $2,423,558
Total New Project Requests:$132,206,372
Total Existing/Above Target + New Projects:$268,505,667
29
Section Challenges
•Program CIP capacity.
• The City's facility inventory has increased by 600,000 square ft. since 2019,
now 1,200 structures and 6,000,000 square ft. under roof.
•As the inventory grows, major capital work is deferred while CIPs cover
operational shortfalls for additional and aging inventory.
30
Thank You.
Questions?