HomeMy WebLinkAboutII. A. 17th Street Update 5.20.202517th Street Improvements Emily Archer, Economic Development Deputy Director City Council Briefing May 20, 2025 1 2 Purpose •Provide a brief history and background of the 17th Street Phase 1 Improvement Project •Review pending improvements •Anticipated construction duration and phasing •Stakeholder engagement before and during construction 3 History •Development began over 100 years ago •Aging utility infrastructure, including water lines installed in the 1940s 17th Street – 1950s Norfolk Avenue 1937 4 Project Background •Improvements to 17th Street identified as a priority in the Resort Area Strategic Action Plans (RASAP 2008 & 2020) •Two typical sections identified in the 2015 ViBe Connectivity Plan •Phase I, Pacific to Cypress Avenues, is first funded in 2017 Capital Improvement Program 2018 Central Beach Conceptual Projects 17th Phasing & Budget2 •Phase 1 fully funded in FY 2022-23 from the Tourism Investment Program at $48,843,040 •Project recently bid for construction, three bids received 4/30/25, the lowest responsible bid within budget at $42,768,000 •Phase 2 not currently funded at this time with a $76 Mil BTC 5 17th Street 6 17th Street2 7 Current conditions 17 St 8 Proposed Conditions 17 St 9 Existing Artic Ave 10 Proposed Artic Ave 11 17th Street Utility Improvements •Undergrounding of overhead utility lines •New water and sanitary sewer utility lines •New LED street lights •Police camera infrastructure reinstalled •New storm sewer to improve drainage 12 Maintenance of Traffic Requirements •Minimize total road closures •Coordinate with property owners and tenants during construction •Maintain safe access to businesses at all times •Provide wayfinding signage for businesses in and around the work zone 13 14 17th Street Construction Schedule (4-yr Total) Construction Phase Description Duration*Estimated Timeframe* Phase 1 Underground Water and Sewer Improvements 6 months October 2025 – May 2026 Phase 2 Electrical/Communications Ductbank construction, southside roadway widening, stormwater improvements and streetscape 18 months June 2026 – December 2027 Phase 3 Northside roadway widening, stormwater improvements, and streetscape 12 months January 2028 – December 2028 Phase 4 Street lighting and landscaping 3 months January – March 2029 *The durations and timeframes listed are estimates and subject to change based on weather and/or unforeseen conditions encountered. Phase 1 – Water and Sewer Improvements •Block closures due to the location of new utilities relative to traffic. •Only one block or intersection may be closed at a time •Detours to utilize 18th Street •Estimated 6-month duration (October 2025 – May 2026) 15 Pacific AvenueArctic AvenueBaltic AvenueMediterranean AveCypress AvenueVirginia Beach Blvd / 17th Street Phase 2 –Duct bank & Southside Roadway Improvements •Two lanes remain open, with intersection and side street closures (only one intersection is closed at a time) •Estimated 18-month duration (June 2026 – December 2027)Pacific AvenueArctic AvenueBaltic AvenueMediterranean AveCypress AvenueVirginia Beach Blvd / 17th Street 16 Phase 3 – Northside Improvements •Two lanes remain open •Intersection and side street closures, only one intersection closed at a time •Estimated 12-month construction (January – December 2028)Pacific AvenueArctic AvenueBaltic AvenueMediterranean AveCypress AvenueVirginia Beach Blvd / 17th Street 17 Phase 4 – Lighting and Landscape •Three lanes remain open •Minimal disruption to sidewalks and driveways •Estimated 3-month duration (January – March 2029) 18 17th Next Steps – Stakeholder Engagement Regular communications will occur with the public before and during construction. The following stakeholder groups will be briefed in advance of construction this spring and summer: •The Resort Advisory Commission and its Transportation Parking and Pedestrian Subcommittee •The ViBe Creative District •The Resort Beach Civic League •The Shadowlawn Civic League •2nd Precinct Citizens Advisory Committee •The 17th Street Gateway Association •All 17th corridor property owners and tenants within or adjacent to the work zone 19 Thank you 20