Loading...
HomeMy WebLinkAboutI. C. Law Enforcement Training Academy (LETA) Update 3.11.2025LAW ENFORCEMENT TRAINING ACADEMY (LETA) UPDATE LJ Hansen, Public Works Director March 11, 2025 March 11,2025 LETA Update| 2 UPDATE AGENDA •Background & Current Facility Issues •Work since last update •Presentation of a conceptual layout – independent of location •Staff are seeking feedback from City Council •Seeking feedback regarding location •Seeking feedback regarding conceptual layout March 11,2025 LETA Update| 3 BACKGROUND •City Police (VBPD) and Sheriffs (VBSO) have utilized the old Seatack Elementary School for training purposes since 2000 •The Law Enforcement Training Academy (LETA) is one of three sites utilized (Creeds Training Facility & Xe in Moyock, NC) for the training of these officers •The LETA facility is relatively unchanged since its utilization as an elementary school •The LETA facility is currently being leased to the City, by the VB School District FACILITY ISSUES •The building is over 50 years old and does not contain enough room or technology to adequately serve its intended purpose •Most facilities (including restrooms) were constructed and outfitted with fixtures for elementary aged children •The school is prone to flooding under storm events and is subject to jet noise issues •The facility lacks the appropriate security measures to adequately protect students, faculty and staff March 11,2025 LETA Update| 4 March 11,2025 LETA Update| 5 PREVIOUS WORK •A CIP proposal was made in 2018 but funded only for studies to date •In 2019 a space needs analysis was performed, in conjunction with the VBPD and VBSO – Estimated at approximately 60,000 sq-ft •From 2019-2022 a number of possible sites have been discussed (Leroy Road, existing location, Creeds and unsolicited submittals from 3rd parties) •A final determination of location has not been made March 11,2025 LETA Update| 6 UPDATED STUDY •Following a January 2023 presentation to City Council, staff were directed to re-visit the basis of design and come up with updated requirements •Staff, along with the City’s consultant met with representatives of the VB Police Department (VBPD) and the VB Sheriff’s Office (VBSO) to identify space, facilities and equipment requirements for both organizations •The City’s consultant generated a potential concept for what this facility might look like March 11,2025 LETA Update| 7 UPDATED SPACE NEEDS March 11,2025 LETA Update| 8 DESIGN CONCEPT Design Purpose & Features: •The new LETA facility is broken down into 3 constituent parts; mental, physical and legacy; further defined as appealing to the mind / body / spirit. •There are 2 primary entrances to the new facility; one for the Academy/ Cadets and another for the Law Enforcement Administrators / Public. •The Main Public Entry leads directly to the auditorium and multi-purpose space, including an open exhibit hall in the Lobby. •Design includes a Legacy Memorial Garden, commemorating and honoring those who have lost their lives in defense of their community. •Lorem ipsum dolor sit amet, connecter aid piscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. •Lorem ipsum dolor sit amet, consectetur adi piscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. •Lorem ipsum dolor sit amet, consectetur adi piscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. NAME OF PRESENTATION | p# PAGE TITLE DESIGN CONCEPT Building Area First Floor 77,000 SF Second Floor 54,000 SF Total GSF 131,000 SF Estimate of Probable Cost (Concept Estimate) The total construction estimate is: $82.6 M – Based upon finished floor space of the concept (Excluding design, site development and FF&E) •Estimate covers construction only (building and site related construction costs.) No cost have been included for FF&E or site access/development •Design Study only. A comprehensive design for the facility is not complete and is not included in the construction costs March 11,2025 LETA Update| 10 CONCEPT SCHEDULE Project Schedule (Neglecting site development) Design Phases: 18 months •City Review / Permitting •Bidding / Negotiations & Award •Construction Duration •FFE / Move In Construction could begin approximately 28-30 months after design begins – Funding dependent Construction estimated to be 24-30 months March 11,2025 LETA Update| 11 NAME OF PRESENTATION | p# PAGE TITLE NAME OF PRESENTATION | p# PAGE TITLE March 11,2025 LETA Update| 13 NAME OF PRESENTATION | p# PAGE TITLE March 11,2025 LETA Update| 14 NAME OF PRESENTATION | p# PAGE TITLE March 11,2025 LETA Update| 15 NAME OF PRESENTATION | p# PAGE TITLE NAME OF PRESENTATION | p# PAGE TITLE March 11,2025 LETA Update| 17 NAME OF PRESENTATION | p# PAGE TITLE March 11,2025 LETA Update| 18 NAME OF PRESENTATION | p# ITA SITE OPTION Site Options: •Existing site of the LETA facility was utilized for this study •Public Works has considered alternative locations, including Area 6 of the ITA. This area has been designated for city municipal services. •Estimate did not include site development costs for this location March 11,2025 LETA Update| 19 NAME OF PRESENTATION | p# ITA SITE OPTION March 11,2025 LETA Update| 20 PROCESS & NEXT STEPS •Meeting with stakeholders •Development of concept •Review concept with City Manager •Review concept with City Council (Here today) •Review comments with stakeholders •Proceed to design with concept revisions - (Funding dependent) •Construction - (Funding dependent) March 11,2025 LETA Update| 21 SEEKING FEEDBACK •After review of all locations, PW staff are now recommending construction in the ITA – requesting confirmation •Other opportunities for existing site •Support for this concept was expressed during ITA discussion •Additional development costs •Feedback on concept •Additional design updates will be shared through budget updates March 11,2025 LETA Update| 22 Questions/Discussion March 11,2025 LETA Update| 23