HomeMy WebLinkAboutII. A. 7. Coastal CIP 4.22.2025PROPOSED FY 2025-26 to FY 2030-31
COASTALCAPITAL IMPROVEMENT PROGRAM
Jim White, PE
Public Works
April 22, 2025
Coastal Overview
•FY 2025-26 Proposed CIP –25 projects:
•$192.6 M Total, including appropriations to date
•Funding Sources:
•Special Service Districts (SSDs)
•General Fund
•Federal Cost Shares
2
Coastal Overview (Continued)
47%
44%
9%Beach Replenishment & Access Years 1-6: $27.6 M (47%)
Navigational Dredging Years 1-6: $25.4 M (44%)
Neighborhood Navigational Dredging Years 1-6: $5.3 M (9%)
Beach
Replenishment
& Access
Neigh. Nav.
Dredging
Total
Coastal
Funding
Years 1-6
Nav.
Dredging
Total Funding in Years 1-6: $58.3 M
25 Total Projects/Programs
Total Coastal Programmed Costs: $192.6 M
→7 Projects/Programs
→9 Projects/Programs
→9 Projects/Programs
Projects | Programs with No Change
Beach Replenishment & Access
4
Programs Council
District Appropriations to Date FY26 Budget FY27-31 Budget Total
100030: Bay Beach Restoration 9 5,855,804 2,600,000 -8,455,804
100674: Chesapeake Beach
Restoration II 9 - -3,580,000 3,580,000
100142: Croatan Beach
Replenishment 5 3,075,674 78,000 1,598,000 4,751,674
100349: Sandbridge Beach Access
Improvements II 2 4,200,000 400,000 2,000,000 6,600,000
100636: Sandbridge Beach
Restoration III 2 21,239,390 --21,239,390
100510: Sandbridge Beach
Restoration IV 2 31,955,465 --31,955,465
Projects | Programs with No Change
Navigational Dredging
5
Project Council
District Appropriations to Date FY26 Budget FY27-31 Budget Total
100304: Pleasure House Point
Mitigation 9 7,086,635 --7,086,635
Program Council
District Appropriations to Date FY26 Budget FY27-31 Budget Total
100258: Lynnhaven Inlet
Maintenance Dredging II 8 2,544,184 375,000 1,875,000 4,794,184
100344: Rudee Inlet Federal
Dredging II 5 6,960,000 600,000 3,000,000 10,560,000
100345: Rudee Inlet Outer
Channel Maintenance Dredging II 5 4,513,433 650,000 3,250,000 8,413,433
100450: Various Minor Dredging
Projects II Citywide 4,535,354 650,000 3,250,000 8,435,354
Projects | Programs with No Change
Neighborhood Navigational Dredging
6
Project Council
District ATD FY26 Budget FY27-31 Budget Total
100253: Bayville Creek Neighborhood
Dredging II 9 515,899 132,940 -648,839
100277: Chesopeian Colony
Neighborhood Dredging II 8 -227,000 1,517,796 1,744,796
100193: Gills Cove Neighborhood
Dredging 8 1,198,072 -601,000 1,799,072
100690: Harbour Point
Neighborhood Dredging III 5 --167,496 167,496
100210: Hurd's Cove Neighborhood
Dredging 8 --1,961,999 1,961,999
100534: Old Donation Creek Area
Dredging II 8 1,123,855 --1,123,855
100643: Schilling Point Neighborhood
Dredging II 8 --445,000 445,000
100550: Shadowlawn Area
Dredging II 5 --230,000 230,000
Program Council
District ATD FY26 Budget FY27-31 Budget Total
100274: Neighborhood Dredging
Spur Channels Citywide 1,487,097 --1,487,097
Projects | Programs with Modifications
7
Program Council
District Appropriations to Date FY26 Budget FY27-31 Budget Total
100038: Beach Replenishment II 5,6 18,398,413 2,400,000 15,000,000 35,798,413
100149: Dredge Operations
Rehab and Modifications 6 3,190,700 275,000 1,375,000 4,840,700
100152: Eastern Branch
Lynnhaven River Dredging 8 11,794,602 500,000 2,500,000 14,794,602
100617: Rudee Inlet Weir
Replacement 5 915,204 4,066,635 -4,981,839
100552: Western Branch
Lynnhaven River Maintenance
Dredging II
8 3,714,040 500,000 2,500,000 6,714,040
100038: Beach Replenishment II
▪Proposed increase of $125,000 in Year 4 (FY29) funding
▪Proposed increase of $2,875,000 in Year 5 (FY30) funding
▪Third renourishment is underway between 15th St. and 45th St.
▪Benefit and Scope:
▪Program funding for the City’s local share of the Virginia Beach Erosion Control and
Hurricane Protection program in partnership with the US Army Corps of Engineers
(USACE).
▪The first nourishment, known as ‘Operation Big Beach’, placed 4 million cubic yards
of sand on the beach between Rudee Inlet and 89th St. in 2002.
