HomeMy WebLinkAboutIndependence Boulevard and Wakefield Drive Intersection ProjectIndependence Blvd. and Wakefield Dr. /
Paul Revere Rd. Intersection Improvements
CIP 100423.106
City Council Briefing
OCTOBER 21, 2025
1
Purpose of this Briefing
-Provide an overview of the project
-Review the purpose and need
-Discuss Project History
-Public Meeting Summary
-Alternatives Analysis
-Results
-Questions/ Answers
2
Note: This is an information briefing only – no action is required by City Council.
Project Location
Intersection Location Location Map
3
Project History (pre-2025)
•2018: Thoroughgood neighborhood
civic league request City to evaluate and
address safety concerns.
•2018: The Public Works’ Traffic
Engineering Division evaluated the
intersection and recommended
installing a traffic signal.
•2018: Recommendation was presented
to the stakeholders, and the project was
paused pending additional analysis.
•2022 & 2024: The City updated the
traffic study. The results were the same
as the original study.
•2024: Design began.
Intersection Location
4
Project Purpose and Need
•Enhance motorist operations and safety
•Provide safe pedestrian and cyclist
connectivity across Independence
Boulevard for nearby residents and
members of the Independence Middle
School community
Intersection Location
5
Public Engagement
A public meeting was held on
March 12, 2025, at Independence
Middle School.
•84 Attendees
•45 Comment Sheets Provided at Meeting
•106 total public comments provided
•96 Comments from Unique Households
•61% of commenters were not in
support of the project.
•63% commenters live in Lake Smith
Terrace
•32% of commenters live in
ThoroughgoodCommenter Locations 6
Project Location
Summer 2025 Study Alternatives
1.Modify the signal timings or phasing at existing
signals along Independence Blvd. at Ewell Rd.
and Haygood Road/ Wishart Road
2.Install signal at Independence Blvd. and at
Wakefield Drive/ Paul Revere Road
3.Close the median at Wakefield Drive/
Paul Revere Road
4.Restrict side street left turns and through
movements
5.Close access to Paul Revere Road at
Independence Blvd.
Intersection Locations 7
Alternative 1
•Modify the signal timings or phasing at
existing signals along Independence Blvd.
at Ewell Rd. and Haygood Road/ Wishart
Road
•Goal of creating additional gaps in traffic
flow along Independence Blvd to
facilitate turning movements from
Wakefield Dr.
8
Alternative 2
•Install signal at Independence Blvd.
and at Wakefield Drive/ Paul Revere
Road
Current proposed alternative
9
Alternative 3
•Close the median at
Wakefield Drive/
Paul Revere Road
•Eliminates all left-turn
movements.
•Eliminates through
movements
•Vehicles from Wakefield Dr
must use the signal at
Independence Blvd and
Ewell Rd.
10
Alternative 4
•Restrict side street left turns
and through movements
•Prohibit left turns from
Wakefield Dr & Paul Revere
Rd onto Independence Blvd.
•Allows left turns from
Independence Blvd onto
Wakefield Dr and Paul
Revere Rd.
•Vehicles from Wakefield Dr
must use the signal at
Independence Blvd and
Ewell Rd.
11
Alternative 5
•Close access to Paul Revere
Road at Independence Blvd.
•Install a new signal to
accommodate all other
movements.
12
Study Results - Delay
13
SCENARIO @ EWELL SB
THROUGH
@WAKEFIELD/ PAUL
REVERE WB LEFT
@HAYGOOD SB
THROUGH
Existing Conditions 42.8 333.1 63.7
Alt. 1 (Corridor Re-timing)108.5 251.6 61.2
Alt. 2 (Corridor Re-timing)114.8 76.7 51.2
Alt. 3 (Corridor Re-timing)84.6 N/A 61.9
Alt. 4 (Corridor Re-timing)79.6 N/A 62.1
Alt. 5 (Corridor Re-timing)108.6 82.1 50
Study Results – Cut Through Traffic
Using Streetlight location
based historical data from
2024
•Avg. total of 1,112 vehicles
travel from Origin Zones to
Destination Zone
•Avg. of 56 vehicles per day
(vpd) (5%) “cut through”
Lake Smith Terrace
14
Summary of Effectiveness
Improves Wakefield Drive Delay
and Queue Distance
Indicates how well the alternative improves the
delay and queue distance for Wakefield Drive left
turns and through movements.
Indicates a reduction in delay and queue
distance such that a significant reduction in
the potential for angle crashes is achieved
Indicates some reduction, but not to
enough to significantly reduce the potential
for angle crashes.
Indicates that the left turn and/or through
movements have been eliminated at the
intersection and will be rerouted to the
Ewell Rd signal.
15
Summary of Effectiveness
Impacts Southbound
Independence Blvd
To improve Wakefield Drive Delay and Queue
there is a corresponding negative impact on
Independence Blvd, especially southbound. This
measure indicates how the alternative impacts
Independence Blvd.
Indicates a negative impact to the delay,
queue distance, and travel time of
Independence Blvd.
No alternatives had a positive impact.
16
Summary of Effectiveness
Impacts to other
Neighborhood Streets
Indicates impacts to other streets within the
neighborhood, particularly Ewell Road and
Dunstan Lane, if an alternative reroutes
traffic by making improvements.
Indicates a likely increase in traffic on
other neighborhood streets is not
expected.
Indicates some neighborhood streets
are likely to experience an increase in
traffic.
17
Summary of Effectiveness
Meets Purpose and Need
Indicates if the alternative meets the stated
purpose of these improvements, which is to
improve safety at Independence Blvd and
Wakefield Drive and reduce the potential for angle
crashes.
Indicates the alternative meets that objective
Indicates some of the safety objective is met.
However, since some Wakefield Dr traffic
movements are prohibited, i.e. no left turns, other
neighborhood streets will experience more traffic
as a result. This is considered a negative impact.
Indicates that the objective of the improvements
has not been met and that no significant changes
have been made to Wakefield Dr delay or queue
distance that suggests the potential for crashes
has been reduced.18
Alternative 2 is the selected alternative
Next Steps
•Finalize Design: 100% design plans for new traffic signal Fall 2025.
•Pre-Construction Preparation: Confirming quotes and ordering of new signal
poles.
•Construction Start: Begin construction in Spring 2026.
•Project Completion: Target completion of construction Summer 2026.
19
Questions
Project Website
www.independencewakefieldpaulrevere.com