HomeMy WebLinkAboutII. A. ATLANTIC AVENUE PROJECT UPDATE 01.21.2025Atlantic Avenue Improvements Emily Archer, Economic Development Deputy Director City Council Briefing January 21, 2025 1 2 Purpose •Provide the history and background of the Atlantic Avenue Improvement Project •Review status of the Atlantic Avenue Design Build Project •Design Concepts •Schedule and Phasing •Budget •Seek direction on the future of the project 3 Atlantic Avenue – The Beach Main Street •Atlantic Avenue is a featured, iconic street in the Resort Area and along the East Coast •Rich with tradition, history, and nostalgia •Provides the full resort experience with places to shop, stay, eat, and be entertained •It’s a host to thousands on foot, wheels or vehicles as well as parade’s, races, and cultural events annually •Its where trends first emerge Seasonal ‘Live On Atlantic!’ Performances 2020 Small Cell Tower Advent 2018 Scooter Invasion 4 History •Atlantic Avenue between 2nd and 40th Streets has evolved over time •1982 – Refresh Plan •1985 - Revitalization Project •1989 - 1996 Phased Atlantic Ave Streetscape Improvements Constructed – still in place today Atlantic Avenue Circa 1932 Atlantic Avenue Circa 1979 5 Existing Conditions 6 Existing Conditions2 7 Background •2017 – Grassroots Advocacy for revitalization (Atlantic Avenue Association Formed) •2018 – Activate Atlantic Avenue Visioning Workshops •2020 – RASAP Update & Atlantic Ave CIP Adopted •2021 – The Ave Demonstration Project •2023 – RAMP Adoption & Streetscape Design Guidelines •2024 – Progressive Design-Build Contract Awarded ‘The Ave’ Demonstration Project 2021-2022 8 The Resort Area Mobility Plan (RAMP) The scope for Atlantic Avenue rehabilitation was developed and refined during the RAMP process based on substantial community input and data collection: When asked how the space along Atlantic Avenue should be prioritized, (1 being the greatest priority and 5 being the least), survey participants place a premium on space for pedestrians and bicyclists 4.17 4.17 4.04 3.61 2.74 1.7 SPACE FOR CARS CORRALS FOR ELECTRIC SCOOTERS SPACE FOR ON-STREET PARKING SPACE FOR TRANSIT VEHICLES SPACE FOR BICYCLES SPACE FOR PEDESTRIANS 9 The Resort Area Mobility Plan (RAMP)2 The decision to recommend the elimination of on-street parking for increased pedestrian space and streetscape was carefully analyzed and considered in the recommendation: •Pedestrian counts collected in July 2021, recorded thousands on foot on Atlantic Avenue •Positive feedback was received on The AVE •Negative feedback was received by first responders concerning the on-street parking •Seasonal parking data showed only 40% of the blocks experienced consistent use •55% of respondents indicated they weren’t aware of the on-street parking or rarely used it Temporary Off-Season On-Street Parking has been offered along Atlantic Ave since 2018 between October and April 10 Atlantic Avenue Design Concept 17th to 25th Street - Representative Segment 11 Flyover Video 12 Atlantic Avenue Design-Build Project Team OWNER’S REPRESENTATIVE ARCHER WESTERN (PRIME CONTRACTOR) RINKER DESIGN ASSOC. (PRIME DESIGNER) 13 Atlantic Avenue Phasing & Budget As conceived in the RAMP, the Atlantic Avenue CIP is divided into three distinct segments between 5th and 40th streets Project Number/Name District Year of Origin Source ATD FY26 FY27 Total BTC 100300: Atlantic Ave Street Improvements 5, 6 2020 Tourism Investment Fund (TIP) 33,900,000 7,900,000 6,300,000 48,100,000 60,900,000 14 Atlantic Avenue Schedule •The first segment between 17th and 24th is fully funded with the ATD and FY 26 programmed funding •On track for construction in the Fall of 2025 •More value engineering and funding is needed on future north and south segments Project Schedule Date 30% Design NTP May 1, 2024 Over-the-Shoulder Reviews (OTSR)June 2024 – August 2024 30% Design Plan Submission October 1, 2024 Design Concurrence/Approval November 2024 100% Design NTP January 2025 GMP Approval - Segment 2 Summer of 2025 Meetings and Outreach January 30, 2025 & Summer 2025 Construction - Segment 2 Fall 2025 - Spring 2026 Construction (Segments 1 & 3)*Fall 2026 - Spring 2027* Fall 2027 - Spring 2028* *Future segments subject to appropriation Atlantic Avenue Phasing & Budget2 •Full rehabilitation between 17th and 24th can occur within funding through FY26 •Likely also be able to repave and mark the roadway within curb line between 24th and 40th within funding through FY27 15 Full rehabilitation Fall ’25 – Spring ‘26 Repaving and marking within curb line Fall ’26 – Spring ‘27 Atlantic Avenue Next Steps •A decision is needed to proceed at this time in order to make the Fall 2025 construction start •A public meeting is scheduled from 6-8 p.m. on Thursday, Jan. 30, 2025, at the Virginia Beach Convention Center, 1000 19th Street to: •View design concepts designs and details •Learn about project •Collect valuable feedback to help shape the future of Atlantic Avenue •VirginiaBeach.gov/AtlanticAvenue 16 Alternatives for Consideration 17 A.Proceed with first segments within existing and programmed funding as currently planned B.Seek additional value engineering options C.Pause further action until the conclusion of the upcoming CIP retreat D.Other as directed