▪Two renourishments have occurred in 2013 and 2019. Each renourishment placed
1.4 million cubic yards of sand along the oceanfront between 15th St. and 70th St.
8
Council
District(s):
5,6
Appropriations
to Date FY26 Budget FY27-31
Budget Total Balance to
Complete
18,398,413 2,400,000 15,000,000 35,798,413 -
100149: Dredge Operations Rehab and Modifications Council
District(s):
6
8
▪Proposed increase to FY26-31 budget by $275,000 annually
▪Proposed increase would be funded by the Pleasure Boat Tax.
▪Design services underway for dredge anchor points and submerged
pipeline replacement.
▪Scope and Benefit:
▪This project provides funding to maintain, rehabilitate and upgrade
related facility and capital equipment replacements at the dredge
operations berthing facility located at 1004 Bells Road and Rudee Inlet.
▪The funding will allow for necessary maintenance of the dredge vessel
which requires service at a local shipyard to address any defects and
perform routine maintenance to avoid degradation of the vessels.
Appropriations
to Date FY26 Budget FY27-31
Budget Total Balance to
Complete
3,190,700 275,000 1,375,000 4,840,700 -
100152: Eastern Branch
Lynnhaven River Dredging
Council
District(s):
8
Total Project
Cost
$14.8 M
8
▪Proposed increase to FY26-31 budget by $500,000 annually
▪Proposed increase would be funded by the Pleasure Boat Tax.
▪The most recent maintenance dredging of the Eastern Branch Lynnhaven
River channel was completed in December 2024.
▪Benefit and Scope:
▪This project is for maintenance dredging of the Eastern Branch Lynnhaven River
channel.
▪Maintaining this waterway is essential to maintain safe navigation for the boating
public.
▪Funding will be required to maintain an eight-to-ten year dredge cycle.
▪Annual funding will allow for planning, design and construction of future dredge
cycles.
Appropriations
to Date FY26 Budget FY27-31
Budget Total Balance to
Complete
11,794,602 500,000 2,500,000 14,794,602 -
100617: Rudee Inlet Weir Replacement Council
District(s):
5
Total Project
Cost
$4.9 M
▪Proposed increase of $4,066,635 in Year 1 (FY26) funding
▪The report study phase is underway. Delivery of final report scheduled for
October 2025.
▪Scope and Benefit:
▪This project provides funding for the design and construction to modify and
replace the sand weir and terminal groin structures at Rudee Inlet.
▪A complete evaluation and replacement of the structure is required to ensure
that the weir & jetty infrastructure performs as designed and to extend the
service life of the system.
▪A stand-alone contract has been awarded for this project (Geosyntec, Inc.)
▪Permitting, bid and construction services will be provided upon completion of
the study and as a result of the selected alternative.
11
Appropriations
to Date FY26 Budget FY27-31
Budget Total Balance to
Complete
915,204 4,066,635 -4,981,839 -
100552: Western Branch Lynnhaven River
Maintenance Dredging II
Council
District(s):
8
Total Project
Cost
$6.7 M
12
▪Proposed increase to FY26-31 budget by $500,000 annually
▪Proposed increase would be funded by the Pleasure Boat Tax.
▪Contract awarded for the maintenance dredging of the Western Branch
Lynnhaven River channel. Dredging to begin in May 2025.
▪Benefit and Scope:
▪This project is for maintenance dredging of the Western Branch Lynnhaven River
channel.
▪Maintaining this waterway is essential to maintain safe navigation for the boating
public.
▪Future funding will be required to maintain an eight-to-ten year dredge cycle.
▪Annual funding will allow for planning, design and construction of future dredge cycles.
Appropriations
to Date FY26 Budget FY27-31
Budget Total Balance to
Complete
3,714,040 500,000 2,500,000 6,714,040 -
Projects Underway & Completed
Completed
•Lynnhaven Inlet Federal Channel System – Navigation Dredging / Cape Henry
Beach - Renourishment
•Chesapeake Beach - Renourishment
•Rudee Inlet Inner Channel / Shadowlawn / Harbor Point – Navigation
Dredging
Underway
•EB Lynnhaven River / Gills Cove / Hurds Cove – Navigation Dredging
•Resort Beach / Croatan Beach - Renourishment
•Dredge Operations Rehab and Modifications/Anchor Points/Submerged Pipe
Coming Soon
•WB Lynnhaven River / Old Donation – Navigation Dredging
•Bayville Creek – Navigation Dredging
•Sandbridge Beach Access Improvements – Phase 11
•Cape Henry Beach Renourishment (Truck Haul)
13
Coastal Major Challenges
•Funding for shore protection
programs is vital to maintaining
and sustaining resilient beaches
•Budgeting to account for continual dredging and
beach nourishment cost increases
•Maintaining Federal Partnerships
with US Army Corps of Engineers (USACE) &
Bureau of Ocean Energy Management (BOEM)
•Regional Sediment
Management (RSM)
•Beneficial Use of Dredge
Material (BUD)
•Oceana Dredged Material Management Area and
future dredge management sites 14
Questions?