Loading...
HomeMy WebLinkAboutLAW ENFORCEMENT TRAINING ACADEMY PROJECT UPDATELaw Enforcement Training Academy Replacement 1 Chad Morris, Acting Chief Facilities Officer October 6, 2026 Purpose Focused Action Plan Places: 2.17 Finalize design plans for the new Law Enforcement Training Academy (LETA) facility; the new facility will expand training capacity and better meet public safety needs. •Provide a LETA project update to City Council •Request concurrence on final site selection 2 History Background •City Police (VBPD) and Sheriffs (VBSO) have utilized the old Seatack Elementary School for training purposes since 2000 •The Law Enforcement Training Academy (LETA) facility is relatively unchanged since its utilization as an elementary school Facility Issues •The building is over 50 years old and does not contain enough room or technology to adequately serve its intended purpose •Many fixtures (including restrooms) were constructed and outfitted with fixtures for elementary aged children, and facility is also prone to flooding under storm events •The facility lacks the appropriate security measures to adequately protect students, faculty and staff 3 History (continued) Previous Work •A space needs analysis was performed in 2019, in conjunction with VBPD and VBSO •From 2019-2022 possible sites were discussed (Leroy Road, existing location, Creeds) •In 2023 the basis of design was revised with updated requirements for VBPD and VBSO and a potential concept was generated •In a Council briefing on March 11th, 2025, a potential concept was presented with Council support to move forward with the ITA Municipal Services Area as the site to be considered •In fall 2025, staff were directed to evaluate the South Birdneck Road site Today •Moseley Architects is now under contract to design the LETA facility 4 Law Enforcement Training Academy Replacement CITY of VIRGINIA BEACH City Council Briefing Session October 06, 2026 Presenter: Ron Davenport Project Manager 5 BRIEFING Introductions Project Status Sites Considered Project Timeline Questions 6 PROJECT STATUS 7 Objective Develop & finalize design plans for the new Law Enforcement Training Academy (LETA) facility; the new facility will expand training capacity and better meet public safety needs. Design Team is currently Finalizing Consultant Contracts Analyzing Sites Preparing Design Team to Advance Project Data (from Study) Building Area: 131,000 gsf Building Construction Budget: $82.0mm 8 Renderings from Original Study 9 Plans from Original Study 10 SITES CONSIDERED 11 SITE 1 Integrity Way, Existing LETA Site 12 SITE 1 Virginia Beach Expressway Integrity Way Current LETA Facility 13 STRENGTHS: •Current location for academy- consistent legacy branding. •Direct regional access (and visibility) by adjacent highways. •All major utility infrastructure generally already in place. •Site elevation reasonable (12’ asl.) CHALLENGES: •Site Utilization And Access Very Limiting Due To Site Geometry. •Construction Activities Disruptive During In-session Academies. •Portions Of New Facility In FEMA SFHA Zone A. •AICUZ Zone Could Be Limiting (APZ II, >75db.) •Property Size Is Quite Limiting For Academy Expansion And Exterior Pt Activities. •Total Property Size: 19.9 Ac. •Property Ownership Transfer. 14 SITE 2 S Birdneck Rd, Waterpark Adjacent 15 SITE 2 General Booth Blvd Birdneck Rd Ocean Breeze Waterpark 16 General Booth Blvd Birdneck Rd Ocean Breeze Waterpark SITE 2 Portion of Property Containing Wetlands 17 STRENGTHS: •Mildly distant access to adjacent highways. •All major utility infrastructure generally already in place. •Site access just off Birdneck Rd. CHALLENGES: •Site Utilization And Access Very Limiting Due To Site Geometry. •Construction Activities Disruptive During In-session Academies. •Portions Of New Facility In FEMA SFHA Zone A. •AICUZ Zone Could Be Limiting (APZ II, >75db.) •Property Size Is Limiting For Academy Expansion And Exterior Pt Activities. •Total Property Size: 12.7 Ac. •Includes 5.1 acres of Wetlands 18 SITE 3 ITA Site, Landstown Rd, Extended *Recommended Site for LETA Project 19 Images from ITA Master Plan Document SITE 3 20 Images from ITA Master Plan Document STRENGTHS: •Site Access Potentially Just Off Immediately Extended Landstown Rd. •Site Elevation Reasonable (12’ Asl.) •As Part Of A City Expansion Zone, Opportunity For Broad Customization. •Use Is Compatible With ITA Master Plan. •AICUZ Zone Has No Impact. •Expanded Shared Use For Cadets- Cross Country Trails, Ballfields. •Property Size Flexible; Tailored To Academy Space Needs. •Approximate Property Size: 167 Ac. CHALLENGES: •All major utility infrastructure needs to be brought to site. •More remote access from adjacent highways. •Property/ parcel does not yet exist. 21 Images from ITA Master Plan Document SITE 3 22 PROJECT TIMELINE 23 Milestones Moving Forward All Design Phases 18 months City Review / Permitting 3 months Bidding / Negotiations & Award 3 months Construction Duration 24 months FFE / Move In 3 months Total Design + Construction 51 months 24 LETA Next Steps Moving Forward: 1.Complete site analysis 2.Focus conceptual options on one site (ITA recommended) 3.Confirm architectural program 4.Establish schematic design workshop milestones 5.Periodic communication with City Council 25 THANK YOU QUESTIONS? 26